CN211079895U CN201921240184.3U CN201921240184U CN211079895U CN 211079895 U CN211079895 U CN 211079895U CN 201921240184 U CN201921240184 U CN 201921240184U CN 211079895 U CN211079895 U CN 211079895U
Authority
CN
China
Prior art keywords
bent cap
cast
support
distribution beams
stiff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921240184.3U
Other languages
Chinese (zh)
Inventor
蒋建军
田波
牟廷敏
周海波
宋开辉
狄秉臻
范碧琨
刘振宇
王勇
何锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Highway Planning Survey and Design Institute Ltd
Original Assignee
Sichuan Highway Planning Survey and Design Institute Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Highway Planning Survey and Design Institute Ltd filed Critical Sichuan Highway Planning Survey and Design Institute Ltd
Priority to CN201921240184.3U priority Critical patent/CN211079895U/en
Application granted granted Critical
Publication of CN211079895U publication Critical patent/CN211079895U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A cast-in-place structure of a high pier bent cap without a support is used for realizing cast-in-place construction of the bent cap without the support, effectively improving the efficiency and the construction safety of the bent cap and being beneficial to saving cost. The bridge pier comprises a stiff framework participating in stress of a bent cap structure, wherein the stiff framework is connected with an embedded steel column at the top of the bridge pier in a welding manner; distribution beams fixedly installed by steel pull rods are arranged below the stiff skeleton at intervals, and template systems are installed on the distribution beams.

Description

High pier bent cap does not have cast-in-place structure of support
Technical Field
The utility model relates to a civil construction engineering, the cast-in-place construction structures of specially adapted high pier bent cap.
Background
The conventional construction method of the ordinary pier capping beam is that the cast-in-place is carried out after an external support is erected, when the pier is high, safety risks such as instability and deformation exist, and the erection of a support system is high in investment cost and long in turnover time; and the storage and maintenance management of the external support system requires both site and labor. In order to reduce the use of external temporary supports, improve construction safety, save cost and improve work efficiency, a high pier capping beam support-free cast-in-place structure needs to be developed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a high pier bent cap does not have cast-in-place structure of support is provided to realize the cast-in-place construction of bent cap no support, effectively improve bent cap efficiency and construction security, and be favorable to practicing thrift the cost.
The utility model provides a technical scheme as follows that above-mentioned technical problem took:
the utility model discloses a cast-in-place structure of high pier bent cap no support, characterized by: the bridge pier comprises a stiff framework participating in stress of a bent cap structure, wherein the stiff framework is connected with an embedded steel column at the top of the bridge pier in a welding manner; distribution beams fixedly installed by steel pull rods are arranged below the stiff skeleton at intervals, and template systems are installed on the distribution beams.
The utility model has the advantages that the stiff frameworks participating in the stress of the bent cap structure are welded and fixed on the top of the pier, and the stiff frameworks are used as the supporting bodies of the template system, so that the cast-in-place construction of the bent cap without the support is realized; the stiff skeleton structure can be installed by a tower crane system, so that the capping efficiency and the construction safety can be effectively improved, and the cost can be saved.
Drawings
The specification includes the following two figures:
FIG. 1 is a cross bridge vertical view of a high pier capping beam non-support cast-in-place structure of the present invention;
FIG. 2 is a cross-sectional view of a high pier bent cap support-free cast-in-place structure of the present invention;
the figures show the components and corresponding references: the steel structure comprises piers 10, embedded steel columns 11, a stiff skeleton 20, steel pull rods 21, transverse distribution beams 22, longitudinal distribution beams 23 and a template system 30.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
Referring to fig. 1 and 2, the utility model discloses a cast-in-place structure of high pier bent cap no support, including a strength nature skeleton 20 of participating in the bent cap structure atress, this strength nature skeleton 20 and the pre-buried steel column 11 welded connection at pier 10 top. Distribution beams fixedly installed by steel pull rods 21 are arranged below the stiff frameworks 20 at intervals, and template systems 30 are installed on the distribution beams.
Referring to fig. 1, a stiff skeleton 20 calculates the stiffness and the structural dimension according to the dead weight of a capping beam, and conventional section steels (such as i-beams, channel steels and angle steels) are adopted to assemble chords, diagonal web members, vertical bars, flat link rods and the like of an inner support system, and the stiff skeleton is welded and connected with embedded steel columns 11 at the top of a pier 10 to serve as a support body of a template system, so that the cast-in-place construction without a support of the capping beam is realized. The stiff skeleton 20 can be installed by a tower crane or a cable hoisting system, and the template system 30 comprises a bottom die and a side die which are installed on the distribution beam, so that the stiff skeleton structure is uniformly stressed when the capping beam is poured with concrete, the capping beam efficiency and the construction safety can be effectively improved, and the cost is saved.
Referring to fig. 1 and 2, the distribution beam includes transverse distribution beams 22 arranged at intervals in the transverse bridge direction and longitudinal distribution beams 23 arranged at intervals in the longitudinal bridge direction, the lower end of the steel tie rod 21 is connected to the intersection of the transverse distribution beams 22 and the longitudinal distribution beams 23, and the upper end is connected to the top of the stiff skeleton 20.
The above is only used for illustrating the present invention, and the present invention is not limited to the specific structure and application range shown and described, so all the corresponding modifications and equivalents that may be utilized all belong to the patent scope applied by the present invention.

Claims (2)

1. The utility model provides a cast-in-place structure of high pier bent cap no support, characterized by: the bridge pier structure comprises a stiff skeleton (20) participating in stress of a bent cap structure, wherein the stiff skeleton (20) is welded and connected with an embedded steel column (11) at the top of the bridge pier (10); distribution beams fixedly installed by steel pull rods (21) are arranged below the stiff frameworks (20) at intervals, and template systems (30) are installed on the distribution beams.
2. The high pier capping beam support-free cast-in-place structure of claim 1, which is characterized in that: the distribution beam comprises transverse distribution beams (22) arranged at intervals in the transverse bridge direction and longitudinal distribution beams (23) arranged at intervals in the bridge direction, the lower end of the steel pull rod (21) is connected to the intersection of the transverse distribution beams (22) and the longitudinal distribution beams (23), and the upper end of the steel pull rod is connected to the top of the stiff framework (20).
CN201921240184.3U 2019-08-01 2019-08-01 High pier bent cap does not have cast-in-place structure of support Active CN211079895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921240184.3U CN211079895U (en) 2019-08-01 2019-08-01 High pier bent cap does not have cast-in-place structure of support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921240184.3U CN211079895U (en) 2019-08-01 2019-08-01 High pier bent cap does not have cast-in-place structure of support

Publications (1)

Publication Number Publication Date
CN211079895U true CN211079895U (en) 2020-07-24

Family

ID=71640553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921240184.3U Active CN211079895U (en) 2019-08-01 2019-08-01 High pier bent cap does not have cast-in-place structure of support

Country Status (1)

Country Link
CN (1) CN211079895U (en)

Similar Documents

Publication Publication Date Title
CN201972237U (en) Section prefabricated rectangular steel pipe concrete truss
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN212200750U (en) Assembled building frame structure combination braced system
CN201506952U (en) Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN211645934U (en) Deep-buried karst cave treatment structure under tunnel bottom plate
CN212983636U (en) Cast-in-place construction steel bracket support frame of concrete box girder
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN211947993U (en) Support for large-span cast-in-situ bridge construction
CN212897482U (en) Construction platform for high-rise building overhanging structural layer
CN110878522B (en) Main tower lower cross beam construction system and construction method
CN211498483U (en) Hollow wall pier tie beam formwork system
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN211079895U (en) High pier bent cap does not have cast-in-place structure of support
CN214993171U (en) Bridge bent cap construction is with assembled sectional shelf-unit platform
CN214656443U (en) Hoop positioning structure for supporting prestressed bent cap
CN113846572B (en) Holding system for bridge capping beam construction and construction method
CN211036710U (en) Cast-in-place box girder support system
CN213233106U (en) Arch ring support
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN211547346U (en) Formwork system for construction of inclined cable tower
CN220266305U (en) Box girder formwork supporting device
CN217268057U (en) Reinforced supporting building structure of reinforced concrete flat slab
CN217678646U (en) Tie rod arch bridge middle beam installation device