CN218619914U - Construction structure for installing bridge deck steel grating through self-made pulley balance car - Google Patents

Construction structure for installing bridge deck steel grating through self-made pulley balance car Download PDF

Info

Publication number
CN218619914U
CN218619914U CN202222994129.1U CN202222994129U CN218619914U CN 218619914 U CN218619914 U CN 218619914U CN 202222994129 U CN202222994129 U CN 202222994129U CN 218619914 U CN218619914 U CN 218619914U
Authority
CN
China
Prior art keywords
rectangular
rectangular pipe
base
bridge floor
steel grating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222994129.1U
Other languages
Chinese (zh)
Inventor
张申亮
朱沈来
许兴年
陈国平
宾涛
李规然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Hebei Construction Co ltd
China Construction Second Engineering Bureau Sichuan Structural Fabricated Building Co ltd
China Construction Second Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Second Engineering Bureau Hebei Construction Co ltd
China Construction Second Engineering Bureau Sichuan Structural Fabricated Building Co ltd
China Construction Second Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Hebei Construction Co ltd, China Construction Second Engineering Bureau Sichuan Structural Fabricated Building Co ltd, China Construction Second Bureau Installation Engineering Co Ltd filed Critical China Construction Second Engineering Bureau Hebei Construction Co ltd
Priority to CN202222994129.1U priority Critical patent/CN218619914U/en
Application granted granted Critical
Publication of CN218619914U publication Critical patent/CN218619914U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a construction structures through self-control pulley balance car installation bridge floor steel grating, include the rectangular base who comprises two width direction rectangular pipe base poles and two length direction rectangular pipe base poles, a plurality of universal wheels are installed to rectangular base's bottom, the top of width direction rectangular pipe base pole is fixedly connected with rectangular pipe stand respectively, the top fixedly connected with rectangular pipe crossbeam of two rectangular pipe stands, the bottom fixed mounting of rectangular pipe crossbeam has the fixed pulley, fixed mounting has a plurality of supporting beam between two length direction rectangular pipe base poles, fixed mounting has block terminal and two motors on the supporting beam, the motor is connected with the cable drum respectively, the winding has wire rope on the cable drum, wire rope passes the fixed pulley on rectangular pipe crossbeam both ends respectively, wire rope's terminal fixedly connected with lifting hook, two lifting hooks at every end of rectangular pipe crossbeam hang the steel grating. Can artifical automatic control rectangle base remove on the bridge floor, reduce and set up scaffold frame and adjust hanging flower basket counter weight, angle time, guarantee the efficiency of construction, reduce construction cost.

Description

Construction structure for installing bridge deck steel grating through self-made pulley balance car
Technical Field
The utility model belongs to bridge floor building construction field, in particular to through construction structures of self-control pulley balance car installation bridge floor steel grating.
Background
The landscape bridge can combine the architectural design and the landscape, and the bridge not only has practical value but also has certain ornamental value by applying unique artistic techniques of borrowing the landscape, framing the landscape and separating the landscape.
With the development of society, the appearance of urban landscape bridges has become a pen-like pen in urban centers or park centers, and the decoration on the bridge body structure is necessary for sucking eyes, wherein the decoration comprises the installation of bridge type project decoration grids. At present, the construction mode of installation of bridge type project decoration grid adopts the mounting means of traditional scaffold frame and hanging flower basket, and the mounting means of traditional scaffold frame and hanging flower basket is because of with high costs, and inefficiency, can not present stage view bridge decoration operation.
SUMMERY OF THE UTILITY MODEL
The utility model provides a construction structures through self-control pulley balance car installation bridge floor steel grating for the construction method who solves bridge type project and decorate grid installation adopts the mounting means of traditional scaffold frame and hanging flower basket, and the mounting means of traditional scaffold frame and hanging flower basket is because of with high costs, and inefficiency, can not present stage view bridge decoration operation's technical problem.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a construction structures through self-control pulley balance car installation bridge floor steel grating, includes the rectangular base that comprises two width direction rectangular tube base poles and two length direction rectangular tube base poles, a plurality of universal wheels are installed to rectangular base's bottom, and rectangular base walks on the bridge floor through the universal wheel, the top of width direction rectangular tube base pole is fixedly connected with rectangular tube stand respectively, and the top fixedly connected with rectangular tube crossbeam of two rectangular tube stands exceeds rectangular tube crossbeam at both ends of rectangular tube crossbeam respectively, the bottom fixed mounting of rectangular tube crossbeam has the fixed pulley, and fixed mounting has a plurality of supporting beams between two length direction rectangular tube base poles, and fixed mounting has block terminal and two motors on the supporting beam, and block terminal and motor electricity are connected, and the motor is connected with the cable drum respectively, and the last winding of cable drum has wire rope, and cable rope passes the fixed pulley on the rectangular tube crossbeam both ends respectively, and rectangular tube crossbeam's both ends are provided with two cable wire rope, and cable rope's terminal fixedly connected with rectangular tube crossbeam fixed connection has the fixed pulley at both ends respectively, and the rectangular tube crossbeam both ends has two lifting hooks to hang the grid steel grating, is fixed with the railing on the bridge floor, is provided with the railing on the railing, and is located the fixed otic placode on one side, and is connected with the fixed otic placode with the lifting hook.
Through adopting the above technical scheme, the universal wheel is installed to rectangular base's bottom, can artifical self-control rectangular base remove on the bridge floor, hang the steel grating on the lifting hook after, lift up the steel grating through manual control motor and wire rope, stop the device at the bridge body needs the local bridge floor that corresponds of dress grid, rethread manual control motor and wire rope transfer the steel grating, thereby make the steel grating install on the bridge floor, reduce and set up the scaffold frame and adjust the hanging flower basket counter weight, the angle time, the efficiency of construction has been guaranteed, construction cost is reduced.
Preferably, the fixed pulley is provided with four positions, two positions are arranged at the outer sides of the two rectangular tube stand columns, and two positions are arranged between the two rectangular tube stand columns.
By adopting the technical scheme, the stress condition of the steel wire rope is better, so that the operation process is more convenient.
Preferably, a rectangular tube inclined support is further fixed to the top end of the rectangular tube base rod in the width direction, and the top of the rectangular tube inclined support is fixed to the rectangular tube stand column.
By adopting the technical scheme, the whole structure is ensured to have stronger stability.
Preferably, the rectangular tube inclined strut is connected to the position 2/3 of the height direction of the rectangular tube upright post.
By adopting the technical scheme, the stability of the structure is stronger.
Preferably, the steel grating comprises two grating single sheets with intervals and galvanized steel plates for connecting the two grating single sheets, and the two grating single sheets are respectively attached to the two side surfaces of the ear plate.
By adopting the technical scheme, the mounting structure of the steel grating is reasonable, the steel grating can be connected with the clamping groove type of the steel grating through the lug plate, the positioning is convenient, and the mounting efficiency is high.
Preferably, two ear plates are arranged in the height direction of the railing.
Through adopting above-mentioned technical scheme, steel grating's installation intensity is high, and the security is high.
The beneficial effects of the utility model embody: the universal wheel is installed to rectangular base's bottom, can artifical self-control rectangular base remove on the bridge floor, hang the steel grating back on the lifting hook, lift up the steel grating through manual control motor and wire rope, with installing and need adorn the local bridge floor that corresponds of grid at the pontic and stop, rethread manual control motor and wire rope transfer the steel grating, thereby make the steel grating install on the bridge floor, reduce and set up the scaffold frame and adjust the hanging flower basket counter weight, the angle time, the efficiency of construction has been guaranteed, construction cost is reduced.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention; the primary objects and other advantages of the invention may be realized and attained by the structure particularly pointed out in the written description.
Drawings
Fig. 1 is a schematic view of a hoisting structure of an embodiment of the present invention;
FIG. 2 is an elevation view of the steel grating according to an embodiment of the present invention;
fig. 3 is a top view of the steel grating according to the embodiment of the present invention.
Reference numerals: 1. a width-direction rectangular tube base rod; 2. a length direction rectangular tube base rod; 3. a universal wheel; 4. a rectangular tube column; 5. a rectangular tube beam; 6. a fixed pulley; 7. a support beam; 8. a distribution box; 9. a motor; 10. a wire rope; 11. a hook; 12. a steel grid; 13. a railing rod; 14. an ear plate; 15. a rectangular tube inclined strut; 16. a grid single sheet; 17. a galvanized steel sheet.
Detailed Description
The technical solutions of the present invention are described in detail below by way of examples, which are only exemplary and can be used only for explaining and explaining the technical solutions of the present invention, but not for explaining the limitations of the technical solutions of the present invention.
With reference to fig. 1-3, a construction structure for installing a bridge floor steel grating through a self-made pulley balance car, includes a rectangular base composed of two width direction rectangular tube base rods 1 and two length direction rectangular tube base rods 2, a plurality of universal wheels 3 are installed at the bottom of the rectangular base, the rectangular base travels on the bridge floor through the universal wheels 3, the tops of the width direction rectangular tube base rods 1 are fixedly connected with rectangular tube upright posts 4 respectively, the tops of the two rectangular tube upright posts 4 are fixedly connected with rectangular tube cross beams 5, both ends of the rectangular tube cross beams 5 exceed the rectangular base respectively, the bottoms of the rectangular tube cross beams 5 are fixedly installed with fixed pulleys 6, a plurality of supporting beams 7 are fixedly installed between the two length direction rectangular tube base rods 2, a distribution box 8 and two motors 9 are fixedly installed on the supporting beams 7, the distribution box 8 is electrically connected with the motors 9, the motors 9 are connected with a rope reel respectively, a steel wire rope 10 is wound on the rope reel, the steel rope 10 passes through the fixed pulleys 6 on both ends of the rectangular tube cross beams 5 respectively, two ends of the rectangular tube cross beams 5 are provided with two steel wire ropes 10, a railing 13 fixed on one side of a fence 12, and a railing 13 is provided with a railing 12.
Universal wheel 3 is installed to rectangular base's bottom, can artifical self-control rectangular base remove on the bridge floor, hang steel grating 12 back on lifting hook 11, lift up steel grating 12 through manual control motor 9 and wire rope 10, stop the device at the bridge body needs the local bridge floor that corresponds of dress grid, rethread manual control motor 9 and wire rope 10 transfer steel grating 12, thereby make steel grating 12 install on the bridge floor, reduce and set up the scaffold and adjust the hanging flower basket counter weight, the angle time, the efficiency of construction has been guaranteed, construction cost is reduced.
The fixed pulley 6 is arranged at four positions, two positions are arranged at the outer sides of the two rectangular tube stand columns 4, two positions are arranged between the two rectangular tube stand columns 4, the stress condition of the steel wire rope 10 is better, and therefore the operation process is more convenient.
The rectangular tube inclined strut 15 is further fixed at the top end of the rectangular tube base rod 1 in the width direction, and the top of the rectangular tube inclined strut 15 is fixed on the rectangular tube upright post 4, so that the whole structure is guaranteed to have high stability. The rectangular tube inclined strut 15 is connected at the 2/3 position of the rectangular tube upright post 4 in the height direction, and the structural stability is strong.
Steel grating 12 includes two grid monolithic 16 that have the interval and the galvanized steel sheet 17 of connecting two grid monolithic 16, and two grid monolithic 16 laminate respectively on the both sides face of otic placode 14, and steel grating 12's mounting structure is reasonable, can connect through otic placode 14 and 12 draw-in grooves of steel grating, and the location is convenient, and the installation effectiveness is high. Two lug plates 14 are arranged in the height direction of the rail 13, and the steel grating 12 is high in installation strength and high in safety.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be considered by those skilled in the art within the technical scope of the present invention should be covered by the protection scope of the present invention.

Claims (6)

1. The utility model provides a construction structures through self-control pulley balance car installation bridge floor steel grating which characterized in that: the steel wire rope grid-type bridge floor comprises a rectangular base consisting of two width direction rectangular pipe base rods (1) and two length direction rectangular pipe base rods (2), wherein a plurality of universal wheels (3) are installed at the bottom of the rectangular base, the rectangular base walks on the bridge floor through the universal wheels (3), the top of each width direction rectangular pipe base rod (1) is fixedly connected with a rectangular pipe stand column (4), the top ends of the two rectangular pipe stand columns (4) are fixedly connected with a rectangular pipe cross beam (5), the two ends of each rectangular pipe cross beam (5) exceed the rectangular base respectively, a fixed pulley (6) is fixedly installed at the bottom of each rectangular pipe cross beam (5), a plurality of supporting beams (7) are fixedly installed between the two length direction rectangular pipe base rods (2), a distribution box (8) and two motors (9) are fixedly installed on each supporting beam (7), the distribution box (8) and the motors (9) are electrically connected, the motors (9) are connected with a rope reel respectively, a steel wire rope (10) is wound on the rope reel, the steel wire rope (10) respectively penetrates through the fixed pulleys (6) on the two ends of the rectangular pipe cross beams (5), two steel wire rope hook (10) are respectively arranged at the two ends of each rectangular pipe cross beam (5), a steel wire rope grid (11) is arranged on each rail (11), and a grille (11) is arranged at the tail end of each rail (11) which surrounds each rail (11), an ear plate (14) positioned on one side of the rail (13) is fixed on the rail (13), and the steel grating (12) is fixedly connected with the ear plate (14).
2. The construction structure for installing the steel grating of the bridge floor through the self-made pulley balance car according to the claim 1, characterized in that: the fixed pulleys (6) are arranged at four positions, two positions are arranged at the outer sides of the two rectangular tube upright posts (4), and two positions are arranged between the two rectangular tube upright posts (4).
3. The construction structure for installing the steel grating of the bridge floor through the self-made pulley balance car according to the claim 2, characterized in that: the top end of the rectangular tube base rod (1) in the width direction is also fixedly provided with a rectangular tube inclined strut (15), and the top of the rectangular tube inclined strut (15) is fixed on the rectangular tube upright post (4).
4. The construction structure for installing the steel grating of the bridge floor through the self-made pulley balance car according to the claim 3, characterized in that: the rectangular tube inclined strut (15) is connected to the position 2/3 of the height direction of the rectangular tube upright post (4).
5. The construction structure for installing the steel grating of the bridge floor through the self-made pulley balance car according to claim 4, wherein: the steel grating (12) comprises two grating single sheets (16) with intervals and galvanized steel plates (17) for connecting the two grating single sheets (16), and the two grating single sheets (16) are respectively attached to two side faces of the ear plate (14).
6. The construction structure for installing the steel grating on the bridge floor through the self-made pulley balance car as claimed in claim 5, wherein: two ear plates (14) are arranged in the height direction of the railing (13).
CN202222994129.1U 2022-11-10 2022-11-10 Construction structure for installing bridge deck steel grating through self-made pulley balance car Active CN218619914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222994129.1U CN218619914U (en) 2022-11-10 2022-11-10 Construction structure for installing bridge deck steel grating through self-made pulley balance car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222994129.1U CN218619914U (en) 2022-11-10 2022-11-10 Construction structure for installing bridge deck steel grating through self-made pulley balance car

Publications (1)

Publication Number Publication Date
CN218619914U true CN218619914U (en) 2023-03-14

Family

ID=85424708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222994129.1U Active CN218619914U (en) 2022-11-10 2022-11-10 Construction structure for installing bridge deck steel grating through self-made pulley balance car

Country Status (1)

Country Link
CN (1) CN218619914U (en)

Similar Documents

Publication Publication Date Title
CN104060540B (en) A kind of cable of space cable suspension bridge false stull and construction method for hanging thereof
CN105822072A (en) Hoisting construction structure and method for air corridor ceiling
CN212926981U (en) I-steel support of encorbelmenting bears hanging flower basket device
CN114753611A (en) Curtain wall construction platform
CN215907365U (en) Supplementary operation platform of high altitude vestibule structure bottom construction
CN218619914U (en) Construction structure for installing bridge deck steel grating through self-made pulley balance car
CN220376298U (en) Hanging basket lifting device
CN1180173C (en) Mounting method for large span power transmission tower
CN113235906A (en) Integrally-lifted peripheral protection hanging frame and lifting method
CN112942847A (en) Construction method for mounting decorative plate outside old curtain wall by crossing bottom barrier
CN213596814U (en) Movable three-dimensional crossing type multipurpose suspension bridge construction platform
CN216108092U (en) Construction system for installing steel bar formwork of building pier column
CN111305433B (en) Construction structure and construction method of roof steel structure platform inclined glass curtain wall
CN2292781Y (en) Self-lifting device of lifter for gantry construction
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN208763390U (en) A kind of suspended operating platform
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN219906818U (en) Hoisting pulley device for flexible photovoltaic bracket construction and mounting structure thereof
CN218668451U (en) Hanging basket for high-altitude auxiliary installation of aluminum plate
CN2263161Y (en) Self-lifting scaffold
CN217924767U (en) Hanging basket mounting structure
CN2637458Y (en) Light type goods crane machine
CN220621124U (en) Unit curtain wall hoisting and hanging basket installing guide rail system
CN218665117U (en) Roof hoisting frame for hoisting large-diameter dome
CN209702154U (en) A kind of translatable driven hanging basket of rail mounted

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant