CN218643800U CN202223147403.8U CN202223147403U CN218643800U CN 218643800 U CN218643800 U CN 218643800U CN 202223147403 U CN202223147403 U CN 202223147403U CN 218643800 U CN218643800 U CN 218643800U
Authority
CN
China
Prior art keywords
operation platform
precast pile
supporting mechanism
complementary
installation operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223147403.8U
Other languages
Chinese (zh)
Inventor
仁科杰
谢元朗
杨晓飞
代国红
雷一平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Engineering Co Ltd
Original Assignee
PowerChina Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Engineering Co Ltd filed Critical PowerChina Guizhou Engineering Co Ltd
Priority to CN202223147403.8U priority Critical patent/CN218643800U/en
Application granted granted Critical
Publication of CN218643800U publication Critical patent/CN218643800U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a photovoltaic installation operation platform on complementary precast pile of farming light, include: the buckling cone which is inserted into the opening at the top of the precast pile for limiting can be tightly buckled and completely filled; the hanging arm is fixedly connected with the button cone; the installation and operation platform supporting mechanism is used for workers to stand for operation, and the installation and operation platform supporting mechanism and the bottom of the hanging arm can be detachably and fixedly installed. Because the installation operation platform supporting mechanism for the worker to stand for operation is fastened through the fastening cone on the hanging arm and is completely filled and inserted in the top opening of the precast pile, no interval is reserved between the top opening of the precast pile and the fastening cone, the situation that the installation operation platform supporting mechanism shakes is avoided, the problem that the hook is smaller than the hanging opening of the vertical pile, the complete filling cannot be limited, and the problem that the hook is hung and arranged on the top opening of the vertical pile and can cause displacement is solved.

Description

Photovoltaic installation operation platform on complementary precast pile of farming light
Technical Field
The utility model relates to a photovoltaic installation operation platform on complementary precast pile of farming light belongs to photovoltaic construction equipment technical field.
Background
Under the background of carbon neutralization and carbon standard reaching, green sustainable energy utilization is taken as a future main force energy layout trend, land resource utilization can be improved in plain agricultural light complementary photovoltaic construction, but the plain agricultural light complementary photovoltaic assembly installation has a plurality of difficulties, particularly, an agricultural light complementary operation platform is higher in distance from the land, and because the land needs to be cultivated subsequently, when a scaffold cannot be built for tamping the land, an installed precast pile is required to be used as a stress base to build a photovoltaic installation operation platform.
The existing photovoltaic installation operation platform is a simple operation platform for installing an agricultural light complementary photovoltaic module with Chinese patent publication No. CN211850732U, and the disclosed technology is as follows: the upper end of each hanging rod is provided with a hook, the lower end of each hanging rod is vertically connected with a U-shaped bracket, the front end of the U-shaped bracket is vertically provided with a retaining column, and the U-shaped bracket is provided with an operating rod; although, the U type support can hang the dress at the stake top of having installed through the couple on the peg, however, the couple is less than stake apical opening, and it is spacing that the couple can not fill completely with stake apical opening when hanging the dress, has the couple to hang the dress and can appear the problem of displacement at stake apical opening, leads to the U type support of lower part to appear rocking the condition.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a photovoltaic installation operation platform on complementary precast pile of farming light.
The utility model discloses a following technical scheme can realize.
The utility model provides a pair of photovoltaic installation operation platform on complementary precast pile of farming light, include:
the buckling cone which is inserted into the opening at the top of the precast pile for limiting can be tightly buckled and completely filled;
the hanging arm is fixedly connected with the button cone;
the installation and operation platform supporting mechanism is used for workers to stand for operation, and the installation and operation platform supporting mechanism and the bottom of the hanging arm can be detachably and fixedly installed.
The button cone is a cone body made of wood or hollow steel.
And a rubber strip is fixed outside the button cone.
The hanging arm is welded with the button cone body or fixedly connected with the button cone body through a bolt.
Hang the arm bottom and be equipped with the opening, the opening part is equipped with the through-hole, hangs arm bottom through-hole through bolt and nut and installation operation platform supporting mechanism demountable fixing installation.
The rear side of the bottom of the supporting mechanism of the installation and operation platform is hinged with a rear inclined strut, and the rear inclined strut can rotate towards the telescopic rod.
The front side of the bottom of the supporting mechanism of the installation and operation platform is hinged with a telescopic rod, and the telescopic rod can rotate towards a rear inclined strut.
The operating platform further comprises an auxiliary pedal frame for the operating personnel to climb onto the operating platform supporting mechanism.
The beneficial effects of the utility model reside in that: because the installation operation platform supporting mechanism for the worker to stand for operation is fastened through the fastening cone on the hanging arm and is completely filled and inserted in the top opening of the precast pile, no interval is reserved between the top opening of the precast pile and the fastening cone, the situation that the installation operation platform supporting mechanism shakes is avoided, the problem that the hook is smaller than the hanging opening of the vertical pile, the complete filling cannot be limited, and the problem that the hook is hung and arranged on the top opening of the vertical pile and can cause displacement is solved.
Drawings
FIG. 1 is a schematic structural view of a buckle cone, a hanging arm, an auxiliary pedal frame and a supporting mechanism for mounting an operating platform during use;
FIG. 2 is a schematic structural view of the fastening cone, the hanging arm and the mounting operation platform support mechanism;
FIG. 3 is a schematic structural view of the mounting operation platform support mechanism;
FIG. 4 is a schematic view of the auxiliary pedal frame;
in the figure: 1-rubber strip; 2-buckling a cone; 3, prefabricating the pile; 4-hanging the arm;
5, mounting an operating platform supporting mechanism; 51-a beam body; 511-rear beam; 512-a truss; 52-damping limit snap-gauge; 521-a limit bayonet; 522-a clamping table; 53-operating panel; 531-card vertical extension; 532-bayonet; 533-mounting edge; 534-mounting bolts; 535-safety delay;
6-rear inclined strut; 7-a telescopic rod;
8-auxiliary setting a pedal frame; 81-main pedal; 82-a secondary pedal; 83-step lever; 84-a limiting plate; 85-adjusting nails; 86-limiting port.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the described.
As shown in fig. 1-4.
The utility model provides a photovoltaic installation operation platform on complementary precast pile of farming light, includes:
the exterior is bonded and fixed with a button cone body 2 of the rubber strip 1, the button cone body 2 is a cone-shaped body formed by wood or hollow steel, the button cone body 2 can be fastened and completely filled and inserted in an opening at the top of the precast pile 3 for limiting, the button cone body 2 is inserted in the opening at the top of the precast pile 3 through the rubber strip 1 as a wear intermediate part, and the wear of a coating at the top of the precast pile 3 is avoided;
and the hanging arm 4 is welded with the buckle cone 2 or fixedly connected with a bolt, the bottom of the hanging arm 4 is detachably and fixedly provided with an installation operation platform supporting mechanism 5 through a bolt and a nut, and the installation operation platform supporting mechanism 5 is used for workers to stand for operation.
Hang 4 bottoms of arm and be equipped with the opening, the opening part is equipped with the through-hole, hangs 4 bottoms of arm through-holes of bolt and nut and installation operation platform supporting mechanism 5 demountable fixing installation.
The rear side of the bottom of the installation and operation platform supporting mechanism 5 is hinged with a rear inclined strut 6, the front side of the bottom of the installation and operation platform supporting mechanism 5 is hinged with a telescopic rod 7, the telescopic rod 7 can be a bolt telescopic rod or a sliding telescopic rod, the installation and operation platform supporting mechanism 5 obtains auxiliary support through the rear inclined strut 6 and the telescopic rod 7, and the stable state of the installation and operation platform supporting mechanism 5 mainly comes from a complete filling state of buckling a cone 2 and a top opening of a precast pile 3.
Because the installation operating platform supporting mechanism 5 that supplies the operation personnel to stand the operation tightly buckles through the knot cone 2 on hanging arm 4 and fills completely and insert spacing in 3 open-tops of precast pile, realize 3 open-tops of precast pile and detain not have the interval between the cone 2, avoided installation operating platform supporting mechanism 5 the condition that rocks to appear, it can not fill completely spacingly to have solved the couple and is less than the stake top mouth and hang the dress, has the couple to hang the problem that the displacement can appear in the stake top mouth.
Still include to lean on the assistance of 3 sides of precast pile above operation platform supporting mechanism 5 and establish step 8, assist and establish step 8 and constitute the assistance of photovoltaic construction in whole equipment and establish step, the operation personnel establishes step 8 through assisting and goes up to operation platform supporting mechanism 5.
The existing photovoltaic installation operation platform is a simple operation platform for installing an agricultural photovoltaic module with Chinese patent publication No. CN211850732U, and the disclosed technology is as follows: the upper end of each hanging rod is provided with a hook, the lower end of each hanging rod is vertically connected with a U-shaped bracket, the front end of each U-shaped bracket is vertically provided with a stop column, and the U-shaped bracket is provided with an operating rod; although the operating rod is limited by the stop column and the upright column when the operating rod is mounted on the U-shaped bracket, when an operator steps on the operating rod to operate, the operating rod is deformed and clamped between the upright column and the stop column, and the operating rod is inconvenient to take out.
The application discloses installation operation platform supporting mechanism 5 includes:
the beam body 51 is composed of a back beam 511 and trusses 512, the back beam 511 and the trusses 512 are both made of hollow steel, and the two trusses 512 are welded and fixed at two ends of the back beam 511; the rear beam 511 is provided with a through hole, and the through hole at the bottom of the hanging arm 4 is detachably and fixedly arranged with the rear beam 511 through a bolt and a nut; the rear inclined strut 6 can be hinged on the rear beam 511 in a rotating way towards the telescopic rod 7, and the telescopic rod 7 can be hinged on the truss beam 512 in a rotating way towards the rear inclined strut 6;
the damping limiting clamping plate 52 is adhered and fixed to the girder 512 in the girder body 51 close to the side edge of the precast pile 3, the damping limiting clamping plate 52 is made of elastic rubber, the damping limiting clamping plate 52 is provided with a limiting bayonet 521, a clamping table 522 is installed in the limiting bayonet 521, the clamping table 522 is a rigid body such as a steel plate or a wood plate which cannot be deformed, and the clamping table 522 is adhered or fixed with the side edge of the precast pile 3 through bolts when in use.
The damping limiting clamping plates 521 and the clamping tables 522 are two and correspondingly distributed on two side edges of the precast pile 3. Two screens platform 522 are fixed on precast pile 3 both sides, and two spacing cardboard 52 of damping are fixed on longeron 512 in the roof beam body 51, receive vibrations or when displacement, and spacing cardboard 52 of damping takes place elastic deformation and supports and carry out spacing shock attenuation in screens platform 522, make installation operation platform supporting mechanism 5 stably be in precast pile 3 both sides limit.
The mounting operation platform supporting mechanism 5 further comprises: the operation board 53 is used for the worker to step on and stand, and the operation board 53 is detachably fixed on the truss 512 of the beam body 51.
The bottom of the operation board 53 is provided with two card vertical extensions 531 which are distributed at intervals, the card vertical extensions 531 are provided with bayonets 532 for being clamped with the trussed beam 512 in a sliding manner, and the bayonets 532 limit the left and right displacement of the operation board 53 on the trussed beam 512.
The vertical clamping extension 531 close to the precast pile 3 is provided with a mounting edge 533, and the mounting edge 533 is detachably fixed on the truss 512 of the beam body 51 through a mounting bolt 534.
A safety extension 535 upwards warping the top of the precast pile 3 is arranged at the side edge of the operation plate 53 of the precast pile 3, and the safety extension 535 provides a barrier for operators; the safety extension 535 overhangs the mounting stud 534 to provide a sheltered environment for the mounting stud 534. The operation board 53 is made of hard plastic or wood board, so that the equipment weight is improved.
During the use, operation panel 53 uses safe 535 to prolong as the border and there is the interval with precast pile 3, operation panel 53's installation limit 533 can dismantle through mounting bolt 534 to be fixed on girder 512 of roof beam body 51, spacing cardboard 52 of damping and screens platform 522 provide spacingly for installation operation platform supporting mechanism 5 at precast pile 3, installation operation platform supporting mechanism 5 is tightly buckled through the cone of the knot 2 on the string arm 4 and is filled completely and insert spacing in precast pile 3 top opening, when the operation personnel trample on operation panel 53, operation panel 53 warp can not warp the chucking, solved the problem that the operating lever warp the chucking and is inconvenient to take out between upright pile and fender post.
And behind photovoltaic installation operation platform, ground operation personnel need establish through the assistance of ladder etc. constitution and step on the frame climbing carries out follow-up operation on the photovoltaic installation operation platform, and current assistance is established and is stepped on the frame like a photovoltaic module maintenance extension ladder of chinese patent CN217632220U, and the technique of open adoption is: the plurality of short pedals and the plurality of long pedals are respectively and fixedly connected with the two sides of the inner walls of the upper ladder frame and the lower ladder frame; although the auxiliary pedal frame is formed by fixing a plurality of pedals in the ladder frame, so that an operator can climb the auxiliary pedal frame, the fixed body formed by the pedals and the ladder frame occupies too much space during transportation, and the technical problem that transportation and transfer are inconvenient exists.
The utility model provides a photovoltaic construction assist establishes and steps on frame, assist and establish and step on frame 8 and include:
when in use, the two ends of the main pedal 81 and the auxiliary pedal 82 are respectively contacted with the precast pile 3 and the ground, and the main pedal 81 and the auxiliary pedal 82 are distributed at intervals;
the main pedal 81 is provided with a through hole for the pedal rod 83 on the auxiliary pedal 82 to slide through, the auxiliary pedal 82 can rotate and hinge the pedal rod 83 through the hinge seat, and the pedal rod 83 can rotate towards the length direction of the auxiliary pedal 82; the through holes and the pedal rods 83 on the main pedals 81 are multiple, and the through hole on one main pedal 81 corresponds to one pedal rod 83.
When the ladder form needs to be formed to assist and establish the pedal frame, vice footboard 82 takes pedal rod 83 to slide and runs through the through-hole installation on main footboard 81, main footboard 81 and vice footboard 82 both ends contact precast pile 3 and ground respectively, the operation personnel climbs operation platform supporting mechanism 5 through stepping on pedal rod 83 and stands and carry out the operation, when needs transportation shift, vice footboard 82 takes pedal rod 83 to slide and runs through the through-hole on the main footboard 81 and breaks away from, pedal rod 83 is packed up around the pin joint rotation to vice footboard 82 length direction, main footboard 81 side contact pair footboard 82 overlaps to be binded and can not occupy too much space when the transport, the problem of the inconvenient transportation shift of too much space can be occupied to the fixed body that footboard and ladder frame formed when the transport is solved.
The pedal rod 83 is mounted in the through hole of the main pedal 81 through the clamping limiting component, when the clamping limiting component is matched with the pedal rod 83, the pedal rod 83 cannot slide in the through hole of the main pedal 81, and when the clamping limiting component is separated from the pedal rod 83, the pedal rod 83 can slide in the through hole of the main pedal 81.
The clamping and limiting assembly comprises a limiting plate 84 and an adjusting nail 85 screwed with the limiting plate 84 through a thread pair.
An L-shaped notch installation limiting plate 84 is arranged below the main pedal 81, and the main pedal 81 and the limiting plate 84 are respectively provided with a threaded through hole correspondingly and screwed with the adjusting nail 85; the pedal rod 83 is provided with a limit port 86 which is tightly clamped and limited by a limit plate 84.
An L-shaped notch installation limiting plate 84 is arranged below the main pedal 81, and the main pedal 81 is provided with a threaded through hole which is screwed with the adjusting nail 85; the adjusting nail 85 is rotatably mounted with the limiting plate 84 through a bearing; the pedal rod 83 is provided with a limit port 86 which is tightly clamped and limited by a limit plate 84.
The adjusting nail 85 brings the limit plate 84 to be clamped and matched with or separated from the limit port 86 on the pedal rod 83.

Claims (8)

1. The utility model provides a photovoltaic installation operation platform on complementary precast pile of farming light which characterized in that includes:
the buckling cone body (2) which can be tightly buckled and completely filled in the opening at the top of the precast pile (3) for limiting;
the hanging arm (4), the hanging arm (4) is fixedly connected with the button cone body (2);
the installation and operation platform supporting mechanism (5) is used for workers to stand for operation, and the installation and operation platform supporting mechanism (5) and the bottom of the hanging arm (4) are detachably and fixedly installed.
2. The photovoltaic installation operation platform on complementary precast pile of farming light of claim 1, characterized by: the button cone body (2) is a cone body made of wood or hollow steel.
3. The photovoltaic installation operation platform on complementary precast pile of farming light of claim 1, characterized by: and a rubber strip (1) is fixed outside the buckling cone body (2).
4. The photovoltaic installation operation platform on complementary precast pile of farming light of claim 1, characterized by: the hanging arm (4) is fixedly connected with the buckling cone body (2) through welding or bolts.
5. The photovoltaic installation operation platform on complementary precast pile of farming light of claim 1, characterized by: hang arm (4) bottom and be equipped with the opening, the opening part is equipped with the through-hole, hangs arm (4) bottom through-hole through bolt and nut and installation operation platform supporting mechanism (5) demountable fixing installation.
6. The photovoltaic installation operation platform on complementary precast pile of farming light of claim 1, characterized by: the rear side of the bottom of the mounting and operating platform supporting mechanism (5) is hinged with a rear inclined support (6), and the rear inclined support (6) can rotate towards the telescopic rod (7).
7. The photovoltaic installation operation platform on complementary precast pile of farming light of claim 1, characterized by: the front side of the bottom of the mounting and operating platform supporting mechanism (5) is hinged with a telescopic rod (7), and the telescopic rod (7) can rotate towards the rear inclined strut (6).
8. The photovoltaic installation operation platform on complementary precast pile of farming light of claim 1, characterized by: the device also comprises an auxiliary pedal frame (8) for the operator to climb onto the operating platform supporting mechanism (5).
CN202223147403.8U 2022-11-27 2022-11-27 Photovoltaic installation operation platform on complementary precast pile of farming light Active CN218643800U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223147403.8U CN218643800U (en) 2022-11-27 2022-11-27 Photovoltaic installation operation platform on complementary precast pile of farming light

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223147403.8U CN218643800U (en) 2022-11-27 2022-11-27 Photovoltaic installation operation platform on complementary precast pile of farming light

Publications (1)

Publication Number Publication Date
CN218643800U true CN218643800U (en) 2023-03-17

Family

ID=85498009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223147403.8U Active CN218643800U (en) 2022-11-27 2022-11-27 Photovoltaic installation operation platform on complementary precast pile of farming light

Country Status (1)

Country Link
CN (1) CN218643800U (en)

Similar Documents

Publication Publication Date Title
CN100590277C (en) High-altitude bridge type cantilever scaffold
CN218643800U (en) Photovoltaic installation operation platform on complementary precast pile of farming light
CN109881585B (en) Assembled working platform for high pier construction
CN218643812U (en) Photovoltaic construction is assisted and is established frame
CN218758631U (en) Supporting mechanism for installing and operating platform
CN2214983Y (en) Guideway self-lifting scaffold
CN112575807A (en) High pile foundation photovoltaic support and assembling method thereof
CN112647702A (en) Aerial working platform with safety structure for assembly type building construction
CN210977519U (en) Steel bow member installation auxiliary device for tunnel construction
CN206016219U (en) A kind of construction operation platform for adapting to different gradient roofing
CN212078624U (en) Scaffold frame is used in elevator installation convenient to height-adjusting
CN114635554A (en) Non-vertical outer vertical face curtain wall construction hanging basket
CN210858160U (en) Prefabricated cabin and prefabricated cabin type transformer substation using same
CN214302795U (en) Operating platform for installing cable head and ring beam ear plate in cable structure
CN218861674U (en) Aluminum alloy scaffold
CN214828592U (en) Assembled material lifting device
CN217567338U (en) Seat device for pole operation
CN216406098U (en) Movable construction platform for workshop construction of factory building
CN211340477U (en) Hang basket convenient to installation
CN217602024U (en) High-altitude overhanging type steel support frame
CN216042488U (en) Novel scaffold for multi-use architecture construction
CN209082945U (en) A kind of Multi-functional road bridge construction ladder
CN215801098U (en) Cable-stay bridge king-tower cable construction operation platform
CN216196535U (en) Support diagonal rod convenient to disassemble and assemble and used for inner and outer vertical rods of climbing frame
CN214989797U (en) Safety passageway attached to tower crane climbing frame for people to climb

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant