CN206406964U - A kind of building board carrier - Google Patents
A kind of building board carrier Download PDFInfo
- Publication number
- CN206406964U CN206406964U CN201720015757.7U CN201720015757U CN206406964U CN 206406964 U CN206406964 U CN 206406964U CN 201720015757 U CN201720015757 U CN 201720015757U CN 206406964 U CN206406964 U CN 206406964U
- Authority
- CN
- China
- Prior art keywords
- supporting rod
- building board
- vertical beam
- right supporting
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
This application discloses a kind of building board carrier of building machinery technical field, including frame and clamping device, the frame bottom is provided with universal wheel, the frame side is provided with servomotor, the rotating shaft of the servomotor is connected with capstan winch, pull rope is connected with the capstan winch, the frame opposite side is provided with vertical beam;The clamping device includes connecting rod and the neck located at connecting rod both sides, the connecting rod is divided into left supporting rod and right supporting rod, sliding bar is connected between the left supporting rod and right supporting rod, one end of the sliding bar is embedded in right supporting rod, the junction of the sliding bar and right supporting rod is provided with spring, wiring post is provided with the left supporting rod and right supporting rod, the pull rope, which is bypassed, to be connected to behind the top of vertical beam between wiring post.Using the carrier of this programme, when carrying out building board carrying, have a safety feature, it is time saving and energy saving.
Description
Technical field
The utility model is related to building machinery technical field, and in particular to a kind of building board carrier.
Background technology
Building board be it is prefabricated or knot prevent prolapse mould after combined wall or prefabricated panels, such as cement plate or glass magnesium board,
Building is spliced into using building board in building trade, this mode is referred to as assembled integral building system, and assembling is overall
Formula building system, which has, to be shortened the duration, reduces building materials loss, reduction equipment use cost, mitigates traditional architecture construction to social institute
Airborne dust, noise for causing etc. endanger, and possess energy-conservation and insulation, fully improve the advantage that building usable floor area etc. is benefited the nation and the people.
Building board needs experience raw material mixing in production process, the processes such as drying forming is poured, after drying
Building board is needed to carry out producing region, and the carrying of current building materials sheet material is mainly carried by the way of artificial, due to
Building board takes up space, and big and weight is big, and artificial building board of carrying is inconvenient, and is wasted time and energy, may be used also in handling process
It can drop, building board is pounded to carrying personnel, causes the personal injury of carrying personnel.
Utility model content
The utility model is intended to provide a kind of building board carrier, to solve building board handling process in the prior art
Waste time and energy, unsafe problem.
In order to solve the above-mentioned technical problem, the utility model provides following technical scheme:A kind of building board carrier, bag
Frame and clamping device are included, the frame bottom is provided with universal wheel, and the frame side is provided with servomotor, described to watch
The rotating shaft for taking motor is connected with capstan winch, the capstan winch and is connected with pull rope, and the frame opposite side is provided with vertical beam;The folder
Holding mechanism includes connecting rod and the neck located at connecting rod both sides, and the connecting rod is divided into left supporting rod and right supporting rod, described
Sliding bar is connected between left supporting rod and right supporting rod, one end of the sliding bar is embedded in right supporting rod, it is described to slide
The junction of bar and right supporting rod, which is provided with spring, the left supporting rod and right supporting rod, is provided with wiring post, the traction
Rope is connected between wiring post after bypassing the top of vertical beam.
Operation principle of the present utility model:When using the carrier in this programme, connecting rod is positioned over building board
Transverse direction on, the length of building board is much larger than the length of connecting rod, manually needs to enter connecting rod along sliding bar when using
Row stretching, because being connected with sliding bar between left supporting rod and right supporting rod, one end of sliding bar is embedded in right supporting rod, sliding
The junction of lever and right supporting rod is provided with spring, when being stretched, sliding bar under the pulling force effect of left supporting rod gradually
Stretching out right supporting rod makes the length elongation of connecting rod, and length after connecting rod is stretched is more than after the length of building board,
Neck positioned at connecting rod two ends blocks the two ends of building materials sheet material, and sliding bar right supporting rod inwall when stretching out fixes bullet
Spring, spring is gradually stretched in the presence of sliding bar applies elastic force to the two ends of connecting rod, makes the stuck building board of neck
Two ends;After the clamping of building board is completed, start makes pull rope be wound on capstan winch under servomotor, axis of rotation,
Because being provided with wiring post on the left supporting rod and right supporting rod of connecting rod, the top that pull rope bypasses vertical beam is fixed on wiring
Between post, as pull rope length is gradually reduced, pull rope slings clamping device, and building board is in the presence of clamping device
Gradually rise, after building board is raised to certain altitude, promote carrier to complete the carrying to building board.
The beneficial effects of the utility model are:Building board is clamped using clamping device in this programme, bullet is utilized
The elastic force of spring makes the neck at connecting rod two ends that the two ends of building board are stuck, can thus avoid the handling process in sheet material
In, sheet material causes injures and deaths to carrying personnel, had a safety feature because shake is dropped;It will be built using servomotor simultaneously
Sheet material is sling, and promotes carrier just can complete the carrying of building board, time saving and energy saving.
Further, the top of the vertical beam is connected with crossbeam.The side of frame is provided with vertical beam, when pull rope bypasses vertical beam
When connecting clamping device with crossbeam, the distance between clamping device and frame can be increased by crossbeam, when clamping device is hung
When playing building board, it can prevent rocking for building board from colliding frame, it is to avoid to cause damage to frame.
Further, it is provided with pulley on the one end of the top of the vertical beam and crossbeam away from vertical beam.When pull rope is bypassed
When pulley slings building board, pull rope is moved on pulley, can extend the service life of pull rope using pulley.
Further, the pull rope is provided with the first balancing weight, the frame close to the side of clamping device and is provided with
Second balancing weight.When pull rope slings building board, the second balancing weight adds the gravity of carrier, makes the center of gravity of carrier
Move down, reach the carrying stable purpose of building board, occur while the first balancing weight can limit pull rope in handling process
Swing, add the security of carrying.
Further, the neck is provided with draw ring.Carrying personnel easily can extend connecting rod by pulling draw ring.
Further, it is connected with cant beam between the vertical beam and frame.When pull rope slings building board, building board
Gravity is all applied on vertical beam, and power is delivered on frame by cant beam after assume responsibility for the gravity of part, extends the use of vertical beam
Life-span.
Further, between the draw ring and neck reinforcement, is provided between vertical beam and cant beam between vertical beam and crossbeam
Beam.By setting buttress brace to share a part of pressure, the stability in handling process is enhanced.
Brief description of the drawings
Fig. 1 is a kind of structural representation of building board carrier of the utility model;
Fig. 2 is the diagrammatic cross-section of clamping device in Fig. 1.
Embodiment
The utility model is described in further detail below by embodiment:
Reference in Figure of description includes:Frame 1, universal wheel 2, cant beam 3, pull rope 4, capstan winch 5, pulley 6,
Wiring post 7, buttress brace 8, neck 9, the first balancing weight 10, the second balancing weight 11, vertical beam 12, spring 13, draw ring 14, left supporting rod
15th, sliding bar 16, right supporting rod 17.
Embodiment is basic as shown in accompanying drawing 1 and Fig. 2:A kind of building board carrier, including frame 1 and clamping device,
The bottom of frame 1 is provided with universal wheel 2, and the side of frame 1 is provided with servomotor, and the rotating shaft of servomotor is connected with capstan winch 5, capstan winch
Pull rope 4 is connected with 5, the opposite side of frame 1 is provided with vertical beam 12, and the top of vertical beam 12 is connected with crossbeam, vertical beam 12 and car frame
It is connected between frame 1 on cant beam 3, the one end of top and crossbeam away from vertical beam 12 of vertical beam 12 and is provided with pulley 6, pull rope 4
It is provided with close to the side of clamping device in the first balancing weight 10, frame 1 and is additionally provided with the second balancing weight 11.
Clamping device includes connecting rod and the neck 9 located at connecting rod both sides, and connecting rod is divided into left supporting rod 15 and right folder
Bar 17 is held, sliding bar 16 is connected between left supporting rod 15 and right supporting rod 17, one end of sliding bar 16 is embedded in right supporting rod
In 17, the junction of sliding bar 16 and right supporting rod 17 is provided with spring 13, between draw ring 14 and neck 9, vertical beam 12 and crossbeam
Between be provided between vertical beam 12 and cant beam 3 on buttress brace 8, left supporting rod 15 and right supporting rod 17 and be provided with wiring post
7, pull rope 4 is connected between wiring post 7 after bypassing the pulley 6 on vertical beam 12 and crossbeam.
When using the carrier in this programme, connecting rod is positioned in the transverse direction of building board, the length of building board
Degree manually pulls draw ring 14 connecting rod is stretched along sliding bar 16, because left much larger than the length of connecting rod when using
Sliding bar 16 is connected between supporting rod 15 and right supporting rod 17, one end of sliding bar 16 is embedded in right supporting rod 17, slided
The junction of bar 16 and right supporting rod 17 is provided with spring 13, when being stretched, and sliding bar 16 is made in the pulling force of left supporting rod 15
Right supporting rod 17 is gradually stretched out under makes the length elongation of connecting rod, and length after connecting rod is stretched is more than building board
Length after, the neck 9 positioned at connecting rod two ends blocks the two ends of building materials sheet material, sliding bar 16 stretch out when right supporting rod 17
Inwall fixes spring 13, and spring 13 is gradually stretched in the presence of sliding bar 16 applies elastic force to the two ends of connecting rod, makes
The two ends of the stuck building board of neck 9.
After the clamping of building board is completed, start makes pull rope 4 be carried out on capstan winch 5 under servomotor, axis of rotation
Winding, because being provided with wiring post 7 on the left supporting rod 15 and right supporting rod 17 of connecting rod, pull rope 4 bypasses crossbeam and perpendicular
Pulley 6 on beam 12 is fixed between wiring post 7, and as the length of pull rope 4 is gradually reduced, pull rope 4 slings clamping device,
Building board gradually rises in the effect of clamping device, after building board is raised to certain altitude, promotes carrier to complete
Carrying to building board.During building board is sling, crossbeam add between clamping device and frame 1 away from
From can prevent rocking for building board from colliding frame 1, it is to avoid cause damage to frame 1;Pull rope 4 is on pulley 6
It is mobile, the service life of pull rope 4 can be extended using pulley 6, by setting the second balancing weight 11 and the first balancing weight 10, the
Two balancing weights 11 add the gravity of carrier, make the decentralization of carrier, reach the carrying stable purpose of building board, together
When the first balancing weight 10 can limit pull rope 4 and swung in handling process, add the security of carrying, work as pull rope
4 when slinging building board, and the gravity of building board is all applied on vertical beam 12, and cant beam 3 assume responsibility for power after the gravity of part
It is delivered on frame 1, extends the service life of vertical beam 12, by setting buttress brace 8 to share a part of pressure, enhance
Stability in handling process.
Above-described is only that the known general knowledge such as concrete structure and characteristic is herein in embodiment of the present utility model, scheme
Excessive description is not made.It should be pointed out that for those skilled in the art, not departing from the premise of the utility model structure
Under, several modifications and improvements can also be made, these should also be considered as protection domain of the present utility model, and these are all without influence
Effect and practical applicability that the utility model is implemented.This application claims protection domain should be with the content of its claim
It is defined, embodiment in specification etc. records the content that can be used for explaining claim.
Claims (7)
1. a kind of building board carrier, it is characterised in that:Including frame and clamping device, the frame bottom is provided with ten thousand
To wheel, the frame side is provided with servomotor, and the rotating shaft of the servomotor, which is connected with capstan winch, the capstan winch, to be connected with
Pull rope, the frame opposite side is provided with vertical beam;The clamping device includes connecting rod and the neck located at connecting rod both sides,
The connecting rod is divided into left supporting rod and right supporting rod, and sliding bar is connected between the left supporting rod and right supporting rod, described
One end of sliding bar is embedded in right supporting rod, and the junction of the sliding bar and right supporting rod is provided with spring, the left clamping
Wiring post is provided with bar and right supporting rod, the pull rope, which is bypassed, to be connected to behind the top of vertical beam between wiring post.
2. a kind of building board carrier according to claim 1, it is characterised in that:The top of the vertical beam is connected with horizontal stroke
Beam.
3. a kind of building board carrier according to claim 2, it is characterised in that:The top of the vertical beam and crossbeam are remote
From being provided with pulley on one end of vertical beam.
4. a kind of building board carrier according to claim 3, it is characterised in that:The pull rope is close to clamping device
Side be provided with the first balancing weight, the second balancing weight is provided with the frame.
5. a kind of building board carrier according to claim 4, it is characterised in that:The neck is provided with draw ring.
6. a kind of building board carrier according to claim 5, it is characterised in that:Connected between the vertical beam and frame
There is cant beam.
7. a kind of building board carrier according to claim 6, it is characterised in that:Between the draw ring and neck, erect
Buttress brace is provided between beam and crossbeam between vertical beam and cant beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720015757.7U CN206406964U (en) | 2017-01-06 | 2017-01-06 | A kind of building board carrier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720015757.7U CN206406964U (en) | 2017-01-06 | 2017-01-06 | A kind of building board carrier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206406964U true CN206406964U (en) | 2017-08-15 |
Family
ID=59553842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720015757.7U Expired - Fee Related CN206406964U (en) | 2017-01-06 | 2017-01-06 | A kind of building board carrier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206406964U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109677906A (en) * | 2018-12-04 | 2019-04-26 | 贵州埃克森环保建材有限公司 | A kind of thermal insulation strip plate barrow based on driving |
CN113021509A (en) * | 2021-03-02 | 2021-06-25 | 海宁舒齐装饰材料有限公司 | Drilling equipment for building decorative plate |
-
2017
- 2017-01-06 CN CN201720015757.7U patent/CN206406964U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109677906A (en) * | 2018-12-04 | 2019-04-26 | 贵州埃克森环保建材有限公司 | A kind of thermal insulation strip plate barrow based on driving |
CN109677906B (en) * | 2018-12-04 | 2020-09-08 | 贵州埃克森环保建材有限公司 | Heat preservation slat transport frame based on driving |
CN113021509A (en) * | 2021-03-02 | 2021-06-25 | 海宁舒齐装饰材料有限公司 | Drilling equipment for building decorative plate |
CN113021509B (en) * | 2021-03-02 | 2022-09-06 | 海宁舒齐装饰材料有限公司 | Drilling equipment for building decorative plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203729592U (en) | Vertical bush hammering equipment | |
CN206406964U (en) | A kind of building board carrier | |
CN206703269U (en) | A kind of resilient support block production line | |
CN106185690A (en) | A kind of building retaining wall automatic lifting Handling device | |
CN205575408U (en) | Concrete precast component shedder | |
CN205638491U (en) | Multi -functional platform truck | |
CN207183923U (en) | A kind of insulator replacement device | |
CN107512631A (en) | A kind of prefabricated components maintenance oilcloth automatic retraction device and its application method | |
CN111422767A (en) | Building site material hoisting device | |
CN201133078Y (en) | Electric hoisting barrel type formwork | |
CN202465162U (en) | Small electric lifting feeding machine for building | |
CN217378856U (en) | Positioning and fixing device for installation of bottom die vertical reinforcement cage | |
CN205442449U (en) | Portable tower crane device | |
CN205713150U (en) | A kind of efficient throwing brick device for building | |
CN111075206B (en) | ALC wallboard installation device | |
CN205275095U (en) | Cross bridge type gin pole device | |
CN210885077U (en) | Building construction hoisting device | |
CN211646392U (en) | Ground anchor dismounting device for power engineering | |
CN207724651U (en) | A kind of acrylic mould placing rack and overturning vehicle combination unit | |
CN203246794U (en) | Machine for hoisting and transporting railway and highway high-cutting protection slope protective construction sandstone materials | |
CN209974152U (en) | Concrete hoisting device for building construction | |
CN208648628U (en) | A kind of movable tube lifting device | |
CN103144992B (en) | Cut-to-length two-layer drum splicing car | |
CN205442450U (en) | Long -range controlled tower crane device | |
CN202175522U (en) | Device for hoisting concrete pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170815 Termination date: 20210106 |
|
CF01 | Termination of patent right due to non-payment of annual fee |