CN218643812U - Photovoltaic construction is assisted and is established frame - Google Patents

Photovoltaic construction is assisted and is established frame Download PDF

Info

Publication number
CN218643812U
CN218643812U CN202223147417.XU CN202223147417U CN218643812U CN 218643812 U CN218643812 U CN 218643812U CN 202223147417 U CN202223147417 U CN 202223147417U CN 218643812 U CN218643812 U CN 218643812U
Authority
CN
China
Prior art keywords
pedal
auxiliary
main
rod
limiting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223147417.XU
Other languages
Chinese (zh)
Inventor
仁科杰
谢元朗
杨进峰
黄拥军
李海齐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Engineering Co Ltd
Original Assignee
PowerChina Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Engineering Co Ltd filed Critical PowerChina Guizhou Engineering Co Ltd
Priority to CN202223147417.XU priority Critical patent/CN218643812U/en
Application granted granted Critical
Publication of CN218643812U publication Critical patent/CN218643812U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a frame is stepped on in assistance of photovoltaic construction, include: a main pedal; the auxiliary pedals are distributed at intervals with the main pedal; the pedal rod is rotatably hinged on the auxiliary pedal, and the pedal rod can rotate in the length direction of the auxiliary pedal. When needing the transportation to shift, vice footboard area foot bar slides and runs through the through-hole on the main footboard and break away from, and the foot bar is packed up round the pin joint rotation to vice footboard length direction, and the vice footboard of main footboard side contact overlaps to bind can not occupy too much space when the transport, has solved the problem that the fixed body that footboard and ladder frame formed can occupy the inconvenient transportation of too much space and shift when the transport.

Description

Photovoltaic construction is assisted and is established frame
Technical Field
The utility model relates to a frame is stepped on in assistance of photovoltaic construction belongs to photovoltaic construction equipment technical field.
Background
Under the background of carbon neutralization and carbon standard reaching, green sustainable energy utilization is taken as a future main force energy layout trend, land resource utilization can be improved in plain agricultural light complementary photovoltaic construction, but the plain agricultural light complementary photovoltaic assembly installation has a plurality of difficulties, particularly, an agricultural light complementary operation platform is higher in distance from the land, and because the land needs to be cultivated subsequently, when a scaffold cannot be built for tamping the land, an installed precast pile is required to be used as a stress base to build a photovoltaic installation operation platform.
And behind photovoltaic installation operation platform, ground operation personnel need establish through the assistance of ladder etc. constitution and step on the frame climbing carries out follow-up operation on the photovoltaic installation operation platform, and current assistance is established and is stepped on the frame like a photovoltaic module maintenance extension ladder of chinese patent CN217632220U, and the technique of disclosing the adoption is: the plurality of short pedals and the plurality of long pedals are respectively and fixedly connected with the two sides of the inner walls of the upper ladder frame and the lower ladder frame; although the auxiliary pedal frame is formed by fixing a plurality of pedals in the ladder frame, so that an operator can climb the auxiliary pedal frame, the fixed body formed by the pedals and the ladder frame occupies too much space during transportation, and the technical problem that transportation and transfer are inconvenient exists.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a photovoltaic construction assist establishes and steps on frame.
The utility model discloses a following technical scheme can realize.
The utility model provides a pair of assist of photovoltaic construction is established and is stepped on frame, include:
a main pedal;
the auxiliary pedals are distributed at intervals with the main pedal;
the pedal rod is rotatably hinged on the auxiliary pedal, and the pedal rod can rotate in the length direction of the auxiliary pedal.
The pedal rod is rotatably hinged on the auxiliary pedal through a hinge seat.
The through holes and the pedal rods on the main pedal are multiple.
The through hole on one main pedal corresponds to one pedal rod.
The pedal rod is installed in the through hole of the main pedal through the clamping limiting assembly, when the clamping limiting assembly is matched with the pedal rod, the through hole of the pedal rod cannot slide, and when the clamping limiting assembly is separated from the pedal rod, the through hole of the pedal rod can slide on the main pedal.
The clamping and limiting assembly comprises a limiting plate and an adjusting nail screwed with the limiting plate through a thread pair.
An L-shaped notch installation limiting plate is arranged below the main pedal, and the main pedal and the limiting plate are correspondingly provided with threaded through holes which are screwed with the adjusting nails; the pedal rod is provided with a limiting port and is clamped and limited by a limiting plate.
An L-shaped notch installation limiting plate is arranged below the main pedal, and the main pedal is provided with a threaded through hole which is screwed with the adjusting nail; the adjusting nail is rotatably mounted with the limiting plate through a bearing; the pedal rod is provided with a limiting port and is clamped and limited by a limiting plate.
The beneficial effects of the utility model reside in that: when needing the transportation to shift, vice footboard area foot bar slides and runs through the through-hole on the main footboard and break away from, and the foot bar is packed up round the pin joint rotation to vice footboard length direction, and the vice footboard of main footboard side contact overlaps to bind can not occupy too much space when the transport, has solved the problem that the fixed body that footboard and ladder frame formed can occupy the inconvenient transportation of too much space and shift when the transport.
Drawings
FIG. 1 is a schematic structural view of a buckle cone, a hanging arm, an auxiliary pedal frame and a supporting mechanism for mounting an operating platform during use;
FIG. 2 is a schematic structural view of the fastening cone, the hanging arm and the mounting operation platform support mechanism;
FIG. 3 is a schematic structural view of the mounting operation platform support mechanism;
FIG. 4 is a schematic view of the auxiliary pedal frame;
in the figure: 1-rubber strip; 2-buckling a cone; 3, prefabricating the pile; 4-hanging the arm;
5, mounting an operating platform supporting mechanism; 51-a beam body; 511-rear beam; 512-truss; 52-damping limit clamping plate; 521-a limit bayonet; 522-a clamping table; 53-an operating panel; 531-card vertical extension; 532-bayonet; 533-mounting edge; 534-mounting bolts; 535-safety delay;
6-rear inclined strut; 7-a telescopic rod;
8-arranging a pedal frame; 81-main pedal; 82-a secondary pedal; 83-step lever; 84-a limiting plate; 85-adjusting nails; 86-limiting port.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the described.
As shown in fig. 1-4.
The existing photovoltaic installation operation platform is a simple operation platform for installing an agricultural photovoltaic module with Chinese patent publication No. CN211850732U, and the disclosed technology is as follows: the upper end of each hanging rod is provided with a hook, the lower end of each hanging rod is vertically connected with a U-shaped bracket, the front end of each U-shaped bracket is vertically provided with a stop column, and the U-shaped bracket is provided with an operating rod; although, the U type support can hang the dress at the stake top of having installed through the couple on the peg, however, the couple is less than stake apical opening, and it is spacing that the couple can not fill completely with stake apical opening when hanging the dress, has the couple to hang the dress and can appear the problem of displacement at stake apical opening, leads to the U type support of lower part to appear rocking the condition.
The application discloses photovoltaic installation operation platform on complementary precast pile of farming light includes:
the exterior is bonded and fixed with a button cone body 2 of the rubber strip 1, the button cone body 2 is a cone-shaped body formed by wood or hollow steel, the button cone body 2 can be fastened and completely filled and inserted in an opening at the top of the precast pile 3 for limiting, the button cone body 2 is inserted in the opening at the top of the precast pile 3 through the rubber strip 1 as a wear intermediate part, and the wear of a coating at the top of the precast pile 3 is avoided;
and the hanging arm 4 is welded with the buckle cone 2 or fixedly connected with a bolt, the bottom of the hanging arm 4 is detachably and fixedly provided with an installation operation platform supporting mechanism 5 through a bolt and a nut, and the installation operation platform supporting mechanism 5 is used for workers to stand for operation.
An opening is formed in the bottom of the hanging arm 4, a through hole is formed in the opening, and the through hole in the bottom of the hanging arm 4 is detachably and fixedly installed with the installation operation platform supporting mechanism 5 through bolts and nuts.
The rear side of the bottom of the installation and operation platform supporting mechanism 5 is hinged with a rear inclined strut 6, the front side of the bottom of the installation and operation platform supporting mechanism 5 is hinged with a telescopic rod 7, the telescopic rod 7 can be a bolt telescopic rod or a sliding telescopic rod, the installation and operation platform supporting mechanism 5 obtains auxiliary support through the rear inclined strut 6 and the telescopic rod 7, and the stable state of the installation and operation platform supporting mechanism 5 mainly comes from a complete filling state of buckling a cone 2 and a top opening of a precast pile 3.
Because the installation operating platform supporting mechanism 5 that supplies the operation personnel to stand the operation tightly buckles through the knot cone 2 on hanging arm 4 and fills completely and insert spacing in 3 open-tops of precast pile, realize 3 open-tops of precast pile and detain not have the interval between the cone 2, avoided installation operating platform supporting mechanism 5 the condition that rocks to appear, it can not fill completely spacingly to have solved the couple and is less than the stake top mouth and hang the dress, has the couple to hang the problem that the displacement can appear in the stake top mouth.
Still include to lean on the assistance of 3 sides of precast pile above operation platform supporting mechanism 5 and establish step 8, assist and establish step 8 and constitute the assistance of photovoltaic construction in whole equipment and establish step, the operation personnel establishes step 8 through assisting and goes up to operation platform supporting mechanism 5.
The existing photovoltaic installation operation platform is a simple operation platform for installing an agricultural photovoltaic module with Chinese patent publication No. CN211850732U, and the disclosed technology is as follows: the upper end of each hanging rod is provided with a hook, the lower end of each hanging rod is vertically connected with a U-shaped bracket, the front end of each U-shaped bracket is vertically provided with a stop column, and the U-shaped bracket is provided with an operating rod; although the operating rod is limited by the stop column and the upright column when the operating rod is mounted on the U-shaped bracket, when an operator steps on the operating rod to operate, the operating rod is deformed and clamped between the upright column and the stop column, and the operating rod is inconvenient to take out.
The application discloses installation operation platform supporting mechanism 5 includes:
the beam body 51 is composed of a back beam 511 and trusses 512, the back beam 511 and the trusses 512 are both made of hollow steel, and the two trusses 512 are welded and fixed at two ends of the back beam 511; the rear beam 511 is provided with a through hole, and the through hole at the bottom of the hanging arm 4 is detachably and fixedly arranged with the rear beam 511 through a bolt and a nut; the rear inclined strut 6 can be rotatably hinged on the rear beam 511 towards the telescopic rod 7, and the telescopic rod 7 can be rotatably hinged on the truss beam 512 towards the rear inclined strut 6;
the damping limiting clamping plate 52 is adhered and fixed to the girder 512 in the girder body 51 close to the side edge of the precast pile 3, the damping limiting clamping plate 52 is made of elastic rubber, the damping limiting clamping plate 52 is provided with a limiting bayonet 521, a clamping table 522 is installed in the limiting bayonet 521, the clamping table 522 is a rigid body such as a steel plate or a wood plate which cannot be deformed, and the clamping table 522 is adhered or fixed with the side edge of the precast pile 3 through bolts when in use.
The damping limiting clamping plates 521 and the clamping tables 522 are two and correspondingly distributed on two sides of the precast pile 3. Two screens platform 522 are fixed on precast pile 3 both sides, and two spacing cardboard 52 of damping are fixed on longeron 512 in the roof beam body 51, receive vibrations or when displacement, and spacing cardboard 52 of damping takes place elastic deformation and supports and carry out spacing shock attenuation in screens platform 522, make installation operation platform supporting mechanism 5 stably be in precast pile 3 both sides limit.
The mounting operation platform supporting mechanism 5 further comprises: the operation board 53 is used for the worker to step on and stand, and the operation board 53 is detachably fixed on the truss 512 of the beam body 51.
The bottom of the operation board 53 is provided with two card vertical extensions 531 which are distributed at intervals, the card vertical extensions 531 are provided with bayonets 532 for being clamped with the trussed beam 512 in a sliding manner, and the bayonets 532 limit the left and right displacement of the operation board 53 on the trussed beam 512.
The vertical clamping extension 531 close to the precast pile 3 is provided with a mounting edge 533, and the mounting edge 533 is detachably fixed on the truss 512 of the beam body 51 through a mounting bolt 534.
A safety extension 535 upwards warping the top of the precast pile 3 is arranged at the side edge of the operation plate 53 of the precast pile 3, and the safety extension 535 provides a barrier for operators; the safety extension 535 overhangs the mounting stud 534 to provide a sheltered environment for the mounting stud 534. The operation board 53 is made of hard plastic or wood board, so that the equipment weight is improved.
During the use, operation panel 53 uses safe 535 to prolong as the border and there is the interval with precast pile 3, operation panel 53's installation limit 533 can dismantle through mounting bolt 534 to be fixed on girder 512 of roof beam body 51, spacing cardboard 52 of damping and screens platform 522 provide spacingly for installation operation platform supporting mechanism 5 at precast pile 3, installation operation platform supporting mechanism 5 is tightly buckled through the cone of the knot 2 on the string arm 4 and is filled completely and insert spacing in precast pile 3 top opening, when the operation personnel trample on operation panel 53, operation panel 53 warp can not warp the chucking, solved the problem that the operating lever warp the chucking and is inconvenient to take out between upright pile and fender post.
The utility model provides a photovoltaic construction assist establishes and steps on frame, assist and establish and step on frame 8 and include:
when in use, the two ends of the main pedal 81 and the auxiliary pedal 82 are respectively contacted with the precast pile 3 and the ground, and the main pedal 81 and the auxiliary pedal 82 are distributed at intervals;
the main pedal 81 is provided with a through hole for the pedal rod 83 on the auxiliary pedal 82 to slide through, the auxiliary pedal 82 can rotate and hinge the pedal rod 83 through the hinge seat, and the pedal rod 83 can rotate towards the length direction of the auxiliary pedal 82; the through holes and the pedal rods 83 on the main pedals 81 are multiple, and the through hole on one main pedal 81 corresponds to one pedal rod 83.
When the ladder form needs to be formed to assist and establish the pedal frame, vice footboard 82 takes pedal rod 83 to slide and runs through the through-hole installation on main footboard 81, main footboard 81 and vice footboard 82 both ends contact precast pile 3 and ground respectively, the operation personnel climbs operation platform supporting mechanism 5 through stepping on pedal rod 83 and stands and carry out the operation, when needs transportation shift, vice footboard 82 takes pedal rod 83 to slide and runs through the through-hole on the main footboard 81 and breaks away from, pedal rod 83 is packed up around the pin joint rotation to vice footboard 82 length direction, main footboard 81 side contact pair footboard 82 overlaps to be binded and can not occupy too much space when the transport, the problem of the inconvenient transportation shift of too much space can be occupied to the fixed body that footboard and ladder frame formed when the transport is solved.
The pedal rod 83 is mounted in the through hole of the main pedal 81 through the clamping limiting component, when the clamping limiting component is matched with the pedal rod 83, the pedal rod 83 cannot slide in the through hole of the main pedal 81, and when the clamping limiting component is separated from the pedal rod 83, the pedal rod 83 can slide in the through hole of the main pedal 81.
The clamping and limiting assembly comprises a limiting plate 84 and an adjusting nail 85 screwed with the limiting plate 84 through a thread pair.
An L-shaped notch installation limiting plate 84 is arranged below the main pedal 81, and the main pedal 81 and the limiting plate 84 are respectively provided with a threaded through hole correspondingly and screwed with the adjusting nail 85; the pedal rod 83 is provided with a limit port 86 which is tightly clamped and limited by a limit plate 84.
An L-shaped notch installation limiting plate 84 is arranged below the main pedal 81, and the main pedal 81 is provided with a threaded through hole which is screwed with the adjusting nail 85; the adjusting nail 85 is rotatably mounted with the limiting plate 84 through a bearing; the pedal rod 83 is provided with a limiting port 86 which is clamped and limited by a limiting plate 84.
The adjusting nail 85 brings the limit plate 84 to be clamped and matched with or separated from the limit port 86 on the pedal rod 83.

Claims (8)

1. The utility model provides a photovoltaic construction assist establishes and steps on frame which characterized in that includes:
a main pedal (81);
the auxiliary pedals (82), the auxiliary pedals (82) and the main pedal (81) are distributed at intervals;
the pedal comprises a pedal rod (83), the main pedal (81) is provided with a through hole for the sliding penetration of the pedal rod (83) on the auxiliary pedal (82), the pedal rod (83) is rotatably hinged on the auxiliary pedal (82), and the pedal rod (83) can rotate in the length direction of the auxiliary pedal (82).
2. The auxiliary tread frame for photovoltaic construction according to claim 1, wherein: the pedal rod (83) is rotatably hinged on the auxiliary pedal (82) through a hinge seat.
3. The auxiliary tread frame for photovoltaic construction according to claim 1, wherein: the main pedal (81) is provided with a plurality of through holes and a plurality of pedal rods (83).
4. The auxiliary tread frame for photovoltaic construction according to claim 3, wherein: the through hole on one main pedal (81) corresponds to one pedal rod (83).
5. The auxiliary tread frame for photovoltaic construction according to claim 1, wherein: the pedal rod (83) is arranged in a through hole in the main pedal (81) through the clamping limiting assembly, when the clamping limiting assembly is matched with the pedal rod (83), the pedal rod (83) cannot slide in the through hole in the main pedal (81), and when the clamping limiting assembly is separated from the pedal rod (83), the pedal rod (83) can slide in the through hole in the main pedal (81).
6. The auxiliary pedal frame for photovoltaic construction according to claim 5, wherein: the clamping and limiting assembly comprises a limiting plate (84) and an adjusting nail (85) screwed with the limiting plate (84) through a thread pair.
7. The auxiliary tread frame for photovoltaic construction according to claim 6, wherein: an L-shaped notch installation limiting plate (84) is arranged below the main pedal (81), and the main pedal (81) and the limiting plate (84) are correspondingly provided with threaded through holes which are screwed with the adjusting nails (85); the pedal rod (83) is provided with a limiting opening (86) which is clamped and limited with a limiting plate (84).
8. The auxiliary pedal frame for photovoltaic construction according to claim 6, wherein: an L-shaped notch installation limiting plate (84) is arranged below the main pedal (81), and the main pedal (81) is provided with a threaded through hole which is screwed with the adjusting nail (85); the adjusting nail (85) is rotatably mounted with the limiting plate (84) through a bearing; the pedal rod (83) is provided with a limiting opening (86) which is clamped and limited with a limiting plate (84).
CN202223147417.XU 2022-11-27 2022-11-27 Photovoltaic construction is assisted and is established frame Active CN218643812U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223147417.XU CN218643812U (en) 2022-11-27 2022-11-27 Photovoltaic construction is assisted and is established frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223147417.XU CN218643812U (en) 2022-11-27 2022-11-27 Photovoltaic construction is assisted and is established frame

Publications (1)

Publication Number Publication Date
CN218643812U true CN218643812U (en) 2023-03-17

Family

ID=85499833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223147417.XU Active CN218643812U (en) 2022-11-27 2022-11-27 Photovoltaic construction is assisted and is established frame

Country Status (1)

Country Link
CN (1) CN218643812U (en)

Similar Documents

Publication Publication Date Title
CN100590277C (en) Overhead bridge type suspension scaffold
CN114396176B (en) Reinforcing device and reinforcing method for steel beam column connecting node
CN218643812U (en) Photovoltaic construction is assisted and is established frame
CN218643800U (en) Photovoltaic installation operation platform on complementary precast pile of farming light
CN202416823U (en) Aerial work platform
CN207792414U (en) Piece-shape type aging blocks install the steel structure derrick of elevator additional
CN218758631U (en) Supporting mechanism for installing and operating platform
CN209799126U (en) roof large-span supporting structure that encorbelments
CN205936370U (en) Module cat ladder that can disassemble
CN212078624U (en) Scaffold frame is used in elevator installation convenient to height-adjusting
CN206016219U (en) A kind of construction operation platform for adapting to different gradient roofing
CN210977519U (en) Steel bow member installation auxiliary device for tunnel construction
CN211998568U (en) Standard knot and tower crane
CN210828286U (en) Overturn-preventing protection device for lifting scaffold
CN211775603U (en) Combined type step construction platform
CN206189834U (en) Double -deck integrally lift up formula operation platform of elevartor shaft
CN214302795U (en) Operating platform for installing cable head and ring beam ear plate in cable structure
CN217602024U (en) High-altitude overhanging type steel support frame
CN218861674U (en) Aluminum alloy scaffold
CN217567338U (en) Seat device for pole operation
CN221590315U (en) Assembled type hand and foot rest for constructional engineering
CN216042488U (en) Novel scaffold for multi-use architecture construction
CN216190203U (en) Tower column construction elevator
CN211340477U (en) Hang basket convenient to installation
CN208236319U (en) A kind of track crane lower beam manhole position is ascended a height inclined ladder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant