CN218861364U - Temporary fixing structure for prefabricated pier column section of pier - Google Patents

Temporary fixing structure for prefabricated pier column section of pier Download PDF

Info

Publication number
CN218861364U
CN218861364U CN202320044449.2U CN202320044449U CN218861364U CN 218861364 U CN218861364 U CN 218861364U CN 202320044449 U CN202320044449 U CN 202320044449U CN 218861364 U CN218861364 U CN 218861364U
Authority
CN
China
Prior art keywords
pier stud
steel pipe
pier
anchor rod
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320044449.2U
Other languages
Chinese (zh)
Inventor
张振钛
张予欣
施文龙
袁国涛
张学斌
徐镭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Railway Survey & Design Institute Co ltd
Original Assignee
Xinjiang Railway Survey & Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Railway Survey & Design Institute Co ltd filed Critical Xinjiang Railway Survey & Design Institute Co ltd
Priority to CN202320044449.2U priority Critical patent/CN218861364U/en
Application granted granted Critical
Publication of CN218861364U publication Critical patent/CN218861364U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a temporary fixing structure of prefabricated assembly type pier stud subsection, include: pier stud, the pre-buried steel pipe reinforcing bar of pier stud, steel pipe, anchor rod iron, nut, shaped steel bracket, the shaped steel bracket constitute by the channel-section steel, be the crisscross horizontal interval of vertically and horizontally crossing respectively in two sections pier studs that link up mutually and setting up the steel pipe, set up the pre-buried steel pipe reinforcing bar of pier stud that constitutes the groined type in the pier stud around the steel pipe respectively, worn an anchor rod iron in the steel pipe of coaxial arrangement respectively, the shaped steel bracket on set up respectively with anchor rod iron end matched with through-hole, through setting up the nut on the anchor rod iron end with the vertical fixed attached on the outer wall of pier stud department that links up mutually. The utility model discloses can fix first section pier stud and second section pier stud, effectively prevent the second section pier stud occurence of failure that falls.

Description

Temporary fixing structure for prefabricated pier column section of pier
Technical Field
The utility model relates to a temporary fixation structure of prefabricated assembled pier stud festival section belongs to bridge engineering technical field.
Background
When the height of the prefabricated pier is more than or equal to 12m and less than or equal to 15m, the structure size is as follows: the outer diameter of each pier column is 2.0m, the wall thickness is 0.4m, and the transverse center distance of the pier columns is 2.8m; the transverse width of the cover beam is 5.6m, the longitudinal width is 2.4m (32m +24m is unequal to the longitudinal width of the connection pier and is 2.5 m), and the height is 1.3m (32 +24m is unequal to the height of the cover beam of the connection pier and is 1.7m,16+24m is unequal to the height of the cover beam of the connection pier and is 1.8 m). In order to facilitate transportation and installation, the pier body is prefabricated into two sections, the pier bottom section is a standard section (7 m long), and the length of the upper section is adjusted according to the pier height. The pier bottom is provided with a post-pouring section, the post-pouring section is 3.2m high, connecting steel bars are arranged in the post-pouring section, and the connecting steel bars are pre-buried in the bearing platform. The capping beam, the pier column and the bearing platform are connected through prestress. First festival pier stud festival section installation finishes, hoists second festival pier stud in first festival pier stud top surface, and the second festival pier stud extremely easily topples, seriously threatens constructor's life safety, must fix the junction. The traditional method is to erect a rigid frame with certain transverse resistance to temporarily fix the joint, and the method has the defects of long erection and dismantling period, large steel consumption and high cost.
Disclosure of Invention
An object of the utility model is to provide a temporary fixed knot of prefabricated assembly type pier stud segment constructs can fix first section pier stud and second section pier stud, prevents effectively that second section pier stud from falling the occurence of failure, ensures the construction safety of follow-up bent cap hoist and mount and prestressing force stretch-draw process, prevents that prefabricated assembly type pier stud from toppling over and falling.
The utility model discloses a realize above-mentioned purpose, the technical solution who adopts is: a temporary fixing structure of prefabricated pier stud segments, comprising: pier stud, the pre-buried steel pipe strengthening rib of pier stud, steel pipe, anchor rod iron, nut, shaped steel bracket, the shaped steel bracket constitute by the channel-section steel, be crisscross horizontal interval respectively in two sections pier studs that link up mutually and setting up the steel pipe, set up the pre-buried steel pipe strengthening rib of pier stud that constitutes the groined type in the pier stud around the steel pipe respectively, worn an anchor rod iron in the steel pipe of coaxial arrangement respectively, the shaped steel bracket on set up respectively with anchor rod iron end matched with through-hole, through setting up the nut on anchor rod iron end with the vertical fixed attached on the outer wall of pier stud department that links up mutually of shaped steel bracket.
The pier column embedded steel pipe reinforcing steel bars are effectively connected with pier column reinforcing steel bars, steel pipes are embedded in the pier columns, prefabricated pier columns of the prefabricated pier are prefabricated, demolding and maintaining are carried out when the strength of concrete reaches 75%, and the prefabricated pier columns are used for standby when the strength reaches 100%; and hoisting the prefabricated pier stud, penetrating the anchoring steel bar through the steel pipe and the reserved hole of the steel section bracket, screwing the nut, and finishing the installation of the device for temporarily fixing the prefabricated pier stud segment.
The utility model discloses: 1. through setting up the pre-buried steel pipe reinforcing bar of pier stud, reserve the steel pipe side concrete to the pier stud and carry out local enhancement. 2. Through setting up the steel pipe, do benefit to the anchor rod iron and pass the pier stud. 3. Through setting up the shaped steel bracket, effectively fix prefabricated assembled pier stud. 4. Through setting up the type nut, effectively be fixed in the pier stud edge with the shaped steel bracket. The utility model discloses can fix first section pier stud and second section pier stud, effectively prevent the second section pier stud accident of falling from taking place, ensure the construction safety of follow-up bent cap hoist and mount and prestressing force stretch-draw process, prevent that prefabricated assembly pier stud from toppling over and falling.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
fig. 2 is a schematic side view of the present invention;
FIG. 3 is a bottom view taken along line I-I of FIG. 1;
FIG. 4 is an enlarged view of part A of FIG. 1;
fig. 5 is the utility model discloses well pre-buried steel pipe reinforcing bar's schematic diagram.
Detailed Description
The invention is described in further detail below with reference to the following description of the figures and the detailed description of the preferred embodiments.
Referring to fig. 1 to 5, a temporary fixing structure of prefabricated pier stud segments, comprising: pier stud 6, the pre-buried steel pipe reinforcing bar of pier stud 1, steel pipe 2, anchor rod iron 3, nut 4, shaped steel bracket 5 constitute by the channel-section steel, be crisscross horizontal interval respectively in two sections pier studs 6 that link up mutually and set up steel pipe 2, set up the pre-buried steel pipe reinforcing bar of pier stud 1 that constitutes the groined type in pier stud 6 around the steel pipe 2 respectively, worn an anchor rod iron 3 in the steel pipe 2 of coaxial arrangement respectively, shaped steel bracket 5 on set up respectively with 3 end matched with through-holes of anchor rod iron, through set up on the pier stud outer wall of the vertical fixed attached 6 looks linking up department of shaped steel bracket iron 5 with nut 4 on 3 end of anchor rod iron. The utility model discloses can fix first section pier stud and second section pier stud, effectively prevent the second section pier stud accident of falling from taking place, ensure the construction safety of follow-up bent cap hoist and mount and prestressing force stretch-draw process, prevent that prefabricated assembly pier stud from toppling over and falling.
The pier column embedded steel pipe reinforcing steel bars 1 are effectively connected with pier column reinforcing steel bars, steel pipes 2 are embedded in the pier columns, prefabricated assembly type pier columns are prefabricated, demolding and maintaining are carried out after the concrete strength reaches 75%, and the prefabricated assembly type pier columns are used for standby after the concrete strength reaches 100%; and hoisting the prefabricated pier stud, penetrating the anchoring steel bar 3 through the steel pipe 2 and the steel bracket 5 to reserve a hole, screwing the nut 4, and completing the installation of the device for temporarily fixing the prefabricated pier stud segment.
The utility model provides a shaped steel bracket 5 is Q235 hot rolling channel-section steel, accords with "hot rolling shaped steel" GB/T706's requirement, and for the setting material, intensity is high, rigidity is big, and rolling technology is ripe, and the material performance is stable. The anchoring steel bar 3 is a high-strength low-relaxation prestressed steel bar, the anchoring force is durable and effective, and the performance of the anchoring steel bar meets the requirements of steel bar for prestressed concrete GB/T5223.3. The screw cap 4 is made of No. 45 high-quality carbon structural steel, needs quenching and tempering heat treatment, cannot generate cracks, overburning and decarburization, has surface hardness not less than HRC25, can effectively anchor the anchoring steel bar 3 and the profile steel corbel 5, and has the performance meeting the requirements of high-quality carbon structural steel GB 699. The screw thread at the end part of the anchoring steel bar 3 is formed by rolling, the pitch diameter of the screw thread at the end part is 16.026mm, the screw pitch is 1.5mm, the screw thread tolerance band is combined by 6H/6g, and the basic size and the tolerance meet the related requirements of 'basic size of common screw thread' GB/T196 and 'tolerance of common screw thread' GB/T197. The utility model discloses the device adopts bolted connection, is convenient for install and demolish.

Claims (1)

1. A temporary fixing structure of prefabricated pier stud segments, comprising: pier stud (6), pier stud embedded steel pipe reinforcing bar (1), steel pipe (2), anchor rod iron (3), nut (4), shaped steel bracket (5), characterized by: shaped steel bracket (5) constitute by the channel-section steel, be crisscross horizontal interval respectively and set up steel pipe (2) in two sections pier stud (6) that link up mutually, set up pre-buried steel pipe reinforcing bar (1) of pier stud that constitutes the groined type in pier stud (6) around steel pipe (2) respectively, worn an anchor rod (3) in steel pipe (2) of coaxial arrangement respectively, shaped steel bracket (5) on set up respectively with anchor rod (3) end matched with through-hole, through setting up nut (4) on anchor rod (3) end with the vertical fixed attachment of shaped steel bracket (5) on the outer wall of pier stud (6) linking department mutually.
CN202320044449.2U 2023-01-09 2023-01-09 Temporary fixing structure for prefabricated pier column section of pier Active CN218861364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320044449.2U CN218861364U (en) 2023-01-09 2023-01-09 Temporary fixing structure for prefabricated pier column section of pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320044449.2U CN218861364U (en) 2023-01-09 2023-01-09 Temporary fixing structure for prefabricated pier column section of pier

Publications (1)

Publication Number Publication Date
CN218861364U true CN218861364U (en) 2023-04-14

Family

ID=87367732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320044449.2U Active CN218861364U (en) 2023-01-09 2023-01-09 Temporary fixing structure for prefabricated pier column section of pier

Country Status (1)

Country Link
CN (1) CN218861364U (en)

Similar Documents

Publication Publication Date Title
CN202017346U (en) Late poured band hanging formwork structure
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN111663449A (en) Combined cast-in-place box girder support system and construction method
CN103469735B (en) The mounting method of curve ultrahigh hollow column plate type pier top solid section template
CN203821907U (en) Large-scale vertical tube cone section profile steel structure cooling tower
CN107059646A (en) A kind of angle-table bracket construction method of cast-in-place large span gate-type pier capping beam
CN218861364U (en) Temporary fixing structure for prefabricated pier column section of pier
CN214498388U (en) Assembled overhanging formwork support bent
CN111691300A (en) A concrete placement support device for steel-concrete composite beam
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN212247894U (en) A concrete placement support device for steel-concrete composite beam
CN213267541U (en) Large-span swivel steel box T-shaped bridge
CN107740342A (en) Prefabricated assembling type reinforced concrete bridge block and its building method
CN211142827U (en) High-altitude large-scale structure bearing section steel support
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN218911161U (en) Temporary fixing structure for prefabricated pier column and bearing platform
CN211171560U (en) Steel diagonal brace combined PC beam
CN114351573B (en) Shock absorption and isolation swing pier for high-speed railway
CN219033527U (en) Assembled pipe network structure
CN218263465U (en) Cable tower X supports and sets up
CN214834657U (en) Suspension type scaffold frame corner girder steel bearing structure
CN211079895U (en) High pier bent cap does not have cast-in-place structure of support
CN216040666U (en) Steel grating step plate hanging basket for railway bridge
CN219430532U (en) Cast-in-situ supporting structure of bridge concrete box girder
CN114922095B (en) Assembled light high-strength fiber composite construction support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant