CN218911161U - Temporary fixing structure for prefabricated pier column and bearing platform - Google Patents

Temporary fixing structure for prefabricated pier column and bearing platform Download PDF

Info

Publication number
CN218911161U
CN218911161U CN202320054705.6U CN202320054705U CN218911161U CN 218911161 U CN218911161 U CN 218911161U CN 202320054705 U CN202320054705 U CN 202320054705U CN 218911161 U CN218911161 U CN 218911161U
Authority
CN
China
Prior art keywords
bearing platform
pier
bracket
anchor bolt
contact surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320054705.6U
Other languages
Chinese (zh)
Inventor
张振钛
张予欣
施文龙
袁国涛
张学斌
徐镭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Railway Survey & Design Institute Co ltd
Original Assignee
Xinjiang Railway Survey & Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Railway Survey & Design Institute Co ltd filed Critical Xinjiang Railway Survey & Design Institute Co ltd
Priority to CN202320054705.6U priority Critical patent/CN218911161U/en
Application granted granted Critical
Publication of CN218911161U publication Critical patent/CN218911161U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a temporary fixing structure of a prefabricated pier column and a bearing platform, which comprises a prefabricated pier, the bearing platform, anchor bolt sleeve reinforcing steel bars, bearing platform inner anchor bolt sleeves, pier column inner anchor bolt sleeves, bolts, bearing bracket and bearing platform contact surface steel plates, bearing bracket and pier column contact surface steel plates and bearing bracket main steel plates, wherein the anchor bolt sleeve reinforcing steel bars are respectively arranged in a groined shape and are connected with pier column reinforcing steel bars of the prefabricated pier and reinforcing steel bars in the bearing platform, bearing platform inner anchor bolt sleeves are vertically embedded in the bearing platform, and pier column inner anchor bolt sleeves are horizontally embedded in pier columns of the prefabricated pier; the steel bracket is manufactured by welding the steel plate at the contact surface of the bracket and the bearing platform, the steel plate at the contact surface of the bracket and the pier column and the main steel plate of the bracket vertically; the bolts penetrate through the steel plate of the contact surface of the bracket and the bearing platform to be connected with the anchor bolt sleeve in the bearing platform, and the bolts penetrate through the steel plate of the contact surface of the bracket and the pier column to be connected with the anchor bolt sleeve in the pier column.

Description

Temporary fixing structure for prefabricated pier column and bearing platform
Technical Field
The utility model relates to a temporary fixing structure of a prefabricated pier column and a bearing platform, and belongs to the technical field of bridge and culvert engineering.
Background
The prefabricated bridge pier consists of a capping beam and a pier column, and is connected by adopting a prestress steel beam. The assembly process comprises the following steps: and pre-burying the pre-stressed steel beam anchoring end in the bearing platform, enabling the tensioning end to pass through pre-stressed pore channels in the pier column and the capping beam, and tensioning pre-stress at the top of the capping beam after pre-assembling the pier column and the capping beam is completed, so that the installation of the prefabricated pier is completed. Epoxy sealant is smeared between the capping beam, the pier stud and the bearing platform.
The connection of pier column and cushion cap top is the key point of assembling, specifically does: (1) the surface flatness accuracy of the joint surface is required to be extremely high. (2) After the initial installation of the pier column is finished, the verticality of the pier column needs to be finely adjusted, and the pier column is ensured to be vertical. (3) The pier stud is temporarily fixed, so that engineering accidents caused by the overturning of the pier stud are prevented, and constructors are injured.
Disclosure of Invention
The utility model aims to provide a temporary fixing structure for a prefabricated pier stud and a bearing platform, which can prevent the junction of the prefabricated pier stud and the top surface of the bearing platform from overturning and ensure construction safety.
The technical scheme adopted by the utility model for achieving the purpose is as follows: the temporary fixing structure comprises a prefabricated pier, a bearing platform, anchor bolt sleeve reinforcing steel bars, bearing platform inner anchor bolt sleeves, pier inner anchor bolt sleeves, bolts, bracket and bearing platform contact surface steel plates, bracket and pier contact surface steel plates and bracket main steel plates, wherein the anchor bolt sleeve reinforcing steel bars are respectively arranged in a groined shape and are connected with pier steel bars of the prefabricated pier and steel bars in the bearing platform, the bearing platform inner anchor bolt sleeves are vertically embedded in the bearing platform, and the pier inner anchor bolt sleeves are horizontally embedded in the pier of the prefabricated pier; the steel bracket is manufactured by welding the steel plate at the contact surface of the bracket and the bearing platform, the steel plate at the contact surface of the bracket and the pier column and the main steel plate of the bracket vertically; the bolts penetrate through the steel plate of the contact surface of the bracket and the bearing platform to be connected with the anchor bolt sleeve in the bearing platform, and the bolts penetrate through the steel plate of the contact surface of the bracket and the pier column to be connected with the anchor bolt sleeve in the pier column; the structure is divided into four groups which are uniformly distributed around the prefabricated bridge pier to temporarily fix the prefabricated bridge pier and the bearing platform together.
According to the utility model, the anchor bolt sleeve reinforcing steel bars are arranged to locally reinforce the concrete at the reserved bolt sleeve sides of the pier column and the bearing platform. Through setting up the bolt sleeve of inner wall tapping, be favorable to bolt and bolt sleeve to connect as wholly, transmit the anchoring force to the steel corbel. Through setting up the steel bracket, carry out effective anchor to prefabricated assembly formula pier stud. Through setting up the bolt, correct the straightness that hangs down of prefabricated assembly pier through adjusting bolt.
Drawings
Fig. 1 is a schematic plan view of the present utility model.
FIG. 2 is a schematic view of the I-I cross-section structure of FIG. 1;
fig. 3 is a schematic view of the anchor bolt sleeve reinforcing bar construction.
Detailed Description
The utility model is described in further detail below with reference to the accompanying drawings and detailed description.
Referring to fig. 1, 2 and 3, a temporary fixing structure of a prefabricated pier column and a bearing platform comprises a prefabricated pier 9, a bearing platform 8, anchor bolt sleeve reinforcing steel bars 1, bearing platform inner anchor bolt sleeves 2, pier column inner anchor bolt sleeves 3, bolts 4, bracket and bearing platform contact surface steel plates 5, bracket and pier column contact surface steel plates 6 and bracket main steel plates 7, wherein the anchor bolt sleeve reinforcing steel bars 1 are respectively arranged in a groined shape and are connected with pier column reinforcing steel bars of the prefabricated pier and reinforcing steel bars in the bearing platform, the bearing platform inner anchor bolt sleeves 2 are vertically embedded in the bearing platform, and the pier column inner anchor bolt sleeves 3 are horizontally embedded in the pier column of the prefabricated pier; constructing a prefabricated pier column, demoulding and curing after the concrete strength reaches 75%, and standing by after the concrete strength reaches 100%; constructing a bearing platform, demoulding and curing after the concrete strength reaches 75%, and standing by after the concrete strength reaches 100%; the steel bracket is manufactured by welding the steel plate 5 at the contact surface of the bracket and the bearing platform, the steel plate 6 at the contact surface of the bracket and the pier column and the main steel plate 7 of the bracket vertically; the bolts 4 penetrate through the steel plates 5 of the contact surfaces of the bracket and the bearing platform to be connected with the anchor bolt sleeves 2 in the bearing platform, and the bolts 4 penetrate through the steel plates 6 of the contact surfaces of the bracket and the pier column to be connected with the anchor bolt sleeves 3 in the pier column; and adjusting the perpendicularity of the pier column by using the spanner adjusting bolt 4, stopping adjusting after the perpendicularity meets the design requirement, wherein the structure is divided into four groups which are uniformly distributed around the prefabricated pier 9, and the prefabricated pier 9 and the bearing platform 8 are temporarily fixed together. The steel plate 5 at the contact surface of the bracket and the bearing platform, the steel plate 6 at the contact surface of the bracket and the pier column and the main steel plate 7 of the bracket are Q235 hot rolled steel plates, meet the requirements of the hot rolled steel plate and the steel strip for size, appearance, weight and allowable deviation GB/T709, and are thick steel plates, high in strength and rigidity, stable in material performance and high in anchoring bearing capacity. The bolt 4 is a high-strength bolt, has high tensile strength and high shearing bearing capacity, and has the performance meeting the requirements of GB/T1228 of high-strength large hexagon head bolt for steel structure. The anchor bolt sleeve is subjected to inner wall tapping treatment and is effectively connected with the bolt 4, and the pier stud, the bearing platform and the steel corbel are connected into a whole. And the bolts 4 are adopted for connection, so that the installation and the removal are convenient.

Claims (1)

1. The utility model provides a temporary fixation structure of prefabricated pier stud and cushion cap, includes prefabricated pier and cushion cap, crab-bolt sleeve reinforcing bar (1), cushion cap interior anchor bolt sleeve (2), interior crab-bolt sleeve (3) of pier stud, bolt (4), bracket and cushion cap contact surface steel sheet (5), bracket and pier stud contact surface steel sheet (6) and bracket main steel sheet (7), characterized by: the anchor bolt sleeve reinforcing steel bars (1) are respectively arranged in a groined shape and are connected with pier column reinforcing steel bars of the prefabricated pier and reinforcing steel bars in the bearing platform, the bearing platform inner anchor bolt sleeve (2) is vertically embedded in the bearing platform, and the pier column inner anchor bolt sleeve (3) is horizontally embedded in the pier column of the prefabricated pier; the steel corbel is manufactured by welding a steel plate (5) at the contact surface of the corbel and the bearing platform, a steel plate (6) at the contact surface of the corbel and the pier column and a main steel plate (7) of the corbel vertically; the bolts (4) penetrate through the bracket and bearing platform contact surface steel plate (5) to be connected with the bearing platform inner anchor bolt sleeve (2), and the bolts (4) penetrate through the bracket and pier column contact surface steel plate (6) to be connected with the pier column inner anchor bolt sleeve (3); the structure is divided into four groups which are uniformly distributed around the prefabricated bridge pier to temporarily fix the prefabricated bridge pier and the bearing platform together.
CN202320054705.6U 2023-01-09 2023-01-09 Temporary fixing structure for prefabricated pier column and bearing platform Active CN218911161U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320054705.6U CN218911161U (en) 2023-01-09 2023-01-09 Temporary fixing structure for prefabricated pier column and bearing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320054705.6U CN218911161U (en) 2023-01-09 2023-01-09 Temporary fixing structure for prefabricated pier column and bearing platform

Publications (1)

Publication Number Publication Date
CN218911161U true CN218911161U (en) 2023-04-25

Family

ID=86045914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320054705.6U Active CN218911161U (en) 2023-01-09 2023-01-09 Temporary fixing structure for prefabricated pier column and bearing platform

Country Status (1)

Country Link
CN (1) CN218911161U (en)

Similar Documents

Publication Publication Date Title
CN109056536B (en) Cast-in-place box girder construction method based on combined hoop support
CN109853375B (en) Bridge expansion joint reserved notch of assembled structure and construction method thereof
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN110886227B (en) Main tower cast-in-place lower cross beam support system and construction method
CN111335181A (en) Mounting support frame and mounting method for cast-in-place concrete structure template of steel-concrete composite beam flange plate
CN219731647U (en) Detachable concrete guardrail structure with buffer function
CN218911161U (en) Temporary fixing structure for prefabricated pier column and bearing platform
CN110878522B (en) Main tower lower cross beam construction system and construction method
KR20030086222A (en) temporaty bridge using prestressed compuond double girder and method for building the temporary bridge
CN216193973U (en) Pier shaft structure is assembled to prefabricated segment
CN214656443U (en) Hoop positioning structure for supporting prestressed bent cap
CN214117597U (en) Connecting joint of existing concrete column and heightened steel column
CN210177354U (en) Anti-seismic pier assembly
CN209873560U (en) Bridge deck continuous connection structure adopting ultra-high performance concrete
CN113186854A (en) Concrete guardrail prefabricated thin plate structure and recycling construction method thereof
CN112282418A (en) Connecting joint of existing concrete column and heightened steel column and construction method
CN112211098A (en) Bolt connection device between prefabricated bridge floor boards of assembled bridge
CN111455817A (en) Cable-stayed bridge integral steel anchor beam and construction method thereof
CN217629489U (en) Broken column jacking heightening and shaping combined hoop supporting system
CN211079895U (en) High pier bent cap does not have cast-in-place structure of support
CN220058071U (en) Prefabricated retaining wall structure for foundation pit
CN220395153U (en) Attaching structure of attaching lifting scaffold
CN218861364U (en) Temporary fixing structure for prefabricated pier column section of pier
CN214738743U (en) Novel beam and column connecting structure for building
CN219604390U (en) But reuse's ladder cage basis prefabricated plate subassembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant