CN204940131U - A kind of hanging basket device of Wavelike steel webplate parts - Google Patents

A kind of hanging basket device of Wavelike steel webplate parts Download PDF

Info

Publication number
CN204940131U
CN204940131U CN201520694026.0U CN201520694026U CN204940131U CN 204940131 U CN204940131 U CN 204940131U CN 201520694026 U CN201520694026 U CN 201520694026U CN 204940131 U CN204940131 U CN 204940131U
Authority
CN
China
Prior art keywords
corrugated steel
hanging basket
steel web
basket device
wavelike steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520694026.0U
Other languages
Chinese (zh)
Inventor
赵国强
叶智勇
王兵
邓国良
余聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Municipal Engineering Group Co Ltd filed Critical Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority to CN201520694026.0U priority Critical patent/CN204940131U/en
Application granted granted Critical
Publication of CN204940131U publication Critical patent/CN204940131U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型公开了一种波形钢腹板部件的挂篮装置,固定于波形钢腹板节段端部,其特征在于所述挂篮装置由若干片纵桥向布置的主桁架通过横联连接而成,各所述主桁架对应布置于所述波形钢腹板节段内的波形钢腹板正上方。本实用新型的优点是,挂篮装置结构简单,通过将各主桁架对应布置于波形钢腹板节段中的各波形钢腹板正上方,以确保在整体起吊过程中波形钢腹板节段能提供稳定的支撑力,实现对波形钢腹板节段的整体起吊。

The utility model discloses a hanging basket device of a corrugated steel web part, which is fixed at the end of a corrugated steel web segment, and is characterized in that the hanging basket device is connected by a plurality of main trusses arranged longitudinally and bridgewise through transverse connections Each of the main trusses is correspondingly arranged directly above the corrugated steel web in the corrugated steel web segment. The utility model has the advantage that the structure of the hanging basket device is simple, and each main truss is correspondingly arranged directly above each corrugated steel web segment in the corrugated steel web segment to ensure that the corrugated steel web segment is It can provide stable supporting force and realize the overall lifting of corrugated steel web segments.

Description

一种波形钢腹板部件的挂篮装置A hanging basket device for corrugated steel web parts

技术领域 technical field

本实用新型涉及桥梁工程技术领域,具体涉及一种波形钢腹板部件的挂篮装置。 The utility model relates to the technical field of bridge engineering, in particular to a hanging basket device for corrugated steel web parts.

背景技术 Background technique

波形钢腹板PC组合箱梁是一种经济、高效、施工简便的新型桥梁形式,其通过采用波形钢腹板取代预应力混凝土箱梁的混凝土腹板作为腹板,减小了腹板对混凝土翼缘板的约束,改善了结构性能,提高了材料效率。我国对波形钢腹板PC箱梁桥的研究起步较晚,现已建成三十余座波形钢腹板PC箱梁桥,以梁桥居多。近年来,随着理论研究日趋成熟和实践经验不断积累,波形钢腹板PC箱梁开始运用于大跨度单箱多室连续梁桥与斜拉桥。波形钢腹板PC箱梁桥建设中普遍采用分块吊装法完成波形钢腹板吊装作业,这种分块吊装方法大大延长了工期、增加了高空作业时间而且难以保证波形钢腹板的焊接质量,对于大跨度超宽单箱多室波形钢腹板PC箱梁桥的劣势尤为凸显。 PC composite box girder with corrugated steel web is a new type of bridge that is economical, efficient, and easy to construct. Flange plate confinement improves structural performance and increases material efficiency. The research on PC box girder bridges with corrugated steel webs started relatively late in China, and more than 30 PC box girder bridges with corrugated steel webs have been built, most of which are girder bridges. In recent years, with the maturation of theoretical research and continuous accumulation of practical experience, PC box girders with corrugated steel webs have begun to be used in long-span single-box multi-chamber continuous girder bridges and cable-stayed bridges. In the construction of PC box girder bridges with corrugated steel webs, the block hoisting method is generally used to complete the hoisting operations of corrugated steel webs. This block hoisting method greatly prolongs the construction period and increases the time for working at heights, and it is difficult to ensure the welding quality of corrugated steel webs. , the disadvantages of PC box girder bridges with long-span and ultra-wide single-box multi-chamber corrugated steel webs are particularly prominent.

因此,如何在保证安全和施工质量的前提条件下,经济、快速地实现波形钢腹板部件吊装,成为本领域技术人员亟待解决的技术问题。 Therefore, how to economically and quickly realize the hoisting of corrugated steel web parts under the premise of ensuring safety and construction quality has become a technical problem to be solved urgently by those skilled in the art.

发明内容 Contents of the invention

本实用新型的目的是根据上述现有技术的不足之处,提供一种波形钢腹板部件的挂篮装置,该挂篮装置通过将各主桁架对应布置于波形钢腹板节段中的各波形钢腹板正上方,以确保在整体起吊过程中波形钢腹板节段能提供稳定的支撑力。 The purpose of this utility model is to provide a hanging basket device for corrugated steel web parts according to the shortcomings of the above-mentioned prior art. The hanging basket device arranges each main truss correspondingly to each The corrugated steel web is directly above to ensure that the corrugated steel web section can provide stable support during the overall lifting process.

本实用新型目的实现由以下技术方案完成: The utility model goal is realized by the following technical solutions:

一种波形钢腹板部件的挂篮装置,固定于波形钢腹板节段端部,其特征在于所述挂篮装置由若干片纵桥向布置的主桁架通过横联连接而成,各所述主桁架对应布置于所述波形钢腹板节段内的波形钢腹板正上方。 A hanging basket device of a corrugated steel web part, which is fixed at the end of a corrugated steel web segment, is characterized in that the hanging basket device is formed by connecting several pieces of main trusses arranged longitudinally and bridgewise through horizontal connections, and each The main truss is correspondingly arranged directly above the corrugated steel web in the corrugated steel web segment.

所述主桁架由两个三角形桁架组合而成,其中一个所述三角形桁架锚固于所述波形钢腹板节段端部,另一个所述三角形桁架突出于所述波形钢腹板端部。 The main truss is composed of two triangular trusses, one of which is anchored at the end of the corrugated steel web section, and the other triangular truss protrudes from the end of the corrugated steel web.

所述挂篮底部与波形钢腹板节段之间经销轴锚固。 The bottom of the hanging basket and the section of the corrugated steel web are anchored by pin shafts.

所述挂篮装置还包括位于所述主桁架顶部的起吊机构,所述起吊机构包括吊车,所述吊车下方经轮绳系统连接有横桥向布置的分配梁,所述分配梁下翼缘间隔布设有若干纵桥向的扁担梁。 The hanging basket device also includes a hoisting mechanism located at the top of the main truss, the hoisting mechanism includes a crane, and a distribution beam arranged in the direction of the bridge is connected below the crane via a wheel rope system, and the lower flange of the distribution beam is spaced There are several pole beams in the longitudinal bridge direction.

本实用新型的优点是,挂篮装置结构简单,通过将各主桁架对应布置于波形钢腹板节段中的各波形钢腹板正上方,以确保在整体起吊过程中波形钢腹板节段能提供稳定的支撑力,实现对波形钢腹板节段的整体起吊。 The utility model has the advantage that the structure of the hanging basket device is simple, and each main truss is correspondingly arranged directly above each corrugated steel web segment in the corrugated steel web segment to ensure that the corrugated steel web segment It can provide stable supporting force and realize the overall lifting of corrugated steel web segments.

附图说明 Description of drawings

图1为本实用新型中波形钢腹板节段的挂篮装置示意图; Fig. 1 is the schematic diagram of the hanging basket device of corrugated steel web segment in the utility model;

图2为本实用新型中波形钢腹板节段的挂篮装置立面图; Fig. 2 is the vertical view of the hanging basket device of the corrugated steel web segment in the utility model;

图3为本实用新型中波形钢腹板节段及吊点平面布置示意图。 Fig. 3 is a schematic diagram of planar arrangement of corrugated steel web segments and lifting points in the utility model.

具体实施方式 detailed description

以下结合附图通过实施例对本实用新型的特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解: The features of the present utility model and other relevant features are further described in detail below in conjunction with the accompanying drawings through the embodiments, so as to facilitate the understanding of those skilled in the art:

如图1-3,图中标记1-16分别为:主桁架1、吊车2、横联3、N-1号波形钢腹板节段4、分配梁5、扁担梁6、吊杆7、N号波形钢腹板节段8、顶板9、钢锚箱10、吊点11、钢横梁12、临时支撑加固装置13、销轴14、轮绳系统15、波形钢腹板16。 As shown in Figure 1-3, the marks 1-16 in the figure are: main truss 1, crane 2, horizontal connection 3, N-1 corrugated steel web segment 4, distribution beam 5, shoulder beam 6, suspender 7, No. N corrugated steel web segment 8, top plate 9, steel anchor box 10, lifting point 11, steel beam 12, temporary support and reinforcement device 13, pin shaft 14, wheel rope system 15, corrugated steel web 16.

实施例:如图1-3所示,本实施例具体涉及一种波形钢腹板部件的挂篮装置,适用于单箱多室、多箱多室的波形钢腹板PC箱梁桥,该挂篮装置由若干片主桁架1、横联3组成,沿横桥向上间隔布置的各纵向主桁架1通过横联3连接构成挂篮整体,各片主桁架1对应布置于N-1号波形钢腹板节段4内的各波形钢腹板正上方,并通过销轴14锚固于N-1号波形钢腹板节段4上的箱梁顶板9上;其中,各片主桁架1均由两个三角形桁架拼接构成倾斜的平行四边形状,即,其中一个三角形桁架锚固于顶板9上,另一个三角形桁架突出于N-1号波形钢腹板节段4的前端部以构成起吊机构的安装平台; Embodiment: As shown in Figures 1-3, this embodiment specifically relates to a hanging basket device for corrugated steel web components, which is suitable for PC box girder bridges with corrugated steel webs with single box and multiple rooms, and multi-box and multiple rooms. The hanging basket device is composed of several main trusses 1 and cross-links 3. The longitudinal main trusses 1 arranged at intervals along the horizontal bridge are connected by cross-links 3 to form the whole hanging basket. Each corrugated steel web in the steel web segment 4 is directly above each corrugated steel web, and is anchored to the box girder roof 9 on the N-1 corrugated steel web segment 4 through the pin shaft 14; wherein, each main truss 1 is An inclined parallelogram shape is formed by splicing two triangular trusses, that is, one of the triangular trusses is anchored on the top plate 9, and the other triangular truss protrudes from the front end of the N-1 corrugated steel web segment 4 to form a lifting mechanism. installation platform;

如图1、2所示,在挂篮突出于N-1号波形钢腹板节段4的顶部还安装有起吊机构,该起吊机构包括两部对称设置的吊车2,在吊车2上下放有用于起吊升降的轮绳系统15,每部吊车2的轮绳系统15下端对应吊挂有一道横桥向布置的分配梁5,各道分配梁5的下翼缘经螺栓连接有若干道间隔布置的纵桥向扁担梁6;其中,分配梁5为钢结构,通过在一块钢板上分别焊接上、下翼缘以及加劲肋组合而成;扁担梁6具体由工字钢梁构成,各工字钢梁上焊接有加劲肋; As shown in Figures 1 and 2, a lifting mechanism is installed on the top of the hanging basket protruding from the corrugated steel web segment 4 of No. N-1. For the hoisting and lifting wheel rope system 15, the lower end of the wheel rope system 15 of each crane 2 is correspondingly hung with a distribution beam 5 arranged in the direction of the bridge, and the lower flange of each distribution beam 5 is connected by bolts. The longitudinal bridge of the vertical bridge faces the pole beam 6; wherein, the distribution beam 5 is a steel structure, which is formed by welding the upper and lower flanges and stiffeners on a steel plate; the pole beam 6 is specifically composed of I-shaped steel beams, and each I-shaped Stiffeners are welded on the steel beam;

需要说明的是,各道分配梁5的重心与待起吊的N号波形钢腹板节段8的重心处于同一竖直平面内,以确保起吊平稳;此外,各道扁担梁6的布置位置对应于下方待起吊的N号波形钢腹板节段8内的各波形钢腹板16布置位置,以使届时各道扁担梁6能与各波形钢腹板16能够对应连接,使N号波形钢腹板节段8的受力点均位于波形钢腹板位置上,避免吊设于其它位置处时的结构变形。 It should be noted that the center of gravity of each distribution beam 5 is in the same vertical plane as the center of gravity of the No. N corrugated steel web segment 8 to be hoisted, so as to ensure stable hoisting; Each corrugated steel web 16 in the No. N corrugated steel web section 8 to be hoisted below is arranged so that each shoulder beam 6 can be connected with each corrugated steel web 16 correspondingly, so that No. N corrugated steel The stress points of the web segment 8 are located on the corrugated steel web to avoid structural deformation when it is hoisted at other positions.

如图1-3所示,利用本实施例中的挂篮装置进行整体起吊的方法包括如下步骤: As shown in Figure 1-3, the method for overall hoisting using the hanging basket device in this embodiment includes the following steps:

(1)在工厂内预制待吊装的N号波形钢腹板节段8,即,将若干块在横桥向上均匀间隔布置的纵向波形钢腹板16通过钢横梁12、临时支撑加固装置13以及钢锚箱10焊接连成一个整体,其中,各块波形钢腹板16的上翼缘布置有两个吊点11以供吊机系统吊装,并在相应吊点11位置处焊接用于起吊连接用的临时耳板,其中一个吊点11位于波形钢腹板16与钢横梁12的连接处,另一个吊点11位于波形钢腹板16与临时支撑加固装置13的连接处;且每块波形钢腹板16上的吊点11位置均布置相同; (1) Prefabricate the No. N corrugated steel web segment 8 to be hoisted in the factory, that is, pass several longitudinal corrugated steel webs 16 evenly spaced above the cross bridge through the steel beam 12, temporary support and reinforcement device 13 and The steel anchor box 10 is welded into a whole, wherein, the upper flange of each piece of corrugated steel web 16 is arranged with two lifting points 11 for hoisting by the crane system, and the corresponding lifting points 11 are welded for lifting connection The temporary lug plate used, one of the hanging points 11 is located at the joint of the corrugated steel web 16 and the steel beam 12, and the other hanging point 11 is located at the joint of the corrugated steel web 16 and the temporary support and reinforcement device 13; and each corrugated The positions of the lifting points 11 on the steel web 16 are all arranged in the same manner;

(2)与此同时,在波形钢腹板PC箱梁桥的N-1号波形钢腹板节段4上拼装挂篮装置并前移至节段的端部; (2) At the same time, assemble the hanging basket device on the N-1 corrugated steel web segment 4 of the corrugated steel web PC box girder bridge and move it forward to the end of the segment;

(3)采用平板驳船将N号波形钢腹板节段8运至其设计位置的正下方; (3) Transport No. N corrugated steel web segment 8 directly below its design position by flat barge;

(4)位于挂篮装置上的吊车2通过轮绳系统15将分配梁5和扁担梁6下放于平板驳船之上,通过调整平板驳船的位置以使N号波形钢腹板节段8上的各块波形钢腹板16同各道扁担梁6的位置一一对应;之后采用倒U形连接件将波形钢腹板16上各吊点11处的临时耳板与锚固于扁担梁6下翼缘的吊杆7相连接; (4) The crane 2 on the hanging basket device lowers the distribution beam 5 and shoulder beam 6 on the flat barge through the wheel rope system 15, and adjusts the position of the flat barge so that the number N corrugated steel web segment 8 Each piece of corrugated steel web 16 is in one-to-one correspondence with the position of each pole beam 6; then the temporary lug plate at each lifting point 11 on the corrugated steel web 16 is anchored to the lower wing of the pole beam 6 by using an inverted U-shaped connector. The suspenders 7 on the edge are connected;

(5)待与N号波形钢腹板节段8连接完毕后,通过吊车2整体起吊N号波形钢腹板节段8就位并与N-1号波形钢腹板节段4端部对齐,之后通过焊接以及高强螺栓完成N号波形钢腹板节段8端部同N-1号波形钢腹板节段4端部之间的连接; (5) After the connection with the corrugated steel web segment 8 of No. N is completed, the corrugated steel web segment 8 of No. N is hoisted by the crane 2 as a whole to be in place and aligned with the end of the corrugated steel web segment 4 of No. N-1 , and then complete the connection between the end of No. N corrugated steel web segment 8 and the end of No. N-1 corrugated steel web segment 4 by welding and high-strength bolts;

(6)完成节段之间的连接后,解除扁担梁6同N号波形钢腹板节段8之间的连接,拆除吊杆7、分配梁5、扁担梁6、倒U形连接件以及临时支撑加固装置13等构件,待吊装N+1号节段时再重复循环使用。 (6) After the connection between the segments is completed, release the connection between the shoulder pole beam 6 and the No. Components such as the temporary support and reinforcement device 13 are to be used repeatedly when the N+1 segment is hoisted.

本实施例中的挂篮装置结构简单,通过将各主桁架对应设置于波形钢腹板节段内的各波形钢腹板正上方,以使波形钢腹板节段能够向挂篮装置提供稳定的竖向支持力;通过采用“分配梁+扁担梁”方案布置波形钢腹板部件吊点,吊点布置于波形钢腹板与钢横梁、临时支撑的连接处,使得吊装过程中波形钢腹板部件受力更为合理,吊装平稳,避免节段在吊装过程中受力不均造成变形。 The structure of the hanging basket device in this embodiment is simple, and each main truss is arranged directly above each corrugated steel web in the corrugated steel web segment, so that the corrugated steel web segment can provide stability for the hanging basket device. The vertical support force of the corrugated steel web is arranged by adopting the "distribution beam + shoulder pole beam" scheme. The force of the plate parts is more reasonable, and the hoisting is stable, avoiding the deformation of the segment caused by uneven force during the hoisting process.

Claims (4)

1. the hanging basket device of Wavelike steel webplate parts, be fixed on Wavelike steel webplate sections end, it is characterized in that described hanging basket device is formed by connecting by horizontal-associate to the main couple arranged by some vertical bridges, each described main couple correspondence is arranged in directly over the Wavelike steel webplate in described Wavelike steel webplate sections.
2. the hanging basket device of a kind of Wavelike steel webplate parts according to claim 1, it is characterized in that described main couple is combined by two triangular trusses, triangular truss described in one of them is anchored in described Wavelike steel webplate sections end, and triangular truss described in another protrudes from described Wavelike steel webplate end.
3. the hanging basket device of a kind of Wavelike steel webplate parts according to claim 1, is characterized in that between described cradle bottom and Wavelike steel webplate sections through bearing pin anchoring.
4. the hanging basket device of a kind of Wavelike steel webplate parts according to claim 1, it is characterized in that described hanging basket device also comprises the derricking gear being positioned at described main couple top, described derricking gear comprises crane, be connected with through wheel rope system the distribution beam that direction across bridge arranges below described crane, interval, described distribution beam bottom flange be laid with some vertical bridges to shoulder pole girder.
CN201520694026.0U 2015-09-09 2015-09-09 A kind of hanging basket device of Wavelike steel webplate parts Expired - Lifetime CN204940131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520694026.0U CN204940131U (en) 2015-09-09 2015-09-09 A kind of hanging basket device of Wavelike steel webplate parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520694026.0U CN204940131U (en) 2015-09-09 2015-09-09 A kind of hanging basket device of Wavelike steel webplate parts

Publications (1)

Publication Number Publication Date
CN204940131U true CN204940131U (en) 2016-01-06

Family

ID=55007573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520694026.0U Expired - Lifetime CN204940131U (en) 2015-09-09 2015-09-09 A kind of hanging basket device of Wavelike steel webplate parts

Country Status (1)

Country Link
CN (1) CN204940131U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778720A (en) * 2019-03-18 2019-05-21 浙江兴土桥梁专用装备制造有限公司 Bridge construction construction method based on cradle construction
CN110820566A (en) * 2019-10-16 2020-02-21 广西翔路建设有限责任公司 Corrugated steel web part bearing type hanging basket suspension casting construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778720A (en) * 2019-03-18 2019-05-21 浙江兴土桥梁专用装备制造有限公司 Bridge construction construction method based on cradle construction
CN109778720B (en) * 2019-03-18 2020-11-06 浙江兴土桥梁专用装备制造有限公司 Bridge construction method based on cradle construction
CN110820566A (en) * 2019-10-16 2020-02-21 广西翔路建设有限责任公司 Corrugated steel web part bearing type hanging basket suspension casting construction method

Similar Documents

Publication Publication Date Title
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN105421249A (en) Novel dragging- hoisting combined type hanging basket structure and construction method
CN104631343A (en) Self-travelling diamond-shaped pin-connected truss-type form traveler structure and form traveler travelling and constructing method
CN205223872U (en) Drag and hang novel string of basket structure of convolution
CN103046754A (en) Construction method for abutting high-altitude long-span roof pipe trusses by adjustable temporary support
CN105113803B (en) A high-altitude sliding hoisting device and its implementation method for a mountain corridor truss
CN103882812A (en) Construction method for midspan main beams of cable-stayed bridge
CN104328734A (en) Multi-connection and multi-span continuous steel truss girder bridge and construction method thereof
CN104060542B (en) Compound beam cable stayed bridge direction across bridge prestress application device and applying method thereof
CN101446074A (en) Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge
CN110820565A (en) Suspended casting method for corrugated steel web hanging basket
CN102877657B (en) Large-span H-shaped plane composite structure beam string upper-air cable replacement construction method
CN105088962B (en) A kind of integral hoisting method of Wavelike steel webplate part
CN105780659A (en) Lifting appliance special for erection of large-tonnage steel box beam segment in non-stayed cable area of cable-stayed bridge
CN115961563A (en) Integral bent cap construction process without embedded part
CN204940130U (en) A kind of integral lifting device of Wavelike steel webplate parts
CN207987749U (en) Ride cable-styled erection crane
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN110820566A (en) Corrugated steel web part bearing type hanging basket suspension casting construction method
CN210103281U (en) Concrete sleeper gang hoisting device
CN210505201U (en) A kind of equipment for hoisting steel bars in batches
CN209816682U (en) Bridge steel box girder aerial working operation platform
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN116696042A (en) Cantilever steel bar truss floor support plate support-free system and construction method thereof
CN208009265U (en) A kind of combined I-shaped steel girder erection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20160106

CX01 Expiry of patent term