CN218543612U - Fixing device is used in public building hot-water heating pipeline construction - Google Patents

Fixing device is used in public building hot-water heating pipeline construction Download PDF

Info

Publication number
CN218543612U
CN218543612U CN202222229933.0U CN202222229933U CN218543612U CN 218543612 U CN218543612 U CN 218543612U CN 202222229933 U CN202222229933 U CN 202222229933U CN 218543612 U CN218543612 U CN 218543612U
Authority
CN
China
Prior art keywords
water heating
plate
pipeline
heating pipeline
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222229933.0U
Other languages
Chinese (zh)
Inventor
冯志平
闫胜利
彭玉泉
王文斌
郭凯丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Eighth Construction Group Co Ltd
Original Assignee
Shanxi Eighth Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Eighth Construction Group Co Ltd filed Critical Shanxi Eighth Construction Group Co Ltd
Priority to CN202222229933.0U priority Critical patent/CN218543612U/en
Application granted granted Critical
Publication of CN218543612U publication Critical patent/CN218543612U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a fixing device for public building water heating pipeline construction, which relates to the technical field of pipeline construction, and comprises a bottom plate, wherein a plurality of supporting members are fixedly arranged at the top of the bottom plate, and a protection plate is arranged between the two supporting members; the supporting member comprises a positioning ring plate, four groups of butt joint mechanisms are fixedly connected to the outer side of the positioning ring plate in the circumferential direction, and each group of butt joint mechanism comprises an installation block A and an installation block B; and the middle part of the mounting block B is provided with a mounting groove A with two through sides. This fixing device is used in public building hot-water heating pipeline construction constitutes the pipeline inoxidizing coating through a plurality of supporting component and a plurality of guard plate, can improve the protection through the pipeline inoxidizing coating to the main pipeline of hot-water heating in the more area of rubble, avoids the pipeline when the regional construction, and ground vibrations and lead to the rubble piece to continuously extrude the pipeline and carry out the condition of destruction to the pipeline, can effectively improve the protection effect to hot-water heating pipeline, keeps hot-water heating pipeline's use stable use.

Description

Fixing device is used in public building hot-water heating pipeline construction
Technical Field
The utility model relates to a pipeline construction technical field specifically is a fixing device is used in public building hot-water heating pipeline construction.
Background
Public hot-water heating pipeline of building is infrastructure, in the complicated area of geological conditions, it is great to lay the hot-water heating pipeline degree of difficulty, for example at laying the pipeline in-process, because the geology in area is hard, the soil the inside contains a large amount of hard rock rubbles etc. after the pipe laying, because natural reason or when near when the construction, the condition of vibrations will appear on ground, present pipeline fixed knot constructs can't provide effectual collision protection to the pipeline, lead to keeping to take place friction or extrusion with hot-water heating pipeline apart from the nearer rubble of pipeline, cause the damage to hot-water heating pipeline gradually, bring the trouble for hot-water heating pipeline's maintenance work.
Therefore, it is necessary to provide a fixing device for public building plumbing pipeline construction to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fixing device is used in public building hot-water heating pipeline construction to solve the current pipeline fixed knot who provides in the above-mentioned background and construct and can't provide effectual collision protection to the pipeline, lead to the nearer rubble of distance pipeline to last to take place to rub or extrude with hot-water heating pipeline, cause the damage to hot-water heating pipeline, bring troublesome problem for hot-water heating pipeline's maintenance work.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a fixing device for public building water heating pipeline construction comprises a bottom plate, wherein a plurality of supporting members are fixedly installed at the top of the bottom plate, and a protection plate is arranged between the two supporting members;
the supporting member comprises a positioning ring plate, four groups of butt joint mechanisms are fixedly connected to the outer side of the positioning ring plate in the circumferential direction, and each group of butt joint mechanism comprises an installation block A and an installation block B;
the middle part of the mounting block B is provided with a mounting groove A with two through sides, the middle part of the mounting groove A is provided with a fixing threaded hole A which is through upwards, the middle part of the mounting block A is provided with a mounting groove B, and the middle part of the mounting groove B is provided with a fixing threaded hole B which is through upwards;
and two ends of the protection plate are respectively and fixedly connected between the mounting blocks A and B of the two supporting members.
Optionally, the protection plate is an annular plate, a through groove with two through sides is formed in the middle of the protection plate, and the through plate is fixedly mounted inside the through groove.
Optionally, the penetration plate and the protection plate are both of a net structure.
Optionally, the included angle between each two of the four groups of support members is ninety degrees.
Optionally, the bottom of the supporting member is fixedly connected with a base, fixing threaded holes C are formed in four corners of the base, and fixing threaded holes D are formed in the base plate and the supporting member through drilling equipment.
Optionally, the top of the bottom plate is fixedly connected with a reference line perpendicular to the base.
Optionally, one side of the mounting groove B penetrates outward.
Compared with the prior art, the utility model provides a fixing device is used in public building hot-water heating pipeline construction possesses following beneficial effect:
1. this fixing device is used in public building hot-water heating pipeline construction, can support and fix a position hot-water heating pipeline through a plurality of supporting members, constitute the pipeline inoxidizing coating through a plurality of supporting members and a plurality of guard plate, can be in the more area of rubble, improve the protection to the main pipeline of hot-water heating through the pipeline inoxidizing coating, avoid the pipeline when the regional construction, ground vibrations and lead to the rubble piece to last the extrusion pipeline and carry out the condition destroyed to the pipeline, can effectively improve the protection effect to hot-water heating pipeline, keep hot-water heating pipeline's stable in use, improve hot-water heating pipeline's life.
2. This fixing device is used in public building hot-water heating pipeline construction, it is fixed with the one end of guard plate that guard plate one side is run through fixed screw hole B and guard plate in proper order through the screw rod, then the other end is through the mounting groove A that passes another supporting member with the guard plate exhibition flat and the flare-out tighten, run through the one end of fixed screw hole A and guard plate through the screw rod and fix, the guard plate that extends cuts off can accomplish laying of length guard plate between two supporting members, lay convenient flexibility, easily operation.
3. This fixing device is used in public building hot-water heating pipeline construction, through seting up and the installation of wearing the board of wearing the groove, can fill the space position of guard plate, further reduce the space of protection to improve protective capacities, can protect littleer rubble.
Drawings
FIG. 1 is a schematic view showing a three-dimensional structure of a fixing device for public building water heating pipeline construction of the present invention;
FIG. 2 is a schematic view showing a supporting member structure I of the fixing device for public building water heating pipeline construction of the present invention;
FIG. 3 is a schematic view of the supporting member structure II of the fixing device for public building water heating pipeline construction of the present invention;
fig. 4 is the utility model discloses public building plumbing pipeline construction is with fixing device wears groove and wears board connection structure's schematic diagram.
In the figure: 1. a base plate; 2. a support member; 3. a base; 4. positioning the ring plate; 5. mounting a block A; 6. a mounting block B; 7. fixing the threaded hole A; 8. mounting grooves A; 9. a fixing threaded hole B; 10. penetrating a groove; 11. penetrating a plate; 12. a reference line; 13. fixing the threaded hole C; 14. mounting grooves B; 15. and (4) a protection plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
Referring to fig. 1 to 3, in one embodiment of the present application, a fixing device for public building water heating pipeline construction is provided, which includes a bottom plate 1, a plurality of supporting members 2 fixedly installed on the top of the bottom plate 1, and a protection plate 15 disposed between the two supporting members 2.
The supporting member 2 comprises a positioning ring plate 4, four groups of butt joint mechanisms are fixedly connected to the outer side of the positioning ring plate 4 in the circumferential direction, and each group of butt joint mechanisms comprises a mounting block A5 and a mounting block B6.
In this embodiment, can support and fix a position the hot-water heating pipeline through a plurality of supporting member 2, constitute the pipeline inoxidizing coating through a plurality of supporting member 2 and a plurality of guard plate 15, can be in the more area of rubble, improve the protection to the main pipeline of hot-water heating through the pipeline inoxidizing coating, avoid the pipeline when the area is under construction, ground vibrations and lead to the rubble piece to continuously extrude the pipeline and carry out the condition destroyed to the pipeline, can effectively improve the protection effect to the hot-water heating pipeline, keep the stable use of hot-water heating pipeline, improve hot-water heating pipeline's life.
In this embodiment, further, the middle part of installation piece B6 is seted up with mounting groove A8 that both sides link up, and the fixed screw hole A7 that upwards link up is seted up at the middle part of mounting groove A8, and mounting groove B14 is seted up at the middle part of installation piece A5, and the fixed screw hole B9 that upwards link up is seted up at the middle part of mounting groove B14.
In this embodiment, 15 one sides of protection plate run through fixed screw hole B9 and protection plate 15 in proper order through the screw rod and fix the one end of protection plate 15, then the other end is through the mounting groove A8 that passes another supporting component 2 with 15 flat and the tension of flare-outing, run through fixed screw hole A7 and the one end of protection plate 15 through the screw rod and fix, cut off protection plate 15 that extends and can accomplish laying of length protection plate 15 between two supporting components 2, lay convenient flexibility, easily operation.
In this embodiment, one side of mounting groove B14 link up to the outside, can make things convenient for 15 one ends of guard plate to insert mounting groove B14, make things convenient for the location of 15 one ends of guard plate.
Both ends of the shielding plate 15 are fixedly connected between the mounting blocks A5 and B6 of the two support members 2, respectively.
Referring to fig. 4, in an embodiment of the present application, the protection plate 15 is an annular plate, the middle of the protection plate 15 is provided with a through groove 10 having two through sides, the through groove 10 is fixedly provided with a through plate 11, and the through groove 10 and the through plate 11 are installed to fill a gap of the protection plate 15, so as to further reduce a gap of protection, thereby improving protection capability and protecting smaller gravels.
In order to save cost and reduce the weight of the protective structure, the perforated plate 11 and the protective plate 15 are both of a net structure, and are more convenient to transport.
In order to improve the protection uniformity, the included angle between every two of the four groups of support members 2 is ninety degrees.
In this embodiment, the bottom fixedly connected with base 3 of supporting member 2, fixing threaded hole C13 has been seted up to four corners of base 3, and fixing threaded hole D has been seted up through drilling equipment to bottom plate 1 and supporting member 2, and supporting member 2 runs through fixing threaded hole C13 and fixing threaded hole D through the screw rod and installs.
To facilitate the mounting of the support member 2 and the alignment of the base 3, a reference line 12 perpendicular to the base 3 is fixedly connected to the top of the base plate 1.
The utility model discloses when using:
firstly, the bottom plate 1 is kept horizontally fixed, and the supporting members 2 are arranged at different positions of the bottom plate 1 according to the required supporting positions of the pipelines through the base 3.
Then, one end of the shielding plate 15 is inserted through the mounting groove A8 and extended to the inside of the mounting groove B14 of the other support member 2, and the one end of the shielding plate 15 is fixed by a screw penetrating the fixing screw hole B9 and the shielding plate 15.
And then, the other end of the protection plate 15 is stretched outwards to straighten the protection plate 15, and the other end of the protection plate 15 penetrates through the fixing threaded hole A7 and the protection plate 15 in sequence through a screw to be fixed, so that the protection plate 15 is arranged.
Finally, the other end of the protection plate 15 is cut off, and a plurality of protection plates 15 are sequentially installed in this manner to protect the water heating pipe.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising one of 8230; \8230;" 8230; "does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a fixing device is used in public building hot-water heating pipeline construction, includes bottom plate (1), its characterized in that: the top of the bottom plate (1) is fixedly provided with a plurality of supporting members (2), and a protection plate (15) is arranged between the two supporting members (2);
the supporting member (2) comprises a positioning ring plate (4), four groups of butt joint mechanisms are fixedly connected to the outer side of the positioning ring plate (4) in the circumferential direction, and each group of butt joint mechanism comprises a mounting block A (5) and a mounting block B (6);
the middle part of the mounting block B (6) is provided with a mounting groove A (8) with two through sides, the middle part of the mounting groove A (8) is provided with a fixing threaded hole A (7) which is communicated upwards, the middle part of the mounting block A (5) is provided with a mounting groove B (14), and the middle part of the mounting groove B (14) is provided with a fixing threaded hole B (9) which is communicated upwards;
and two ends of the protection plate (15) are respectively and fixedly connected between the mounting blocks A (5) and B (6) of the two supporting members (2).
2. The fixing device for public building water heating pipeline construction according to claim 1, characterized in that: the protection plate (15) is an annular plate, the middle of the protection plate (15) is provided with a through groove (10) with two through sides, and the through plate (11) is fixedly mounted inside the through groove (10).
3. The fixing device for public building water heating pipeline construction according to claim 2, characterized in that: the penetration plate (11) and the protection plate (15) are both of a net structure.
4. The fixing device for public building water heating pipeline construction according to claim 3, characterized in that: the included angle between every two of the four groups of the supporting members (2) is ninety degrees.
5. The fixing device for public building water heating pipeline construction according to claim 4, characterized in that: the bottom fixedly connected with base (3) of supporting member (2), fixed threaded hole C (13) have been seted up to four corners of base (3), fixed threaded hole D has been seted up through drilling equipment in bottom plate (1) and supporting member (2).
6. The fixing device for public building water heating pipeline construction according to claim 5, characterized in that: the top of the bottom plate (1) is fixedly connected with a reference line (12) which is vertical to the base (3).
7. The fixing device for public building water heating pipeline construction according to claim 6, characterized in that: one side of the mounting groove B (14) penetrates outwards.
CN202222229933.0U 2022-08-24 2022-08-24 Fixing device is used in public building hot-water heating pipeline construction Active CN218543612U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222229933.0U CN218543612U (en) 2022-08-24 2022-08-24 Fixing device is used in public building hot-water heating pipeline construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222229933.0U CN218543612U (en) 2022-08-24 2022-08-24 Fixing device is used in public building hot-water heating pipeline construction

Publications (1)

Publication Number Publication Date
CN218543612U true CN218543612U (en) 2023-02-28

Family

ID=85270538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222229933.0U Active CN218543612U (en) 2022-08-24 2022-08-24 Fixing device is used in public building hot-water heating pipeline construction

Country Status (1)

Country Link
CN (1) CN218543612U (en)

Similar Documents

Publication Publication Date Title
CN218543612U (en) Fixing device is used in public building hot-water heating pipeline construction
CN212561363U (en) River course protector for garden planning
BR112021001732A2 (en) bulkhead assembly with alternating well grooves in plate and method of use thereof
CN105720353B (en) A kind of antenna structure and its installation method of wireless network covering well lid
RU2521927C1 (en) Anodic earthing method
RU2006106834A (en) WAY OF LAYING UNDERGROUND TRANSITIONS AND TUNNELS AND SECTION OF UNDERGROUND TRANSITION OR TUNNEL
JP5283721B2 (en) Protective plate posture holder and underground structure protection structure
CN204876609U (en) Foundation ditch sleet system of shielding
US7021868B1 (en) Lightweight shoring system for accommodating crossing utilities
GB2520679A (en) New house service connection chamber
CN210888127U (en) High-rise building deep foundation pit enclosure structure
RU159048U1 (en) DEVICE FOR PROTECTING PIPELINE CUFF
KR100731957B1 (en) A case for prevention damage of a drain pipe
CN210661647U (en) Natural gas pipeline protection device
KR100753970B1 (en) Supporting apparatus using pc wire for box in weakness ground
CN106803653A (en) A kind of fixing means of distribution line
KR101016056B1 (en) Support member of underground cable for high-voltage electric cable
CN210216501U (en) Finished product outdoor well
JP3005619B2 (en) Wire joint groove
CN212052861U (en) Underground comprehensive pipe gallery
CN110130354A (en) A kind of fixing means of buried cable marker peg
CN217782089U (en) Novel portable groove supporting device
CN218095124U (en) Fixing device for submarine surveying of oilfield block
JP2014205987A (en) Tunnel protective sheet and method of constructing the same
CN214576217U (en) Foundation ditch guardrail convenient to equipment is dismantled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant