CN218842903U - Creeping formwork construction platform - Google Patents

Creeping formwork construction platform Download PDF

Info

Publication number
CN218842903U
CN218842903U CN202223441352.XU CN202223441352U CN218842903U CN 218842903 U CN218842903 U CN 218842903U CN 202223441352 U CN202223441352 U CN 202223441352U CN 218842903 U CN218842903 U CN 218842903U
Authority
CN
China
Prior art keywords
construction platform
pier
section
construction
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223441352.XU
Other languages
Chinese (zh)
Inventor
吕亚辉
张雯彬
顾光金
王晓玲
郭小芳
张哲译
马瑞璞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Highway Engineering Group Co Ltd
Original Assignee
Henan Highway Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Highway Engineering Group Co Ltd filed Critical Henan Highway Engineering Group Co Ltd
Priority to CN202223441352.XU priority Critical patent/CN218842903U/en
Application granted granted Critical
Publication of CN218842903U publication Critical patent/CN218842903U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a creeping formwork construction platform, which comprises a hollow section of a pier and an inner construction platform, wherein the inner construction platform is matched with the inner wall of the hollow section of the pier and a gap is arranged between the inner construction platform and the hollow section of the pier; a plurality of lifting bolts are detachably arranged above the inner construction platform, limiting idler wheels are respectively arranged on the four sides of the inner construction platform, and the limiting idler wheels are in contact with the inner wall of the hollow section of the pier and roll along the inner wall of the hollow section of the pier; a plurality of overturning clamping seats are rotatably arranged below the inner construction platform, torsion springs are arranged at the switching positions of the overturning clamping seats and the inner construction platform so as to keep the overturning clamping seats horizontal, and the overturning clamping seats extend outwards and protrude out of the inner construction platform; a plurality of clamping grooves are pre-buried in the inner wall of the hollow section of the pier, and the overturning clamping seat is in matched clamping connection with the clamping grooves so that the inner construction platform is arranged in a suspended mode. The utility model discloses an interior construction platform can upwards freely remove to under the cooperation of upset cassette and draw-in groove, the stable unsettled of interior construction platform can be realized, the construction of the hollow section of pier can be carried out with the high-efficient cooperation of creeping formwork.

Description

Creeping formwork construction platform
Technical Field
The utility model relates to a creeping formwork construction technical field especially relates to creeping formwork construction platform.
Background
The climbing formwork is widely applied to pier construction, the climbing formwork is arranged on the outer side of a pier, however, in the construction of a hollow section of the pier, a construction platform needs to be arranged in the hollow section, and a constructor can conveniently match binding steel bars and support the inner formwork and the outer formwork on platforms on the inner side and the outer side of the hollow section of the pier respectively.
The construction is pour for segmentation successive layer to the hollow section of pier, is mostly the conventional scaffold mode of putting up when its inside arrangement construction platform, and the setting up of scaffold needs a large amount of steel pipes, and the material use amount is big, causes that scaffold structure is complicated, the construction is loaded down with trivial details and consume time long, and hollow section inner space is narrow and small moreover, construction platform's the setting up of being not convenient for.
The scaffold is also required to be built layer by layer and for multiple times by matching with the construction of the hollow section, so that the construction efficiency is low and the building is slow; and the creeping formwork can be used for carrying out efficient construction, and can quickly form a construction platform on the outer side, so that the construction progress of the scaffold and the creeping formwork is not matched, and the construction period is prolonged.
Disclosure of Invention
The utility model discloses a solve the scaffold and build the construction loaded down with trivial details, be difficult to and the high-efficient complex problem of creeping formwork, provide creeping formwork construction platform, cancel the buildding of conventional scaffold to the construction platform cooperation creeping formwork of hoist and mount formula carries out high-efficient construction.
In order to achieve the above object, the utility model adopts the following technical scheme:
the creeping formwork construction platform comprises a hollow pier section and an inner construction platform, wherein the inner construction platform is arranged in the hollow pier section and is used as an operation construction platform of an inner cavity of the hollow pier section, the inner construction platform is a steel structure platform, and the inner construction platform is matched with the inner wall of the hollow pier section and has a gap with the inner wall, so that the inner construction platform can be prevented from being touched with the hollow pier section;
a plurality of lifting bolts are detachably arranged above the inner construction platform, the lifting bolts are used for lifting and moving the inner construction platform upwards and can be matched with the layered multiple construction of the hollow section of the pier, limiting idler wheels are respectively arranged on the four sides of the inner construction platform, the limiting idler wheels are in contact with the inner wall of the hollow section of the pier and roll along the inner wall of the hollow section of the pier, and the inner construction platform can stably and smoothly move upwards in the hollow section of the pier;
a plurality of turnover clamping seats are rotatably arranged below the inner construction platform, torsion springs are arranged at the switching positions of the turnover clamping seats and the inner construction platform so as to keep the turnover clamping seats horizontal, the turnover clamping seats extend outwards and protrude out of the inner construction platform, and the turnover clamping seats are parts connected with the hollow sections of the piers;
the interior wall of the hollow section of the pier is pre-buried with a plurality of clamping grooves, the overturning clamping seats correspond to the clamping grooves one to one, the overturning clamping seats are matched and clamped with the clamping grooves so that the interior construction platform is arranged in a suspending mode, and the interior construction platform can be stably fixed in the hollow section of the pier through the clamping of the overturning clamping seats and the clamping grooves.
Furthermore, the inner construction platform comprises a construction pedal, a square tube layer and a channel steel layer which are sequentially arranged in an up-down stacking manner, and screws are arranged among the construction pedal, the square tube layer and the channel steel layer for connection, so that the components can be conveniently disassembled and assembled;
the construction footboard is the checkered plate, and there is the clearance at construction footboard edge and the hollow section inner wall of pier, avoids bumping the hollow section inner wall of pier, lays the construction footboard below the square tube layer, the square tube layer is the layer structure that many side's pipes that the interval was laid constitute, and lay side's pipe layer below channel steel layer, channel steel layer are the layer structure that many channel-section steels that the interval was laid constitute, and it is mutually perpendicular with the channel-section steel direction to manage.
Furthermore, threaded sleeves are arranged on two sides of each channel steel of the channel steel layer and penetrate through the channel steel, the upper ends of the threaded sleeves extend upwards to be close to the bottom surface of the construction pedal, trapezoidal rib plates are further arranged between the threaded sleeves and the channel steel for reinforcement, and the rib plates can improve the installation strength of the threaded sleeves;
the construction pedal is provided with a through hole corresponding to the position of the threaded sleeve for the suspension bolt to pass through, the suspension bolt is in threaded connection with the threaded sleeve, the suspension bolt is convenient to install, and after the suspension bolt is taken down, the walking of construction personnel on the construction platform is not influenced.
Furthermore, the four sides of the square pipe layer are respectively provided with the limiting idler wheels, and the limiting idler wheels extend outwards and protrude out of the edge of the construction pedal to be in contact with the inner wall of the hollow section of the pier.
Furthermore, the end part of each channel steel of the channel steel layer is provided with the turnover clamping seat, a rotating shaft is arranged between the turnover clamping seat and the channel steel for connection, a torsional spring is sleeved on the rotating shaft, one end of the torsional spring abuts against the inner wall of the channel steel, the other end of the torsional spring abuts against the turnover clamping seat, and the turnover clamping seat is tightly attached to the inner wall of the channel steel and keeps a horizontal state under the action of the torsional spring;
the draw-in groove is hollow hexahedron groove structure, draw-in groove one end opening, and inside the draw-in groove open end towards the hollow section of pier, upset cassette one end level stretched into in the draw-in groove rather than the joint, and upset cassette cross-section is less than the draw-in groove cross-section, the entering of the cassette of conveniently overturning and breaking away from.
Through the technical scheme, the beneficial effects of the utility model are that:
the utility model has the advantages of reasonable design, interior construction platform comprises three layer construction, is construction footboard, square tube layer and channel steel layer respectively, adopts the screw connection between the three layer construction, installs simple also convenient to detach. Wherein there is the clearance in construction footboard and the hollow section inner wall of pier, and then interior construction platform does not bump with the hollow section of pier when upwards handling, can guarantee interior construction platform stable, smooth shifting up under four spacing gyro wheel effects, also avoids taking place to rock and produces and touch.
The utility model discloses an upset cassette has rotatable function, and the upset cassette tends to the level under the torsional spring effect, and then in it can stretch into the draw-in groove automatically, also can break away from the draw-in groove smoothly. The joint cooperation of upset cassette and draw-in groove for interior construction platform can be unsettled to be fixed at the inner chamber of pier hollow segment, makes things convenient for constructor to develop the construction of next stage pier hollow segment.
The utility model discloses an interior construction platform adopts the handling mode to shift up, can realize in a flexible way upwards freely removing to under upset cassette and draw-in groove mating reaction, can realize stable unsettled fixed, have the fast characteristics of installation fixed speed, consequently interior construction platform can cooperate the creeping formwork to carry out the efficient construction, has avoided the tradition to build the operation that the scaffold frame is wasted time and energy.
Drawings
Fig. 1 is the front view of the creeping formwork construction platform of the utility model.
Fig. 2 is the utility model discloses creeping formwork construction platform's upset cassette and draw-in groove cooperation sketch map.
Fig. 3 is the top view of the creeping formwork construction platform of the utility model.
Fig. 4 is a side view of the creeping formwork construction platform of the present invention.
Fig. 5 is a bottom view of the creeping formwork construction platform of the present invention.
The reference numbers in the figures are: 1 hollow section of pier, 2 construction footboard, 3 square tube layers, 31 side's pipe, 4 channel steel layers, 41 channel-section steels, 5 screws, 6 eyebolt, 7 threaded sleeve, 8 floor, 9 spacing gyro wheels, 10 upset cassettes, 11 axis of rotation, 12 torsional springs, 13 draw-in grooves.
Detailed Description
The following detailed description of the embodiments of the present invention is made with reference to the accompanying drawings:
as shown in figures 1-5, the creeping formwork construction platform comprises a hollow pier section 1 and an inner construction platform, wherein the inner construction platform is arranged in the hollow pier section 1, and the inner construction platform is matched with the inner wall of the hollow pier section 1. Constructors can stand on the inner construction platform and then are arranged on the inner side of the hollow section 1 of the pier, and the constructors on the outside creeping formwork can be matched to carry out reinforcement binding and supporting of the inner formwork and the outer formwork.
Interior construction platform is steel construction platform, and interior construction platform includes from top to bottom stacks gradually construction footboard 2, square pipe layer 3 and the channel-section steel layer 4 of laying. Wherein the footboard 2 of being under construction is checkered plate, and the square pipe layer 3 is laid to the footboard 2 below of being under construction, and square pipe layer 3 is the layer structure that three square pipes 31 that the interval was laid constitute, and channel-section steel layer 4 is laid to square pipe layer 3 below, and channel-section steel layer 4 is the layer structure that two channel-section steels 41 that the interval was laid constitute, and square pipe layer 3 is perpendicular with channel-section steel layer 4 mutually, and it is also that square pipe 31 lays the direction mutually perpendicularly with channel-section steel 41.
Construction footboard 2, square pipe layer 3 and channel-section steel layer 4 are connected and are constituted interior construction platform after the combination, and is specific, be provided with screw 5 between construction footboard 2, square pipe layer 3 and the channel-section steel layer 4 with the connection. Namely, the screws 5 are arranged at the positions of the three square tubes 31 and the two channel steels 41 which are overlapped up and down, the screws 5 are inner hexagon round head screws 5, and the screws 5 downwards sequentially penetrate through the construction pedal 2, the square tubes 31 and the channel steels 41 and then are connected with nuts for locking.
The inner construction platform is constructed layer by layer along with the hollow section 1 of the bridge pier, and moves upwards for a plurality of times, namely the inner construction platform is lifted upwards, and lifting equipment such as a tower crane or a crane commonly used for construction is selected for lifting. In order to facilitate the connection of the hoisting equipment and the inner construction platform, four lifting bolts 6 can be detachably arranged above the inner construction platform and are connected with the hoisting equipment through the lifting bolts 6, so that the inner construction platform can be hoisted.
When the lifting bolt 6 is installed, the two sides of each channel steel 41 of the channel steel layer 4 are provided with the threaded sleeves 7, the number of the threaded sleeves 7 is four, two threaded sleeves 7 are arranged on each channel steel 41, and each threaded sleeve 7 is located between two adjacent square pipes 31. The threaded sleeve 7 is welded on the channel steel 41, the threaded sleeve 7 penetrates through the channel steel 41, and the upper end of the threaded sleeve 7 extends upwards to be close to the bottom surface of the construction pedal 2.
In order to improve the installation strength of the threaded sleeve 7, a trapezoidal rib plate 8 is further arranged between the threaded sleeve 7 and the channel steel 41, the rib plate 8 is welded and fixed, and the rib plate 8 plays a role in reinforcement.
The construction footboard 2 corresponds the threaded sleeve 7 position and has seted up the through-hole, and through-hole quantity is four, and the through-hole effect supplies eyebolt 6 to pass, and eyebolt 6 passes behind the through-hole with threaded sleeve 7 threaded connection, and then realizes eyebolt 6 and interior construction platform's being connected, can adopt the handling that equipment carried out interior construction platform this moment. Because the eyebolt 6 can be dismantled with interior construction platform and be connected, can pull down eyebolt 6 after the handling, prevent that construction footboard 2 top from producing protrudingly, guarantee that constructor normally walks, not receive to stumble.
In order to prevent during the handling that interior construction platform and hollow section of pier 1 from colliding, there is the clearance between interior construction platform edge and the hollow section of pier 1 inner wall, and 2 edges of construction footboard and the hollow section of pier 1 inner wall have the clearance promptly, and the purpose is the collision hollow section of pier 1 inner wall when preventing interior construction platform rebound.
In order to prevent the inner construction platform from shaking when moving upwards, the four sides of the inner construction platform are respectively provided with four limiting idler wheels 9, the number of the limiting idler wheels 9 is four, and the limiting idler wheels 9 are respectively arranged on the four sides of the square tube layer 3. The specific arrangement form of the limiting idler wheels 9 is as follows: the middle parts of the two square pipes 31 positioned at two sides are provided with limiting rollers 9, the length of the square pipe 31 positioned in the middle part is longer, the two ends of the square pipe 31 are provided with steel plates to seal the square pipe, and the steel plates at the two ends of the square pipe 31 are also provided with the limiting rollers 9.
The limiting idler wheel 9 is in contact with the inner wall of the hollow section 1 of the pier, and can roll along the inner wall of the hollow section 1 of the pier, namely, the limiting idler wheel 9 extends outwards and protrudes out of the edge of the construction pedal 2 to be in contact with the inner wall of the hollow section 1 of the pier. Interior construction platform passes through four spacing gyro wheels 9 and 1 inner wall rolling contact of hollow section of pier, can guarantee interior construction platform can be stable smooth shifting up, also avoids bumping.
The inner construction platform is not only lifted upwards, but also can be stably placed in the hollow section 1 of the pier, so that the construction personnel can stand. Therefore, four overturning clamping seats 10 are rotatably arranged below the inner construction platform, the inner construction platform is connected with the hollow pier section 1 through the overturning clamping seats 10, and the inner construction platform is supported through the hollow pier section 1 to be fixed.
When upset cassette 10 was installed, upset cassette 10 was laid to every channel-section steel 41 tip on channel-section steel layer 4, and upset cassette 10 quantity is four, is provided with axis of rotation 11 between upset cassette 10 and the channel-section steel 41 in order to be connected, and then upset cassette 10 can be rotatory for channel-section steel 41 relatively.
Meanwhile, a torsional spring 12 is arranged at the switching position of the turnover clamping seat 10 and the inner construction platform, namely, the torsional spring 12 is sleeved on the rotating shaft 11, one end of the torsional spring 12 abuts against the inner wall of the channel steel 41, and the other end of the torsional spring abuts against the turnover clamping seat 10. Under the effect of torsional spring 12, upset cassette 10 tends to the horizontality all the time, and under this state, upset cassette 10 hugs closely channel-section steel 41 inner wall, and the outside level of extending of upset cassette 10 is outstanding in interior construction platform.
In order to realize being connected of upset cassette 10 and hollow section 1 of pier, pre-buried four draw-in grooves 13 that have at hollow section 1 inner wall of pier, draw-in groove 13 is hollow hexahedron groove structure, draw-in groove 13 adopts the steel to draw-in groove 13 one end opening, draw-in groove 13 open end is inside towards hollow section 1 of pier, so that upset cassette 10 gets into, upset cassette 10 and draw-in groove 13 one-to-one, upset cassette 10 cross-section is less than draw-in groove 13 cross-section.
The turnover clamping seat 10 is matched and clamped with the clamping groove 13, namely, one end of the turnover clamping seat 10 horizontally extends into the clamping groove 13 to be clamped with the clamping groove, and the inner construction platform is arranged in a suspended mode.
The utility model discloses the principle does: and manufacturing an inner construction platform according to the design specification of the hollow section 1 of the pier, wherein the inner construction platform is ensured to be matched with the hollow section 1 of the pier. The pre-buried draw-in groove 13 of the inner wall of the upper end of the pier hollow section 1 which is cast in advance, the inner construction platform is hoisted to the pier hollow section 1 by adopting hoisting equipment, the inner construction platform is kept in a suspended fixed state after the turnover clamping seat 10 is clamped into the draw-in groove 13, a constructor can stand on the inner construction platform to perform operations such as binding steel bars and supporting templates of the pier hollow section 1 of the next stage, the draw-in groove 13 needs to be pre-buried, and preparation is made for hoisting and lifting the inner construction platform again.
1 ligature reinforcing bar of pier hollow section in next stage, prop up and establish the template and pour the shaping after, when preparing to develop the pier hollow section 1 construction in next stage, continue to upwards hoist interior construction platform, the rotatory original draw-in groove 13 that breaks away from of upset cassette 10 this moment, under torsional spring 12 effect, upset cassette 10 tightly supports at 1 inner wall of pier hollow section, under the effect of four spacing gyro wheels 9, interior construction platform can be stable smooth rebound. And after the turnover clamping seat 10 meets the clamping groove 13 again, the turnover clamping seat is clamped with the clamping groove 13, the inner construction platform keeps a suspended fixed state again, and at the moment, constructors can carry out construction operation on the hollow pier segment 1 in the next stage.
Interior construction platform handling removes swiftly, also can realize stable unsettled fixed, can cooperate the creeping formwork to carry out the construction of efficient pier hollow section 1, improves the efficiency of construction.
The above-mentioned embodiments are merely preferred embodiments of the present invention, and not intended to limit the scope of the present invention, so that equivalent changes or modifications made by the structure, features and principles of the present invention should be included in the claims of the present invention.

Claims (5)

1. The creeping formwork construction platform comprises a hollow pier section (1) and is characterized by also comprising an inner construction platform, wherein the inner construction platform is arranged in the hollow pier section (1), the inner construction platform is a steel structure platform, and the inner construction platform is matched with the inner wall of the hollow pier section (1) and a gap is formed between the inner construction platform and the inner wall of the hollow pier section (1);
a plurality of lifting eye bolts (6) are detachably arranged above the inner construction platform, limiting idler wheels (9) are respectively arranged on the four sides of the inner construction platform, and the limiting idler wheels (9) are in contact with the inner wall of the hollow pier section (1) and roll along the inner wall of the hollow pier section (1);
a plurality of overturning clamping seats (10) are rotatably arranged below the inner construction platform, torsion springs (12) are arranged at the switching positions of the overturning clamping seats (10) and the inner construction platform so as to tend to keep the overturning clamping seats (10) horizontal, and the overturning clamping seats (10) extend outwards and protrude out of the inner construction platform;
a plurality of clamping grooves (13) are pre-buried in the inner wall of the hollow section (1) of the pier, the overturning clamping seats (10) correspond to the clamping grooves (13) one by one, and the overturning clamping seats (10) are matched and clamped with the clamping grooves (13) to enable the inner construction platform to be arranged in a suspended mode.
2. The creeping formwork construction platform according to claim 1, wherein the inner construction platform comprises a construction pedal (2), a square pipe layer (3) and a channel steel layer (4) which are sequentially arranged in an up-down stacked manner, and screws (5) are arranged among the construction pedal (2), the square pipe layer (3) and the channel steel layer (4) for connection;
construction footboard (2) are checkered plate, and there is the clearance at construction footboard (2) edge and hollow section of pier (1) inner wall, and lay construction footboard (2) below square tube layer (3), square tube layer (3) are the layer structure that many square tubes (31) that the interval laid constitute, and lay square tube layer (3) below channel-section steel layer (4), channel-section steel layer (4) are the layer structure that many channel-section steels (41) that the interval laid constitute, and the direction is perpendicular mutually in square tube (31) and channel-section steel (41) the laying direction.
3. The creeping formwork construction platform according to claim 2, wherein threaded sleeves (7) are arranged on two sides of each channel steel (41) of the channel steel layer (4), the threaded sleeves (7) penetrate through the channel steel (41), the upper ends of the threaded sleeves (7) extend upwards to be close to the bottom surface of the construction pedal (2), and trapezoidal rib plates (8) are arranged between the threaded sleeves (7) and the channel steel (41) for reinforcement;
the construction pedal (2) is provided with a through hole corresponding to the position of the threaded sleeve (7) for the eye bolt (6) to pass through, and the eye bolt (6) is in threaded connection with the threaded sleeve (7).
4. The creeping formwork construction platform according to claim 2, wherein the limiting rollers (9) are respectively arranged on the peripheral sides of the square pipe layers (3), and the limiting rollers (9) extend outwards and protrude out of the edge of the construction pedal (2) to contact with the inner wall of the hollow pier section (1).
5. The creeping formwork construction platform according to claim 2, wherein the turning clamping seat (10) is arranged at the end of each channel steel (41) of the channel steel layer (4), a rotating shaft (11) is arranged between the turning clamping seat (10) and the channel steel (41) for connection, a torsion spring (12) is sleeved on the rotating shaft (11), one end of the torsion spring (12) abuts against the inner wall of the channel steel (41), the other end of the torsion spring abuts against the turning clamping seat (10), and the turning clamping seat (10) is tightly attached to the inner wall of the channel steel (41);
draw-in groove (13) are hollow hexahedron groove structure, draw-in groove (13) one end opening, and inside draw-in groove (13) open end orientation pier hollow section (1), upset cassette (10) one end level stretched into in draw-in groove (13) rather than the joint, upset cassette (10) cross-section was less than draw-in groove (13) cross-section.
CN202223441352.XU 2022-12-22 2022-12-22 Creeping formwork construction platform Active CN218842903U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223441352.XU CN218842903U (en) 2022-12-22 2022-12-22 Creeping formwork construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223441352.XU CN218842903U (en) 2022-12-22 2022-12-22 Creeping formwork construction platform

Publications (1)

Publication Number Publication Date
CN218842903U true CN218842903U (en) 2023-04-11

Family

ID=87295131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223441352.XU Active CN218842903U (en) 2022-12-22 2022-12-22 Creeping formwork construction platform

Country Status (1)

Country Link
CN (1) CN218842903U (en)

Similar Documents

Publication Publication Date Title
CN100476076C (en) Mobile integral construction platform, construction method thereof and special sling for the same
JP2008150159A (en) Jib crane
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
CN111648585A (en) Construction method and device of suspended support type steel truss platform
JP2017048635A (en) Bridge disassembly method of using installation girder
CN103132702A (en) Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN108396749B (en) Installation system and installation method of steel support in foundation pit
CN218842903U (en) Creeping formwork construction platform
CN210855047U (en) Be suitable for transmission material between reverse construction method floor with small-size swing arm formula electric hoist
CN208870380U (en) Mobile device and removable wall form for wall form
CN216515141U (en) Novel cantilever construction creeping formwork device
CN115613478A (en) Continuous beam cantilever casting method
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN210767897U (en) Unit type curtain wall plate construction machine
CN210684485U (en) Steel arch frame dismantling device for deck box type arch bridge construction
CN209835463U (en) Prefabricated bridge deck hoisting equipment
CN110606439A (en) Be suitable for transmission material between reverse construction method floor with small-size swing arm formula electric hoist
CN220317265U (en) Fire control construction hoist device
CN115613477B (en) Main girder cantilever trackless triangular hanging basket and construction method
CN215107150U (en) Stiff beam pouring support structure
CN218145471U (en) Pile foundation reinforcement cage hoisting device for low space
CN212956170U (en) System for dismantling and replacing bridge deck structure of ultra-large span steel pipe concrete arch bridge
CN114263115B (en) Bridge deck construction device and method
CN221093460U (en) Nearby business line pile foundation construction removes gallows device
CN217104777U (en) Interim landing stage demolishs device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant