CN215801098U - Cable-stay bridge king-tower cable construction operation platform - Google Patents
Cable-stay bridge king-tower cable construction operation platform Download PDFInfo
- Publication number
- CN215801098U CN215801098U CN202122392984.0U CN202122392984U CN215801098U CN 215801098 U CN215801098 U CN 215801098U CN 202122392984 U CN202122392984 U CN 202122392984U CN 215801098 U CN215801098 U CN 215801098U
- Authority
- CN
- China
- Prior art keywords
- cable
- main tower
- platform
- annular
- vertical beams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a construction operation platform for a stay cable of a main tower of a cable-stayed bridge, which comprises: the beam frame is fixedly connected with the top surface of the main tower; the vertical beams are fixedly connected to the beam frame; the annular platforms are fixed between the vertical beams, a square hole for passing through the main tower is formed in the middle of each annular platform, the annular platforms are uniformly arranged from top to bottom, and the edge of each annular platform is fixedly provided with a grid part; and the climbing mechanisms are fixed between every two adjacent annular platforms. This operation platform simple structure, the buildding that can be quick is on main tower, and the installation nature is high, makes things convenient for the operator to carry out the cable operation.
Description
Technical Field
The utility model belongs to the field of bridge construction, and particularly relates to a construction operation platform for a stay cable of a main tower of a cable-stayed bridge.
Background
A cable-stayed bridge is also called a diagonal tension bridge, is a bridge with a main beam directly pulled on a bridge tower by a plurality of guys, and is a structural system formed by combining a pressure-bearing tower, a pulled guy and a bending-bearing beam body. When the cable-stay bridge is under construction, one of important processes is installation suspension cable, and the mode that adopts usually at present is that the hoist and mount hanging flower basket is under construction, and the operator stands and rocks easily on the hanging flower basket, and if meet strong wind suddenly, danger is bigger, and it is inconvenient to adopt hanging flower basket work simultaneously, and is inefficient, so need design one kind and can make things convenient for the operator to install the operation platform of suspension cable.
SUMMERY OF THE UTILITY MODEL
In order to solve one or more technical problems in the prior art, the utility model discloses an operation platform for cable construction of a main tower of a cable-stayed bridge, which is simple in structure, can be quickly built on the main tower, is high in installation performance and facilitates cable operation of an operator.
In order to achieve the above object, the present invention provides an operation platform for cable construction of main tower cable of cable-stayed bridge, comprising: the beam frame is fixedly connected with the top surface of the main tower;
the vertical beams are fixedly connected to the beam frame;
the annular platforms are fixed between the vertical beams, a square hole for passing through the main tower is formed in the middle of each annular platform, the annular platforms are uniformly arranged from top to bottom, and the edge of each annular platform is fixedly provided with a grid part;
and the climbing mechanisms are fixed between every two adjacent annular platforms.
Furthermore, the beam frame comprises a first cross beam and a second cross beam, a connecting support plate is fixedly connected between the first cross beam and the second cross beam, and the connecting support plate is fixedly connected with the main tower through screws.
Furthermore, check baffle portion adopts check baffle, the arc notch has all been seted up towards main tower front and back region to check baffle, the arc notch separates out a peg portion that is used for hanging cover safety hook with check baffle.
Furthermore, the vertical beams comprise two groups, the climbing mechanism is composed of each group of vertical beams and fixed ladder rods between the vertical beams, crawling holes are formed in the annular platform, and the crawling mechanism penetrates through the crawling holes.
Furthermore, a plurality of U-shaped frames are fixed on the annular platform, and the U-shaped frames and the vertical beams are fastened through screws.
The utility model has the beneficial effects that:
firstly, the operation platform is simple in structure, can be quickly built on a main tower, is high in installation performance, and facilitates cable operation of an operator;
the first cross beam and the second cross beam can be fixedly connected with the top surface of the main tower through the connecting support plate, and meanwhile, the middle part of the annular platform is provided with the square hole, so that the annular platform cannot shake when being connected into the main tower, and an operator is more stable in working;
the third, erect the roof beam and be two sets of, every group erects and is fixed with the ladder pole between the roof beam, so the operator can be convenient climb and descend between annular platform, and the security is good, in addition, erects roof beam and annular platform and passes through the screw and connect, can dismantle, is convenient for store the transportation.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a top view of the present invention;
fig. 3 is an enlarged view of a portion a of fig. 1 of the present invention.
In the figure, 1, a main tower; 2. a first cross member; 3. connecting the support plate; 4. erecting a beam; 5. a ladder bar; 6. a U-shaped frame; 7. an annular platform; 8. an arc-shaped notch; 9. a rod hanging part; 10. a cable; 11. creeping holes; 12. a screw; 13. a second cross member; 14. check baffle
Detailed Description
The utility model is further illustrated by the following examples in conjunction with the accompanying drawings:
referring to fig. 1 to 3, an operation platform for constructing a cable of a main tower 1 of a cable-stayed bridge includes: the beam frame is fixedly connected with the top surface of the main tower 1;
the vertical beams 4 are fixedly connected to the beam frame;
the annular platforms 7 are fixed between the vertical beams 4, a square hole for allowing the main tower 1 to pass through is formed in the middle of each annular platform 7, the annular platforms 7 are uniformly arranged from top to bottom, and a grid part is fixed on the edge of each annular platform 7;
and the climbing mechanisms are fixed between every two adjacent annular platforms 7.
The construction operation platform is firstly assembled, after the construction platform is assembled, the construction platform is hoisted by a hoisting tool and then passes through the main tower 1 of the cable-stayed bridge, wherein the middle part of the annular platform 7 is provided with a square hole, so that the construction platform can be limited to only move up and down, and finally is fixedly connected with the top surface of the main tower 1 by a beam frame, after the construction operation platform is assembled on the main tower 1, an operator can construct the stay cable 10, specifically, the operator stands on the annular platform 7 to construct, the stay cable 10 is positioned between the two annular platforms 7, so the construction is not influenced, after the stay cable 10 of one layer is assembled, the operator moves downwards or upwards by the climbing mechanism to construct the stay cable 10 of the other layer, because the annular platform 7 is adopted, therefore, the movement space of an operator is larger, the safety is better during construction, and the safety of the operation platform can be further improved by the grid stopping part at the edge of the annular platform 7.
Further, the beam frame comprises a first cross beam 2 and a second cross beam 13, a connecting support plate 3 is fixedly connected between the first cross beam 2 and the second cross beam, and the connecting support plate 3 is fixedly connected with the main tower 1 through a screw 12. Specifically, a connecting support plate 3 is fixedly connected between the beam frames, and the operating platform is more stable through the connecting support plate 3 and the main tower 1.
Further, check baffle 14 is adopted in check fender portion, arc notch 8 has all been seted up towards main tower 1 front and back region to check baffle 14, arc notch 8 separates out a peg portion 9 that is used for hanging cover safety hook with the check baffle. Seted up arc notch 8 on the check baffle, arc notch 8 separates into two parts with the check baffle, and wherein operator's safety rope can avoid the careless operator of operation to take place to fall on hanging rod portion 9 through the hook, further strengthens its security.
Furthermore, the vertical beams 4 comprise two groups, the climbing mechanism comprises each group of vertical beams 4 and a fixed ladder bar 5 between the vertical beams 4, a crawling hole 11 is formed in the annular platform 7, and the crawling mechanism penetrates through the crawling hole 11. Specifically, the crawling mechanism comprises a vertical beam 4 and a ladder bar 5, wherein the vertical beam 4 directly penetrates through a crawling hole 11 of the annular platform 7, the width of the crawling hole 11 does not need to be too large, an operator can pass through the crawling hole, the operator can drop onto the annular platform 7 even if the operator accidentally slips off, the crawling hole 11 cannot be formed in the platform at the lowest position, and the safety performance of the operating platform is further enhanced.
Furthermore, a plurality of U-shaped frames 6 are fixed on the annular platform 7, and the U-shaped frames 6 and the vertical beams 4 are fastened through screws 12. The annular platform 7 of the utility model is fixedly connected with the vertical beam 4 through the U-shaped frame, namely, the annular platform 7 of the operation platform can be detached from the vertical beam 4, so that the operation platform is more convenient to transport and store.
The foregoing detailed description of the preferred embodiments of the utility model has been presented. It should be understood that numerous modifications and variations could be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions available to those skilled in the art through logic analysis, reasoning and limited experiments based on the prior art according to the concept of the present invention should be within the scope of protection defined by the claims.
Claims (5)
1. The utility model provides a cable-stay bridge king-tower cable construction operation platform which characterized in that includes:
the beam frame is fixedly connected with the top surface of the main tower;
the vertical beams are fixedly connected to the beam frame;
the annular platforms are fixed between the vertical beams, a square hole for passing through the main tower is formed in the middle of each annular platform, the annular platforms are uniformly arranged from top to bottom, and the edge of each annular platform is fixedly provided with a grid part;
and the climbing mechanisms are fixed between every two adjacent annular platforms.
2. The cable-stayed bridge main tower cable construction operating platform as claimed in claim 1, wherein the beam frame comprises a first cross beam and a second cross beam, a connecting support plate is fixedly connected between the first cross beam and the second cross beam, and the connecting support plate is fixedly connected with the main tower through screws.
3. The cable-stayed bridge main tower cable construction operation platform as claimed in claim 2, wherein the grid baffle is adopted by the grid baffle, arc-shaped notches are formed in the areas of the grid baffle, which face the front side and the back side of the main tower, and the arc-shaped notches separate the grid baffle into a rod part for hanging and sleeving a safety hook.
4. The cable-stayed bridge main tower cable construction operation platform as claimed in claim 3, wherein the vertical beams comprise two groups, the climbing mechanism comprises each group of vertical beams and a ladder bar fixed between the vertical beams, a crawling hole is formed in the annular platform, and the crawling mechanism penetrates through the crawling hole.
5. The cable-stayed bridge main tower cable construction operation platform as claimed in claim 4, wherein a plurality of U-shaped frames are fixed on the annular platform, and the U-shaped frames and the vertical beams are fastened through screws.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122392984.0U CN215801098U (en) | 2021-09-30 | 2021-09-30 | Cable-stay bridge king-tower cable construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122392984.0U CN215801098U (en) | 2021-09-30 | 2021-09-30 | Cable-stay bridge king-tower cable construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215801098U true CN215801098U (en) | 2022-02-11 |
Family
ID=80168452
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122392984.0U Active CN215801098U (en) | 2021-09-30 | 2021-09-30 | Cable-stay bridge king-tower cable construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215801098U (en) |
-
2021
- 2021-09-30 CN CN202122392984.0U patent/CN215801098U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383588A (en) | Lifting platform for protecting safety of high-level construction | |
CN212836630U (en) | All-steel integrated operation scaffold | |
CN211736322U (en) | Climb a fabricated wall auxiliary device | |
CN215441501U (en) | Cantilever steel structure combined construction hanging basket | |
CN214424055U (en) | Attached lifting scaffold platform of unloading | |
CN215801098U (en) | Cable-stay bridge king-tower cable construction operation platform | |
CN216587570U (en) | Viscous damper's mounting platform | |
CN217461573U (en) | Fast-assembling high-rise horizontal protection shed | |
CN209457359U (en) | Combined type promotes material platform | |
CN213572944U (en) | Overhead working hanging basket arranged on flower stand beam | |
CN212316699U (en) | Steel-concrete combined embedded thrust structure of stayed-cable bridge guyed hanging basket | |
CN211923428U (en) | High-altitude construction platform | |
CN101670994B (en) | Lifting working platform for construction | |
CN211200105U (en) | Hanging flower basket is used in bridge construction | |
CN107795267A (en) | A kind of hanging ladder | |
CN209970667U (en) | Roller type photovoltaic glass assembly platform | |
CN109537868B (en) | Portable operation platform for hoisting assembled main beams | |
CN202899720U (en) | Steel pole provided with foot treadles and used for high-tension transmission line iron tower | |
CN112573341A (en) | Column top hoisting mechanism and construction method thereof | |
CN213326369U (en) | Hoisting frame | |
CN217782808U (en) | Hanging basket support for installing tower crown structure of building | |
CN211622697U (en) | Anti-falling device for building construction | |
CN218612546U (en) | Detachable light steel column welding platform | |
CN212583157U (en) | Straight-through type aluminum frame structure of scaffold | |
CN221942014U (en) | Building structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |