CN218715111U - Prefabricated strutting arrangement of block terminal is secretly buried to construction shear force wall - Google Patents

Prefabricated strutting arrangement of block terminal is secretly buried to construction shear force wall Download PDF

Info

Publication number
CN218715111U
CN218715111U CN202222885484.5U CN202222885484U CN218715111U CN 218715111 U CN218715111 U CN 218715111U CN 202222885484 U CN202222885484 U CN 202222885484U CN 218715111 U CN218715111 U CN 218715111U
Authority
CN
China
Prior art keywords
prefabricated
block terminal
square steel
strutting arrangement
symmetry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222885484.5U
Other languages
Chinese (zh)
Inventor
王喜裕
朱红英
徐成
黄俊杰
张多才
靳轩
杨力
林义杰
朱蓓蓓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Original Assignee
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd filed Critical China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority to CN202222885484.5U priority Critical patent/CN218715111U/en
Application granted granted Critical
Publication of CN218715111U publication Critical patent/CN218715111U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Connection Or Junction Boxes (AREA)

Abstract

The utility model belongs to building construction shear force wall secretly buries the auxiliary device of block terminal, a building construction shear force wall secretly buries the prefabricated strutting arrangement of block terminal very much, secretly bury the prefabricated strutting arrangement of block terminal on the shear force wall, prefabricated strutting arrangement's structure is welded respectively on two square steel pipes of symmetry and is being perpendicular with square steel pipe, and two harness cord screw rods of symmetry syntropy, the nut at two basket of flowers bolt both ends matches with two harness cord screw rods on the square steel pipe respectively and is connected, in the block terminal of rectangular bodily form, two sets of prefabricated strutting arrangement are being installed in the cooperation between the longitudinal center line of the long limit inner wall in both sides of its symmetry, two square steel pipes of its symmetry pass through basket of flowers bolt and tightly support on the both sides inner wall of block terminal. The utility model discloses it is rational in infrastructure, through adopting the inside prefabricated support that adds of block terminal box, increase box bearing pressure can used repeatedly, improves labor efficiency.

Description

Prefabricated strutting arrangement of block terminal is secretly buried to construction shear force wall
Technical Field
The utility model belongs to building construction shear force wall secretly buries the auxiliary device of block terminal, a special kind of building construction shear force wall secretly buries the prefabricated strutting arrangement of block terminal.
Background
In the electromechanical construction process, the power distribution box is buried in part of the shear walls. The traditional method is that a box body hole is reserved in advance, a template is used for prefabricating and processing a mold during the construction of the shear wall, and after concrete pouring is completed, multiple procedures of mold dismantling, distribution box installation, pipe distribution, hole opening repair and the like are carried out manually. The construction process is complex, the construction cost is high, and meanwhile, the reserved hole is easy to be detached and modified due to the fact that the reserved hole is not appropriate, quality risks are caused, and construction progress is delayed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building construction shear force wall secretly buries prefabricated strutting arrangement of block terminal, its is rational in infrastructure, through adopting the inside prefabricated support that adds of block terminal box, increases box bearing pressure, can used repeatedly, improves labor efficiency.
The purpose of the utility model is realized like this: the utility model provides a building construction shear force wall secretly buries prefabricated strutting arrangement of block terminal, secretly bury the prefabricated strutting arrangement of block terminal on the shear force wall, prefabricated strutting arrangement's structure is for welding respectively on two square steel pipes of symmetry and is perpendicular with square steel pipe, and two harness cord screw rods of symmetry syntropy, the nut at two basket bolts both ends cooperatees with two harness cord screw rods on the square steel pipe respectively and is connected, in rectangular bodily form's block terminal, two sets of prefabricated strutting arrangement are being installed in the cooperation between the longitudinal center line of the long limit inner wall in the both sides of its symmetry, two square steel pipes of its symmetry pass through basket bolt and tightly support on the both sides inner wall of block terminal.
The utility model discloses the material is the metal material, including square steel pipe, harness cord screw rod, turn buckle.
Square tube: two 30 × 30 square steel tubes, 1200mm in length. So as to increase the bearing pressure of the distribution box body and ensure the quality of the box body.
A harness cord screw: four M10 harness cord screws are fixed on the square steel tube in a welding mode.
The flower basket bolt: two M10 turnbuckles are respectively connected with the harness cord screw, and the adjustable distance is 115mm.
1. The square steel tube is connected with the turn buckle after being welded with the harness cord screw to form the adjustable distribution box internal supporting device, and the requirements that the internal support can be adjusted, disassembled and reused when the multi-specification distribution box body is embedded on a shear wall body can be completely met.
2. The internal supporting device can be installed in the distribution box after the length is adjusted, and then the pre-burying work can be carried out.
The utility model discloses it is rational in infrastructure, through adopting the inside prefabricated support that adds of block terminal box, increased box bearing pressure, used repeatedly has improved labor efficiency.
Drawings
The present invention will be further described with reference to the accompanying drawings, and fig. 1 is a schematic view of the main structure of the present invention.
Detailed Description
The utility model provides a building construction shear force wall secretly buries prefabricated strutting arrangement of block terminal, as shown in fig. 1, secretly bury the prefabricated strutting arrangement of block terminal on shear force wall 1, prefabricated strutting arrangement's structure is welded respectively on two square steel pipes 3 of symmetry and is being perpendicular with square steel pipe 3, and two harness cord screw rods 4 of symmetry syntropy, the nut at two basket bolts 2 both ends cooperatees with two harness cord screw rods 4 on the square steel pipe 3 respectively and is connected, in block terminal 5 of rectangular bodily form, two sets of prefabricated strutting arrangements are being installed in the cooperation between the longitudinal center line of the long limit inner wall in both sides of its symmetry, two square steel pipes 3 of its symmetry tightly support on the both sides inner wall of block terminal 5 through basket bolts 2. The square steel pipe 3 is composed of a 30 × 30mm square steel pipe. The length of the square steel tube 3 is shorter than that of the inner wall of the long edge of the power distribution box. The harness cord screw rod 4 connected with the turn buckle 2 can be adjusted to be 115mm in length. The distance between the two groups of prefabricated supporting devices is 300mm.

Claims (5)

1. The utility model provides a prefabricated strutting arrangement of block terminal is secretly buried to construction shear wall, characterized by: bury the prefabricated strutting arrangement of block terminal secretly on shear force wall (1), prefabricated strutting arrangement's structure is welded respectively on two square steel pipes (3) of symmetry and is being perpendicular with square steel pipe (3), and two harness cord screw rods (4) of symmetry syntropy, the nut at two basket bolts (2) both ends cooperatees with two harness cord screw rods (4) on square steel pipe (3) respectively and is connected, in block terminal (5) of rectangular bodily form, two sets of prefabricated strutting arrangement are being installed in the cooperation between the longitudinal center line of the long limit inner wall in the both sides of its symmetry, two square steel pipes (3) of its symmetry tightly support on the both sides inner wall of block terminal (5) through basket bolt (2).
2. The prefabricated support device for the building construction shear wall buried distribution box according to claim 1, which is characterized in that: the square steel tube (3) is composed of a 30 × 30mm square steel tube.
3. The prefabricated support device for the building construction shear wall buried distribution box according to claim 1, which is characterized in that: the length of the square steel pipe (3) is shorter than that of the inner wall of the long edge of the power distribution box.
4. The prefabricated support device for the building construction shear wall buried distribution box according to claim 1, which is characterized in that: the length of a harness cord screw (4) connected with the turn buckle (2) can be adjusted to be 115mm.
5. The prefabricated support device for the building construction shear wall buried distribution box according to claim 1, which is characterized in that: the distance between the two groups of prefabricated supporting devices is 300mm.
CN202222885484.5U 2022-10-31 2022-10-31 Prefabricated strutting arrangement of block terminal is secretly buried to construction shear force wall Active CN218715111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222885484.5U CN218715111U (en) 2022-10-31 2022-10-31 Prefabricated strutting arrangement of block terminal is secretly buried to construction shear force wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222885484.5U CN218715111U (en) 2022-10-31 2022-10-31 Prefabricated strutting arrangement of block terminal is secretly buried to construction shear force wall

Publications (1)

Publication Number Publication Date
CN218715111U true CN218715111U (en) 2023-03-24

Family

ID=85597067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222885484.5U Active CN218715111U (en) 2022-10-31 2022-10-31 Prefabricated strutting arrangement of block terminal is secretly buried to construction shear force wall

Country Status (1)

Country Link
CN (1) CN218715111U (en)

Similar Documents

Publication Publication Date Title
CN218715111U (en) Prefabricated strutting arrangement of block terminal is secretly buried to construction shear force wall
CN108590299B (en) Reinforced concrete silo centrum does not have split bolt template system
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN212078667U (en) Expansion joint shear wall combination template capable of being assembled and disassembled quickly
CN110821147A (en) Expansion joint shear wall combination template capable of being assembled and disassembled quickly
CN217734843U (en) Hoop for fixing template
CN211898553U (en) Fixing template of underground pipe gallery band steel edge rubber waterstop
CN216181483U (en) Integral prefabricated frame mould of block terminal
CN215055279U (en) Thickness control device for steel plate concrete shear wall symmetrical wall body
CN201738454U (en) Unit type connecting piece for connecting beam slab and wall
CN207032874U (en) A kind of anti-top bracing means for shear wall formwork at floor aseismic joint
CN210947726U (en) Simple and easy anchor clamps of building templates
CN203891449U (en) Wall connecting piece for wall connection of scaffold
CN203022346U (en) Three-section-head type water stop threaded rod
CN207934069U (en) A kind of precast inspection well reserved opening circular apparatus
CN111236313A (en) Fixing template and reinforcing method for steel-edge rubber water stop of underground pipe gallery belt
CN221609482U (en) Floor surface opening hanging die sealing device
CN214615404U (en) Concrete retaining wall template connection structure
CN221422760U (en) Pre-buried adjustable turnover internal support system of block terminal
CN205116241U (en) Inspection shaft maintenance mould
CN220927931U (en) Tubular prefabricated bolt hole die
CN217028091U (en) Reserved hole hanging die reinforcing device
CN216181484U (en) Integral prefabricated frame structure of block terminal
CN218263530U (en) Be used for box culvert entrance to a cave plugging device
CN218933855U (en) Anti-floating reinforcement back ridge structure of inverted bank aluminum mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant