CN218493302U CN202222104124.7U CN202222104124U CN218493302U CN 218493302 U CN218493302 U CN 218493302U CN 202222104124 U CN202222104124 U CN 202222104124U CN 218493302 U CN218493302 U CN 218493302U
Authority
CN
China
Prior art keywords
guardrail
dwang
base
connecting plate
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222104124.7U
Other languages
Chinese (zh)
Inventor
彭涛涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Xianglong Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222104124.7U priority Critical patent/CN218493302U/en
Application granted granted Critical
Publication of CN218493302U publication Critical patent/CN218493302U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model belongs to the technical field of the construction technology and specifically relates to a guardrail for construction draws together two bases, one of them fixedly connected with connecting rod on the base, another rotate through the bearing on the base and be connected with the dwang, the dwang with be connected with between the connecting rod and enclose and keep off cloth, be provided with positioning mechanism on the dwang. The utility model discloses have so that according to the site operation condition, the maintenance length of needs is adjusted the whole length of guardrail, has increased the suitability of device.

Description

Guardrail for construction
Technical Field
The utility model relates to a building technical field especially relates to a guardrail for construction.
Background
When carrying out building construction, in order to protect the scene of construction, prevent the entering of pedestrian and vehicle, cause dangerous accident, play the effect of interception protection through adopting the guardrail, and current guardrail when protecting, length is fixed, leads to the length of protection when carrying out the interception protection to be fixed, can not adjust to the suitability of device has been influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the length that leads to protecting when carrying out the interception protection that exists among the prior art and being fixed, can not adjust to influenced the shortcoming of device suitability, and the guardrail for construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a guardrail for construction, includes two bases, one of them fixedly connected with connecting rod on the base, another rotate through the bearing on the base and be connected with the dwang, the dwang with be connected with between the connecting rod and enclose and keep off cloth, be provided with positioning mechanism on the dwang.
Preferably, positioning mechanism includes connecting plate, diaphragm, screw thread post, butt joint piece, the connecting plate fixed connection be in on the base, the diaphragm with connecting plate fixed connection, the diaphragm pass through the bearing with the dwang rotates to be connected, threaded connection has on the connecting plate the screw thread post, fixedly connected with on the screw thread post the butt joint piece.
Preferably, a plurality of through holes are formed in the enclosing and blocking cloth at equal distances.
Preferably, a plurality of fixing holes are formed in each of the two bases.
Preferably, the connecting rod and the rotating rod are hollow structures.
Preferably, the upper end of the rotating rod is fixedly connected with a rotating handle.
Preferably, the threaded column is a stainless steel threaded column.
The utility model provides a pair of guardrail for construction, beneficial effect lies in: through rotating the dwang, will enclose fender cloth and carry out the pine book to according to the site operation condition, the maintenance length of needs is adjusted the whole length of guardrail, has increased the suitability of device.
Drawings
Fig. 1 is a schematic structural view of a guardrail for building construction provided by the utility model;
fig. 2 is a perspective view of a guardrail for building construction provided by the utility model;
fig. 3 is a front view of the utility model provides a guardrail for construction.
In the figure: connecting rod 1, dwang 2, enclose and keep off cloth 3, base 4, fixed orifices 5, rotation handle 6, connecting plate 7, diaphragm 8, screw post 9, butt piece 10, through-hole 11.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1
Referring to fig. 1-3, a guardrail for construction, including two bases 4, fixedly connected with connecting rod 1 on one of them base 4, base 4 supports for stainless steel material, certain weight has, stability has been increased, prevent the condition of empting, it is connected with dwang 2 to rotate through the bearing on another base 4, be connected with between dwang 2 and the connecting rod 1 and enclose fender cloth 3, be provided with positioning mechanism on the dwang 2, when using, through rotating dwang 2, will enclose fender cloth 3 and go on the pine book, so that according to site operation, the maintenance length of needs, adjust the whole length of guardrail, the suitability of device has been increased.
Positioning mechanism includes connecting plate 7, diaphragm 8, threaded post 9, butt piece 10, connecting plate 7 fixed connection is on base 4, diaphragm 8 and connecting plate 7 fixed connection, diaphragm 8 passes through the bearing and is connected with dwang 2 rotation, threaded post 9 is connected to the threaded post on the connecting plate 7, fixedly connected with butt piece 10 on the threaded post 9, through rotating threaded post 9, with butt piece 10 butt on dwang 2, will play fixed effect to dwang 2, the pivoted condition has been prevented from taking place for dwang 2, thereby fix the length of enclosing fender cloth 3, avoided unnecessary enclosing fender cloth 3 from dwang 2 pine to roll down.
The upper end of the rotating rod 2 is fixedly connected with a rotating handle 6, and the rotating handle 6 is designed to drive the rotating rod 2 to rotate.
When using, place connecting rod 1 in the extreme point department that needs the enclosure, then remove dwang 2, rotate dwang 2 when removing simultaneously, will enclose and keep off cloth 3 and carry out the pine book, when removing another extreme point department, put down dwang 2, through rotating thread post 9, with butt joint piece 10 butt on dwang 2, will play fixed effect to dwang 2.
Example 2
Referring to fig. 1-3, as another preferred embodiment of the present invention, on the basis of embodiment 1, a plurality of through holes 11 are opened on the barrier cloth 3 at equal distances, and through the design of the through holes 11, the ventilation effect is increased, and the barrier cloth 3 is prevented from being blown down by wind.
Example 3
Referring to fig. 1-3, as another preferred embodiment of the present invention, on the basis of embodiment 1, a plurality of fixing holes 5 are provided on two bases 4, and through the design of using the fixing holes 5, so as to insert bolts into the fixing holes 5, fix the bases 4, increase the stability of the guardrail, and prevent the occurrence of toppling.
Example 4
Referring to fig. 1-3, as another preferred embodiment of the present invention, on the basis of embodiment 1, the connecting rod 1 and the rotating rod 2 are hollow structures, so as to reduce the weight and facilitate the transportation of the guardrail by adopting the hollow structure design.
Example 5
Referring to fig. 1-3, as another preferred embodiment of the present invention, on the basis of embodiment 1, the threaded post 9 is a stainless steel threaded post, because the guardrail is mostly used outdoors, through adopting the stainless steel threaded post, the occurrence of corrosion is avoided, which is favorable for prolonging the service life of the threaded post 9.
The above, only be the embodiment of the preferred of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, which are designed to be replaced or changed equally, all should be covered within the protection scope of the present invention.

Claims (6)

1. A guardrail for building construction comprises two bases (4), and is characterized in that one base (4) is fixedly connected with a connecting rod (1), the other base (4) is rotatably connected with a rotating rod (2) through a bearing, a barrier cloth (3) is connected between the rotating rod (2) and the connecting rod (1), and a positioning mechanism is arranged on the rotating rod (2);
positioning mechanism includes connecting plate (7), diaphragm (8), screw post (9), butt piece (10), connecting plate (7) fixed connection be in on base (4), diaphragm (8) with connecting plate (7) fixed connection, diaphragm (8) through the bearing with dwang (2) rotate to be connected, threaded connection has on connecting plate (7) screw post (9), fixedly connected with on screw post (9) butt piece (10).
2. The guardrail for building construction according to claim 1, wherein the barrier cloth (3) is provided with a plurality of through holes (11) at equal distances.
3. The guardrail for building construction according to claim 1 or 2, wherein a plurality of fixing holes (5) are formed on both of the bases (4).
4. A guardrail for construction according to claim 3, characterized in that the connecting rod (1) and the turning rod (2) are hollow structures.
5. The guardrail for building construction according to claim 3, characterized in that the upper end of the rotating rod (2) is fixedly connected with a rotating handle (6).
6. A guardrail for construction according to claim 2, characterized in that the threaded post (9) is a stainless steel threaded post.
CN202222104124.7U 2022-08-10 2022-08-10 Guardrail for construction Active CN218493302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222104124.7U CN218493302U (en) 2022-08-10 2022-08-10 Guardrail for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222104124.7U CN218493302U (en) 2022-08-10 2022-08-10 Guardrail for construction

Publications (1)

Publication Number Publication Date
CN218493302U true CN218493302U (en) 2023-02-17

Family

ID=85186274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222104124.7U Active CN218493302U (en) 2022-08-10 2022-08-10 Guardrail for construction

Country Status (1)

Country Link
CN (1) CN218493302U (en)

Similar Documents

Publication Publication Date Title
CN218493302U (en) Guardrail for construction
CN206646900U (en) A kind of easily climbing high safety type electricity transmission iron tower
CN206607966U (en) A kind of construction protective fence
CN212201545U (en) Protection device for road engineering construction is used
CN221095940U (en) Construction elevator platform protector
CN210460032U (en) Material protective equipment for building assembly with telescopic turnover
CN212054068U (en) Fence for transformer substation protection
CN211691352U (en) Bearing frame for building construction
CN221118309U (en) Construction security protection device
CN216866079U (en) Road pit rail guard
CN221000731U (en) Warning device for security engineering construction
CN218540490U (en) Elevator inspection safety warning device
CN213927826U (en) Bridge detects with enclosing fender device
CN215907588U (en) Novel protective fence structure
CN211818552U (en) Safety barrier is used in construction of building outer wall
CN219061207U (en) Stable form pin-connected panel construction encloses fender structure
CN213837994U (en) Municipal works are with construction rail guard
CN214786176U (en) A outer wall protector for building engineering
CN217581362U (en) Building construction protection casing
CN212249435U (en) Take protector's electric power iron tower
CN212024701U (en) Support arm for improving stability of hanging basket
CN220203613U (en) Rail guard with anti function of falling
CN215829327U (en) Municipal administration is with concatenation formula protection isolated column
CN211044849U (en) Signboard is used in gardens
CN210326132U (en) Antenna rainshelter for communication technology design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230517

Address after: No. 1202-1204, Building A, Business Center, No. 1166 Mingyue North Road, Yuanzhou District, Yichun City, Jiangxi Province, 336000 (self committed)

Patentee after: Jiangxi Xianglong Construction Engineering Co.,Ltd.

Address before: Room 506, No. 1094, Zhongshan Avenue Middle, Tianhe District, Guangzhou, Guangdong 510000

Patentee before: Peng Taotao

TR01 Transfer of patent right