CN215055297U - A reserve template for main equipment basis - Google Patents
A reserve template for main equipment basis Download PDFInfo
- Publication number
- CN215055297U CN215055297U CN202120906281.2U CN202120906281U CN215055297U CN 215055297 U CN215055297 U CN 215055297U CN 202120906281 U CN202120906281 U CN 202120906281U CN 215055297 U CN215055297 U CN 215055297U
- Authority
- CN
- China
- Prior art keywords
- template
- loop bar
- wall
- main body
- equipment foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a reserved template for large-scale equipment foundation, which is characterized in that a small equipment foundation template main body is manufactured through the matching of a template main body and a benzene plate, the benzene plate is wrapped outside the equipment foundation template main body, the equipment foundation template main body is fixed through a first adhesive tape and a second adhesive tape, the difficulty in template demolition and the waste of demolition materials are solved, the efficiency is improved on the premise of ensuring the safety of construction, the great difficulty in demolition of an ultra-deep reserved bolt hole template of the equipment foundation is solved, the traditional construction method of the reserved bolt hole template is that a wooden box meeting the requirements is manufactured by adopting a template and a square timber according to the design requirements and then fixed by using a reinforcing steel bar to prevent rotation, then concrete construction operation is carried out, in the construction process of the reserved bolt hole template, the construction efficiency is high, the cost is low, the small template main body is matched with the benzene plate, the template main body is wrapped outside, the template demolition is simple after the concrete construction is finished, can be reused, and does not cause waste of manpower and materials.
Description
Technical Field
The utility model relates to a technical field is built on the basis of main equipment, and concrete field is a reservation template for main equipment basis.
Background
At present, the chemical industry is along with social development, this kind of mode of the chemical industry large-scale equipment basic installation retort body is intensive, compact space's construction scheme is adopted in a large number, the super deep reservation hole construction method of large-scale equipment basis is also very important, the super deep reservation hole quantity of large-scale equipment basis is many, the degree of depth is high, the construction method of the pre-buried bolt cover of traditional fixed equipment basic wood system, utilize reinforcing bar welding, it is fixed, prevent rotating, cause artifical and the waste of material and reduce work efficiency, when demolising, demolish the difficulty, waste time and energy, lead to the practicality poor, therefore this technical scheme provides one kind and can solve the reservation template that is used for large-scale equipment basis of above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a reserve template for main equipment basis to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a reserve template for main equipment basis, includes steel framework and template main part, steel framework's inside is pegged graft and is had the template main part, the quantity of template main part is twenty four, the outer wall winding of template main part has the benzene board, the surface paste of benzene board has first sticky tape, the surface paste of benzene board and first sticky tape has the second sticky tape.
Preferably, the through-hole has all been seted up on the both sides top of template main part, the inner wall of through-hole runs through there is the loop bar, the quantity of loop bar is two, two the inner wall of loop bar is pegged graft and is had the horizontal pole, the outer wall fixed assembly of loop bar has articulated seat, it is articulated to be equipped with the vaulting pole on the articulated seat, the outer wall of loop bar is close to the fixed position of articulated seat and is equipped with the one end of dog, the outer wall of loop bar is provided with two wire rope's one end, four wire rope's other end fixed assembly has rings.
Preferably, the one end that the horizontal pole was kept away from to the loop bar is fixed to be equipped with the nut, the inner wall spiro union of nut has the bolt, the both sides of bolt are all fixed to be equipped with the ejector pin, the ejector pin closely laminates with the template main part.
Preferably, the outer wall of the loop bar is fixedly provided with two clamping blocks, the outer walls of the clamping blocks and the loop bar are suspended with hooks, and the hooks are fixedly assembled with the steel wire rope.
Preferably, the outer wall of the loop bar is fixedly provided with a lug.
Preferably, the other end of the block is fixedly provided with a rubber ball.
Compared with the prior art, the beneficial effects of the utility model are that: a reserved template for a large-scale equipment foundation is characterized in that in order to ensure that a tank body is installed after a large-scale equipment foundation ultra-deep reserved bolt hole template is removed, a protective plate is arranged firstly, the protective plate is composed of a plurality of wood templates, a steel bar framework is arranged, a template main body is arranged at a specified position, concrete is poured finally, a small-size equipment foundation template main body is manufactured through the matching of the template main body and a benzene plate, the benzene plate is wrapped on the outer side of the small-size equipment foundation template main body, the first adhesive tape and the second adhesive tape are matched and fixed through the first adhesive tape and the second adhesive tape, the problems of difficulty in removing the template and waste of removing materials are solved, the efficiency is improved on the premise of ensuring the safety of construction, the great difficulty in removing the equipment foundation ultra-deep reserved bolt hole template is solved, the traditional construction method of the reserved bolt hole template is to manufacture a wooden box which meets the requirements through templates and square timbers according to the design requirements and then fix the wooden box through the steel bars, prevent to rotate, then carry out concrete construction operation again, in reserving bolt hole template work progress, the efficiency of construction is high, and is with low costs, and the template main part cooperation outsourcing benzene board of little No. one has guaranteed that concrete construction accomplishes the back template and has demolishd simply, can the reutilization, does not cause the waste of manpower and material.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the reinforcement frame structure of FIG. 1 without the reinforcement frame installed;
FIG. 3 is a schematic view of the structure of the template main body and the benzene plate of the present invention;
FIG. 4 is a schematic view of the structure of the sleeve rod for installing the main body of the formwork of the present invention;
fig. 5 is a schematic structural diagram of a point a in fig. 4.
In the figure: 1. a template body; 2. a guard plate; 3. a steel reinforcement frame; 4. benzene board; 5. a first adhesive tape; 6. a second tape; 7. a through hole; 8. a loop bar; 9. a cross bar; 10. a hinged seat; 11. a stay bar; 12. a stopper; 13. a rubber ball; 14. a bump; 15. a nut; 16. a bolt; 17. a top rod; 18. a clamping block; 19. hooking; 20. a wire rope; 21. a lifting ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a reserve template for large equipment foundation, includes steel framework 3 and template main part 1, and steel framework 3's inside is pegged graft and is had template main part 1, and the quantity of template main part 1 is twenty four, and the outer wall winding of template main part 1 has benzene board 4, and the surface paste of benzene board 4 has first sticky tape 5, and the surface paste of benzene board 4 and first sticky tape 5 has second sticky tape 6.
In order to ensure the tank installation after the large-scale equipment foundation ultra-deep reserved bolt hole template is removed, firstly, a protective plate 2 is arranged, the protective plate 2 consists of a plurality of wood templates, a steel bar frame 3 is arranged, a template main body 1 is arranged at a specified position, finally, concrete is poured, the number of the template main body 1 needs to be set according to actual requirements, therefore, the traditional construction method is broken through aiming at the particularity that the large-scale equipment foundation ultra-deep reserved bolt holes are large in number, the small-scale equipment foundation template main body 1 is manufactured by combining with the field objective environment, a benzene plate 4 is wrapped on the outer side of the small-scale equipment foundation template main body 1 and is fixed by adopting a first adhesive tape 5 and a second adhesive tape 6, the benzene plate 4 can be fixed on the template main body 1 by the first adhesive tape 5 and the second adhesive tape 6, the problems of difficulty in template removal and material waste are solved, the efficiency is improved on the premise of ensuring the safety of construction, the problem of the very dark reserved bolt hole template of equipment foundation demolish is solved, the traditional construction method of reserved bolt hole template adopts the template according to the design requirement, the wooden box that the square timber preparation meets the requirements then utilizes the reinforcing bar to fix, prevent to rotate, then carry out concrete construction operation, in reserved bolt hole template work progress, the efficiency of construction is high, and is with low costs, template main part 1 cooperation outsourcing benzene board 4 of little number, it is simple to have guaranteed that the template demolishs after the concrete construction is accomplished, can reutilization, do not cause the waste of manpower and material.
Particularly, through-hole 7 has all been seted up on the both sides top of template main part 1, the inner wall of through-hole 7 runs through has loop bar 8, the quantity of loop bar 8 is two, it has horizontal pole 9 to peg graft the inner wall of two loop bars 8, the outer wall fixed mounting of loop bar 8 has articulated seat 10, articulated being equipped with vaulting pole 11 on the articulated seat 10, the outer wall of loop bar 8 is close to the fixed one end that is equipped with dog 12 of the position of articulated seat 10, the outer wall of loop bar 8 is provided with the one end of two wire rope 20, four wire rope 20's the other end fixed mounting has rings 21.
In order to facilitate the demolding of the formwork main bodies 1, the operation process includes that the loop bars 8 are inserted into the through holes 7 and then are drawn close to the middle position, the steel wire ropes 20 are installed and are hoisted through the hoisting rings 21, the specific working principle is that the two loop bars 8 are simultaneously inserted into the through holes 7 on the two formwork main bodies 1, one ends of the steel wire ropes 20 are fixed on the loop bars 8 in the use process, the stay bars 11 extend into the formwork main bodies 1, the stay bars 11 start to swing under the support of the hinge seats 10 according to the action of gravity, the stop blocks 12 limit the swinging angles of the stay bars 11, the loop bars 8 are pulled to the middle position, the loop bars 8 move along the outer walls of the cross bars 9 until the end parts of the stay bars 11 abut against the inner walls of the formwork main bodies 1, the hoisting rings 21 are hooked when the formwork main bodies 1 are taken out, the loop bars 8 are pulled through the connection of the steel wire ropes 20, and the two formwork main bodies 1 are driven to move upwards, the purpose of rapid demoulding is achieved.
Particularly, the one end that the horizontal pole 9 was kept away from to loop bar 8 is fixed to be equipped with nut 15, and the inner wall spiro union of nut 15 has bolt 16, and the both sides of bolt 16 are all fixed to be equipped with ejector pin 17, and ejector pin 17 closely laminates with template main part 1.
In the process of using loop bar 8 and horizontal pole 9, in order to further prevent that template main part 1 from rocking, be equipped with nut 15 at the end fixing of loop bar 8, with the bolt 16 spiro union in nut 15, until ejector pin 17 top lean on the outer wall of template main part 1, cooperate vaulting pole 11 together again, reach the effect of further stabilizing to template main part 1.
Specifically, two clamping blocks 18 are fixedly assembled on the outer wall of the loop bar 8, a hook 19 is hung on the outer walls of the clamping blocks 18 and the loop bar 8, and the hook 19 is fixedly assembled with a steel wire rope 20.
In order to fix the end part of the steel wire rope 20 conveniently, the clamping block 18 is fixedly installed on the outer wall of the loop bar 8, the clamping block 18 is used for limiting the position of the hook 19, the hook 19 is prevented from moving freely on the outer wall of the loop bar 8, and the purpose of connecting the steel wire rope 20 and the loop bar 8 can be achieved quickly.
Specifically, the outer wall of the loop bar 8 is fixedly fitted with a projection 14.
The projection 14 can limit the moving position of the loop bar 8, and enhance the connecting effect between the loop bar 8 and the template main body 1.
Specifically, the other end of the stopper 12 is fixedly fitted with a rubber ball 13.
The working principle is as follows: in order to ensure the tank installation after the large-scale equipment foundation ultra-deep reserved bolt hole template is removed, firstly, a protective plate 2 is arranged, the protective plate 2 consists of a plurality of wood templates, a steel bar frame 3 is arranged, a template main body 1 is arranged at a specified position, finally, concrete is poured, the number of the template main body 1 needs to be set according to actual requirements, therefore, the traditional construction method is broken through aiming at the particularity that the large-scale equipment foundation ultra-deep reserved bolt holes are large in number, the small-scale equipment foundation template main body 1 is manufactured by combining with the field objective environment, a benzene plate 4 is wrapped on the outer side of the small-scale equipment foundation template main body 1 and is fixed by adopting a first adhesive tape 5 and a second adhesive tape 6, the benzene plate 4 can be fixed on the template main body 1 by the first adhesive tape 5 and the second adhesive tape 6, the problems of difficulty in template removal and material waste are solved, the efficiency is improved on the premise of ensuring the safety of construction, the problem of the very dark reserved bolt hole template of equipment foundation demolish is solved, the traditional construction method of reserved bolt hole template adopts the template according to the design requirement, the wooden box that the square timber preparation meets the requirements then utilizes the reinforcing bar to fix, prevent to rotate, then carry out concrete construction operation, in reserved bolt hole template work progress, the efficiency of construction is high, and is with low costs, template main part 1 cooperation outsourcing benzene board 4 of little number, it is simple to have guaranteed that the template demolishs after the concrete construction is accomplished, can reutilization, do not cause the waste of manpower and material.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a reserve template for large equipment basis, includes steel framework (3) and template main part (1), its characterized in that: the concrete formwork is characterized in that a formwork main body (1) is inserted into the steel bar framework (3), the number of the formwork main body (1) is twenty-four, a benzene plate (4) is wound on the outer wall of the formwork main body (1), a first adhesive tape (5) is adhered to the surface of the benzene plate (4), and a second adhesive tape (6) is adhered to the surfaces of the benzene plate (4) and the first adhesive tape (5).
2. A reservation template for a large equipment foundation according to claim 1, characterized in that: through-hole (7) have all been seted up on the both sides top of template main part (1), the inner wall of through-hole (7) runs through loop bar (8), the quantity of loop bar (8) is two, two the inner wall of loop bar (8) is pegged graft and is had horizontal pole (9), the outer wall of loop bar (8) is fixed to be equipped with articulated seat (10), articulated on articulated seat (10) is equipped with vaulting pole (11), the outer wall of loop bar (8) is close to the fixed one end that is equipped with dog (12) of articulated seat (10), the outer wall of loop bar (8) is provided with the one end of two wire rope (20), four the other end of wire rope (20) is fixed to be equipped with rings (21).
3. A reservation template for a large equipment foundation according to claim 1, characterized in that: the one end fixed assembly that horizontal pole (9) were kept away from in loop bar (8) has nut (15), the inner wall spiro union of nut (15) has bolt (16), the equal fixed assembly in both sides of bolt (16) has ejector pin (17), ejector pin (17) and template main part (1) closely laminate.
4. A reservation template for a large equipment foundation according to claim 1, characterized in that: the outer wall of the loop bar (8) is fixedly provided with two clamping blocks (18), the outer walls of the clamping blocks (18) and the loop bar (8) are hung with hooks (19), and the hooks (19) are fixedly assembled with steel wire ropes (20).
5. A reservation template for a large equipment foundation according to claim 1, characterized in that: the outer wall of the loop bar (8) is fixedly provided with a convex block (14).
6. A reservation template for a large equipment foundation according to claim 1, characterized in that: the other end of the block (12) is fixedly provided with a rubber ball (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120906281.2U CN215055297U (en) | 2021-04-28 | 2021-04-28 | A reserve template for main equipment basis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120906281.2U CN215055297U (en) | 2021-04-28 | 2021-04-28 | A reserve template for main equipment basis |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215055297U true CN215055297U (en) | 2021-12-07 |
Family
ID=79107134
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120906281.2U Active CN215055297U (en) | 2021-04-28 | 2021-04-28 | A reserve template for main equipment basis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215055297U (en) |
-
2021
- 2021-04-28 CN CN202120906281.2U patent/CN215055297U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202450774U (en) | Shaft template of small-step-pitch self-climbing elevator | |
CN207160585U (en) | Superelevation outer wall of basement Bailey bracket single side formwork architecture | |
CN104975719A (en) | Novel material distribution device and floor concrete casting construction method of novel material distribution device | |
CN108457243A (en) | A kind of construction method of assembly concrete wave wall | |
CN113216234A (en) | Open caisson bottom sealing and bottom plate connecting device and construction method | |
CN215055297U (en) | A reserve template for main equipment basis | |
CN202401769U (en) | Detachable concrete cloth machine for self-elevating creeping formwork system | |
CN212714951U (en) | A template for cantilever type shore protection barricade | |
CN202926333U (en) | Hanging system of whole-circle integral upside down hanging formwork | |
CN206158204U (en) | Construction equipment of chimney shaft | |
CN205397855U (en) | Pothook formula safety device of glomeration mode hoist and mount building block brickwork wall piece | |
CN210164235U (en) | Simple slip form mold for small-diameter reinforced concrete cylinder structure | |
CN218322855U (en) | Basement height strides unilateral side formwork reinforced structure | |
CN206406964U (en) | A kind of building board carrier | |
CN2599134Y (en) | Construction apparatus of high chimney scaffold mould plate | |
CN109372185A (en) | A kind of fast-assembling for building exempts to tear beam form plate structure and construction method open | |
CN213171212U (en) | A hoisting apparatus for building engineering | |
CN201495548U (en) | Manual hole digging filling pile protective wall concrete material receiving platform | |
CN108193874A (en) | A kind of stairway steel formwork for building | |
CN201339311Y (en) | Turning plate device of hanging rack | |
CN108222503A (en) | A kind of combined large pier stud steel form | |
CN210620081U (en) | Cantilever crane device suitable for dismantling external scaffold of assembled high-rise residence | |
CN207988487U (en) | The constructing device of diameter Silo conical shell | |
CN203924652U (en) | The operation platform of periphery shear wall between a kind of precast stair | |
CN209308275U (en) | A kind of fast-assembling for building exempts to tear beam form plate structure open |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |