CN218712195U - High-speed railway section prefabricated full-glue spliced continuous beam in-box transportation equipment - Google Patents

High-speed railway section prefabricated full-glue spliced continuous beam in-box transportation equipment Download PDF

Info

Publication number
CN218712195U
CN218712195U CN202221773528.9U CN202221773528U CN218712195U CN 218712195 U CN218712195 U CN 218712195U CN 202221773528 U CN202221773528 U CN 202221773528U CN 218712195 U CN218712195 U CN 218712195U
Authority
CN
China
Prior art keywords
box
speed railway
strand wires
steel
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221773528.9U
Other languages
Chinese (zh)
Inventor
陈钰
赵业亭
左连芹
丛炳刚
高北
王兆刚
南蒙
吴法尧
何华
胡云峰
齐李晨
李俊
郭子尊
张博伦
段渝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Luqiao Group Co Ltd
Original Assignee
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luqiao Group Co Ltd filed Critical Shandong Luqiao Group Co Ltd
Priority to CN202221773528.9U priority Critical patent/CN218712195U/en
Application granted granted Critical
Publication of CN218712195U publication Critical patent/CN218712195U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a prefabricated full gluey continuous roof beam incasement transportation of piecing together of high-speed railway festival section is equipped, be connected fixed bearing device including a plurality of and case roof beam, bearing device is formed by two box steel construction welding, two box steel construction mutually perpendicular sets up, and two the junction of box steel construction is equipped with stiffening plate, top the box steel construction pass through top anchor bolt with case roof beam top connection is fixed, the bottom be equipped with steel strand wires anchor on the box steel construction, among two adjacent bearing device connect through steel strand wires between the steel strand wires anchor, be equipped with hoist and mount subassembly on the steel strand wires. Has the advantages that: the device simple structure, with simple, the convenient operation of material, can be used to the transportation work of construction article in the high-speed railway section roof beam case, can reach the purpose that improves section roof beam incasement conveying efficiency through low-cost mode.

Description

High-speed railway section prefabricated full-glue spliced continuous beam box internal transportation equipment
Technical Field
The utility model relates to a bridge construction technical field particularly, relates to a prefabricated full gluey continuous beam incasement transportation of piecing together of high-speed railway festival section is equipped.
Background
At present, in the construction process of a segmental girder bridge, the internal space of a box girder is usually narrow. For construction articles such as reinforcing steel bars, jacks and the like which need to be used in the box girder, the articles are transported in a mode of a single-wheel trolley or a mode of hoisting by using a hoisting machine at a cantilever end of the bridge. However, along with the propulsion of the construction progress, because the juncture of the adjacent beam spans is usually provided with the cross slab, the single-wheel handcart is difficult to pass through the beam section provided with the cross slab when carrying out long-distance article transportation, and other auxiliary means such as manual carrying, base plate erection and the like need to be relied on at the moment, so that the transportation efficiency of the articles constructed in the box is low. For transporting articles at the cantilever end of the bridge by using a hoisting machine hoisting mode, the articles need to be transported to the cantilever end position of the bridge on the ground, then the hoisting machine is driven to the position, then the hoisting machine is used for hoisting and transporting, and along with the propulsion of the bridge construction progress, the transportation time of the mode is prolonged, and the transportation efficiency is low.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
To the problem among the correlation technique, the utility model provides a prefabricated full gluey continuous beam incasement transportation of piecing together of high-speed railway festival section is equipped to overcome the above-mentioned technical problem that current correlation technique exists.
Therefore, the utility model discloses a specific technical scheme as follows:
the utility model provides a prefabricated full gluey continuous roof beam incasement transportation of splicing of high speed railway festival section is equipped, includes that a plurality of and case roof beam roof are connected fixed bearing device, bearing device is formed by two box steel construction welding, two box steel construction mutually perpendicular sets up, and two the junction of box steel construction is equipped with stiffening plate, top the box steel construction pass through top anchor bolt with case roof beam roof board is connected fixedly, the bottom be equipped with steel strand wires anchor on the box steel construction, among two adjacent bearing device connect through steel strand wires between the steel strand wires anchor, be equipped with hoist and mount subassembly on the steel strand wires.
Preferably, the box steel structure comprises a top plate, a web plate is arranged on one side of the top plate, and a bottom plate is arranged on the other side of the web plate.
Preferably, the top plate in the box steel structure at the top is fixed with the box girder top plate through the top anchor bolt, and the box steel structure at the bottom is fixed at the bottom of the bottom plate in the box steel structure at the top.
Preferably, the hoisting component comprises a sliding wheel disc installed on the steel strand, a connecting hook is arranged at the bottom of the sliding wheel disc, a hoist crane is arranged on the connecting hook in a hoisting mode, and a hoisting chain is fixed in the middle of the hoist crane.
Preferably, the top plate is provided with a mounting hole, and the top plate and the box girder top plate are fixed together by the top anchoring bolt through the mounting hole.
Preferably, the side edge of the box-type steel structure at the bottom is provided with a plurality of openings matched with the steel strands, and a bearing base plate is arranged between the top plate and the box girder top plate.
The utility model has the advantages that:
the device has simple structure, simple material and convenient operation, can be used for transporting construction articles in the segmental beam box of the high-speed railway, and can achieve the purpose of improving the transportation efficiency in the segmental beam box in a low-cost mode;
the lifting function of construction articles is completed through the hoisting assembly, the bearing structure is anchored on the box girder top plate through the top anchoring bolt so as to keep the structure stable, and a transportation line capable of bearing load is formed through tensioning and anchoring steel strands.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic front view structure diagram of transportation equipment in a high-speed railway section prefabricated full-glue spliced continuous beam box according to an embodiment of the utility model;
FIG. 2 is a schematic side view of transportation equipment in a high-speed railway section prefabricated full-glued-spliced continuous beam box according to an embodiment of the utility model;
fig. 3 is a work flow chart of the transportation equipment in the high-speed railway section prefabricated full-glue spliced continuous beam box according to the embodiment of the utility model.
In the figure:
1. a top anchor bolt; 2. a box girder top plate; 3. a support pad; 4. a top plate; 5. a web; 6. a base plate; 7. a stiffening plate; 8. a steel strand anchoring device; 9. steel strand wires; 10. a sliding wheel disc; 11. connecting a hook; 12. hoisting a gourd; 13. and (5) hoisting the chain.
Detailed Description
For further explanation of the embodiments, the drawings are provided as part of the disclosure and serve primarily to illustrate the embodiments and, together with the description, to explain the principles of operation of the embodiments, and to provide further explanation of the invention and advantages thereof, it will be understood by those skilled in the art that various other embodiments and advantages of the invention are possible, and that elements in the drawings are not to scale and that like reference numerals are generally used to designate like elements.
According to the utility model discloses an embodiment provides a prefabricated full gluey continuous beam incasement transportation equipment of piecing together of high-speed railway festival section.
An embodiment, as shown in fig. 1-3, according to the utility model provides a prefabricated full gluey continuous beam incasement transportation equipment of high-speed railway festival section, including a plurality of and case roof beam 2 be connected fixed load bearing device, load bearing device is formed by two box steel construction welding, two box steel construction mutually perpendicular sets up, and two the junction of box steel construction is equipped with stiffening plate 7, top the box steel construction pass through top anchor bolt 1 with case roof beam 2 is connected fixedly, the bottom be equipped with steel strand wires anchor 8 on the box steel construction, in two adjacent load bearing devices connect through steel strand wires 9 between the steel strand wires anchor 8, be equipped with hoist and mount subassembly on the steel strand wires 9.
Embodiment two, as shown in fig. 1-3, according to the utility model discloses a prefabricated full gluey continuous beam incasement transportation equipment of splicing of high-speed railway festival section, including a plurality of and the fixed load bearing device of box roof beam 2 connection, load bearing device is formed by two box steel construction welding, two box steel construction mutually perpendicular sets up, and two box steel construction's junction is equipped with stiffening plate 7, the top box steel construction pass through top anchor bolt 1 with box roof beam 2 is connected fixedly, the bottom be equipped with steel strand wires anchor 8 on the box steel construction, in two adjacent load bearing devices connect through steel strand wires 9 between the steel strand wires anchor 8, be equipped with hoist and mount subassembly on the steel strand wires 9, box steel construction includes roof 4, one side of roof 4 is equipped with web 5, the opposite side of web 5 is equipped with bottom plate 6, the top in the box steel construction the roof bolt 4 passes through the top bolt 1 with box roof beam 2 is fixed, the bottom is fixed at the top in the box steel construction 6's bottom. From the design, the bearing device formed by the box-type steel structure is simple in structure and convenient to install, and a manufacturer can manufacture the bearing device by utilizing materials such as common steel plates on a construction site.
Embodiment three, as shown in fig. 1-3, according to the utility model discloses a prefabricated full gluey continuous beam incasement transportation equipment of splicing of high-speed railway festival section, including a plurality of and case roof beam 2 be connected fixed load bearing device, load bearing device is formed by two box steel construction welding, two box steel construction mutually perpendicular sets up, and two box steel construction's junction is equipped with stiffening plate 7, the top box steel construction pass through top anchor bolt 1 with case roof beam 2 is connected fixedly, the bottom be equipped with steel strand wires anchor 8 on the box steel construction, in two adjacent load bearing devices connect through steel strand wires 9 between the steel strand wires anchor 8, be equipped with hoisting assembly on the steel strand wires 9, hoisting assembly is including installing slip rim plate 10 on the steel strand wires 9, the bottom of slip rim plate 10 is equipped with connect hook 11, it has calabash 12 to hoist on the connect hook 11, the middle part of calabash 12 is fixed with hoist chain 13. From the design, the lifting action of the construction articles to be transported can be completed through the design of the hoisting assembly.
Fourth embodiment, as shown in fig. 1-3, according to the utility model discloses a prefabricated full gluey continuous beam incasement transportation equipment of splicing of high-speed railway festival section, including a plurality of and the fixed load bearing device of case roof beam 2 connection, load bearing device is formed by two box steel construction welding, two box steel construction mutually perpendicular sets up, and two the junction of box steel construction is equipped with stiffening plate 7, the top the box steel construction pass through top anchor bolt 1 with case roof beam 2 is connected fixedly, the bottom be equipped with steel strand wires anchor 8 on the box steel construction, in two adjacent load bearing devices connect through steel strand wires 9 between the steel strand wires anchor 8, be equipped with hoist and mount assembly on the steel strand wires 9, be equipped with the mounting hole on the roof plate 4, top anchor bolt 1 passes through the mounting hole will roof plate 4 with case roof beam 2 both are fixed together, the bottom the side of box steel construction seted up a plurality of with steel strand wires 9 matched with the trompil, roof plate 4 with be equipped with supporting backing plate 3 between the case roof beam 2. From the above design, it is easy to see that, for the design of the anti-skid texture, through the design of the open pores, the manufacturer can stretch and anchor the plurality of steel strands 9 according to the transportation volume and the load requirement on site to meet different transportation requirements, and the transportation of the articles is accelerated.
In practical application, an operator firstly welds the top plate 4, the web plate 5 and the bottom plate 6 to form an integral box-type steel structure, then two box-type steel structures are welded to form a bearing device, then the top plate 4 in the top box-type steel structure is fixed on the box girder top plate 2 through the top anchor bolt 1 according to a transportation distance, steel strands 9 in a corresponding number are tensioned and anchored on the side face of the bearing device through the steel strand anchor device 8 according to transportation load requirements, objects to be transported are bound on the hoisting chain 13, the operator pulls the hoisting chain 13 to complete hoisting work of the transported objects, the operator pushes the hoisting chain 13 to complete object transportation work through manpower, after the transportation destination is reached, the operator pulls the hoisting chain 13 to complete descending work of the transported objects, then unbinds the transported objects from the hoisting chain 13, and completes uninstalling work of the objects.
The above description is only for the preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a prefabricated full gluey continuous roof beam incasement transportation of splicing of high speed railway festival section is equipped with, includes that a plurality of and case roof beam roof (2) are connected fixed bearing device, its characterized in that, bearing device is formed by two box steel construction welding, two box steel construction mutually perpendicular sets up, and two the junction of box steel construction is equipped with stiffening plate (7), the top box steel construction pass through top anchor bolt (1) with case roof beam roof (2) are connected fixedly, the bottom be equipped with steel strand wires anchor (8) on the box steel construction, in two adjacent bearing device connect through steel strand wires (9) between steel strand wires anchor (8), be equipped with hoist and mount subassembly on steel strand wires (9).
2. The transportation equipment for the high-speed railway section prefabricated full-glued-spliced continuous beam in the box is characterized in that the box-type steel structure comprises a top plate (4), a web plate (5) is arranged on one side of the top plate (4), and a bottom plate (6) is arranged on the other side of the web plate (5).
3. The transportation equipment for the high-speed railway segmental prefabricated full-glued-joint continuous beam in the box is characterized in that the top plate (4) in the box steel structure at the top is fixed with the box beam top plate (2) through the top anchor bolts (1), and the box steel structure at the bottom is fixed at the bottom of the bottom plate (6) in the box steel structure at the top.
4. The transportation equipment for the high-speed railway segmental prefabricated full-glued-spliced continuous beam box is characterized in that the hoisting assembly comprises a sliding wheel disc (10) installed on the steel strand (9), a connecting hook (11) is arranged at the bottom of the sliding wheel disc (10), a hoist crane (12) is hoisted on the connecting hook (11), and a hoisting chain (13) is fixed in the middle of the hoist crane (12).
5. The transportation equipment in the high-speed railway section prefabricated full-glued-spliced continuous beam box is characterized in that the top plate (4) is provided with mounting holes, and the top anchoring bolts (1) fix the top plate (4) and the box beam top plate (2) together through the mounting holes.
6. The transportation equipment in the box of the high-speed railway segmental prefabricated full-glued continuous beam according to claim 1, characterized in that a plurality of openings matched with the steel strands (9) are formed in the side edge of the box-type steel structure at the bottom, and a bearing backing plate (3) is arranged between the top plate (4) and the box beam top plate (2).
CN202221773528.9U 2022-07-11 2022-07-11 High-speed railway section prefabricated full-glue spliced continuous beam in-box transportation equipment Active CN218712195U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221773528.9U CN218712195U (en) 2022-07-11 2022-07-11 High-speed railway section prefabricated full-glue spliced continuous beam in-box transportation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221773528.9U CN218712195U (en) 2022-07-11 2022-07-11 High-speed railway section prefabricated full-glue spliced continuous beam in-box transportation equipment

Publications (1)

Publication Number Publication Date
CN218712195U true CN218712195U (en) 2023-03-24

Family

ID=85628101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221773528.9U Active CN218712195U (en) 2022-07-11 2022-07-11 High-speed railway section prefabricated full-glue spliced continuous beam in-box transportation equipment

Country Status (1)

Country Link
CN (1) CN218712195U (en)

Similar Documents

Publication Publication Date Title
CN102797226B (en) Integral erection construction method of 60m steel box girder
CN202899044U (en) Vierendeel box-shaped double-girder bridge crane
JP4264470B2 (en) Bridge girder member erection method and erection device
CN111139743A (en) Method for improving speed of highway beam frame and installation method of gantry crane
CN109653105A (en) Box girder bridge cantilever construction main truss cradle system and its application method
CN218712195U (en) High-speed railway section prefabricated full-glue spliced continuous beam in-box transportation equipment
CN209652772U (en) Box girder bridge cantilever construction main truss cradle system
CN215592333U (en) Multi-adaptability double-guide-beam bridge crane lifting appliance device with adjustable hole pitch
JP4489872B2 (en) Bridge erection method and apparatus
CN216425408U (en) Jig frame for storing and transporting heavy hanging beam
CN102251785A (en) Lifting system for tunnel lining trolley, and tunnel lining trolley
CN204940131U (en) A kind of hanging basket device of Wavelike steel webplate parts
CN110745707B (en) Lifting device for dismantling fabricated support of concrete cast-in-place beam close to railway side
CN215055466U (en) Discharging platform for high-rise building
CN211815662U (en) Cable force conversion device for replacing suspender
CN111139742B (en) Method for mounting and dismounting highway bridge girder erection machine
CN110593132B (en) Cantilever type bearing structure of bridge girder erection machine
CN208701520U (en) A kind of hanging-filling beam suspension basket stretch-draw jack mobile device
CN105088962A (en) Integrated hoisting method for corrugated steel web part
CN202156886U (en) Lifting system and tunnel lining trolley comprising same
CN212425204U (en) Special lifting appliance for middle box type beam embedded plate of large-width steel structure bridge
CN212799315U (en) Three-beam crane bridge
CN214399608U (en) Triangular combined support for hoisting component
CN219670013U (en) Hoisting system suitable for long and narrow tunnel anchor hole with multiple dip angles
CN217756530U (en) Lifting device for floor without back jacking

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant