CN109826117A - Electronic sliding formwork integrally leads to without pull rod contains wall formwork for placing trolley - Google Patents

Electronic sliding formwork integrally leads to without pull rod contains wall formwork for placing trolley Download PDF

Info

Publication number
CN109826117A
CN109826117A CN201910195987.XA CN201910195987A CN109826117A CN 109826117 A CN109826117 A CN 109826117A CN 201910195987 A CN201910195987 A CN 201910195987A CN 109826117 A CN109826117 A CN 109826117A
Authority
CN
China
Prior art keywords
support
reinforcing
reinforcing beam
trolley
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910195987.XA
Other languages
Chinese (zh)
Other versions
CN109826117B (en
Inventor
徐博
谭强
肖尧
吴成刚
庹大美
刘向阳
甘才华
秦曙光
胡栾乔
刘新秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201910195987.XA priority Critical patent/CN109826117B/en
Publication of CN109826117A publication Critical patent/CN109826117A/en
Application granted granted Critical
Publication of CN109826117B publication Critical patent/CN109826117B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention, which discloses a kind of electronic sliding formwork, integrally leads to without pull rod and contains wall formwork for placing trolley, formwork jumbo includes trolley and the template symmetrical positioned at trolley two sides, template includes external mold, internal model and end mould, the first pull rod is equipped between the external mold and internal model, trolley includes running gear, bracing means, support device, lifting device.Template system assembly one-pass molding, recycling, the turnover of the electronic no pulling rod formwork trolley of the present invention are convenient, artificial less investment, construction efficiency are high when the formwork jumbo operation, and presentation quality is good, safety coefficient is high, greatly reduce the amount of setting up of steel pipe support, Safety standardization is higher, and construction speed more can reach one day one and recycle;The electronic no pulling rod formwork trolley of the present invention effectively prevents the problem of wall tie rod hole caused by traditional equipment construction culvert seeps water, it solves the mass defects such as obvious formwork edge joint, construction faulting of slab ends, concrete color difference, ensure that the flatness and engineering entity quality in the big face of culvert walls.

Description

Electronic sliding formwork integrally leads to without pull rod contains wall formwork for placing trolley
Technical field
The present invention relates to logical culvert wall formwork for placing trolley, specifically electronic sliding formwork integrally leads to culvert wall without pull rod and pours mould Pallet vehicle.
Background technique
The logical project amount for containing cast-in-place wall is larger, carries out wall with plane template combination using conventional steel pipe bracket and applies Work, speed of application is slow, and the vertically and horizontally seam of wall is more, faulting of slab ends is big, seriously affects culvert appearance, inevitably there is pull rod Hole periphery leakiness, dew sand and tie rod hole percolating water phenomenon, need to expend and are largely manually polished the faulting of slab ends of appearance, drawn Brushing water proofing asphalt coating behind the blocking of rod aperture, the waterproof of tie rod hole and wall.
Summary of the invention
Integrally lead to the purpose of the present invention is to provide a kind of electronic sliding formwork without pull rod and contain wall formwork for placing trolley, trolley is logical It crosses lifting device and lifting fixation is carried out to external mold and internal model, lifting device is mounted on reinforcing beam by the hook sleeve of electric block, End mould is added between external mold and internal model, two end moulds is used when pouring for the first time, subsequent to pour using one, the other end uses upper On the basis of the secondary wall poured, external mold and internal model are fixed by the first pull rod, are fixed by screw rod opposite end mould, The thickness for pouring wall is adjusted by the width of the first pull rod and end mould, fixed rear chassis release is to external mold and internal model Lifting, trolley are supported internal model by support device, and stretching for the hydraulic cylinder of support device is adjusted between cast wall Width after pouring, is demoulded, and carries out lifting transhipment to template using trolley, and so on lower section wall is poured It builds;The template system assembly one-pass molding of the electronic no pulling rod formwork trolley of the present invention, has enough to meet the need convenient, the Schaltisch at recycling Artificial less investment, construction efficiency are high when vehicle operation, and presentation quality is good, safety coefficient is high, greatly reduces steel pipe support The amount of setting up, Safety standardization is higher, and construction speed more can reach one day one and recycle, and do not need during template movement using Remaining lifting appliance only uses crane when holding mould installation on a small quantity, and fuel burning is few, and environmental pollution is small, meets instantly energy saving The industry requirement of environmental protection;Electronic no pulling rod formwork trolley effectively prevents wall tie rod hole caused by traditional equipment construction culvert and seeps The problem of water, solves the mass defects such as obvious formwork edge joint, construction faulting of slab ends, concrete color difference, ensure that the big face of culvert walls Flatness and engineering entity quality.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of electronic sliding formwork integrally leads to without pull rod contains wall formwork for placing trolley, and formwork jumbo includes trolley and is located at trolley The symmetrical template in two sides, template include external mold, internal model and end mould, and the first pull rod, platform are equipped between the external mold and internal model Vehicle includes running gear, bracing means, support device, lifting device.
The trolley includes supportive body, and running gear includes idler wheel, and guide rail is equipped with below idler wheel, and running gear is placed Plate is equipped with driving motor and speed changer.
The bracing means includes rotation support, and rotation support includes column spinner, and one end of column spinner is equipped with the second limit Block, the other end are equipped with extension rod, and extension rod is equipped with the 6th threaded hole.
The rotation support, which is equipped with, reinforces supporting element, and reinforcing supporting element includes the second rotary screw rod, the second rotary screw rod One end, which is equipped with, reinforces supporting block, and the other end is equipped with second receipts.
The support device includes the hydraulic cylinder on support device mounting table, and the movable part of hydraulic cylinder is connected with support Contact block.
The lifting device includes the electric block slided on electric block sliding rail.
The trolley is equipped with rotary work horse block, and rotary work horse block includes horse block main body, and horse block main body is equipped with pair Claim the first square hole of distribution, fixing axle is equipped in the first square hole, rotary work horse block is located at the second rotation by fixing axle Rotation in set, rotary work horse block are equipped with the second square hole of array distribution.
Further, the external mold includes the first support plate, and the first support plate is equipped with the first reinforcing rib of array distribution With the second reinforcing rib, the first reinforcing rib and the second reinforcing rib vertical distribution, the first support plate be equipped with array distribution first plus Brutal and the second reinforcing beam;Outer membrane is extended at first reinforcing beam and the second reinforcing beam both ends, the first reinforcing beam Both ends are equipped with the support of the first fastening screw, and the support of the first fastening screw is equipped with the first threaded hole, the both ends of the second reinforcing beam It is equipped with the first counterbore, is equipped with the first through hole in the first counterbore.
Further, first support plate is equipped with the third reinforcing beam of array distribution, and third reinforcing beam is located at the It is distributed vertically on one reinforcing beam and the second reinforcing beam, extends the first support plate above third reinforcing beam and be equipped with the second counterbore, The second through hole is equipped in second counterbore;The third reinforcing beam is equipped with bearing beam, and bearing beam is equipped with the of array distribution One reinforcement block is fastenedly connected with third reinforcing beam, and symmetrical third is equipped between the both ends and third reinforcing beam of bearing beam and is added Strengthening tendons.
Further, the internal model includes the second support plate, and the second support plate is equipped with the 4th reinforcing rib of array distribution With the 5th reinforcing rib, the 4th reinforcing rib and the 5th reinforcing rib vertical distribution, the second support plate be equipped with array distribution the 4th plus Brutal and the 5th reinforcing beam;4th reinforcing beam is equipped with symmetrical third threaded hole, and the both ends of the 5th reinforcing beam are equal It is supported equipped with the second fastening screw, the support of the second fastening screw is equipped with the second threaded hole;Second support plate is equipped with battle array 6th reinforcing beam of column distribution, the 6th reinforcing beam are distributed vertically, and one end of the 6th reinforcing beam extends the second support plate and is equipped with the Four threaded holes and the 5th threaded hole.
Further, the external mold and internal model Relative distribution hold mould between external mold and internal model, and end mould includes third branch Fagging, third support plate are equipped with the 6th reinforcing rib of array distribution, and third support plate is equipped with symmetrical stiffening plate;Institute It states end mould to contact by third support plate with the first support plate and the second support plate, passes through the first reinforcing beam of stiffening plate and external mold It is contacted with the second reinforcing beam, with the 4th reinforcing beam of internal model and the 5th reinforcing beam.
Further, rotation is equipped with screw rod in first threaded hole and the second threaded hole, and screw acting is in stiffening plate Opposite end mould fixes.
Further, first pull rod includes support rod, and one end of support rod is equipped with the first limited block, and the other end is equipped with First rotary screw rod, one end and the support rod of the first rotary screw rod are fastenedly connected, and the other end is equipped with the first in command.
Further, rotation is equipped with the second pull rod, the structure phase of the second pull rod and the first pull rod in the 5th threaded hole Together, the second pull rod is cooperated by the first rotary screw rod and the 5th threaded hole.
Further, the supportive body includes symmetrical support base, and support base is equipped with symmetrical point The third through hole of cloth is equipped with the fastening plates of array distribution between support base, is equipped with running gear between support base and places Plate, support base are equipped with symmetrical supporting beam, and supporting beam is equipped with the first rotary sleeve, is equipped with and is obliquely installed between supporting beam Fastening support, supportive body is equipped with support device mounting table, and support device mounting table is fixed in supporting beam, support dress Placement location platform is equipped with reinforcer, and support device mounting table is equipped with symmetrical hydraulic cylinder fixed plate, hydraulic cylinder fixed plate It is equipped with the 4th through hole of array distribution.
Further, the supportive body is equipped with workbench, and workbench is fixed in supporting beam, and workbench two sides are all provided with There is the second symmetrical rotary sleeve, the company end of workbench is equipped with safety barrier;The supportive body is equipped with support reinforcing frame, Support reinforcing frame is equipped with the support reinforcing block of array distribution, and it is sliding to be equipped with symmetrical electric block below support reinforcing frame Rail is equipped with the 6th reinforcing beam between the both ends and support reinforcing block of electric block sliding rail.
Beneficial effects of the present invention:
1, template system assembly one-pass molding, recycling, the turnover of the electronic no pulling rod formwork trolley of the present invention are convenient, should Artificial less investment, construction efficiency are high when formwork jumbo operation, and presentation quality is good, safety coefficient is high, greatly reduces steel pipe The amount of setting up of bracket, Safety standardization is higher, and construction speed more can reach one day one and recycle, and be not required to during template movement Remaining lifting appliance is used, only uses crane on a small quantity when holding mould installation, fuel burning is few, and environmental pollution is small, meets and works as Under energy-saving and environment-friendly industry requirement;
2, the electronic no pulling rod formwork trolley of the present invention effectively prevents wall tie rod hole caused by traditional equipment construction culvert The problem of infiltration, solves the mass defects such as obvious formwork edge joint, construction faulting of slab ends, concrete color difference, ensure that culvert walls are big The flatness and engineering entity quality in face.
Detailed description of the invention
The present invention will be further described below with reference to the drawings.
Fig. 1 is formwork jumbo structural schematic diagram of the present invention;
Fig. 2 is formwork jumbo structural schematic diagram of the present invention;
Fig. 3 is formwork structure schematic diagram of the present invention;
Fig. 4 is cast outer mold structure schematic diagram of the present invention;
Fig. 5 is internal model structure schematic diagram of the present invention;
Fig. 6 is mode structure schematic diagram in end of the present invention;
Fig. 7 is the first drawbar structure diagram of the invention;
Fig. 8 is trolley structure schematic diagram of the present invention;
Fig. 9 is trolley structure schematic diagram of the present invention;
Figure 10 is trolley partial structure diagram of the present invention;
Figure 11 is trolley partial structure diagram of the present invention;
Figure 12 is rotary work horse block structural schematic diagram of the present invention;
Figure 13 is enlarged structure schematic diagram at A in Fig. 2 of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
Electronic sliding formwork without pull rod integrally lead to contain wall formwork for placing trolley, formwork jumbo include trolley 6 and be located at trolley two The symmetrical template in side, template include external mold 1, internal model 2 and hold mould 3, as shown in Figure 1, Figure 2, Figure 3 shows.
External mold 1 includes the first support plate 11, and the first support plate 11 is equipped with the first reinforcing rib 12 and second of array distribution Reinforcing rib 13,13 vertical distribution of the first reinforcing rib 12 and the second reinforcing rib, the first support plate 11 are equipped with the first of array distribution Reinforcing beam 14 and the second reinforcing beam 15, the first reinforcing beam 14 and 15 level of the second reinforcing beam distribute alternately, 14 He of the first reinforcing beam Second reinforcing beam 15 is fastenedly connected on the first reinforcing rib 12 and the second reinforcing rib 13.
Outer membrane 1 is extended at first reinforcing beam 14 and the second reinforcing beam 15 both ends, and the both ends of the first reinforcing beam 14 are equal Equipped with the first fastening screw support 141, the first fastening screw support 141 is equipped with the first threaded hole 142, the second reinforcing beam 15 Both ends are equipped with the first counterbore 151, are equipped with the first through hole 152 in the first counterbore 151.
First support plate 11 is equipped with the third reinforcing beam 16 of array distribution, and third reinforcing beam 16 is located at the first reinforcing beam 14 and second are distributed vertically on reinforcing beam 15, and the first support plate 11 is extended equipped with the second counterbore in the top of third reinforcing beam 16 161, the second counterbore 161 is interior equipped with the second through hole 162.
Third reinforcing beam 16 is equipped with bearing beam 17, and bearing beam 17 is equipped with the first reinforcement block 18 and third of array distribution Reinforcing beam 16 is fastenedly connected, and symmetrical third reinforcing rib 19 is equipped between the both ends and third reinforcing beam 16 of bearing beam 17.
Internal model 2 includes the second support plate 21, and the second support plate 21 is identical with 11 structure of the first support plate, and difference is, First support plate 11 is higher than the second support plate 21, facilitates later period pouring platform cap, and the second support plate 21 is equipped with the of array distribution Four reinforcing ribs 22 and the 5th reinforcing rib 23, the 4th reinforcing rib 22 and 23 vertical distribution of the 5th reinforcing rib are set in the second support plate 21 There are the 4th reinforcing beam 24 and the 5th reinforcing beam 25 of array distribution, the 4th reinforcing beam 24 and the 5th reinforcing beam 25 are alternate point horizontal Cloth.
4th reinforcing beam 24 is equipped with symmetrical third threaded hole 241, and the both ends of the 5th reinforcing beam 25 are equipped with the Two fastening screws support 251, the second fastening screw support 251 are equipped with the second threaded hole 252.
Second support plate 21 is equipped with the 6th reinforcing beam 26 of array distribution, and the 6th distribution vertically of reinforcing beam 26, the 6th adds Extend the second support plate 21 equipped with the 4th threaded hole 261 and the 5th threaded hole 262 in one end of brutal 26.
2 Relative distribution of external mold 1 and internal model holds mould 3 between external mold 1 and internal model 2, and end mould 3 includes third support plate 31, Third support plate 31 is equipped with the 6th reinforcing rib 32 of array distribution, and third support plate 31 is equipped with symmetrical stiffening plate 33。
End mould 3 is contacted with the first support plate 11 and the second support plate 21 by third support plate 31, by stiffening plate 33 and The first reinforcing beam 14 and the second reinforcing beam 15 of external mold 1 are contacted with the 4th reinforcing beam 24 of internal model 2 and the 5th reinforcing beam 25,
Rotation is equipped with screw rod 5 in first threaded hole 142 and the second threaded hole 252, and screw rod 5 acts on 33 opposite end mould of stiffening plate 3 fix, and during the work time, the first wall poured, external mold 1 and 2 both ends of internal model are equipped with end mould 3, subsequent On the basis of the wall that last time pours, the other side carries out pouring work using end mould for wall, external mold 1 and 2 side of internal model.
The first pull rod 4 is equipped between external mold 1 and internal model 2, as shown in Fig. 1, Fig. 3, Fig. 7, the first pull rod 4 includes support rod 41, one end of support rod 41 is equipped with the first limited block 42, and the other end is equipped with the first rotary screw rod 43, and the one of the first rotary screw rod 43 End is fastenedly connected with support rod 41, and the other end is equipped with the first in command 44.
First pull rod 4 is located at the first counterbore 151 of external mold 1, the interior rotation of the second counterbore 161 by the first limited block 42, leads to Support rod 41 is crossed across the first through hole 152, the second through hole 162, passes through the third screw thread of the first rotary screw rod 43 and internal model 2 Adjusting is fixed to external mold 1, internal model 2 and end mould 3 in hole 241, the cooperation of the 4th threaded hole 261.
It is rotated in 5th threaded hole 262 and is equipped with the second pull rod, the structure of the second pull rod and the first pull rod 4 is identical, and second draws Bar is cooperated by the first rotary screw rod 43 and the 5th threaded hole 262, and the template poured to platform cap is fixed.
Trolley 6 includes running gear, bracing means, support device, lifting device, as shown in Figure 8, Figure 9.
Trolley 6 includes supportive body 61, and as shown in Figure 10, supportive body 61 includes symmetrical support base 611, branch It supports pedestal 611 and is equipped with symmetrical third through hole 6111, the fastening plates of array distribution are equipped between support base 611 6112, running gear placement plate 612 is equipped between support base 611.
Support base 611 is equipped with symmetrical supporting beam 614, and supporting beam 614 is equipped with the first rotary sleeve 613, support The fastening support 615 being obliquely installed is equipped between beam 614.
Supportive body 61 is equipped with support device mounting table 616, and support device mounting table 616 is fixed in supporting beam 614, Support device mounting table 616 is equipped with reinforcer 6161, and support device mounting table 616 is equipped with symmetrical hydraulic cylinder and fixes Plate 6162, hydraulic cylinder fixed plate 6162 are equipped with the 4th through hole 6163 of array distribution.
Supportive body 61 is equipped with workbench 617, and workbench 617 is fixed in supporting beam 614, and 617 two sides of workbench are equal Equipped with the second symmetrical rotary sleeve 6171, the company end of workbench 617 is equipped with safety barrier 6172.
Supportive body 61 is equipped with support reinforcing frame 618, and support reinforcing frame 618 is equipped with the support reinforcing block of array distribution 6181, symmetrical electric block sliding rail 81, the both ends of electric block sliding rail 81 and support are equipped with below support reinforcing frame 618 The 6th reinforcing beam 619 is equipped between reinforcement block 6181.
Running gear includes being located at the idler wheel 62 rotated in third through hole 6111 by bearing, as shown in figure 9, idler wheel 62 Lower section is equipped with guide rail 7, and running gear placement plate 612 is equipped with driving motor 64 and speed changer 63, and driving motor 64 passes through change Fast device 63 controls idler wheel 62 and rolls, and moves so that trolley 6 is located on guide rail 7.
Bracing means includes the rotation support 65 rotated in the first rotary sleeve 613, as shown in Fig. 9, Figure 11, rotation branch Support 65 includes column spinner 651, and one end of column spinner 651 is equipped with the second limited block 652, and the other end is equipped with extension rod 653, extension rod 653 are equipped with the 6th threaded hole 654, and rotation support 65 is located at rotation in the first rotary sleeve 613 by column spinner 651.
Rotation support 65, which is equipped with, reinforces supporting element 66, and reinforcing supporting element 66 includes the second rotary screw rod 661, the second rotation silk One end of bar 661, which is equipped with, reinforces supporting block 662, and the other end is equipped with second receipts 663, reinforces supporting element 66 and passes through the second rotation silk Bar 661 is located at rotation in the 6th threaded hole 654, reinforces supporting element 66 by rotation, makes to reinforce supporting block 662 and ground face contact, Trolley 6 in work is reinforced.
Support device includes the hydraulic cylinder 67 on support device mounting table 616, as shown in Fig. 9, Figure 13, hydraulic cylinder 67 Movable part pass through the 4th through hole 6163 and be fastenedly connected with support contact block 671, support device passes through support in use process Contact block 671 is contacted with the 6th reinforcing beam 26 and is supported to internal model 2.
Lifting device includes being located at the electric block 8 slided on electric block sliding rail 81, on each electric block sliding rail 81 If there are two electric block 8, electric block 8 carries out lifting shipment to external mold 1 and internal model 2.
Trolley 6 is equipped with rotary work horse block 68, and as shown in Fig. 9, Figure 12, Figure 13, rotary work horse block 68 includes horse block Main body 681, horse block main body 681 are equipped with the first symmetrical square hole 682, are equipped with fixing axle in the first square hole 682 683, rotary work horse block 68 is located at rotation in the second rotary sleeve 6171 by fixing axle 683, and rotary work horse block 68 is equipped with Second square hole 684 of array distribution in the course of work, passes through the 4th reinforcing beam of 2 top of rotary work horse block 68 and internal model 24 contact supports, the second square hole 684 are stuck on the 6th reinforcing beam 26, facilitate work.
In use, trolley 6 carries out lifting fixation to external mold 1 and internal model 2 by lifting device, lifting device passes through electronic calabash The hook sleeve of reed 8 adds end mould 3 on reinforcing beam between external mold 1 and internal model 2, and two end moulds 3 are used when pouring for the first time, It is subsequent to pour using one, on the basis of the wall that the other end was poured using last time, by the first pull rod 4 for external mold 1 and internal model 2 It is fixed, is fixed by 5 opposite end mould 3 of screw rod, by the width of the first pull rod 4 and end mould 3 to the thickness for pouring wall It is adjusted, fixed rear chassis 6 discharges the lifting to external mold 1 and internal model 2, and trolley 6 props up internal model 2 by support device Support, stretching for the hydraulic cylinder 67 of support device, adjusts the width between cast wall, after pouring, is demoulded, use platform Vehicle 6 carries out lifting transhipment to template, and so on lower section wall is poured.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close Suitable mode combines.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.

Claims (10)

1. a kind of electronic sliding formwork without pull rod integrally lead to contain wall formwork for placing trolley, formwork jumbo include trolley (6) and be located at platform The symmetrical template in vehicle two sides, template include external mold (1), internal model (2) He Duanmo (3), which is characterized in that the external mold (1) The first pull rod (4) are equipped between internal model (2), trolley (6) includes running gear, bracing means, support device, lifting device;
The trolley (6) includes supportive body (61), and running gear includes idler wheel (62), is equipped with guide rail below idler wheel (62) (7), running gear placement plate (612) is equipped with driving motor (64) and speed changer (63);
The bracing means includes rotation support (65), and rotation support (65) includes column spinner (651), and the one of column spinner (651) End is equipped with the second limited block (652), and the other end is equipped with extension rod (653), and extension rod (653) is equipped with the 6th threaded hole (654);
The rotation support (65), which is equipped with, reinforces supporting element (66), and reinforcing supporting element (66) includes the second rotary screw rod (661), the One end of two rotary screw rods (661), which is equipped with, reinforces supporting block (662), and the other end is equipped with second receipts (663);
The support device includes the hydraulic cylinder (67) on support device mounting table (616), the movable part of hydraulic cylinder (67) It is connected with support contact block (671);
The lifting device includes the electric block (8) slided on electric block sliding rail (81);
The trolley (6) is equipped with rotary work horse block (68), and rotary work horse block (68) includes horse block main body (681), horse block Main body (681) is equipped with symmetrical the first square hole (682), is equipped with fixing axle (683) in the first square hole (682), rotation It changes a job and makees horse block (68) and be located in the second rotary sleeve (6171) by fixing axle (683) to rotate, rotary work horse block is set on (68) There is the second square hole (684) of array distribution.
2. electronic sliding formwork according to claim 1 integrally leads to without pull rod contains wall formwork for placing trolley, which is characterized in that institute Stating external mold (1) includes the first support plate (11), and the first support plate (11) is equipped with the first reinforcing rib (12) and the of array distribution Two reinforcing ribs (13), the first reinforcing rib (12) and the second reinforcing rib (13) vertical distribution, the first support plate (11) are equipped with array The first reinforcing beam (14) and the second reinforcing beam (15) of distribution;First reinforcing beam (14) and the second reinforcing beam (15) two End is extended outer membrane (1), and the both ends of the first reinforcing beam (14) are equipped with the first fastening screw support (141), the first fastening spiral shell Bar supports (141) to be equipped with the first threaded hole (142), and the both ends of the second reinforcing beam (15) are equipped with the first counterbore (151), and first The first through hole (152) are equipped in counterbore (151).
3. electronic sliding formwork according to claim 2 integrally leads to without pull rod contains wall formwork for placing trolley, which is characterized in that institute The third reinforcing beam (16) that the first support plate (11) are equipped with array distribution is stated, third reinforcing beam (16) is located at the first reinforcing beam (14) and on the second reinforcing beam (15) it is distributed vertically, extends the first support plate (11) above third reinforcing beam (16) and be equipped with the Two counterbores (161), the second counterbore (161) is interior to be equipped with the second through hole (162);The third reinforcing beam (16) is equipped with bearing beam (17), the first reinforcement block (18) that bearing beam (17) is equipped with array distribution is fastenedly connected with third reinforcing beam (16), bearing beam (17) symmetrical third reinforcing rib (19) is equipped between both ends and third reinforcing beam (16).
4. electronic sliding formwork according to claim 1 integrally leads to without pull rod contains wall formwork for placing trolley, which is characterized in that institute Stating internal model (2) includes the second support plate (21), and the second support plate (21) is equipped with the 4th reinforcing rib (22) and the of array distribution Five reinforcing ribs (23), the 4th reinforcing rib (22) and the 5th reinforcing rib (23) vertical distribution, the second support plate (21) are equipped with array The 4th reinforcing beam (24) and the 5th reinforcing beam (25) of distribution;4th reinforcing beam (24) is equipped with symmetrical third spiral shell Pit (241), the both ends of the 5th reinforcing beam (25) are equipped with the second fastening screw support (251), the support of the second fastening screw (251) the second threaded hole (252) are equipped with;Second support plate (21) is equipped with the 6th reinforcing beam (26) of array distribution, 6th reinforcing beam (26) is distributed vertically, and the second support plate (21) are extended equipped with the 4th threaded hole in one end of the 6th reinforcing beam (26) (261) and the 5th threaded hole (262).
5. electronic sliding formwork according to claim 1 integrally leads to without pull rod contains wall formwork for placing trolley, which is characterized in that institute External mold (1) and internal model (2) Relative distribution are stated, end mould (3) is located between external mold (1) and internal model (2), and end mould (3) includes third branch Fagging (31), third support plate (31) be equipped with array distribution the 6th reinforcing rib (32), third support plate (31) be equipped with pair Claim the stiffening plate (33) of distribution;The end mould (3) passes through third support plate (31) and the first support plate (11) and the second support plate (21) it contacts, passes through the first reinforcing beam (14) and the second reinforcing beam (15) of stiffening plate (33) and external mold (1) and internal model (2) 4th reinforcing beam (24) and the contact of the 5th reinforcing beam (25).
6. electronic sliding formwork according to claim 2 integrally leads to without pull rod contains wall formwork for placing trolley, which is characterized in that institute It states to rotate in the first threaded hole (142) and the second threaded hole (252) and is equipped with screw rod (5), screw rod (5) acts on stiffening plate (33) Opposite end mould (3) fixes.
7. electronic sliding formwork according to claim 2 integrally leads to without pull rod contains wall formwork for placing trolley, which is characterized in that institute Stating the first pull rod (4) includes support rod (41), and one end of support rod (41) is equipped with the first limited block (42), and the other end is equipped with first Rotary screw rod (43), one end and the support rod (41) of the first rotary screw rod (43) are fastenedly connected, and the other end is equipped with the first in command (44)。
8. electronic sliding formwork according to claim 4 integrally leads to without pull rod contains wall formwork for placing trolley, which is characterized in that institute It states to rotate in the 5th threaded hole (262) and is equipped with the second pull rod, the structure of the second pull rod and the first pull rod (4) is identical, the second pull rod Cooperated by the first rotary screw rod (43) and the 5th threaded hole (262).
9. electronic sliding formwork according to claim 1 integrally leads to without pull rod contains wall formwork for placing trolley, which is characterized in that institute Stating the supportive body (61) includes symmetrical support base (611), and support base (611) is equipped with symmetrical the Three through holes (6111), are equipped with the fastening plates (6112) of array distribution between support base (611), between support base (611) Equipped with running gear placement plate (612), support base (611) is equipped with symmetrical supporting beam (614), in supporting beam (614) Equipped with the first rotary sleeve (613), the fastening support (615) being obliquely installed, supportive body (61) are equipped between supporting beam (614) It is equipped with support device mounting table (616), support device mounting table (616) is fixed on supporting beam (614), and support device is placed Platform (616) is equipped with reinforcer (6161), and support device mounting table (616) is equipped with symmetrical hydraulic cylinder fixed plate (6162), hydraulic cylinder fixed plate (6162) is equipped with the 4th through hole (6163) of array distribution.
10. electronic sliding formwork according to claim 1 integrally leads to without pull rod contains wall formwork for placing trolley, which is characterized in that The supportive body (61) is equipped with workbench (617), and workbench (617) is fixed on supporting beam (614), workbench (617) Two sides are equipped with symmetrical the second rotary sleeve (6171), and the company end of workbench (617) is equipped with safety barrier (6172);It is described Supportive body (61) is equipped with support reinforcing frame (618), and support reinforcing frame (618) is equipped with the support reinforcing block of array distribution (6181), it is equipped with symmetrical electric block sliding rail (81) below support reinforcing frame (618), the two of electric block sliding rail (81) The 6th reinforcing beam (619) is equipped between end and support reinforcing block (6181).
CN201910195987.XA 2019-03-15 2019-03-15 Electric slip form pull-rod-free integral through culvert wall body pouring formwork trolley Active CN109826117B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910195987.XA CN109826117B (en) 2019-03-15 2019-03-15 Electric slip form pull-rod-free integral through culvert wall body pouring formwork trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910195987.XA CN109826117B (en) 2019-03-15 2019-03-15 Electric slip form pull-rod-free integral through culvert wall body pouring formwork trolley

Publications (2)

Publication Number Publication Date
CN109826117A true CN109826117A (en) 2019-05-31
CN109826117B CN109826117B (en) 2021-07-09

Family

ID=66870134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910195987.XA Active CN109826117B (en) 2019-03-15 2019-03-15 Electric slip form pull-rod-free integral through culvert wall body pouring formwork trolley

Country Status (1)

Country Link
CN (1) CN109826117B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748148A (en) * 2019-11-02 2020-02-04 上海建工五建集团有限公司 Construction method suitable for high-precision construction formwork equipment of double-width ultra-long wall
CN113928967A (en) * 2021-11-03 2022-01-14 晟通科技集团有限公司 Template hoisting method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2270807Y (en) * 1996-08-16 1997-12-17 北京市第二水利工程处 Advancing tunnel sliding shuttering
CN102127966A (en) * 2011-02-14 2011-07-20 宿迁华夏建设(集团)工程有限公司 Fixing device for template of cast-in-place reinforced concrete column
CN102322028A (en) * 2011-07-20 2012-01-18 中铁四局集团第一工程有限公司 Semi-automatic arch culvert construction template
CN204163738U (en) * 2014-06-10 2015-02-18 芜湖市昌伟钢模制造有限公司 A kind of novel hydraulic lining trolley
CN204609906U (en) * 2015-04-28 2015-09-02 金中天集团建设有限公司 A kind of modularization steel form carrier
CN204627625U (en) * 2015-04-14 2015-09-09 甘肃路桥建设集团有限公司 Automatic walking lining trolley
CN107859324A (en) * 2017-11-03 2018-03-30 北京中易房建筑工程有限公司 A kind of U-device for clamping template
CN207348463U (en) * 2017-10-17 2018-05-11 上海市浦东新区建设(集团)有限公司 A kind of pulling-on piece component for aluminum alloy mould plate
CN208534043U (en) * 2018-04-13 2019-02-22 中国建筑第七工程局有限公司 Formwork reinforcement tools

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2270807Y (en) * 1996-08-16 1997-12-17 北京市第二水利工程处 Advancing tunnel sliding shuttering
CN102127966A (en) * 2011-02-14 2011-07-20 宿迁华夏建设(集团)工程有限公司 Fixing device for template of cast-in-place reinforced concrete column
CN102322028A (en) * 2011-07-20 2012-01-18 中铁四局集团第一工程有限公司 Semi-automatic arch culvert construction template
CN204163738U (en) * 2014-06-10 2015-02-18 芜湖市昌伟钢模制造有限公司 A kind of novel hydraulic lining trolley
CN204627625U (en) * 2015-04-14 2015-09-09 甘肃路桥建设集团有限公司 Automatic walking lining trolley
CN204609906U (en) * 2015-04-28 2015-09-02 金中天集团建设有限公司 A kind of modularization steel form carrier
CN207348463U (en) * 2017-10-17 2018-05-11 上海市浦东新区建设(集团)有限公司 A kind of pulling-on piece component for aluminum alloy mould plate
CN107859324A (en) * 2017-11-03 2018-03-30 北京中易房建筑工程有限公司 A kind of U-device for clamping template
CN208534043U (en) * 2018-04-13 2019-02-22 中国建筑第七工程局有限公司 Formwork reinforcement tools

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748148A (en) * 2019-11-02 2020-02-04 上海建工五建集团有限公司 Construction method suitable for high-precision construction formwork equipment of double-width ultra-long wall
CN110748148B (en) * 2019-11-02 2021-07-20 上海建工五建集团有限公司 Construction method suitable for high-precision construction formwork equipment of double-width ultra-long wall
CN113928967A (en) * 2021-11-03 2022-01-14 晟通科技集团有限公司 Template hoisting method

Also Published As

Publication number Publication date
CN109826117B (en) 2021-07-09

Similar Documents

Publication Publication Date Title
CN103774561B (en) The job execution of speedway prefabricated small box girder frock method streamlined
CN109057339B (en) One-time pouring construction method for anti-ridge of toilet
CN207419520U (en) Piping lane construction template component
CN208072950U (en) A kind of combination set shaped steel formwork
CN209163516U (en) A kind of post-cast strip tool support device
CN109826117A (en) Electronic sliding formwork integrally leads to without pull rod contains wall formwork for placing trolley
CN105421781A (en) Synchronous pouring construction method and formwork system for concrete ridge platform and structural floor slab
CN110485636A (en) A kind of cavity frame column and its forming method
CN208310186U (en) A kind of wall reinforcement formwork structure with corner
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN109025262B (en) Construction method for one-time pouring forming of concrete flanging
CN206418523U (en) A kind of liftable post-cast strip template structure and system
CN205874980U (en) Two traitorous internal mold of hollow plate beam and two -way rigidity locking bearing structure
CN205976472U (en) Pour mould of building post -cast strip
CN101629454A (en) Bracket concrete construction formwork
CN108979136B (en) Anti-bank's of bathroom integrative construction formwork structure of pouring
CN209976019U (en) Sink tank template assembly for toilet
CN211006352U (en) Pier stud template reinforced structure
CN108979142B (en) Hang mould and pour construction structures
CN208267865U (en) A kind of backform trolley
CN207863469U (en) A kind of stringer type stairway mold
CN2061580U (en) Shuttering device for lifting removal form of box-type building member
CN109930712A (en) The cast-in-place double mesh sheet of one kind exempt from the plaster dedicated framework of partition wall construction and its construction method
CN204728698U (en) The closed formwork structure of a kind of concrete suspension bridging piece
CN220599175U (en) Steel-wood combined template reinforcing device for steel-structure parapet wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210524

Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Applicant after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd.

Applicant after: THE FOURTH ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Address before: No.2-8 Hongli Road, Nanning, Guangxi 530000

Applicant before: THE FOURTH ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant