CN218757047U - Movable steel cable bridge deck pavement auxiliary equipment - Google Patents

Movable steel cable bridge deck pavement auxiliary equipment Download PDF

Info

Publication number
CN218757047U
CN218757047U CN202222928821.4U CN202222928821U CN218757047U CN 218757047 U CN218757047 U CN 218757047U CN 202222928821 U CN202222928821 U CN 202222928821U CN 218757047 U CN218757047 U CN 218757047U
Authority
CN
China
Prior art keywords
basket structure
upper portion
hanging basket
bridge deck
cable bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222928821.4U
Other languages
Chinese (zh)
Inventor
陈双林
马骏
杨建虎
崔凯
王高伟
杨超
霍凡
张建伟
张普育
赵宇
田丽红
关丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 3 Co Ltd
Original Assignee
Sinohydro Bureau 3 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 3 Co Ltd filed Critical Sinohydro Bureau 3 Co Ltd
Priority to CN202222928821.4U priority Critical patent/CN218757047U/en
Application granted granted Critical
Publication of CN218757047U publication Critical patent/CN218757047U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a portable cable wire decking auxiliary assembly that mats formation, hang basket structure and lower part including the upper portion that can dismantle the connection and hang basket structure, upper portion is hung and is provided with the cat ladder between basket structure and the lower part one side outside of hanging basket structure, and the bottom that basket structure was hung on upper portion is provided with operation platform, and the bottom that basket structure was hung to the lower part is provided with operation platform down, and the bottom that basket structure was hung on upper portion is provided with the track wheelset that the multiunit is used for following the cable wire and removes, and every track wheelset all includes a plurality of U type tracks, all is provided with a walking wheel in every U type track. The utility model has the advantages of reasonable design, be convenient for install and dismantle, the security is high, can dismantle through hanging basket structure with upper portion and lower part and link together and carry out mating formation of steel cable bridge panel, can make a plurality of constructors be located upper portion respectively and hang basket structure and lower part and hang the basket structure in, carry out the cable wire top panel simultaneously and mat formation and panel lower part and consolidate, can effectively reduce the steel cable bridge deck pavement construction degree of difficulty, improve the construction progress.

Description

Movable steel cable bridge deck pavement auxiliary equipment
Technical Field
The utility model belongs to the technical field of the bridge construction, concretely relates to portable cable wire decking auxiliary assembly that mats formation.
Background
At present, in order to show the diversified characteristics of landscape gardens in modern gardens, and simultaneously to fuse the straight line and the curve of garden each other, promote garden landscape effect, generally all can set up the steel cable bridge in landscape gardens and reflect the beauty of the curve of cable bridge through its curve structure. The bridge deck pavement construction of steel cable bridge usually adopts and hangs the basket construction, but traditional basket of hanging generally adopts the individual layer to hang the basket, consequently needs to mat the top panel of steel cable bridge and the separate construction of lower panel reinforcement, causes the big, the slow problem of progress of the bridge deck pavement construction degree of difficulty of steel cable bridge. Therefore, it is necessary to design a steel cable bridge deck paving device which can simultaneously meet the requirements of paving the steel cable upper deck and reinforcing the lower part of the deck.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that not enough among the above-mentioned prior art is directed against, a portable cable wire decking auxiliary assembly that mats formation is provided, its structural design is reasonable, be convenient for install and dismantle, the security is high, can dismantle through hanging basket structure and lower part with upper portion and link together and form the bilayer and hang the basket structure and carry out the supplementary pavement of cable wire decking, can make a plurality of constructors be located upper portion respectively and hang basket structure and lower part and hang the basket structure in, carry out cable wire top panel simultaneously and mat formation and panel lower part reinforcement, can effectively reduce the cable wire bridge deck pavement construction degree of difficulty, improve the construction progress.
In order to solve the technical problem, the utility model adopts the technical scheme that: the utility model provides a portable cable wire decking auxiliary assembly that mats formation which characterized in that: hang basket structure and lower part including the upper portion that can dismantle the connection and hang basket structure, be provided with the cat ladder between the outside of one side of basket structure and the outside of one side of lower part string basket structure on the outside of one side of basket structure is hung on upper portion, the basket structure is hung on upper portion and the lower part is hung basket structure and is the open cube frame structure in upper portion, the bottom that basket structure was hung on upper portion is provided with operation platform, the bottom that basket structure was hung on upper portion is provided with the multiunit and is used for following the track wheelset that the cable wire removed, every the track wheelset all includes a plurality of by preceding to detain the U type track of establishing on same root cable wire after to in proper order, all is provided with one in every U type track and can carries out the walking wheel that removes along the cable wire, one side top that basket structure was hung on upper portion is provided with cat ladder positioning mechanism, can dismantle between the bottom of cat ladder and the bottom that basket structure was hung to the lower part.
Foretell portable cable wire decking auxiliary assembly that mats formation, its characterized in that: the hanging basket is characterized in that four corners of the bottom of the upper hanging basket structure are respectively fixed with an inserting rod, four corners of the top of the lower hanging basket structure are respectively fixed with an outer sleeve for the inserting rod to be inserted, the inserting rod is parallel to the outer sleeve, the inserting rod is arranged along the height direction of the upper hanging basket structure, and the outer sleeve is arranged along the height direction of the lower hanging basket structure.
Foretell portable cable wire decking auxiliary assembly that mats formation, its characterized in that: the plug rod is detachably connected with the outer sleeve through a bolt, a through hole for the bolt to pass through is formed in the plug rod, and a plurality of bolt through holes are formed in the outer sleeve along the length direction of the outer sleeve.
Foretell portable cable wire decking auxiliary assembly that mats formation, its characterized in that: the upper operating platform is a wood board or a bamboo plywood paved at the bottom of the upper operating platform, and the lower operating platform is a wood board or a bamboo plywood paved at the bottom of the lower operating platform.
Foretell portable cable wire decking auxiliary assembly that mats formation, its characterized in that: the walking wheels are self-locking wheels.
Foretell portable cable wire decking auxiliary assembly that mats formation, its characterized in that: the cat ladder includes two side rails and from top to bottom equidistant connection at the convex crosspiece between two side rails.
The movable steel cable bridge deck pavement auxiliary equipment is characterized in that: the ladder stand positioning mechanism comprises two positioning sleeves for the two side railings to pass through respectively.
Foretell portable cable wire decking auxiliary assembly that mats formation, its characterized in that: every the bottom of side railing all is provided with a fixed block, pass through bolted connection between fixed block and the bottom of lower part string basket structure.
Compared with the prior art, the utility model has the following advantage:
1. the utility model discloses a hang basket structure and lower part with upper portion and hang basket structure can dismantle the connection and form the bilayer and hang basket structure and carry out the mat formation of steel cable bridge panel together, be convenient for realize hanging the installation and the dismantlement of basket structure, can make a plurality of constructors be located upper portion respectively and hang basket structure and lower part and hang the basket structure in, carry out the cable wire top panel simultaneously and mat formation and the reinforcement of panel lower part, can effectively reduce the steel cable bridge deck pavement construction degree of difficulty, improve the construction progress.
2. The utility model discloses a be provided with multiunit track wheelset in the bottom of hanging basket structure in upper portion, can effectively will hang basket stable in structure and place on many cable wires, can also be convenient for simultaneously hang the removal of basket structure along the cable wire.
3. The utility model discloses a set up the cat ladder between the outside of one side of hanging the basket structure in upper portion outside and one side of hanging the basket structure in lower part outside, the constructor of being convenient for hangs basket structure and lower part through the cat ladder and hangs safety current between the basket structure in upper portion.
To sum up, the utility model has the advantages of reasonable design, be convenient for installation and dismantlement, the security is high, can dismantle the connection and form the double-deck basket structure of hanging of formation and carry out the supplementary of steel cable bridge panel and mat formation through hanging basket structure with upper portion and lower part, can make a plurality of constructors be located upper portion respectively and hang basket structure and lower part and hang the basket structure in, carry out the cable wire top panel simultaneously and mat formation and panel lower part reinforcement, can effectively reduce the steel cable bridge deck pavement construction degree of difficulty, improve the construction progress.
The technical solution of the present invention is further described in detail by the accompanying drawings and examples.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a left side view of fig. 1.
Fig. 3 is a top view of fig. 1.
Description of the reference numerals:
1-upper hanging basket structure; 2-lower hanging basket structure; 3, climbing a ladder;
3-1-side rail; 3-2-arc crosspiece; 4-an upper operating platform;
5-lower operation platform; 6-U-shaped rail; 7-a travelling wheel;
8, inserting a rod; 9-outer sleeve; 9-1-bolt perforation;
10-bolt; 11-a fixed block; 12-a positioning sleeve;
13-steel cord.
Detailed Description
As shown in fig. 1 to 3, the utility model discloses a can dismantle upper portion of connection and hang basket structure 1 and lower part and hang basket structure 2, one side outside of hanging basket structure 1 on upper portion and one side outside of hanging basket structure 2 on lower part are provided with cat ladder 3 between, upper portion hang basket structure 1 and lower part hang basket structure 2 and are the open cube frame structure in upper portion, the bottom of hanging basket structure 1 on upper portion is provided with operation platform 4, the bottom of hanging basket structure 2 on lower part is provided with lower operation platform 5, the bottom of hanging basket structure 1 on upper portion is provided with the track wheelset that the multiunit is used for following cable wire 13 and removes, every the track wheelset all includes a plurality of U type track 6 of establishing on same root cable wire 13 by preceding to the back in proper order, all is provided with a walking wheel 7 that can follow cable wire 13 and move in every U type track 6, one side top of hanging basket structure 1 on upper portion is provided with cat ladder positioning mechanism, can dismantle between the bottom of cat ladder 3 and the bottom of hanging basket structure 2 on lower part and be connected.
During the in-service use, hang basket structure 1 and lower part through hanging upper portion and hang basket structure 2 and can dismantle the connection and form the bilayer and hang the basket structure and carry out the steel cable bridge panel mat formation together, be convenient for realize hanging the installation and the dismantlement of basket structure, can make a plurality of constructors be located upper portion respectively and hang basket structure 1 and lower part and hang basket structure 2 in, carry out the cable wire top panel simultaneously and mat formation and panel lower part reinforcement, can effectively reduce the steel cable bridge deck pavement construction degree of difficulty, improve the construction progress.
It should be noted that, by providing multiple sets of track wheel sets at the bottom of the upper hanging basket structure 1, the hanging basket structure can be effectively and stably placed on the multiple steel cables 13, and meanwhile, the hanging basket structure can be conveniently moved along the steel cables 13.
During specific implementation, through hang on upper portion one side outside and the lower part and hang and set up cat ladder 3 between basket structure 2's one side outside, the constructor of being convenient for hangs basket structure 1 and lower part through cat ladder 3 and hangs safe passage between basket structure 2.
During concrete implementation, basket structure 1 is hung on upper portion and basket structure 2 is hung to the lower part all adopts the square steel welding to form, and basket structure 1 is hung on upper portion and basket structure 2 is hung to the lower part's bottom all is provided with a plurality of horizontal poles and is used for supporting operation platform 4 and lower operation platform 5, and the week side that basket structure 1 is hung on upper portion and basket structure 2 is hung to the lower part all is provided with horizontal rod piece or vertical rod piece and protects, and the week side protective structure's that basket structure 1 and basket structure 2 is hung to upper portion sets up and does not influence the bridge deck pavement operation.
It should be noted that, after the cradle structure is installed, two sides of the U-shaped rail 6 are respectively located at two sides of the corresponding steel cable 13, the bottom of the U-shaped rail 6 is lower than the bottom of the steel cable 13, so as to ensure the stability of the cradle structure, and the traveling wheels 7 move along the upper portion of the steel cable 13.
In practical applications, the number of the track wheel sets is equal to the number of the steel cables 13, and the track wheel sets correspond to the steel cables 13 one by one.
In this embodiment, four corners of the bottom of the upper hanging basket structure 1 are respectively fixed with an insertion rod 8, four corners of the top of the lower hanging basket structure 2 are respectively fixed with an outer sleeve 9 for the insertion rod 8 to be inserted, the insertion rod 8 is parallel to the outer sleeve 9, the insertion rod 8 is arranged along the height direction of the upper hanging basket structure 1, and the outer sleeve 9 is arranged along the height direction of the lower hanging basket structure 2.
During the in-service use, the height of basket structure 2 is hung to the lower part can be adjusted in certain extent to the setting of peg graft 8 and outer tube 9, and then can not the co-altitude constructor of adaptation, guarantees constructor's safety.
It should be noted that the insertion rod 8 and the outer sleeve 9 are both made of square steel.
As shown in fig. 1, in this embodiment, the insertion rod 8 is detachably connected to the outer sleeve 9 through a bolt 10, the insertion rod 8 is provided with a through hole for the bolt 10 to pass through, and the outer sleeve 9 is provided with a plurality of bolt through holes 9-1 along a length direction thereof.
In practical use, the bolt 10 is a high-strength bolt, and the opening position of the bolt through hole 9-1 is matched with the position of the through hole on the insertion rod 8, so that the bolt 10 can conveniently penetrate to connect the insertion rod 8 with the outer sleeve 9.
In this embodiment, the upper operating platform 4 is a wood board or a bamboo plywood laid on the bottom of the upper operating platform 4, and the lower operating platform 5 is a wood board or a bamboo plywood laid on the bottom of the lower operating platform 5.
In actual use, the thickness of the wood board or the bamboo plywood is 2cm.
In this embodiment, the traveling wheels 7 are self-locking wheels.
When the hanging basket is actually used, the walking wheels 7 are self-locking wheels, so that the walking wheels 7 can freely rotate when the hanging basket needs to walk, and the hanging basket can be moved forwards by manually pushing the hanging basket structure; when the construction, walking wheel 7 locks, guarantees that the hanging flower basket stable in structure is balanced.
As shown in fig. 2 and 3, in this embodiment, the ladder stand 3 includes two side rails 3-1 and a circular arc-shaped crosspiece 3-2 connected between the two side rails 3-1 at an equal interval from top to bottom.
During the in-service use, the concave cambered surface of convex crosspiece 3-2 is laid inwards, and the concave cambered surface of whole cat ladder 3 is laid towards the direction of hanging flower basket structure promptly, can make during the constructor climbing, cat ladder 3 is as for constructor's the outside all the time, and then guarantees constructor's safety.
As shown in fig. 1 and 2, in this embodiment, the ladder positioning mechanism includes two positioning sleeves 12 through which the two side rails 3-1 pass.
In actual use, the inner diameter of the positioning sleeve 12 is slightly larger than the outer diameter of the side rail 3-1, so that the side rail 3-1 does not shake relative to the positioning sleeve 12.
In this embodiment, the bottom of each side rail 3-1 is provided with a fixing block 11, and the fixing block 11 is connected with the bottom of the lower hanging basket structure 2 through a high-strength bolt.
When the side rail fixing device is actually used, the fixing block 11 is located at the lower end of the side rail 3-1, and the fixing block 11 is fixed with the side rail 3-1.
The above, only be the utility model discloses a preferred embodiment, it is not right the utility model discloses do any restriction, all according to the utility model discloses the technical entity all still belongs to any simple modification, change and the equivalent structure change of doing above embodiment the utility model discloses technical scheme's within the scope of protection.

Claims (8)

1. The utility model provides a portable cable wire decking auxiliary assembly that mats formation which characterized in that: hang basket structure (1) and lower part including the upper portion that can dismantle the connection and hang basket structure (2), one side outside of hanging basket structure (1) and one side outside of hanging basket structure (2) in lower part on upper portion are provided with cat ladder (3) between, upper portion hangs basket structure (1) and lower part and hangs basket structure (2) and be the open cube frame construction in upper portion, the bottom of hanging basket structure (1) in upper portion is provided with operation platform (4), the bottom of hanging basket structure (2) in lower part is provided with down operation platform (5), the bottom of hanging basket structure (1) in upper portion is provided with the track wheelset that the multiunit is used for removing along cable wire (13), every the track wheelset all includes a plurality ofly by preceding to the back in proper order detain establish U type track (6) on same root cable wire (13), all is provided with one in every U type track (6) and can follow cable wire (13) and carry out walking wheel (7) that remove, one side top of hanging basket structure (1) in upper portion is provided with a positioning mechanism, the bottom of cat ladder (3) and the bottom of hanging basket structure (2) in lower part can dismantle and be connected between.
2. A mobile cable bridge deck paving assist apparatus as recited in claim 1, wherein: the utility model discloses a hanging basket structure, including upper portion string basket structure (1), be fixed with one peg graft pole (8) on four angles of upper portion string basket structure (1) bottom respectively, be fixed with one respectively on four angles at lower part string basket structure (2) top and supply peg graft pole (8) insert outer tube (9) of establishing, peg graft pole (8) are parallel to each other with outer tube (9), peg graft pole (8) are laid along the direction of height of upper portion string basket structure (1), outer tube (9) are laid along the direction of height of lower part string basket structure (2).
3. A mobile cable bridge deck paving assist apparatus as recited in claim 2, wherein: the plug rod (8) is detachably connected with the outer sleeve (9) through a bolt (10), a through hole for the bolt (10) to penetrate through is formed in the plug rod (8), and a plurality of bolt through holes (9-1) are formed in the outer sleeve (9) along the length direction of the outer sleeve.
4. A mobile cable bridge deck paving assist apparatus as recited in claim 1, wherein: the upper operating platform (4) is a wood board or a bamboo plywood paved at the bottom of the upper operating platform (4), and the lower operating platform (5) is a wood board or a bamboo plywood paved at the bottom of the lower operating platform (5).
5. A mobile cable bridge deck paving assist apparatus as recited in claim 1, wherein: the walking wheels (7) are self-locking wheels.
6. A mobile cable bridge deck paving assist apparatus as recited in claim 1, wherein: the crawling ladder (3) comprises two side railings (3-1) and arc-shaped crosspieces (3-2) which are connected between the two side railings (3-1) at equal intervals from top to bottom.
7. A mobile cable bridge deck paving assist apparatus as recited in claim 6, wherein: the ladder climbing positioning mechanism comprises two positioning sleeves (12) for the two side railings (3-1) to penetrate through respectively.
8. A mobile cable bridge deck paving assist apparatus as recited in claim 6, wherein: the bottom of each side rail (3-1) is provided with a fixing block (11), and the fixing blocks (11) are connected with the bottom of the lower hanging basket structure (2) through bolts.
CN202222928821.4U 2022-11-03 2022-11-03 Movable steel cable bridge deck pavement auxiliary equipment Active CN218757047U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222928821.4U CN218757047U (en) 2022-11-03 2022-11-03 Movable steel cable bridge deck pavement auxiliary equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222928821.4U CN218757047U (en) 2022-11-03 2022-11-03 Movable steel cable bridge deck pavement auxiliary equipment

Publications (1)

Publication Number Publication Date
CN218757047U true CN218757047U (en) 2023-03-28

Family

ID=85645125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222928821.4U Active CN218757047U (en) 2022-11-03 2022-11-03 Movable steel cable bridge deck pavement auxiliary equipment

Country Status (1)

Country Link
CN (1) CN218757047U (en)

Similar Documents

Publication Publication Date Title
CN203813323U (en) Folding bracing frame for power transmission line crossing rack
CN212656515U (en) Adjustable movable scaffold
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN215887959U (en) Hanging flower basket of encorbelmenting is used in aqueduct construction
CN102082400B (en) Simple line spanning frame
CN218757047U (en) Movable steel cable bridge deck pavement auxiliary equipment
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN108005373A (en) A kind of integrated form lifting platform system and its assembling method
CN107604825B (en) The bridging method of T-type beam bridge
CN208056613U (en) A kind of overhanging type framed bent sets up structure
CN205975365U (en) Cast -in -situ box girder combined type moving die carrier
CN111379227A (en) Variable-width platform device for hydraulic creeping formwork for quickly constructing double-limb cable tower and construction method
CN204325939U (en) Large span arch bridge erection without scaffolding cable hoisting device
CN114108480B (en) Suspension bridge catwalk full-section lower sliding frame arrangement structure and construction method thereof
CN217201855U (en) Pipeline elevating gear of building electromechanical installation usefulness
AU2008227238B2 (en) Scaffold with handrail frames provided with post sections
CN201148725Y (en) Trolley type inclining-proof device adhering to elevating scaffold
CN206128588U (en) Facing tile joins externally construction platform
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN210263847U (en) Stride and establish portable construction platform on subway U type groove
CN214246528U (en) Scaffold for building construction
CN211257766U (en) Movable operating platform with anti-overturning supporting legs
CN209874433U (en) Assembly type integral moving operation frame
CN104818859B (en) The installation method of orbit traffic overhead station operation platform
CN207761269U (en) A kind of integrated form lifting platform system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant