CN214989797U - Safety passageway attached to tower crane climbing frame for people to climb - Google Patents

Safety passageway attached to tower crane climbing frame for people to climb Download PDF

Info

Publication number
CN214989797U
CN214989797U CN202120939519.1U CN202120939519U CN214989797U CN 214989797 U CN214989797 U CN 214989797U CN 202120939519 U CN202120939519 U CN 202120939519U CN 214989797 U CN214989797 U CN 214989797U
Authority
CN
China
Prior art keywords
tower crane
bottom plate
rods
supporting component
climbing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120939519.1U
Other languages
Chinese (zh)
Inventor
望开瞭
何伟
张攀勇
郑瑞华
易晏春
向文军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunfa Construction Co ltd
Original Assignee
Kunfa Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunfa Construction Co ltd filed Critical Kunfa Construction Co ltd
Priority to CN202120939519.1U priority Critical patent/CN214989797U/en
Application granted granted Critical
Publication of CN214989797U publication Critical patent/CN214989797U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a person's escape way on tower crane who adheres to and climbs frame, include: the fixing frame comprises two vertical rods and a plurality of transverse rods, the vertical rods are vertically arranged in parallel, and the transverse rods are fixedly connected between the vertical rods; the channel comprises a bottom plate and two rows of railings, the bottom plate is hinged on the cross rod positioned at the uppermost end, and the railings are arranged on two sides of the bottom plate; supporting component, supporting component's one end can be dismantled with the montant and be connected, supporting component's the other end can be dismantled with the bottom plate and be connected, supporting component is with the passageway overlap joint on the tower crane, it has solved tower crane driver physical stamina and has consumed too big, be unfavorable for the accuracy of tower crane to control, the risk of taking place the incident has been increased, the tower crane driver goes out the control room at every turn and extremely inconvenient technical problem on ground, the physical power of tower crane driver has been saved greatly, the accuracy of tower crane control has been improved, the security of climbing tower crane has been increased, also make things convenient for the tower crane driver to get back to ground and have a rest, and simultaneously, erect the operation to the passageway in the structure, and the security is improved.

Description

Safety passageway attached to tower crane climbing frame for people to climb
Technical Field
The utility model relates to a construction escape way technical field especially relates to a people escape way on tower crane who adheres to and climbs frame.
Background
At the job site, the tower crane driver generally climbs the tower crane control room from the stair in the tower crane, erects when higher at the tower crane, and tower crane driver physical stamina consumes too big, is unfavorable for the accurate of tower crane to be controlled, has increased the risk of taking place the incident, and it is extremely inconvenient that the tower crane driver goes out the control room at every turn and arrives ground.
SUMMERY OF THE UTILITY MODEL
Not enough to exist among the prior art, the utility model provides a people's escape way on tower crane attached to climbing frame, it has solved the tower crane driver physical stamina that exists among the prior art and has consumed too big, is unfavorable for the accuracy of tower crane to be controlled, has increased the risk that takes place the incident, and the tower crane driver goes out the control room at every turn and extremely inconvenient problem to ground.
According to the utility model discloses an embodiment, a people's escape way on tower crane who adheres to and climbs frame, include: the fixing frame comprises two vertical rods and a plurality of cross rods, the vertical rods are vertically arranged in parallel, and the cross rods are fixedly connected between the vertical rods; the channel comprises a bottom plate and two rows of railings, the bottom plate is hinged to the cross rod at the uppermost end, and the railings are arranged on two sides of the bottom plate; the supporting component, the one end of supporting component with the connection can be dismantled to the montant, the other end of supporting component with the connection can be dismantled to the bottom plate, the supporting component will the passageway overlap joint is on the tower crane.
The technical principle of the utility model is that: fix the mount in the position that the wall that is close to the tower crane control room is fit for earlier, the bottom plate of passageway is perpendicular downwards parallel with the mount, operating personnel installs the railing on the bottom plate in the structure, then use supporting component to connect respectively on bottom plate and montant, stabilize the ascending state at the level or slope a little with the bottom plate of passageway, and with the tower crane overlap joint, the tower crane driver takes the construction elevator from the structure and comes to passageway department, get into the tower crane from the passageway, reentrant control room, tower crane driver's physical power has been saved greatly, the accuracy of tower crane control has been improved, the security of climbing tower crane has been increased, also make things convenient for the tower crane driver to get back to ground rest, and simultaneously, the operation in the structure is erect to the passageway, the security has been improved, convenient operation.
Compared with the prior art, the utility model discloses following beneficial effect has: erect the passageway of overlap joint on the tower crane outside the structure that is close to the tower crane control room, it has solved tower crane driver physical stamina and has consumed too big, be unfavorable for the accuracy of tower crane to control, the risk of taking place the incident has been increased, the tower crane driver goes out the control room at every turn and extremely inconvenient technical problem to ground, the physical power of tower crane driver has been saved greatly to the production, the accuracy of tower crane control has been improved, the security of climbing tower crane has been increased, also make things convenient for the tower crane driver to get back to ground rest, and simultaneously, the erection of passageway is operated in the structure, the safety is improved, the technological effect of convenient operation.
Drawings
Fig. 1 is a schematic view of a front view structure according to an embodiment of the present invention.
The fixing frame in the attached figure 1; 11. a vertical rod; 12. a cross bar; 2. a channel; 21. a base plate; 211. a main keel; 212. a secondary keel; 213. a slot; 22. a railing; 221. a connecting rod; 222. a support rod; 23. a baffle plate; 231. buckling; 232. inserting plates; 24. a first extension section; 25. a support bar; 3. a support assembly; 31. a hoisting ring; 32. a steel rope; 4. a slide rail; 41. and connecting the holes.
Detailed Description
The technical solution of the present invention will be further explained with reference to the accompanying drawings and embodiments.
As shown in FIG. 1, the embodiment of the utility model provides a people's escape way on tower crane who has attached to climbing frame is proposed, include: the fixing frame 1 comprises two vertical rods 11 and a plurality of cross rods 12, the vertical rods 11 are vertically arranged in parallel, and the cross rods 12 are fixedly connected between the vertical rods 11; the channel 2 comprises a bottom plate 21 and two rows of railings 22, the bottom plate 21 is hinged on the cross rod 12 at the uppermost end, and the railings 22 are installed on two sides of the bottom plate 21; one end of the supporting component 3 is detachably connected with the vertical rod 11, the other end of the supporting component 3 is detachably connected with the bottom plate 21, and the channel 2 is lapped on a tower crane by the supporting component 3;
the specific working process is as follows: fix mount 1 in the position that the wall that is close to the tower crane control room is fit for earlier, bottom plate 21 of passageway 2 is perpendicular downwards parallel with mount 1, operating personnel installs railing 22 on bottom plate 21 in the structure, then use supporting component 3 to connect respectively on bottom plate 21 and montant 11, stabilize bottom plate 21 of passageway 2 at the ascending state of level or slope a little, and with the tower crane overlap joint, the tower crane driver takes construction elevator from the structure and comes to passageway 2 department, get into the tower crane from passageway 2, reentrant control room, tower crane driver's physical power has been saved greatly, the accuracy of tower crane control has been improved, the security of climbing tower crane has been increased, also make things convenient for the tower crane driver to get back to ground rest, and simultaneously, the operation in the structure is erect to passageway 2, the security has been improved, and convenient for operation.
According to the utility model discloses a further embodiment, as shown in fig. 1, a people's escape way on tower crane who adheres to and climbs the frame, bottom plate 21 includes two main joist 211 and a plurality of secondary joist 212, secondary joist 212 arranges side by side and fixed connection is in between the main joist 211, reduce the weight of passageway 2, make things convenient for the handling.
According to the utility model discloses a further embodiment, as shown in fig. 1, a people's escape way on tower crane that adheres to climbing frame, supporting component 3 includes two sets of rings 31 and two sets of steel rope 32, and a set of rings 31 fixed connection is in the top of montant 11, another set of rings 31 fixed connection be in the free end both sides of main joist 211, steel rope 32 is fixed respectively on two sets of rings 31, steel rope 32 sets up respectively the both sides of bottom plate 21 are through installing steel rope 32 on the rings 31 of bottom plate 21 both sides, and the other end of steel rope 32 is hung and is established on the rings 31 of montant 11, conveniently pulls up passageway 2 to the level and stabilizes passageway 2 on horizontal position, hangs and establishes conveniently, stable in structure.
According to the utility model discloses a another embodiment, a people's escape way on tower crane who is attached to and climbs frame, supporting component 3 includes two connecting pieces, the both ends of connecting piece are respectively through bolt fixed connection the top of montant 11 with on the free end of main joist 211, pass through the bolt fastening earlier the one end of connecting piece on the main joist 211 of bottom plate 21 in the structure, then prop to the level with bottom plate 21 with the vaulting pole, the end of reuse connecting piece is fixed on montant 11, fixes passageway 2 stable fixation at horizontal position, stable in structure, convenient operation.
According to the utility model discloses a further embodiment, as shown in fig. 1, a people's safety passageway on tower crane who adheres to climbing frame, railing 22 includes a plurality of connecting rods 221 and handrail 222, connecting rod 221 evenly spaced articulates on main joist 211, handrail 222 articulates the top of connecting rod 221, when bottom plate 21 of passageway 2 hangs down freely, install connecting rod 221 and handrail 222 on main joist 211 in the structure to make connecting rod 221 and handrail 222 fold on bottom plate 21, after hoisting passageway 2 to the level, push up connecting rod 221 and handrail 222, make connecting rod 221 vertical, handrail 222 level, stand up the back with railing 22 and fix connecting rod 221 and montant 11 with rope or bolt, railing 22 installs and operates in the structure, has avoided high altitude construction, has reduced the risk of taking place the incident, has practiced thrift the cost of operation.
According to the utility model discloses a further embodiment, as shown in fig. 1, a people's escape way on tower crane who adheres to and climb the frame, install a plurality of slots 213 on the main joist 211, be provided with a plurality of baffles 23 between the connecting rod 221, the top fixedly connected with buckle 231 of baffle 23, the bottom fixedly connected with picture peg 232 of baffle 23, buckle 231 lock joint is in on the handrail, picture peg 232 inserts correspondingly in the slot 213, when using picture peg 232 to insert slot 213, detain buckle 231 on handrail 222, increase the guardrail for railing 22, improve passageway 2's security.
According to the utility model discloses a further embodiment, as shown in FIG. 1, a people's escape way on tower crane who adheres to and climb frame, the end of passageway 2 is provided with first extension section 24, first extension section 24 with passageway 2 is articulated, and when non-operating condition, first extension section 24 is folded in passageway 2, when the tower crane was far away with the structure, rotated first extension section 24 in order to increase passageway 2's length, made first extension section 24 overlap joint on the tower crane, improved passageway 2's suitability.
According to the utility model discloses a another embodiment, a people's escape way on tower crane that adheres to and climbs frame, passageway 2's end is provided with the second and extends the section, second extension section sliding connection is in on passageway 2, when the tower crane was far away with the structure, to the length of tower crane roll-off second extension section in order to increase passageway 2, make second extension section overlap joint on the tower crane, improve passageway 2's suitability.
According to the utility model discloses a another embodiment, as shown in fig. 1, a people's escape way on tower crane who adheres to and climbs frame, be provided with two spinal branch vaulting poles 25 under the passageway 2, the connection can be dismantled to the one end of bracing piece 25 the bottom of montant 11, the connection can be dismantled to the other end of bracing piece 25 on the middle section of passageway 2, bracing piece 25 is located respectively passageway 2's both sides further stabilize passageway 2 at horizontal position, make passageway 2 structure more stable, firm.
According to the utility model discloses a another embodiment, as shown in fig. 1, a people's escape way on the tower crane who adheres to climbing frame, be provided with the spout on the montant 11, and two the spout of montant 11 sets up relatively, 11 sliding connection of montant has the slide rail 4 of a plurality of concatenations, set up corresponding connecting hole 41 on montant 11 and on slide rail 4, with the vertical concatenation of slide rail 4 and fix on the structure, then with montant 11 and slide rail 4 cooperation, use the lifting machine pulling montant 11 to suitable position, rethread bolt and the cooperation of connecting hole 41 fix montant 11 on slide rail 4, along with the high increase of structure, the position of convenient passageway 2 that rises on the structure to make things convenient for the tower crane driver to get into the tower crane control room more.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the present invention can be modified or replaced by other means without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims.

Claims (10)

1. The utility model provides a people's escape way on tower crane who is attached to and climbs frame which characterized in that includes: the fixing frame comprises two vertical rods and a plurality of cross rods, the vertical rods are vertically arranged in parallel, and the cross rods are fixedly connected between the vertical rods;
the channel comprises a bottom plate and two rows of railings, the bottom plate is hinged to the cross rod at the uppermost end, and the railings are arranged on two sides of the bottom plate;
the supporting component, the one end of supporting component with the connection can be dismantled to the montant, the other end of supporting component with the connection can be dismantled to the bottom plate, the supporting component will the passageway overlap joint is on the tower crane.
2. The tower crane pedestrian safety passage attached to the climbing frame according to claim 1, characterized in that: the bottom plate comprises two main keels and a plurality of secondary keels, and the secondary keels are arranged side by side and fixedly connected between the main keels.
3. The tower crane pedestrian safety passage attached to the climbing frame according to claim 2, characterized in that: the supporting component comprises two groups of lifting rings and two groups of steel ropes, one group of lifting rings are fixedly connected to the top end of the vertical rod, the other group of lifting rings are fixedly connected to two sides of the free end of the main keel, the steel ropes are respectively fixed to the two groups of lifting rings, and the steel ropes are respectively arranged on two sides of the bottom plate.
4. The tower crane pedestrian safety passage attached to the climbing frame according to claim 2, characterized in that: the supporting component comprises two connecting pieces, and two ends of each connecting piece are fixedly connected to the top end of the corresponding vertical rod and the free end of the corresponding main keel through bolts.
5. The safety passageway for people on tower crane attached to climbing frame as claimed in claim 3 or 4, wherein: the railing comprises a plurality of connecting rods and holding rods, the connecting rods are hinged to the main keel at even intervals, and the holding rods are hinged to the top ends of the connecting rods.
6. The tower crane pedestrian safety passage attached to the climbing frame according to claim 5, characterized in that: install a plurality of slots on the main joist, be provided with a plurality of baffles between the connecting rod, the top fixedly connected with buckle of baffle, the bottom fixedly connected with picture peg of baffle, the buckle lock joint is in hold up on the pole, the picture peg inserts correspondingly in the slot.
7. The tower crane pedestrian safety passage attached to the climbing frame according to claim 1, characterized in that: the tail end of the channel is provided with a first extension section, the first extension section is hinged with the channel, and the first extension section is folded in the channel in a non-working state.
8. The tower crane pedestrian safety passage attached to the climbing frame according to claim 1, characterized in that: the tail end of the channel is provided with a second extending section which is connected to the channel in a sliding mode.
9. The tower crane pedestrian safety passage attached to the climbing frame according to claim 1, characterized in that: two support rods are arranged below the channel, one ends of the support rods can be detachably connected to the bottom end of the vertical rod, the other ends of the support rods can be detachably connected to the middle section of the channel, and the support rods are respectively located on two sides of the channel.
10. The tower crane pedestrian safety passage attached to the climbing frame according to claim 1, characterized in that: the vertical rod is provided with sliding grooves which are oppositely arranged, the vertical rod is connected with a plurality of spliced sliding rails in a sliding manner, and the vertical rod and the sliding rails are provided with corresponding connecting holes.
CN202120939519.1U 2021-04-30 2021-04-30 Safety passageway attached to tower crane climbing frame for people to climb Active CN214989797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120939519.1U CN214989797U (en) 2021-04-30 2021-04-30 Safety passageway attached to tower crane climbing frame for people to climb

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120939519.1U CN214989797U (en) 2021-04-30 2021-04-30 Safety passageway attached to tower crane climbing frame for people to climb

Publications (1)

Publication Number Publication Date
CN214989797U true CN214989797U (en) 2021-12-03

Family

ID=79089230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120939519.1U Active CN214989797U (en) 2021-04-30 2021-04-30 Safety passageway attached to tower crane climbing frame for people to climb

Country Status (1)

Country Link
CN (1) CN214989797U (en)

Similar Documents

Publication Publication Date Title
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN113120785A (en) Safety device attached to climbing frame for people on tower crane
CN213626818U (en) Frame type safety ladder cage
CN214989797U (en) Safety passageway attached to tower crane climbing frame for people to climb
CN211736309U (en) Building climbing frame lifting device
CN216662305U (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform
CN212773388U (en) Novel all-steel lifting scaffold
CN214462394U (en) High-altitude overhanging scaffold
CN213742239U (en) Construction well security protection platform equipment
CN114753611A (en) Curtain wall construction platform
CN210529505U (en) Circulation device is torn open in ann of wet seam template of bridge concatenation formula
CN209760761U (en) Construction platform and elevator core section of thick bamboo construction structures in a core section of thick bamboo
CN211340477U (en) Hang basket convenient to installation
CN218881540U (en) Construction protection frame
CN215671309U (en) Prefabricated temporary stair of going up people
CN216840812U (en) Assembled ladder cage device
CN218027232U (en) Bridge hanging basket cast-in-place section vertical safety channel attached to outer side formwork
CN215948853U (en) Building courtyard lifting construction platform
CN210857952U (en) Novel attached lifting scaffold
CN115043330B (en) Support structure of inner climbing frame of tower crane in non-core tube area, inner climbing frame and tower crane
CN215107151U (en) Support novel stores pylon of intensive
CN211369478U (en) Door type structural hanging basket suspension structure mounting system
CN218058252U (en) Light partition plate mounting tool suitable for different floor height conveniently remove
CN219823484U (en) Attached tower crane pedestrian passageway
CN215714714U (en) Hanging basket equipment for installing bridge guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant