CN108240110A - Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue and its method - Google Patents

Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue and its method Download PDF

Info

Publication number
CN108240110A
CN108240110A CN201810027944.6A CN201810027944A CN108240110A CN 108240110 A CN108240110 A CN 108240110A CN 201810027944 A CN201810027944 A CN 201810027944A CN 108240110 A CN108240110 A CN 108240110A
Authority
CN
China
Prior art keywords
plate
shear wall
reserved opening
outrigger
side plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810027944.6A
Other languages
Chinese (zh)
Inventor
韩鹏
孔繁聪
唐群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGHUA CONSTRUCTION Co Ltd OF YANKUANG GROUP
Original Assignee
DONGHUA CONSTRUCTION Co Ltd OF YANKUANG GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGHUA CONSTRUCTION Co Ltd OF YANKUANG GROUP filed Critical DONGHUA CONSTRUCTION Co Ltd OF YANKUANG GROUP
Priority to CN201810027944.6A priority Critical patent/CN108240110A/en
Publication of CN108240110A publication Critical patent/CN108240110A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00—Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06—Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to a kind of outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue and its methods.The existing outrigger easy falling object from high altitude of shear wall reserved opening blocking technology, this outrigger shear wall reserved opening forming composition template, including inner template, exterior sheathing, two perpendicular side plates, top plate and support plate, inner template, opposite square breach are provided on exterior sheathing, the horizontal width of the square breach of inner template is more than the horizontal width of the square breach of exterior sheathing, each perpendicular side plate is by foreboard, middle plate and back plate composition, front and rear panels are parallel, intersect on the outside of middle plate with back plate leading vertical, it intersects vertically on the inside of middle plate with foreboard rear, the top plate is projected in the horizontal plane in convex shape.The present invention also relates to corresponding shear wall, reserved opening sprue and its method, and the present invention has the advantages of easy to use, to prevent falling object from high altitude, and the builder's jack of various buildings is suitble to use.

Description

挑梁用剪力墙预留洞口成形组合模板、剪力墙、预留洞口堵块 及其方法Shear wall reserved openings for cantilever beam forming combined formwork, shear walls, reserved openings blocking blocks and its methods

技术领域technical field

本发明涉及一种挑梁用剪力墙预留洞口成形组合模板、剪力墙、预留洞口堵块及其方法。The invention relates to a combined template for forming a reserved opening of a shear wall for cantilever beams, a shear wall, a blocking block for a reserved opening and a method thereof.

背景技术Background technique

高层剪力墙结构的悬挑脚手架一般采用悬挑工字钢作为脚手架的支撑基础,在悬挑层剪力墙施工时要预留悬挑工字钢洞口,待脚手架、工字钢拆除后,洞口需要重新支模浇筑混凝土,外侧模板安装非常麻烦,很容易导致高空坠物。The cantilevered scaffolding of the high-rise shear wall structure generally adopts the cantilevered I-beam as the supporting foundation of the scaffold. When the cantilevered layer shear wall is constructed, the cantilevered I-beam hole should be reserved. After the scaffold and the I-beam are removed, The opening needs to be re-formed to pour concrete, and the installation of the outer formwork is very troublesome, which can easily lead to falling objects.

发明内容Contents of the invention

本发明要解决的技术问题是如何克服现有技术的上述缺陷,提供一种挑梁用剪力墙预留洞口成形组合模板、剪力墙、预留洞口堵块及其方法。The technical problem to be solved by the present invention is how to overcome the above-mentioned defects of the prior art, and provide a combination formwork for forming a shear wall with a reserved opening for cantilever beams, a shear wall, a reserved opening block and a method thereof.

为解决上述技术问题,本挑梁用剪力墙预留洞口成形组合模板,包括内模板、外模板、两个竖侧板、顶板和支撑板,内模板、外模板上开有相对的方形缺口,所述顶板前后两端上表面分别贴在两个方形缺口的上沿上,顶板左右两侧分别压在两个竖侧板的上沿上,两个竖侧板前后分别贴靠方形缺口的侧壁上,支撑板平行于顶板,其左右两端分别抵在两个竖侧板的内侧面上,其特征在于:内模板的方形缺口的水平宽度大于外模板的方形缺口的水平宽度,每个竖侧板由前板、中板和后板组成,前板和后板平行,中板外侧与后板前缘垂直相交,中板内侧与前板后缘垂直相交,所述顶板在水平面上投影呈凸字形。其使用方法如下:In order to solve the above-mentioned technical problems, the shear wall for the cantilever is used to reserve a hole forming combination formwork, including an inner formwork, an outer formwork, two vertical side plates, a roof plate and a support plate, and there are opposite square gaps on the inner formwork and the outer formwork The upper surfaces of the front and rear ends of the top plate are respectively attached to the upper edges of the two square notches, the left and right sides of the top plate are respectively pressed on the upper edges of the two vertical side plates, and the front and rear of the two vertical side plates are respectively attached to the upper edges of the square notches. On the side wall, the support plate is parallel to the top plate, and its left and right ends respectively abut against the inner surfaces of the two vertical side plates. A vertical side panel is composed of a front panel, a middle panel and a rear panel, the front panel and the rear panel are parallel, the outer side of the middle panel is vertically intersected with the front edge of the rear panel, the inner side of the middle panel is vertically intersected with the rear edge of the front panel, and the top panel is projected on a horizontal plane Convex shape. Its usage is as follows:

a.先将内模板和外模板固定好,使其方形缺口相对,然后将两个竖侧板前后分别贴靠方形缺口的侧壁上,将顶板左右两侧分别压在两个竖侧板的上沿上,将支撑板左右两端分别抵在两个竖侧板的内侧面上,并保持水平,使内模板和外模板之间形成一个隆起的箱体。a. First fix the inner formwork and the outer formwork so that the square notches are facing each other, then respectively attach the two vertical side panels to the side walls of the square notches, and press the left and right sides of the top plate on the two vertical side panels respectively. On the upper edge, the left and right ends of the support plate are respectively pressed against the inner sides of the two vertical side plates, and kept horizontal, so that a raised box is formed between the inner formwork and the outer formwork.

b.然后先在内模板、外模板内壁和第a.步所得箱体外壁上涂混凝土隔离剂或附上混凝土隔离膜,然后向箱体内注入混凝土;b. Then first apply concrete release agent or attach a concrete isolation film on the inner formwork, the inner wall of the outer formwork and the outer wall of the box obtained in step a., and then inject concrete into the box;

c.待混凝土凝固后,先拆掉螺栓,然后依次拆除支撑板、两个竖侧板、和顶板,就可形成相应挑梁用剪力墙预留洞口,然后就可以在挑梁用剪力墙预留洞口安装配套的挑梁及挑梁支撑的悬挑脚手架了。c. After the concrete is solidified, first remove the bolts, and then remove the support plate, two vertical side plates, and the top plate in sequence, and the openings reserved for the shear walls for the cantilever beams can be formed, and then the shear force can be used for the cantilever beams. The supporting cantilever beams and the cantilevered scaffolding supported by the cantilever beams are installed in the openings reserved for the walls.

作为优化,每个竖侧板的后板的内侧面上焊有一个水平支撑条,所述支撑板左右两端下沿分别搭在两侧的水平支撑条上。如此设计,便于安放支撑板。As an optimization, a horizontal support bar is welded on the inner side of the rear plate of each vertical side plate, and the lower edges of the left and right ends of the support plate are respectively placed on the horizontal support bars on both sides. This design makes it easy to place the support board.

作为优化,中板外侧面与前板外侧面之间的夹角、中板外侧面与后板外侧面之间的夹角均作倒角或圆角处理。如此设计,结构强度大,且容易脱模。As an optimization, the angle between the outer surface of the middle plate and the outer surface of the front plate, and the angle between the outer surface of the middle plate and the outer surface of the rear plate are all chamfered or rounded. With such a design, the structure is strong and easy to demould.

作为优化,所述顶板前后两端、竖侧板前后两端分别突出于内模板、外模板。如此设计,拆模板时,可以用橡胶锤敲击突出部分,便于模板与混凝土分离。As an optimization, the front and rear ends of the top plate and the front and rear ends of the vertical side plates respectively protrude from the inner formwork and the outer formwork. With such a design, when the formwork is removed, the protruding part can be hit with a rubber hammer to facilitate the separation of the formwork from the concrete.

利用前述挑梁用剪力墙预留洞口成形组合模板浇筑的剪力墙,剪力墙上设有多个挑梁用剪力墙预留洞口,其横截面呈方形,其特征在于:挑梁用剪力墙预留洞口的外侧洞口水平宽度小于挑梁用剪力墙预留洞口的内侧洞口水平宽度,挑梁用剪力墙预留洞口的水平截面呈凸字形。如此设计,预留洞口内大外小,安装的预留洞口堵块不易脱落,杜绝了高空坠物。The shear wall poured by using the above-mentioned shear wall reserved openings for cantilever beams to form combined formwork, the shear wall is provided with a plurality of reserved openings for cantilever beams, the cross section of which is square, and is characterized in that: cantilever beams The horizontal width of the outer opening of the opening reserved for the shear wall is smaller than the horizontal width of the inner opening of the opening reserved for the shear wall for the cantilever beam, and the horizontal section of the opening reserved for the shear wall for the cantilever beam is convex. With such a design, the inside of the reserved hole is large and the outside is small, and the installed block of the reserved hole is not easy to fall off, preventing falling objects from high altitude.

封堵前述新型挑梁用剪力墙预留洞口的预留洞口堵块,其特征在于:该预留洞口堵块使用时的水平截面呈凸字形。如此设计,优点同上。The reserved opening block for blocking the aforementioned new type of cantilever shear wall reserved opening is characterized in that: the horizontal section of the reserved opening blocking block is in a convex shape when used. Such design has the same advantages as above.

前述预留洞口堵块的成形组合模具包括两个侧板、两个端板和一块底板,其中侧板均由上立板、中板和下立板组成,上立板和下立板相互平行,中板外侧与上立板下缘垂直相交,中板内侧与下立板上缘垂直相交,两个端板主体呈凸字形,其两侧分别设有垂直翻边,两个侧板两侧及端板两侧的垂直翻边的相应位置分别开有通孔,两个侧板、两个端板从四面围成一个箱体,并由穿设在相应通孔内的螺栓固定,所述底板设置箱体底部,每个端板的下沿压在底板的上表面,底板两端分别突出于端板。具体使用方法如下:The forming combination mold for the aforementioned reserved hole block includes two side plates, two end plates and a bottom plate, wherein the side plates are composed of an upper vertical plate, a middle plate and a lower vertical plate, and the upper vertical plate and the lower vertical plate are parallel to each other , the outer side of the middle plate vertically intersects the lower edge of the upper vertical plate, the inner side of the middle plate vertically intersects the upper edge of the lower vertical plate, the main bodies of the two end plates are in a convex shape, and vertical flanges are provided on both sides, and the two sides of the side plates There are through holes at the corresponding positions of the vertical flanges on both sides of the end plate, and the two side plates and the two end plates form a box from four sides, and are fixed by bolts in the corresponding through holes. The base plate is provided with the bottom of the box body, the lower edge of each end plate is pressed against the upper surface of the base plate, and the two ends of the base plate respectively protrude from the end plate. The specific usage method is as follows:

a.将两个侧板、两个端板从四面围成一个箱体,并由穿设在相应通孔内的螺栓固定,所述底板设置箱体底部;a. Two side plates and two end plates form a box from four sides, and are fixed by bolts pierced in the corresponding through holes, and the bottom plate is set at the bottom of the box;

b.然后先在第a步所得箱体内壁涂混凝土隔离剂或附上混凝土隔离膜,然后向箱体注入混凝土;b. Then first apply concrete release agent or attach a concrete isolation film to the inner wall of the box obtained in step a, and then inject concrete into the box;

c.待混凝土凝固后,先拆掉螺栓,然后依次拆除底板、两个侧板、两个端板,取得相应的预留洞口堵块。如此设计,使用方便。c. After the concrete is solidified, remove the bolts first, and then remove the bottom plate, two side plates, and two end plates in sequence to obtain the corresponding reserved hole block. So designed, easy to use.

作为优化,中板外侧面与上立板外侧面之间的夹角、中板外侧面与下立板外侧面之间的夹角均作倒角或圆角处理,并配有一个压板。如此设计,浇筑混凝土时,可用压板压实混凝土。As an optimization, the angle between the outer surface of the middle plate and the outer surface of the upper vertical plate, and the angle between the outer surface of the middle plate and the outer surface of the lower vertical plate are all chamfered or rounded, and a pressing plate is provided. With such a design, when pouring concrete, the concrete can be compacted with a pressure plate.

本发明挑梁用剪力墙预留洞口成形组合模板浇筑的剪力墙的方法,包括下述步骤:The method for the shear wall pouring of the beam with the shear wall reserved opening forming combination formwork for cantilever of the present invention comprises the following steps:

①.用前述预留洞口堵块的成形组合模具,浇注前述的预留洞口堵块,具体方法如下:①. Use the forming combination mold of the aforementioned reserved hole block to cast the aforementioned reserved hole block. The specific method is as follows:

a.将两个侧板、两个端板从四面围成一个箱体,并由穿设在相应通孔内的螺栓固定,所述底板设置箱体底部;a. Two side plates and two end plates form a box from four sides, and are fixed by bolts pierced in corresponding through holes, and the bottom plate is set at the bottom of the box;

b.然后先在第a步所得箱体内壁涂混凝土隔离剂或附上混凝土隔离膜,然后向箱体注入混凝土,并用压板压实;b. Then firstly coat the inner wall of the box obtained in step a with a concrete isolating agent or attach a concrete isolating film, then pour concrete into the box and compact it with a pressure plate;

c.待混凝土凝固后,先拆掉螺栓,然后依次拆除底板、两个侧板、两个端板,取得相应的预留洞口堵块;c. After the concrete is solidified, remove the bolts first, and then remove the bottom plate, two side plates, and two end plates in sequence to obtain the corresponding reserved hole block;

②.搭设前述挑梁用剪力墙预留洞口成形组合模板,并用混凝土浇注前述剪力墙,具体方法如下:②. Set up the above-mentioned cantilever shear wall with reserved openings to form the combined formwork, and pour the aforementioned shear wall with concrete. The specific method is as follows:

a.先将内模板和外模板固定好,使其方形缺口相对,然后将两个竖侧板前后分别贴靠方形缺口的侧壁上,将顶板左右两侧分别压在两个竖侧板的上沿上,将支撑板左右两端分别抵在两个竖侧板的内侧面上,并保持水平,使内模板和外模板之间形成一个隆起的箱体,a. First fix the inner formwork and the outer formwork so that the square notches are facing each other, then respectively attach the two vertical side panels to the side walls of the square notches, and press the left and right sides of the top plate on the two vertical side panels respectively. On the upper edge, the left and right ends of the support plate are respectively pressed against the inner sides of the two vertical side plates, and kept horizontal, so that a raised box is formed between the inner formwork and the outer formwork.

b.然后先在内模板、外模板内壁和第a.步所得箱体外壁上涂混凝土隔离剂或附上混凝土隔离膜,然后向内模板、外模板之间注入混凝土;b. Then first apply concrete release agent or attach a concrete isolation film on the inner formwork, the inner wall of the outer formwork and the outer wall of the box obtained in step a., and then inject concrete between the inner formwork and the outer formwork;

c.待混凝土凝固后,先拆掉螺栓,然后依次拆除支撑板、两个竖侧板、和顶板,就可形成相应挑梁用剪力墙预留洞口,然后就可以在挑梁用剪力墙预留洞口安装配套的挑梁及挑梁支撑的悬挑脚手架了。c. After the concrete is solidified, first remove the bolts, and then remove the support plate, two vertical side plates, and the top plate in sequence, and the openings reserved for the shear walls for the cantilever beams can be formed, and then the shear force can be used for the cantilever beams. The supporting cantilever beams and the cantilevered scaffolding supported by the cantilever beams are installed in the openings reserved for the walls.

③.待悬挑脚手架及挑梁用毕,并拆除后,取第①步所得预留洞口堵块,在与侧板、端板接触的面涂沫混凝土膏,然后使其与所述底板相接触面向外,从内向外,堵在第②所得剪力墙的相应挑梁用剪力墙预留洞口上,并在预留洞口堵块上下左右各面上涂抹混凝土膏,将挑梁用剪力墙预留洞口内外两面均用混凝土膏抹平即可。如此设计,封堵预留洞口方便、省力,且不易脱落,杜绝了高空坠物。③. After the cantilevered scaffolding and cantilever beams are used and dismantled, take the reserved hole blocking block obtained in step ①, and apply concrete paste on the surface in contact with the side plate and end plate, and then make it contact with the bottom plate. Outside, from the inside to the outside, block the corresponding cantilever beam shear wall reserved hole of the shear wall obtained in ②, and apply concrete paste on the upper, lower, left, and right sides of the reserved hole block, and the cantilever beam shear wall Both the inside and outside of the reserved hole can be smoothed with concrete paste. With such a design, it is convenient and labor-saving to block the reserved hole, and it is not easy to fall off, preventing falling objects from high altitude.

本发明挑梁用剪力墙预留洞口成形组合模板、剪力墙、预留洞口堵块及其方法具有使用方便,杜绝高空坠物的优点,适合各种建筑的悬挑脚手架使用。The present invention has the advantages of convenient use and the prevention of falling objects, and is suitable for cantilevered scaffolding of various buildings.

附图说明Description of drawings

下面结合附图对本实用挑梁用剪力墙预留洞口成形组合模板、剪力墙、预留洞口堵块及其方法作进一步说明:Below in conjunction with accompanying drawing, further explanation is made on the combined formwork, shear wall, reserved opening block and method thereof for the shear wall with shear wall of the utility model:

图1是图2所示挑梁用剪力墙预留洞口成形组合模板的分解示意图;Fig. 1 is the exploded schematic diagram of forming combined formwork with the shear wall reserved for cantilever shown in Fig. 2;

图2是本挑梁用剪力墙预留洞口成形组合模板的立体结构示意图;Fig. 2 is the three-dimensional structure schematic diagram of the forming combination formwork of the reserved opening of the shear wall for the cantilever beam;

图3是图2所示挑梁用剪力墙预留洞口成形组合模板浇筑在剪力墙局部立体结构示意图;Fig. 3 is a partial three-dimensional structure schematic diagram of casting the shear wall with the reserved opening of the shear wall for the cantilever beam shown in Fig. 2 and forming the composite template;

图4是利用预留洞口堵块的成形组合模具浇筑预留洞口堵块的立体示意图;Fig. 4 is the three-dimensional schematic view of pouring the reserved hole blocking block by using the forming combination mold of the reserved hole blocking block;

图5是图4的分解示意图;Fig. 5 is an exploded schematic diagram of Fig. 4;

图6是图4中预留洞口堵块的成形组合模具的分解示意图;Fig. 6 is the exploded schematic view of the forming combination die of reserved hole blocking block in Fig. 4;

图7是利用预留洞口堵块封堵挑梁用剪力墙预留洞口的立体示意图(为清楚显示,墙体及预留洞口堵块均作翻转处理)。Fig. 7 is a three-dimensional schematic diagram of the reserved opening of the shear wall for cantilever beams blocked by the reserved opening block (for clear display, the wall body and the reserved opening block are both turned over).

图中:1为内模板、2为外模板、3为竖侧板、31为前板、32为中板、33为后板、4为顶板、5为支撑板、6为方形缺口、7为水平支撑条、8为剪力墙、9为挑梁用剪力墙预留洞口、10为预留洞口堵块、11为侧板、111为上立板、112为中板、113为下立板、12为端板、13为底板、14为垂直翻边、15为通孔、16为压板。In the figure: 1 is the inner formwork, 2 is the outer formwork, 3 is the vertical side plate, 31 is the front plate, 32 is the middle plate, 33 is the rear plate, 4 is the top plate, 5 is the support plate, 6 is the square gap, 7 is the Horizontal support bar, 8 is the shear wall, 9 is the opening reserved for the shear wall for the cantilever beam, 10 is the block for the reserved opening, 11 is the side plate, 111 is the upper vertical plate, 112 is the middle plate, and 113 is the lower vertical Plate, 12 are end plates, 13 are base plates, 14 are vertical flanges, 15 are through holes, and 16 are pressing plates.

具体实施方式Detailed ways

实施方式一:如图1-2所示,本挑梁用剪力墙预留洞口成形组合模板,包括内模板1、外模板2、两个竖侧板3、顶板4和支撑板5,内模板1、外模板2上开有相对的方形缺口6,所述顶板4前后两端上表面分别贴在两个方形缺口6的上沿上,顶板4左右两侧分别压在两个竖侧板3的上沿上,两个竖侧板3前后分别贴靠方形缺口6的侧壁上,支撑板5平行于顶板4,其左右两端分别抵在两个竖侧板3的内侧面上。内模板1的方形缺口6的水平宽度大于外模板2的方形缺口6的水平宽度,每个竖侧板3由前板31、中板32和后板33组成,前板31和后板33平行,中板32外侧与后板33前缘垂直相交,中板32内侧与前板31后缘垂直相交,所述顶板4在水平面上投影呈凸字形。Embodiment 1: As shown in Fig. 1-2, the shear wall reserved opening for the cantilever beam is used to form a combined formwork, including an inner formwork 1, an outer formwork 2, two vertical side plates 3, a top plate 4 and a support plate 5. The formwork 1 and the outer formwork 2 are provided with opposite square notches 6, the upper surfaces of the front and rear ends of the top plate 4 are attached to the upper edges of the two square notches 6 respectively, and the left and right sides of the top plate 4 are respectively pressed against the two vertical side plates On the upper edge of 3, two vertical side plates 3 front and rear respectively lean against the side walls of the square gap 6, the support plate 5 is parallel to the top plate 4, and its left and right ends are respectively against the inner sides of the two vertical side plates 3. The horizontal width of the square notch 6 of the inner template 1 is greater than the horizontal width of the square notch 6 of the outer template 2, and each vertical side panel 3 is composed of a front panel 31, a middle panel 32 and a rear panel 33, and the front panel 31 and the rear panel 33 are parallel , the outer side of the middle plate 32 vertically intersects the front edge of the rear plate 33, the inner side of the middle plate 32 perpendicularly intersects the rear edge of the front plate 31, and the projection of the top plate 4 on the horizontal plane is convex.

每个竖侧板3的后板33的内侧面上焊有一个水平支撑条7,所述支撑板5左右两端下沿分别搭在两侧的水平支撑条7上。A horizontal support bar 7 is welded on the inner side of the back plate 33 of each vertical side plate 3 , and the lower edges of the left and right ends of the support plate 5 ride on the horizontal support bars 7 on both sides respectively.

中板32外侧面与前板31外侧面之间的夹角、中板32外侧面与后板33外侧面之间的夹角均作倒角或圆角处理。The angle between the outer surface of the middle plate 32 and the outer surface of the front plate 31, and the angle between the outer surface of the middle plate 32 and the outer surface of the rear plate 33 are all chamfered or rounded.

如图2所示,所述顶板4前后两端、竖侧板3前后两端分别突出于内模板1、外模板2。As shown in FIG. 2 , the front and rear ends of the top plate 4 and the front and rear ends of the vertical side plate 3 protrude from the inner formwork 1 and the outer formwork 2 respectively.

如图3所示,本发明剪力墙8,该剪力墙8上设有多个挑梁用剪力墙预留洞口9,其横截面呈方形,其特征在于:该剪力墙8上的挑梁用剪力墙预留洞口9利用前述挑梁用剪力墙预留洞口成形组合模板浇筑而成,该挑梁用剪力墙预留洞口9的外侧洞口水平宽度小于挑梁用剪力墙预留洞口9的内侧洞口水平宽度,挑梁用剪力墙预留洞口9的水平截面呈凸字形。As shown in Figure 3, the shear wall 8 of the present invention is provided with a plurality of openings 9 reserved for cantilever beams in the shear wall, and its cross section is square, and it is characterized in that: The reserved opening 9 of the shear wall for the cantilever beam is formed by pouring the formed combination formwork of the reserved opening of the shear wall for the cantilever beam. The horizontal width of the inner opening of the reserved opening 9 of the force wall, and the horizontal section of the reserved opening 9 of the shear wall for the cantilever beam is convex.

如图4、7所示,本发明封堵前述新型挑梁用剪力墙预留洞口的预留洞口堵块10,该预留洞口堵块10使用时的水平截面呈凸字形。As shown in Figures 4 and 7, the present invention seals the reserved opening block 10 of the aforementioned new-type cantilever beam with a reserved opening of the shear wall. The horizontal section of the reserved opening blocking block 10 is in a convex shape when used.

如图4-6所示,前述预留洞口堵块的成形组合模具包括两个侧板11、两个端板12和一块底板13,其中侧板均由上立板111、中板112和下立板113组成,上立板111下立板113相互平行,中板112外侧与上立板111下缘垂直相交,中板112内侧与下立板113上缘垂直相交,两个端板12主体呈凸字形,其两侧分别设有垂直翻边14,两个侧板11两侧及端板12两侧的垂直翻边14的相应位置分别开有通孔15,两个侧板11、两个端板12从四面围成一个箱体,并由穿设在相应通孔15内的螺栓(图中未示出)固定,所述底板13设置箱体底部,每个端板12的下沿压在底板13的上表面,底板13两端分别突出于端板12。As shown in Figures 4-6, the forming combination mold for the aforementioned reserved hole block includes two side plates 11, two end plates 12 and a bottom plate 13, wherein the side plates are all composed of an upper vertical plate 111, a middle plate 112 and a lower plate. Composed of vertical plates 113, the upper vertical plate 111 and the lower vertical plate 113 are parallel to each other, the outer side of the middle plate 112 is vertically intersected with the lower edge of the upper vertical plate 111, the inner side of the middle plate 112 is vertically intersected with the upper edge of the lower vertical plate 113, and the two end plates 12 are mainly It is in a convex shape, and its two sides are respectively provided with vertical flanges 14, and the corresponding positions of the vertical flanges 14 on both sides of the two side plates 11 and the two sides of the end plate 12 are respectively provided with through holes 15, and the two side plates 11, two Each end plate 12 forms a box body from four sides, and is fixed by the bolt (not shown in the figure) that is passed in the corresponding through hole 15, and described bottom plate 13 is provided with box body bottom, and the lower edge of each end plate 12 Pressed on the upper surface of the bottom plate 13, the two ends of the bottom plate 13 respectively protrude from the end plate 12.

如图4-6所示,中板112外侧面与上立板111外侧面之间的夹角、中板112外侧面与下立板113外侧面之间的夹角均作倒角或圆角处理,并配有一个压板16,压板16主体为一个方板,方板上表面设有一个把手。As shown in Figure 4-6, the angle between the outer surface of the middle plate 112 and the outer surface of the upper vertical plate 111, and the angle between the outer surface of the middle plate 112 and the outer surface of the lower vertical plate 113 are chamfered or rounded. processing, and is equipped with a pressing plate 16, the main body of the pressing plate 16 is a square plate, and a handle is provided on the upper surface of the square plate.

本发明挑梁用剪力墙预留洞口成形组合模板浇筑的剪力墙的方法,包括下述步骤:The method for the shear wall pouring of the beam with the shear wall reserved opening forming combination formwork for cantilever of the present invention comprises the following steps:

①.用前述预留洞口堵块10的成形组合模具,浇注前述的预留洞口堵块10,具体方法如下:①. Use the forming combination mold of the aforementioned reserved hole block 10 to pour the aforementioned reserved hole block 10, the specific method is as follows:

a.将两个侧板11、两个端板12从四面围成一个箱体,并由穿设在相应通孔15内的螺栓(图中未示出)固定,所述底板13设置箱体底部,如图5-6所示。a. Two side plates 11 and two end plates 12 form a box from four sides, and are fixed by bolts (not shown in the figure) pierced in corresponding through holes 15, and the bottom plate 13 is provided with a box bottom, as shown in Figure 5-6.

b.然后先在第a步所得箱体内壁涂混凝土隔离剂或附上混凝土隔离膜,然后向箱体内注入混凝土,并用压板16压实;如图4-5所示。b. Then first coat the inner wall of the box obtained in step a with a concrete release agent or attach a concrete isolation film, then pour concrete into the box and compact it with a pressure plate 16; as shown in Figure 4-5.

c.待混凝土凝固后,先拆掉螺栓,然后依次拆除底板13、两个侧板11、两个端板12,取得相应的预留洞口堵块10,如图4所示。c. After the concrete is solidified, remove the bolts first, and then remove the bottom plate 13, two side plates 11, and two end plates 12 in sequence to obtain the corresponding reserved hole block 10, as shown in Figure 4.

②.搭设前述挑梁用剪力墙预留洞口成形组合模板,并用混凝土浇注前述剪力墙8,如图1-3所示,具体方法如下:②.Establish the combination formwork with the reserved opening of the shear wall for the cantilever beam, and pour the aforementioned shear wall 8 with concrete, as shown in Figure 1-3. The specific method is as follows:

a.先将内模板1和外模板2固定好,使其方形缺口相对,然后将两个竖侧板3前后分别贴靠方形缺口6的侧壁上,将顶板4左右两侧分别压在两个竖侧板3的上沿上,将支撑板5左右两端分别抵在两个竖侧板3的内侧面上,并保持水平,使内模板1和外模板2之间形成一个隆起的箱体,如图1-2所示。(内模板1和外模板2只画出了局部,实际应更大,内模板1和外模板2之间的浇筑区域两端应封闭,图略)a. First fix the inner formwork 1 and the outer formwork 2 so that the square gaps are opposite to each other, then respectively attach the two vertical side plates 3 to the side walls of the square gap 6, and press the left and right sides of the top plate 4 on the two sides respectively. On the upper edge of the two vertical side plates 3, the left and right ends of the support plate 5 are respectively pressed against the inner sides of the two vertical side plates 3, and kept horizontal, so that a raised box is formed between the inner formwork 1 and the outer formwork 2. body, as shown in Figure 1-2. (The inner formwork 1 and the outer formwork 2 are only partially drawn, and they should be larger in reality. The two ends of the pouring area between the inner formwork 1 and the outer formwork 2 should be closed, and the figure is omitted.)

b.然后先在内模板1、外模板2的内壁和第a步所得箱体外壁上涂混凝土隔离剂或附上混凝土隔离膜,然后向内模板1、外模板2之间注入混凝土;b. Then first coat the inner wall of the inner formwork 1, the outer formwork 2 and the outer wall of the box obtained in step a with a concrete release agent or attach a concrete isolation film, and then inject concrete between the inner formwork 1 and the outer formwork 2;

c.待混凝土凝固后,先拆掉螺栓,然后依次拆除支撑板5、两个竖侧板3、和顶板4,就可形成相应挑梁用剪力墙预留洞口9,然后就可以在挑梁用剪力墙预留洞口9安装配套的挑梁(图中未示出)及挑梁支撑的悬挑脚手架(图中未示出)了。c. After the concrete is solidified, first remove the bolts, and then remove the support plate 5, the two vertical side plates 3, and the top plate 4 in sequence to form the opening 9 reserved for the shear wall of the corresponding cantilever beam, and then the cantilever can be used in the cantilever Beams have been installed with supporting cantilever beams (not shown in the figure) and cantilevered scaffolding (not shown in the figure) supported by the cantilever beams in the reserved opening 9 of the shear wall.

③.待悬挑脚手架及挑梁用毕,并拆除后,取第①步所得预留洞口堵块10,在与侧板11、端板12接触的面涂沫混凝土膏,然后使其与所述底板13相接触面向外,从内向外,堵在第②所得剪力墙8的相应挑梁用剪力墙预留洞口9上,并在预留洞口堵块10上下左右各面上涂抹混凝土膏,将挑梁用剪力墙预留洞口9内外两面均用混凝土膏抹平即可,如图7所示。③. After the cantilevered scaffolding and cantilever beams have been used and removed, take the reserved hole block 10 obtained in step ①, and apply concrete paste on the surface in contact with the side plate 11 and end plate 12, and then make it contact with the bottom plate 13. The contact surface of phase 13 is outward, from inside to outside, and is blocked on the corresponding cantilever shear wall opening 9 of the shear wall 8 obtained in ②, and concrete paste is applied on the upper, lower, left, and right sides of the reserved opening blocking block 10, Both the inner and outer sides of the hole 9 reserved for the cantilever beam with the shear wall can be smoothed with concrete paste, as shown in Figure 7.

Claims (9)

1. a kind of outrigger shear wall reserved opening forming composition template, including inner template, exterior sheathing, two perpendicular side plates, top plates And support plate, opposite square breach are provided in inner template, exterior sheathing, and top plate rear and front end upper surface is attached to two respectively In the upper edge of square breach, it is pressed respectively against in the upper edge of two perpendicular side plates at left and right sides of top plate, is pasted respectively before and after two perpendicular side plates By on the side wall of square breach, support plate is parallel to top plate, left and right ends are against respectively on the medial surface of two perpendicular side plates, It is characterized in that:The horizontal width of the square breach of inner template is more than the horizontal width of the square breach of exterior sheathing, each erects side plate It is made of foreboard, middle plate and back plate, front and rear panels are parallel, intersect on the outside of middle plate with back plate leading vertical, on the inside of middle plate with before Plate rear intersects vertically, and the top plate is projected in the horizontal plane in convex shape.
2. outrigger according to claim 1 shear wall reserved opening forming composition template, it is characterised in that:Each perpendicular side Horizontal braces, support plate left and right ends lower edge to ride over the level of both sides respectively there are one welderings on the medial surface of the back plate of plate On support bar.
3. outrigger according to claim 1 shear wall reserved opening forming composition template, it is characterised in that:On the outside of middle plate The angle between angle, middle plate lateral surface and back plate lateral surface between face and foreboard lateral surface makees chamfering or fillet processing.
4. outrigger according to claim 1 shear wall reserved opening forming composition template, it is characterised in that:The top plate Rear and front end, perpendicular side plate rear and front end protrude from inner template, exterior sheathing respectively.
5. the shear wall poured using any outrigger of Claims 1-4 4 with shear wall reserved opening forming composition template, is cut Power wall is equipped with multiple outriggers shear wall reserved opening, and cross section is square, it is characterised in that:Outrigger is reserved with shear wall The outside hole horizontal width at hole is less than the inside hole horizontal width of outrigger shear wall reserved opening, outrigger shear wall The horizontal cross-section of reserved opening is in convex shape.
6. block the reserved opening sprue of novel outrigger shear wall reserved opening described in claim 5, it is characterised in that:This is pre- Horizontal cross-section when box out mouth sprue uses is in convex shape.
7. the Combined Forming Die of the reserved opening sprue described in claim 6, it is characterised in that:Including two side plates, two End plate and one piece of bottom plate, latus inframedium are made of upper vertical plate, middle plate and lower riser, and upper vertical plate and lower riser are mutually parallel, in It intersecting vertically with upper vertical plate lower edge on the outside of plate, intersects vertically on the inside of middle plate with lower riser upper limb, two end plate main bodys are in convex shape, Its both sides is respectively equipped with vertical flange, and the corresponding position of the vertical flange of two side plate both sides and end plate both sides has logical Hole, two side plates, two end plates from surrounding a babinet, and the bolt by being threaded through in respective through hole is fixed, the bottom on four sides Plate sets the bottom of box, and the lower edge of each end plate is pressed in the upper surface of bottom plate, and bottom plate both ends protrude from end plate respectively.
8. the Combined Forming Die of the reserved opening sprue described in claim 7, it is characterised in that:Middle plate lateral surface and upper vertical plate The angle between angle, middle plate lateral surface and lower riser lateral surface between lateral surface makees chamfering or fillet processing, and is furnished with One pressing plate.
9. a kind of method of shear wall that outrigger is poured with shear wall reserved opening forming composition template, includes the following steps:
1. the Combined Forming Die of reserved opening sprue described in claims 8 pours into a mould the reserved opening described in claim 6 Sprue, specific method are as follows:
A. by two side plates, two end plates from surrounding a babinet on four sides, and the bolt by being threaded through in respective through hole is fixed, institute State the bottom plate setting bottom of box;
B. and then first concrete isolation agent is applied in cabinet wall obtained by a steps or enclose concrete isolation film, then into babinet Concrete is injected, and is compacted with pressing plate;
C. after concrete setting, then bolt of first dismantling removes bottom plate, two side plates, two end plates successively, obtains corresponding Reserved opening sprue;
2. sets up any outrigger shear wall reserved opening forming composition template of Claims 1-4, and is poured with concrete The shear wall described in claim 5 is noted, specific method is as follows:
A. first inner template and exterior sheathing are fixed, makes its square breach opposite, then will respectively reclined before and after two perpendicular side plates It on the side wall of square breach, will be pressed respectively against in the upper edge of two perpendicular side plates at left and right sides of top plate, by support plate left and right ends point It is not against on the medial surface of two perpendicular side plates, and keeps horizontal, make to form the babinet of a protuberance between inner template and exterior sheathing,
B. and then first concrete isolation agent is being applied on cabinet exterior obtained by inner template, exterior sheathing inner wall and a. step or enclosing coagulation Native isolation film, then injects concrete between inner template, exterior sheathing;
C. after concrete setting, then bolt of first dismantling removes support plate, two perpendicular side plates and top plate, so that it may be formed successively Then corresponding outrigger shear wall reserved opening can install mating outrigger and outrigger in outrigger shear wall reserved opening The builder's jack of support,
3. treats builder's jack and outrigger with finishing, and after removing, take the 1. step gained reserved opening sprue, with side plate, end plate The face of contact applies foam concrete cream, then makes it outside with the bottom plate phase-contact surface, from inside to outside, get lodged in the 2. gained shear The corresponding outrigger of wall smears coagulation soil cream on shear wall reserved opening on reserved opening sprue up and down each face, will Two sides is smoothed out with coagulation soil cream inside and outside outrigger shear wall reserved opening.
CN201810027944.6A 2018-01-11 2018-01-11 Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue and its method Pending CN108240110A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810027944.6A CN108240110A (en) 2018-01-11 2018-01-11 Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810027944.6A CN108240110A (en) 2018-01-11 2018-01-11 Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue and its method

Publications (1)

Publication Number Publication Date
CN108240110A true CN108240110A (en) 2018-07-03

Family

ID=62699586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810027944.6A Pending CN108240110A (en) 2018-01-11 2018-01-11 Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue and its method

Country Status (1)

Country Link
CN (1) CN108240110A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110843083A (en) * 2019-11-28 2020-02-28 鞍山市华兴冶金炉料有限公司 Forming method of steel ladle current stabilizer
CN111877407A (en) * 2020-07-27 2020-11-03 中铁十一局集团第一工程有限公司 Construction method for reserved interface of underground space connecting channel
CN112459267A (en) * 2020-11-18 2021-03-09 中建八局第一建设有限公司 Non-designed reserved hole plugging device and plugging method
CN112854717A (en) * 2021-01-13 2021-05-28 中建七局(上海)有限公司 Reserved hole anti-leakage treatment process and wall-penetrating overhanging scaffold profile steel
CN114704112A (en) * 2022-03-03 2022-07-05 山西三建集团有限公司 Disassembly-free anti-seepage plugging method for cantilever type scaffold steel beam through-wall opening

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE834629A (en) * 1974-10-19 1976-02-16 PROCESS AND DEVICE FOR THE PRODUCTION OF PREFABRICATED CONCRETE PANELS WITH INCORPORATED EXTERNAL SLEEPING FRAMES
CN202081641U (en) * 2011-05-10 2011-12-21 中天建设集团有限公司天津分公司 Hanging mold used for floor prepared hole
CN203867048U (en) * 2014-06-05 2014-10-08 翡柯机械(福建)有限公司 Window hole insulating and shaping module for energy-saving building
CN104141351A (en) * 2014-05-16 2014-11-12 中国建筑第四工程局有限公司 Sealing method for reserved paying-off hole and paying-off hole mold
CN104234304A (en) * 2014-09-22 2014-12-24 张英保 Concrete prefabricated structural member and wall body formed by concrete prefabricated structural member

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE834629A (en) * 1974-10-19 1976-02-16 PROCESS AND DEVICE FOR THE PRODUCTION OF PREFABRICATED CONCRETE PANELS WITH INCORPORATED EXTERNAL SLEEPING FRAMES
CN202081641U (en) * 2011-05-10 2011-12-21 中天建设集团有限公司天津分公司 Hanging mold used for floor prepared hole
CN104141351A (en) * 2014-05-16 2014-11-12 中国建筑第四工程局有限公司 Sealing method for reserved paying-off hole and paying-off hole mold
CN203867048U (en) * 2014-06-05 2014-10-08 翡柯机械(福建)有限公司 Window hole insulating and shaping module for energy-saving building
CN104234304A (en) * 2014-09-22 2014-12-24 张英保 Concrete prefabricated structural member and wall body formed by concrete prefabricated structural member

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110843083A (en) * 2019-11-28 2020-02-28 鞍山市华兴冶金炉料有限公司 Forming method of steel ladle current stabilizer
CN110843083B (en) * 2019-11-28 2024-09-10 鞍山市华兴冶金炉料有限公司 Forming method of ladle current stabilizer
CN111877407A (en) * 2020-07-27 2020-11-03 中铁十一局集团第一工程有限公司 Construction method for reserved interface of underground space connecting channel
CN112459267A (en) * 2020-11-18 2021-03-09 中建八局第一建设有限公司 Non-designed reserved hole plugging device and plugging method
CN112854717A (en) * 2021-01-13 2021-05-28 中建七局(上海)有限公司 Reserved hole anti-leakage treatment process and wall-penetrating overhanging scaffold profile steel
CN114704112A (en) * 2022-03-03 2022-07-05 山西三建集团有限公司 Disassembly-free anti-seepage plugging method for cantilever type scaffold steel beam through-wall opening

Similar Documents

Publication Publication Date Title
CN203452379U (en) Construction floor axis control hole preserving and plugging die of concrete structure
CN109025262A (en) A kind of molding construction method of concrete flanging one-time-concreting
CN208072950U (en) A kind of combination set shaped steel formwork
CN105569333B (en) A kind of construction formwork and construction method of overhang layer exterior wall preformed hole
CN207228633U (en) Exempt from that template is cast-in-place to build the prefabricated connector of heat-insulating and decorating wall plug-in type
CN203394030U (en) Setting steel die for caisson hanging dies of bathrooms of building structures
CN207847074U (en) Outrigger shear wall reserved opening forming composition template, shear wall, reserved opening sprue
CN217896800U (en) Plugging structure of shaped steel preformed hole of encorbelmenting of wall body outrigger
CN209082988U (en) A kind of Collapsible concrete sealing hole mold
CN216552610U (en) Cast-in-place area of assembled superimposed sheet hangs mould device can have enough to meet need
CN207813019U (en) A kind of UHPC non-dismantling formworks of casting concrete column
CN204001723U (en) The detachable combined steel tool of a kind of shear wall reserved opening
CN101748893A (en) Method for manufacturing high-rise building balcony boards
CN217751940U (en) Prefabricated part mold assembly
CN207813015U (en) Floor slab preformed hole tool-typed formwork support construction
CN111236624A (en) Construction method of PCF structure cast-in-place node template reinforcing system
CN215948938U (en) Adjustable turnover type anti-splash drainage device for constructional column pouring
CN211250603U (en) A prefabricated stair formwork
CN207063499U (en) A kind of detachable lossless template climbing frame is encorbelmented channel-section steel fixing device
CN109235709B (en) Full cast-in-place outer wall structure of building
CN211447767U (en) Back-up structure and formwork structure of floor slab post-casting belt support
CN210910473U (en) An anti-side leakage pouring formwork
CN108843016B (en) Shear wall template internal stay and tie bar combined type component and method
CN220840740U (en) Precast column pouring die
CN205058263U (en) Prefabricated mould that turns over of new jersey safety barrier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180703

RJ01 Rejection of invention patent application after publication