CN218779945U - Building channel steel hole shutoff mould - Google Patents
Building channel steel hole shutoff mould Download PDFInfo
- Publication number
- CN218779945U CN218779945U CN202223006946.8U CN202223006946U CN218779945U CN 218779945 U CN218779945 U CN 218779945U CN 202223006946 U CN202223006946 U CN 202223006946U CN 218779945 U CN218779945 U CN 218779945U
- Authority
- CN
- China
- Prior art keywords
- baffle
- curb plate
- plate
- plate body
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a building groove steel hole shutoff mould belongs to shutoff mould technical field, including first baffle, a lateral symmetry of first baffle is equipped with first curb plate and second curb plate, rotates between first curb plate and the second curb plate to install the second baffle of mutually supporting with first baffle. The utility model discloses a first curb plate, the second curb plate, locking mechanism, second baffle and locking screw's setting, can rotate the second baffle that is located between first curb plate and the second curb plate when using, make and form the contained angle between second baffle and the wall, conveniently carry out the shutoff of pouring in channel steel hole, then the position through the fixed second baffle of locking screw, can pour shutoff work, when concrete placement finishes, unscrew locking screw then rotate the second baffle and make the second baffle tightly paste the wall, unnecessary concrete is extruded this moment, prevent that shutoff position concrete from solidifying the back and being higher than the wall.
Description
Technical Field
The utility model relates to a shutoff mould especially relates to a building channel-section steel hole shutoff mould, belongs to shutoff mould technical field.
Background
When the building channel steel hole is plugged, the interior of the channel steel hole is cleaned firstly, then a plugging die and concrete are used for pouring and plugging, the die is removed after the concrete is solidified, if the plugging position is higher than the wall surface, the excessive parts are polished and cleaned until the excessive parts are level to the wall surface, the simple channel steel hole plugging die disclosed in the application with the application number of CN202122165660.3 comprises a precast concrete pull plate and a reinforcing rod arranged on the precast concrete pull plate, the reinforcing rod is a section of steel bar rod, one end of the rod body is provided with an anti-pulling cap, the anti-pulling cap is a round steel plate, the plate and the reinforcing rod are fixedly welded, and the other end of the reinforcing rod is provided with an external thread structure; through setting up precast concrete pull plate, the anchor strut, pour structures such as mould, thereby form through its position department combination in the channel steel hole of building the wall body and pour the chamber, thereby come to the channel steel hole on the building wall body to bury through concreting among its cavity, it is better compared in the effect that traditional directly used fine stone concrete stifled hole, and can insert its plain jolt to the concrete in pouring the mouth through the concrete vibrting spear after pouring, thereby improve its hole sealing effect, thereby effectively avoid its position department of sealing to appear rainwater seepage phenomenon. But the concrete of more outstanding wall can be stayed in above-mentioned application when using, still need cut the operation to the concrete part of outstanding wall in the later stage, comparatively wastes time and energy.
Concrete to more outstanding wall can be preserved to current mould when using, still need cut the operation to the concrete part of outstanding wall in the later stage, problem comparatively wasting time and energy, the utility model provides a new solution.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main objective is in order to solve prior art not enough, and the building channel-section steel hole shutoff mould that provides.
The purpose of the utility model can be achieved by adopting the following technical scheme:
the utility model provides a building channel-section steel hole shutoff mould, includes first baffle, a lateral symmetry of first baffle is equipped with first curb plate and second curb plate, first curb plate with rotate between the second curb plate install with the second baffle of first baffle mutually supporting, first baffle with through locking mechanism interconnect between the second baffle, first curb plate with the equal threaded connection in top of second curb plate is used for locking the locking screw of second baffle position.
Preferably, the first side plate and the second side plate both comprise a first plate body, and a sliding groove is formed in the front face of the first plate body.
Preferably, a first through hole formed in the first plate body is formed below the sliding groove.
Preferably, the second baffle comprises a second plate body, and a second through hole matched with the locking mechanism is formed in the middle of the second plate body.
Preferably, two first rotating shafts are symmetrically arranged on two sides of the second plate body.
Preferably, a second rotating shaft fixedly connected to the second plate body is arranged below each of the two first rotating shafts.
Preferably, the locking mechanism includes a stud extending through the first and second shutters.
Preferably, one end of the stud is fixedly connected with a limiting piece.
Preferably, the outer side of the stud is in threaded connection with a nut.
Preferably, one side of the nut is provided with a gasket movably arranged on the outer side of the stud.
The utility model has the advantages of: according to the utility model discloses a building channel-section steel hole shutoff mould, through the setting of first curb plate, second curb plate, locking mechanism, second baffle and locking screw, can rotate when using to be located first curb plate with second baffle between the second curb plate makes and forms the contained angle between second baffle and the wall, conveniently carries out the shutoff of pouring in channel-section steel hole, then passes through the position of the fixed second baffle of locking screw, can pour the shutoff work, when concrete placement ended, unscrew locking screw then rotate the second baffle and make the second baffle tightly paste the wall, unnecessary concrete was extruded this moment, is higher than the wall after preventing that shutoff position concrete from solidifying.
Drawings
Fig. 1 is a schematic overall structure diagram of a preferred embodiment according to the present invention;
fig. 2 is a cross-sectional view of a preferred embodiment according to the present invention;
fig. 3 is a schematic structural view of a second plate according to a preferred embodiment of the present invention;
fig. 4 is a schematic structural view of a first plate according to a preferred embodiment of the present invention;
fig. 5 is a schematic view of a screw structure according to a preferred embodiment of the present invention;
fig. 6 is an enlarged view of the structure at a in fig. 1 according to a preferred embodiment of the present invention.
In the figure: 1. a first baffle; 2. a first side plate; 3. a second side plate; 4. a locking mechanism; 5. a second baffle; 6. locking the screw; 201. a first plate body; 202. a sliding groove; 203. a first through hole; 401. a stud; 402. a limiting sheet; 403. a nut; 404. a gasket; 501. a second plate body; 502. a first rotating shaft; 503. a second through hole; 504. a second rotating shaft.
Detailed Description
In order to make the technical solutions of the present invention clearer and clearer for those skilled in the art, the present invention is further described in detail below with reference to the following examples and drawings, but the embodiments of the present invention are not limited thereto.
As shown in fig. 1-6, the building channel steel hole plugging die provided in this embodiment includes a first baffle 1, a first side plate 2 and a second side plate 3 are symmetrically arranged on one side of the first baffle 1, a second baffle 5 mutually matched with the first baffle 1 is rotatably installed between the first side plate 2 and the second side plate 3, the first baffle 1 and the second baffle 5 are mutually connected through a locking mechanism 4, and locking screws 6 for locking the positions of the second baffle 5 are respectively in threaded connection with the tops of the first side plate 2 and the second side plate 3. Through first curb plate 2, second curb plate 3, locking mechanism 4, the setting of second baffle 5 and locking screw 6, can rotate the second baffle 5 that is located between first curb plate 2 and the second curb plate 3 when using, make and form the contained angle between second baffle 5 and the wall, conveniently carry out the shutoff of pouring in channel steel hole, then the position through locking screw 6 fixed second baffle 5, can pour the shutoff work, when concrete placement finishes, unscrew locking screw 6 then rotate second baffle 5 and make second baffle 5 hug closely the wall, unnecessary concrete this moment is extruded, prevent that the shutoff position concrete from solidifying the back and being higher than the wall.
The first side plate 2 and the second side plate 3 both include a first plate body 201, a sliding groove 202 is provided on the front surface of the first plate body 201, and a first through hole 203 provided on the first plate body 201 is provided below the sliding groove 202. The second baffle 5 can be conveniently and rotatably mounted through the arrangement of the sliding groove 202 and the first through hole 203.
The second baffle 5 comprises a second plate 501, and a second through hole 503 matched with the locking mechanism 4 is formed in the middle of the second plate 501. Through the setting of second through-hole 503, can make things convenient for double-screw bolt 401 to run through second plate body 501, and do not influence the rotation of second plate body 501.
Two first rotating shafts 502 are symmetrically installed on two sides of the second plate body 501, and second rotating shafts 504 fixedly connected to the second plate body 501 are arranged below the two first rotating shafts 502. Through the setting of first pivot 502 and second pivot 504, can conveniently cooperate sliding tray 202 and first through-hole 203 to use, can make the second plate body 501 use second pivot 504 to rotate as the center, cooperate sliding tray 202 and first pivot 502 simultaneously, can lead to and spacing when the second plate body 501 rotates.
The locking mechanism 4 comprises a stud 401 penetrating through the first baffle 1 and the second baffle 5, one end of the stud 401 is fixedly connected with a limiting piece 402, and the outer side of the stud 401 is in threaded connection with a nut 403. The first baffle 1 and the second through hole 503 can be conveniently fixed by the arrangement of the nut 403 and the stud 401.
A washer 404 is disposed on one side of the nut 403 and sleeved outside the stud 401. By the arrangement of the gasket 404, the concrete inside the channel steel hole can be prevented from leaking through the second through hole 503.
In this embodiment, as shown in fig. 1 to fig. 6, the working process of the building channel hole plugging mold provided in this embodiment is as follows:
step 1: when the wall body groove steel hole blocking device is used, the first baffle plate 1 is arranged on the outer side of a wall body groove steel hole, the first side plate 2, the second side plate 3 and the second baffle plate 5 are arranged on the inner side of the wall body groove steel hole, the second baffle plate 5 positioned between the first side plate 2 and the second side plate 3 is rotated, an included angle is formed between the second baffle plate 5 and the wall surface, the groove steel hole can be conveniently poured and blocked, and then the position of the second baffle plate 5 is fixed through the locking screw 6;
step 2: the nut 403 is rotated to enable the gasket 404 to abut against the locking screw 6, so that the bottom ends of the first side plate 2, the second side plate 3 and the locking screw 6 are tightly attached to the wall surface, the pouring and blocking work can be carried out, when the concrete pouring is finished, the locking screw 6 is unscrewed, then the second baffle 5 is rotated to enable the second baffle 5 to be tightly attached to the wall surface, at the moment, redundant concrete is extruded, and the nut 403 is rotated to abut against the locking screw 6 through the gasket 404 to prevent the unset concrete in the channel steel hole from leaking.
The above description is only a further embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, and any person skilled in the art can replace or change the technical solution and the concept of the present invention within the scope of the present invention.
Claims (10)
1. The utility model provides a building channel-section steel hole shutoff mould, includes first baffle (1), its characterized in that, a lateral symmetry of first baffle (1) is equipped with first curb plate (2) and second curb plate (3), first curb plate (2) with rotate between second curb plate (3) install with second baffle (5) that first baffle (1) was mutually supported, first baffle (1) with through locking mechanism (4) interconnect between second baffle (5), first curb plate (2) with the equal threaded connection in top of second curb plate (3) is used for the locking screw (6) of second baffle (5) position.
2. The plugging die for the channel steel hole of the building according to claim 1, wherein the first side plate (2) and the second side plate (3) comprise a first plate body (201), and a sliding groove (202) is formed in the front face of the first plate body (201).
3. The building channel hole plugging die as claimed in claim 2, wherein a first through hole (203) formed in the first plate body (201) is arranged below the sliding groove (202).
4. The building channel steel hole plugging die as claimed in claim 1, wherein the second baffle (5) comprises a second plate body (501), and a second through hole (503) matched with the locking mechanism (4) is formed in the middle of the second plate body (501).
5. The building channel hole plugging die as claimed in claim 4, wherein two first rotating shafts (502) are symmetrically arranged on two sides of the second plate body (501).
6. The building channel hole plugging die as claimed in claim 5, wherein a second rotating shaft (504) fixedly connected to the second plate body (501) is arranged below each of the two first rotating shafts (502).
7. A building channel hole plugging die according to claim 1, wherein said locking mechanism (4) comprises a stud (401) penetrating said first (1) and said second (5) shutters.
8. The building channel hole plugging die according to claim 7, wherein one end of the stud (401) is fixedly connected with a limiting piece (402).
9. A building channel hole blocking mould according to claim 8, characterized in that a nut (403) is screwed on the outer side of the stud (401).
10. The building channel hole plugging die as claimed in claim 9, wherein a washer (404) movably mounted on the outer side of the stud (401) is arranged on one side of the nut (403).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223006946.8U CN218779945U (en) | 2022-11-11 | 2022-11-11 | Building channel steel hole shutoff mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223006946.8U CN218779945U (en) | 2022-11-11 | 2022-11-11 | Building channel steel hole shutoff mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218779945U true CN218779945U (en) | 2023-03-31 |
Family
ID=85715553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223006946.8U Active CN218779945U (en) | 2022-11-11 | 2022-11-11 | Building channel steel hole shutoff mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218779945U (en) |
-
2022
- 2022-11-11 CN CN202223006946.8U patent/CN218779945U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112412024B (en) | Special-shaped aluminum alloy template applied to construction of window water retaining platform | |
CN213683198U (en) | Pay-off hole mold sealing device capable of being circulated | |
CN218779945U (en) | Building channel steel hole shutoff mould | |
CN108240110A (en) | Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue and its method | |
CN220889178U (en) | Assembled combined prefabricated column | |
CN207608925U (en) | Piping lane box type telescopic internal model | |
CN109826117A (en) | Electronic sliding formwork integrally leads to without pull rod contains wall formwork for placing trolley | |
CN211286620U (en) | Constructional column template structure | |
CN212714939U (en) | Bored concrete pile convenient to demolish pile head | |
CN211396640U (en) | Building template opposite-pulling device | |
CN212053788U (en) | Novel concrete pumping device | |
CN207296415U (en) | A kind of push mode stripper apparatus | |
CN217301629U (en) | Prevent switch that ends of concrete car pump line overflow concrete | |
CN213683206U (en) | Template mounting structure for building construction | |
CN221627663U (en) | Filling wall constructional column pouring device | |
CN219754044U (en) | Concrete pump discharge port controller | |
CN211499820U (en) | Post-cast concrete column pouring and tamping opening device and pouring system | |
CN218659680U (en) | Aerated block wall body constructional column template | |
CN220414854U (en) | Construction device for pouring reserved waterproof bench on windowsill roof | |
CN214981985U (en) | Prevent prefabricated case roof beam template of centre form come-up | |
CN213015387U (en) | Reinforcing steel bar grillage for indoor building construction | |
CN211974349U (en) | Template fastening device for controlling concrete protective layer | |
CN215715560U (en) | City beautifies with preventing stifled type well lid | |
CN221742117U (en) | Pouring device for production of pore canal slurry pressing | |
CN214833778U (en) | Wallboard mould in prefabricated component of assembled building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |