CN208870380U - Mobile device and removable wall form for wall form - Google Patents

Mobile device and removable wall form for wall form Download PDF

Info

Publication number
CN208870380U
CN208870380U CN201821368725.6U CN201821368725U CN208870380U CN 208870380 U CN208870380 U CN 208870380U CN 201821368725 U CN201821368725 U CN 201821368725U CN 208870380 U CN208870380 U CN 208870380U
Authority
CN
China
Prior art keywords
wall form
bracket
mobile device
connect
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821368725.6U
Other languages
Chinese (zh)
Inventor
卢健
金辉
李凤君
苏立宽
朱继军
宋涛
宫红杰
于波
袁志强
李聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BUCG NO 16 CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
BUCG NO 16 CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BUCG NO 16 CONSTRUCTION ENGINEERING Co Ltd filed Critical BUCG NO 16 CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201821368725.6U priority Critical patent/CN208870380U/en
Application granted granted Critical
Publication of CN208870380U publication Critical patent/CN208870380U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to technical field of buildings, more particularly, to a kind of mobile device for wall form and removable wall form.The mobile device for wall form, including bracket, walking mechanism and driving mechanism;For installing wall form, walking mechanism is connect bracket with bracket, and driving mechanism and walking mechanism are sequentially connected to drive walking mechanism to drive support motion.Work progress is enormously simplified, thus make construction speed block, it is high-efficient, it saves for the duration;And it is easy to operate to make to pour formwork, saves artificial, reduces construction personnel labour.

Description

Mobile device and removable wall form for wall form
Technical field
The utility model relates to technical field of buildings, more particularly, to a kind of mobile device for wall form and removable Dynamic wall form.
Background technique
After walls concrete pours, conventional concrete large formwork construction technique is using tower crane or truck crane Template is hung to construction site template storage space, after manual cleaning, brush are oily, to next flowing water section wall by equal vertical transportation machineries The binding of body reinforcing bar is completed, then is hung to next flowing water section by vertical transport equipment and is carried out template installation again;
Conventional construction method must be equipped with enough vertical transport equipments, and construction efficiency is slower, mechanical, the artificial, duration Input cost is more.
Utility model content
The purpose of this utility model is to provide for wall form mobile device and removable wall form, with solve Low, the at high cost technical problem of construction efficiency existing in the prior art.
The utility model provides the mobile device for being used for wall form, including bracket, walking mechanism and driving mechanism;Branch For installing wall form, walking mechanism is connect frame with bracket, and driving mechanism and walking mechanism are sequentially connected to drive vehicle with walking machine Structure drives support motion.
Further, bracket includes the first crossbearer and the first stand being oppositely arranged;The side of first crossbearer with one First stand connection, the other side is connect with another first stand;For installing wall form between two the first stands.
Further, bracket includes the second stand and the second crossbearer;Second crossbearer is connect with the top of the second stand, and The second stand is stretched out in the two sides of second crossbearer, and the two sides of the second stand of stretching of the second crossbearer are for installing wall form.
Further, bracket includes diagonal brace, at least two columns and multiple spreaders;Multiple spreaders are along the extension side of column To successively interval setting, two neighboring column and two neighboring spreader form a truss element, and one end of diagonal brace is connected to At first jiao of truss element, the other end is connected at second opposite with first jiao jiao of truss element.
Further, walking mechanism includes traveling wheel and for track on the support surface to be arranged, and traveling wheel is in track Interior movement.
Further, driving mechanism includes hoist engine, and one end of the wirerope of hoist engine is connect with bracket.
The utility model also provides a kind of removable wall form, including wall form and use provided by the utility model In the mobile device of wall form, wall form is mounted on the bracket in the mobile device for wall form.
Further, removable wall form further includes bracing means, and bracing means is connected to wall form and support Between face, to be reinforced to wall form.
Further, bracing means includes reinforcing to shore steel pipe, and the one end for shoring steel pipe is connect with bracket, and the other end is used for It is connect with supporting surface.
Further, bracing means further includes wirerope;One end of wirerope is connect with bracket, and is located at and is shored steel pipe Top, the other end of wirerope with supporting surface for connecting.
The utility model provides the mobile device for being used for wall form, including bracket, walking mechanism and driving mechanism;Branch For installing wall form, walking mechanism is connect frame with bracket, and driving mechanism and walking mechanism are sequentially connected to drive vehicle with walking machine Structure drives support motion.
During using the mobile device provided by the utility model for wall form, first wall form is mounted on On bracket, walking mechanism is driven by driving mechanism, to drive support motion, and then template is transported to specified construction location, Carry out pouring for wall.It avoids using vertical transportation machineries such as tower crane or truck cranes, so that tower crane and truck crane be avoided to construct The operation at scene reduces security risk, greatly reduces the investment of vertical transportation machinery;It avoids repeating sling wall form, tear open The process for unloading storage and transport, enormously simplifies work progress, thus make construction speed block, it is high-efficient, it saves for the duration;And And it is easy to operate to make to pour formwork, saves artificial, reduces construction personnel labour.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram for the mobile device for wall form that an embodiment of the present invention provides;
Fig. 2 is the structural schematic diagram of leveling structure in removable wall form shown in FIG. 1;
Fig. 3 is the structural schematic diagram for the mobile device for wall form that another embodiment of the utility model provides;
Fig. 4 is the structural schematic diagram of bracket in the mobile device shown in Fig. 3 for wall form;
Fig. 5 is the structural schematic diagram of walking mechanism in the mobile device shown in Fig. 3 for wall form;
Fig. 6 is the structural schematic diagram for the removable wall form that an embodiment of the present invention provides;
Fig. 7 is the structural schematic diagram for the removable wall form that another embodiment of the utility model provides;
Fig. 8 is the structural schematic diagram of bracing means in removable wall form shown in Fig. 7.
In figure: 10- bracket;20- walking mechanism;30- triangle leads support;40- bend reinforcement;50- bracing means;11- first Stand;The first crossbearer of 12-;The second stand of 13-;The second crossbearer of 14-;15- column;16- spreader;17- diagonal brace;21- traveling wheel; 22- track;51- shores steel pipe;52- wirerope;The first connecting cross beam of 121-;The first hanging beam of 122-;141- second connects cross Beam;The second hanging beam of 142-;100- wall form;200- is used for the mobile device of wall form.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
Fig. 1 is the main view for the mobile device for wall form that an embodiment of the present invention provides;Fig. 2 is Fig. 1 Shown in move wall form in leveling structure structural schematic diagram;Fig. 3 is the use that another embodiment of the utility model provides In the main view of the mobile device of wall form;Fig. 4 is the structure of bracket in the mobile device shown in Fig. 3 for wall form Schematic diagram;Fig. 5 is the structural schematic diagram of walking mechanism in the mobile device shown in Fig. 3 for wall form.
It should be noted that the template of wall includes pairs of template, pairs of template is oppositely arranged, the reinforcing bar binding of partition wall After good, pairs of template-setup clamps the reinforcing bar bound in the two sides of partition wall, then pours between two templates, with Form wall.Setting interval is needed between pairs of template, which needs to be arranged according to the thickness of wall.
As shown in Figures 1 to 6, the utility model provides the mobile device for being used for wall form 100, including bracket 10, row Walk mechanism 20 and driving mechanism;Bracket 10 is for installing wall form 100, and walking mechanism 20 is connect with bracket 10, driving machine Structure and walking mechanism 20 are sequentially connected to drive walking mechanism 20 that bracket 10 is driven to move.
During using the mobile device provided in this embodiment for wall form 100, first wall form 100 is pacified Dress drives walking mechanism 20 over the mount 10, by driving mechanism, so that bracket 10 be driven to move, and then template is transported to finger Determine construction location, carries out pouring for wall.The overall movement for realizing template is avoided using vertical transports such as tower crane or truck cranes Machinery reduces security risk, greatly reduces vertical transportation machinery to avoid the operation of tower crane and truck crane at the construction field (site) Investment;The process for avoiding repeating to sling wall form 100, dismantling storage and transport, enormously simplifies work progress, thus Make construction speed block, it is high-efficient, it saves for the duration;And it is easy to operate to make to pour formwork, saves artificial, reduces construction personnel's labor Power.
Wherein, the material of bracket 10 can be a variety of, such as: perhaps stone material etc. preferably uses iron or steel to timber Equal metals, intensity are high.
The structure type of bracket 10 can be a variety of, such as: bracket 10 includes pairs of riser, pairs of riser face setting, One in the pairs of template of wall is installed on one riser, set distance is provided between two risers (according to pouring walling The size of body is arranged);Or supporting plate includes multiple pairs of risers, multiple pairs of risers according to multiple partition walls in building it Between distance be configured, in this way can once to multiple walls carry out formwork.
As shown in Figure 4, it is preferable that bracket 10 includes diagonal brace 17, at least two columns 15 and multiple spreaders 16;It is multiple Spreader 16 is successively spaced setting along the extending direction of column 15, and two neighboring column 15 and two neighboring spreader 16 form one Truss element, one end of diagonal brace 17 are connected at first jiao of truss element, the other end be connected to truss element with first jiao At opposite second jiao, both with column 15 and the angled setting of spreader 16, to improve the intensity of truss element.That is Bracket 10 uses truss structure, and intensity is high, and light-weight, convenient transportation is moved easily.
Wherein, column 15 can use rhabodoid or column, preferably use steel square tube, such as 100 × 100 × 5mm Square tube, intensity can be protected, lighter in weight.
Spreader 16 can use rhabodoid or column, preferably use channel steel, e.g., double 10# channel steels, intensity can It is protected, and facilitates the later period that other structures component is installed.
Diagonal brace 17 can use rhabodoid or column, preferably use square tube, such as: 80 × 40 × 3 square tube intensity energy Access guarantee, lighter in weight.
The quantity of column 15 can be multiple for two, three or four etc., can be according to 100 degree of truss of wall form The quantity of intensity requirement setting column 15.
There are many structure types of walking mechanism 20 and driving mechanism, such as: walking mechanism 20 includes wheel, driving Mechanism includes motor, and motor is connect with wheel by transmission shaft driven, to drive vehicle wheel rotation, so that wheel be made to drive entire branch Frame 10 moves.
For another example: walking mechanism 20 include the electromagnet that the lower part of bracket 10 is set, setting guide rail on the ground and Magnet and propulsion coil on guide rail are set;Pass through the mutually exclusive work of the magnet on the electromagnet and guide rail on chassis With making walking mechanism suspend;Bracket is realized to the effect of the electric coil for the electromagnet being used to support on chassis by propulsion coil 10 propulsion;
For another example: walking mechanism 20 uses crawler type walking mechanism 20, and both walking mechanism 20 included Athey wheel and creeper tread, drives Motivation structure includes motor and the drive sprocket that connect with motor drive.
As shown in Figure 1, further, bracket 10 is including the first crossbearer 12 and relatively on above-described embodiment basis The first stand 11 being arranged;The side of first crossbearer 12 is connect with first stand 11, the other side and another first stand 11 connections;For installing wall form 100 between two the first stands 11.
In the present embodiment, the side of the first crossbearer 12 is connect with first stand 11, and the other side and another stand connect It connects, the first crossbearer 12 and two the first stands 11 form portal support 10, and the pairs of template of wall is mounted on two first Between column 15.The convenient partition wall positioned at outside in building of portal support 10 carries out, the pairs of template of fixed wall, It is then simple for the mobile device structure of wall form 100, it is small in size, it is moved easily.
Wherein it is possible to template is fixed in the first stand 11 by wirerope 52 or rebar connector etc., preferably It is to hang on the first crossbearer 12, the upper end of template directly can be hung over into the first crossbearer 12 by welding or threaded connection etc. On, it is preferably connect, the first column 15 can be arranged so higher by one with the first crossbearer 12 by connector such as connecting rod etc. It is conveniently transported at walling body to be poured a bit, it can be more convenient by the length of adjusting connector come the mounting height of adjusting template It uses.
First crossbearer 12 may include the first connecting cross beam 121 for connecting the first stand 11, further include for lifting First hanging beam 122 of wall form 100, the first connecting cross beam 121 are from top to bottom arranged along the vertical direction with the first hanging beam 122, First connecting cross beam 121 can be using double 10# channel steels;First hanging beam 122 can be using double 14# channel steels.
Fixed diagonal brace 17 is set among first connecting cross beam 121 and the first hanging beam 122 to reinforce 121 He of the first connecting cross beam The intensity of first hanging beam 122.
As shown in Fig. 2, in order to ensure that its movement is steady, formwork is stablized, and has under bracket 10 when bracket 10 is gate-type truss Triangle leads support 30, when the traveling wheel 21 of guide rail and movement in guide rail of 20 treasure-house of walking mechanism setting on the support surface, needs To be used to levelling by welding bend reinforcement 40 on leading support, then track 22 be fallen on reinforcing bar.
As shown in figure 3, bracket 10 includes the second stand 13 and the second crossbearer 14;Second crossbearer 14 and the second stand 13 Top connection, and the second stand 13, the two sides of the second stand of stretching 13 of the second crossbearer 14 are stretched out in the two sides of the second crossbearer 14 For installing wall form 100.
In the present embodiment, the second crossbearer 14 and the second stand 13 form T-type bracket 10, install twice in the two sides of T shape frame The pairs of template of wall installs a pairs of template in the side of the second column 15, installs another in the other side of column 15 Pairs of template, so as to carry out formwork simultaneously to two partition walls positioned at middle section in building, so as into one Step improves construction efficiency.
Wherein it is possible to directly the upper end of template be hung on the second crossbearer 14 by welding or threaded connection etc., preferably Ground is connect by connector such as connecting rod etc. with the second crossbearer 14, the second column 15 can be arranged somewhat higher facilitate fortune in this way It, can be more convenient to use by the length of adjusting connector come the mounting height of adjusting template at walling body to be poured.
Second crossbearer 14 may include the second connecting cross beam 141 for connecting the second stand 13, further include for lifting Second hanging beam 142 of wall form 100, the second connecting cross beam 141 are from top to bottom arranged along the vertical direction with the second hanging beam 142, Second connecting cross beam 141 can be using double 10# channel steels;Second hanging beam 142 can be using double 14# channel steels.
Fixed diagonal brace 17 is set among second connecting cross beam 141 and the second hanging beam 142 to reinforce 141 He of the second connecting cross beam The intensity of second hanging beam 142.
As shown in figure 5, further, further, walking mechanism 20 includes traveling wheel on above-described embodiment basis 21 and for track 22 on the support surface to be arranged, traveling wheel 21 moves in track 22.
In the present embodiment, walking mechanism 20 uses traveling wheel 21 and guide rail, and traveling wheel 21 moves in guide rail, can be with Keep entire mobile device movement steady, skew is avoided to influence mobile efficiency.The structure of traveling wheel 21 is simple, easy to install, at low cost.
Wherein, traveling wheel 21 can be air filled tyre, preferably use tank wheel, steadily.
Traveling wheel 21 can be driven by motor or hydraulic motor.Preferably, driving mechanism includes hoist engine, hoist engine One end of wirerope 52 connect with bracket 10, bracket 10 is pulled by hoist engine, so that traveling wheel 21 be driven to move, Jin Ershi Mobile device walking movement, it is at low cost, it is easy to control.
Fig. 6 is the structural schematic diagram for the removable wall form that an embodiment of the present invention provides;Fig. 7 is that this is practical new The structural schematic diagram for the removable wall form that the another embodiment of type provides;Fig. 8 is to add in removable wall form shown in Fig. 7 It is fixedly mounted with the structural schematic diagram set.
The utility model also provides a kind of 100 device of removable wall form, including wall form 100 and this is practical new The mobile device for wall form 100 that type provides, wall form 100 are mounted on the mobile device for wall form 100 In bracket 10 on.
During using removable 100 device of wall form provided in this embodiment, is driven and walked by driving mechanism Template so that bracket 10 be driven to move, and then is transported to specified construction location, carries out pouring for wall by mechanism 20.Realize mould The overall movement of plate is avoided using vertical transportation machineries such as tower crane or truck cranes, to avoid tower crane and truck crane existing in construction The operation of field reduces security risk, greatly reduces the investment of vertical transportation machinery;It avoids repeating sling wall form 100, tear open The process for unloading storage and transport, enormously simplifies work progress, thus make construction speed block, it is high-efficient, it saves for the duration;And And it is easy to operate to make to pour formwork, saves artificial, reduces construction personnel labour.
Wherein, different according to the form of the bracket 10 in the mobile device for wall form 100, move wall form The form of 100 devices is different.
As shown in fig. 7, moving 100 device of wall form is the mobile dress of gate-type when bracket 10 is portal support 10 It sets.Portal support 10 includes the first crossbearer 12 and the first stand 11 being oppositely arranged;The side of first crossbearer 12 with one the One stand 11 connection, the other side is connect with another first stand 11;Two the first stands 11, wall form 100 are mounted on two Between a first column 15.
When bracket 10 is T shape bracket 10, moving 100 device of wall form is T shape mobile device.T shape bracket 10 wraps Include the second stand 13 and the second crossbearer 14;Second crossbearer 14 is connect with the top of the second stand 13, and the two of the second crossbearer 14 The second stand 13 is stretched out in side, and the two sides of the second stand of stretching 13 of the second crossbearer 14 are for installing wall form 100.Wall Template 100 is mounted on the two sides of the second column 15.
The setting form of wall form 100 can be a variety of, such as: the entirety of template can be set according to the size of partition wall The installation of monolith template over the mount 10, or by template is divided into multiple points of templates, multiple points of templates is hung over one by one by size On bracket 10.
Such as: each flowing water section matches 3 groups of template movement brackets 10, and every group of length 6500mm, each column 15 is down with a set of smooth Gram wheel, tank wheel walk on track 22, track 22 be the mono- channel steel of 20#.Every group of mobile bracket 10 is close to one side mounting 3 of metope Block template, template size are 2440 × 7450mm.
As shown in figure 8, further, removable 100 device of wall form further includes adding on above-described embodiment basis It is fixedly mounted with and sets 50, bracing means 50 is connected between wall form 100 and supporting surface, to reinforce to wall form 100.
In the present embodiment, bracing means 50 avoids wall form 100 crooked, topples over, to ensure to wall form 100 The pouring quality of wall.
Wherein, the structure type of bracing means 50 can be a variety of, such as: bracing means 50 includes in triangular shape shape Gusset.
Alternatively, bracing means 50 includes reinforcing to shore steel pipe 51, the one end for shoring steel pipe 51 is connect with bracket 10, the other end For being connect with supporting surface.
Or bracing means 50 further includes wirerope 52;One end of wirerope 52 is connect with bracket 10, and is located at and is shored The top of steel pipe, the other end of wirerope 52 with supporting surface for connecting.
Preferably, bracing means 50 had not only included shoring steel pipe 51 admittedly but also had included wirerope 52, it can either be to wall form 100 Be supported, and drawknot can be carried out to wall form 100, thus to the more firm stabilization of the reinforcing of wall form 100, more added with Operation is poured conducive to the later period.
It specifically, can be on the support surface such as the U steel bar of the pre-buried HRB400 diameter 25mm in floor, U-shaped steel muscle and bottom plate Muscle is welded to connect, away from being shored plate top surface 2250mm and 3600mm at using diameter 48mm steel pipe, away from plate top surface 4950mm and 52 drawknot of diameter 6mm wirerope is used at 7200mm, wirerope 52 is longitudinally arranged spacing 5000mm, and steel pipe is longitudinally arranged spacing 1500mm。
On above-described embodiment basis, further, takes action, can be being propped up over the mount 10 in order to facilitate construction personnel Builder's jack, tripod are set on frame 10;Or upper people's steel ladder is set between adjacent two layers truss element;Or over the mount 10 It is laid with springboard etc..
Specifically, following steps can be used, removable 100 device of wall form are installed: by drawing positioning complete track 22 → Tank wheel and bottom linker → successively install square tube column 15, channel steel, spreader 16 and diagonal brace 17 are installed, install people's steel ladder, Be laid with large form that springboard → installation top crossbearer and 17 → installation template of diagonal brace traveling wheel 21 → lifting have been spelled in place → install Moving device and builder's jack → truss installa-tion finish afterwards.
It can be such that and pour using the sequence that removable 100 device of wall form provided in this embodiment is constructed The one flowing water section mid-board concrete → next flowing water section mid-board reinforcing bar of binding → dismounting reinforcing bar binds crosshead → laying track 22 → being molded afterwards in place with elevator machine travel truss movement → truss → pour this flowing water section internal partition wall concrete.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of mobile device for wall form characterized by comprising bracket and walking mechanism and driving machine Structure;
For installing wall form, the walking mechanism is connect the bracket with the bracket, the driving mechanism and the row Mechanism driving connection is walked to drive the walking mechanism to drive the support motion.
2. the mobile device according to claim 1 for wall form, which is characterized in that the bracket includes first horizontal Frame and the first stand being oppositely arranged;The side of first crossbearer is connect with first stand, the other side and another One the first stand connection;For installing wall form between two first stands.
3. the mobile device according to claim 1 for wall form, which is characterized in that the bracket includes second vertical Frame and the second crossbearer;Second crossbearer is connect with the top of second stand, and the two sides of second crossbearer are stretched Second stand out, the two sides of stretching second stand of second crossbearer are for installing wall form.
4. the mobile device according to any one of claim 1-3 for wall form, which is characterized in that the bracket Including diagonal brace, at least two columns and multiple spreaders;
Multiple spreaders are successively spaced setting along the extending direction of the column, the two neighboring column and two neighboring The spreader forms a truss element, and one end of the diagonal brace is connected at first jiao of the truss element, and the other end connects Connect the truss element at first jiao of opposite second jiao.
5. the mobile device according to claim 1 for wall form, which is characterized in that the walking mechanism includes row It walks wheel and for track on the support surface to be arranged, the traveling wheel is in the move in tracks.
6. the mobile device according to claim 1 for wall form, which is characterized in that the driving mechanism includes volume Machine is raised, one end of the wirerope of the hoist engine is connect with the bracket.
7. a kind of removable wall form, which is characterized in that including wall form and as described in any one of claim 1-6 The mobile device for wall form, the wall form is mounted on the bracket in the mobile device for wall form On.
8. removable wall form according to claim 7, which is characterized in that it further include bracing means, the reinforcing dress It sets and is connected between the wall form and supporting surface, to be reinforced to the wall form.
9. removable wall form according to claim 8, which is characterized in that the bracing means includes reinforcing to shore steel Pipe, described one end for shoring steel pipe are connect with the bracket, and the other end with supporting surface for connecting.
10. removable wall form according to claim 9, which is characterized in that the bracing means further includes wirerope; One end of the wirerope is connect with the bracket, and is located at the top for shoring steel pipe, and the other end of the wirerope is used It is connect in supporting surface.
CN201821368725.6U 2018-08-23 2018-08-23 Mobile device and removable wall form for wall form Active CN208870380U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821368725.6U CN208870380U (en) 2018-08-23 2018-08-23 Mobile device and removable wall form for wall form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821368725.6U CN208870380U (en) 2018-08-23 2018-08-23 Mobile device and removable wall form for wall form

Publications (1)

Publication Number Publication Date
CN208870380U true CN208870380U (en) 2019-05-17

Family

ID=66465550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821368725.6U Active CN208870380U (en) 2018-08-23 2018-08-23 Mobile device and removable wall form for wall form

Country Status (1)

Country Link
CN (1) CN208870380U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952146A (en) * 2018-08-23 2018-12-07 北京城建十六建筑工程有限责任公司 Mobile device and removable wall form for wall form
CN111779253A (en) * 2020-07-17 2020-10-16 中国十九冶集团有限公司 Movable scaffold suitable for wall monitoring construction and wall monitoring construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952146A (en) * 2018-08-23 2018-12-07 北京城建十六建筑工程有限责任公司 Mobile device and removable wall form for wall form
CN111779253A (en) * 2020-07-17 2020-10-16 中国十九冶集团有限公司 Movable scaffold suitable for wall monitoring construction and wall monitoring construction method

Similar Documents

Publication Publication Date Title
CN104533460B (en) Support replacement formula formwork jumbo and the construction method of underpass concreting
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN106013233A (en) Slippage system used for underground pipe rack cast-in-place construction and construction method of slippage system
CN102042021A (en) Automatically walking stepped mobile trestle
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN106012717B (en) One kind is vibrated apparatus for leveling
KR20060112504A (en) Downward construction system and method for 1-way girder and slab of underground structure
CN208870380U (en) Mobile device and removable wall form for wall form
CN113235472A (en) Concrete placement platform truck is contained to apron
CN107201719A (en) Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method
CN108824199A (en) The Arch Bridge Construction method of underneath type Hanging Basket
CN109355983B (en) Trackless construction method for urban rail
CN107829370A (en) High pier is from climbing liquid press to turn over molds construction technology
JP2006028881A (en) Self-propelled pc floor slab erecting machine and pc floor slab erecting method
CN205638491U (en) Multi -functional platform truck
CN110700418B (en) Construction process for mounting laminated slab by matching laminated slab mounting trolley with tower crane
CN110846955A (en) Tunnel track laying machine and hydraulic cylinder support arm for track laying machine
JP5292019B2 (en) Pile construction device and cast-in-place concrete pile construction method
CN106639303A (en) Hydraulic climbing formwork frame special for lift
CN108952146A (en) Mobile device and removable wall form for wall form
CN208778013U (en) Collapsible tunnel anchor-section lining trolley
CN201962596U (en) Movable support device
CN201963311U (en) Automatic-marching type movable scaffoldbridge
CN110258359A (en) The And of Varying Depth girder steel construction method of rack construction is pushed away by hanging
JPH0390777A (en) Concrete placement method and device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant