CN214786176U - A outer wall protector for building engineering - Google Patents
A outer wall protector for building engineering Download PDFInfo
- Publication number
- CN214786176U CN214786176U CN202023159960.2U CN202023159960U CN214786176U CN 214786176 U CN214786176 U CN 214786176U CN 202023159960 U CN202023159960 U CN 202023159960U CN 214786176 U CN214786176 U CN 214786176U
- Authority
- CN
- China
- Prior art keywords
- safety net
- snap ring
- tie rod
- building engineering
- mounting base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000001012 protector Effects 0.000 title claims abstract description 9
- 238000013016 damping Methods 0.000 claims abstract description 9
- 238000000926 separation method Methods 0.000 claims description 10
- 238000004804 winding Methods 0.000 claims description 10
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 5
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 5
- 241001330002 Bambuseae Species 0.000 claims description 5
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 5
- 239000011425 bamboo Substances 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 5
- 230000015572 biosynthetic process Effects 0.000 abstract description 7
- 238000005096 rolling process Methods 0.000 description 7
- 230000001681 protective effect Effects 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 238000009435 building construction Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 210000003811 finger Anatomy 0.000 description 2
- 230000013011 mating Effects 0.000 description 2
- 210000003813 thumb Anatomy 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses an outer wall protector for building engineering relates to building engineering technical field, and comparatively loaded down with trivial details when laying mat formation for solving current protector, installs and removes the lower problem of reuse rate of inconvenient and safety net. Two install longitudinal tie rod and transverse connection pole between the mounting base respectively, the externally mounted of longitudinal tie rod has safety net stop gear, and safety net stop gear and longitudinal tie rod sliding connection, and longitudinal tie rod and transverse connection pole mutually perpendicular, the mounting base includes the stand, the connecting cylinder is installed in the outside of stand, and the inboard of connecting cylinder is provided with the internal thread, the chassis is installed to the lower extreme of stand, the upper end on chassis is provided with the mounting hole, safety net stop gear includes the snap ring, the inboard of snap ring is provided with the damping pad, and the damping pad is connected with the snap ring cementing, one side of snap ring upper end is provided with first elastic catch.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is an outer wall protector for building engineering.
Background
The building engineering, which is a part of the construction engineering, refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation activities of lines, pipelines and equipment matched with the building constructions. The protective net is arranged on the outer wall of a building in a building construction site, the protective net is in a combined form of a support and screen cloth, and broken stones, residues and the like generated in the building process are prevented from flying out of the building to injure nearby people through the protective net.
However, the existing protective device is complex to pave, inconvenient to assemble and disassemble and low in recycling rate of the safety net, so that the existing requirements are not met, and the outer wall protective device for the building engineering is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an outer wall protector for building engineering to comparatively loaded down with trivial details when solving the current protector that proposes in the above-mentioned background art and mating formation, install and remove the lower problem of reuse rate of inconvenient and safety net.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an outer wall protector for building engineering, includes mounting base, safety net wind-up roll and the fixed section of thick bamboo of wind-up roll, two install longitudinal tie rod and transverse connection pole between the mounting base respectively, the externally mounted of longitudinal tie rod has safety net stop gear, and safety net stop gear and longitudinal tie rod sliding connection, and longitudinal tie rod and transverse connection pole mutually perpendicular, the mounting base includes the stand, the connecting cylinder is installed in the outside of stand, and the inboard of connecting cylinder is provided with the internal thread, the chassis is installed to the lower extreme of stand, the upper end on chassis is provided with the mounting hole.
Preferably, safety net stop gear includes the snap ring, the inboard of snap ring is provided with the damping pad, and damping pad and snap ring cementing are connected, one side of snap ring upper end is provided with first elastic separation blade, the opposite side of snap ring upper end is provided with second elastic separation blade, and second elastic separation blade equals with first elastic separation blade size.
Preferably, the fixed section of thick bamboo of wind-up roll passes through the bearing with the safety net wind-up roll and is connected, the connecting axle is installed to the lower extreme of the fixed section of thick bamboo of wind-up roll, and connecting axle and the fixed section of thick bamboo welded connection of wind-up roll, and the inside of connecting axle embedding stand, and stand and connecting axle interference fit.
Preferably, the connectors are arranged at two ends of the longitudinal connecting rod and the transverse connecting rod, external threads are arranged on the outer sides of the connectors, and the connectors, the longitudinal connecting rod and the transverse connecting rod are all arranged into an integrally formed structure.
Preferably, the connecting cylinders are four and are connected with the upright posts in a welding mode.
Preferably, the longitudinal connecting rod and the transverse connecting rod are in threaded connection with the mounting base.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a longitudinal tie rod and transverse connection pole and the equal threaded connection of mounting base, and the equal erection joint pole of four directions of mounting base can accomplish the large tracts of land fast and mat formation, and the rethread bolt can accomplish mat formation to safety net protection frame with mounting base and external wall fixation, and mat formation is quick, installs and removes simply.
2. The utility model discloses an install the safety net wind-up roll on the top, then put long safety net downwards, can realize mating formation fast to the safety net large tracts of land, first elasticity separation blade and second elasticity separation blade rely on the high tenacity of self, carry on spacingly to the safety net, make safety net and wall fastening, improve the safety in utilization.
3. The utility model discloses a safety net wind-up roll realizes putting long and the rolling to the safety net, when dismantling the safety net, only needs to rotate the safety net wind-up roll, can realize the rolling to the safety net, and the rolling is quick, and the safety net after the rolling is accomplished is convenient for the case transportation, and is not fragile, has improved the reuse ratio to the safety net greatly.
Drawings
Fig. 1 is a schematic structural view of an outer wall protection device for construction engineering according to the present invention;
fig. 2 is a schematic structural view of the mounting base of the present invention;
FIG. 3 is a schematic structural view of a safety net limiting mechanism of the present invention;
fig. 4 is a schematic structural view of the wind-up roll fixing cylinder of the present invention;
fig. 5 is a schematic structural view of the longitudinal connecting rod and the transverse connecting rod of the present invention.
In the figure: 1. mounting a base; 2. a longitudinal connecting rod; 3. a transverse connecting rod; 4. a safety net limiting mechanism; 5. a safety net wind-up roll; 6. a column; 7. a connecting cylinder; 8. an internal thread; 9. a chassis; 10. mounting holes; 11. a snap ring; 12. a damping pad; 13. a first elastic baffle sheet; 14. a second elastic baffle sheet; 15. a wind-up roll fixing cylinder; 16. a connecting shaft; 17. a bearing; 18. a connector; 19. and (4) external threads.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, the present invention provides an embodiment: an outer wall protection device for constructional engineering comprises mounting bases 1, a safety net wind-up roll 5 and a wind-up roll fixing cylinder 15, wherein a longitudinal connecting rod 2 and a transverse connecting rod 3 are respectively arranged between the two mounting bases 1, a safety net limiting mechanism 4 is arranged outside the longitudinal connecting rod 2, the safety net limiting mechanism 4 is connected with the longitudinal connecting rod 2 in a sliding way, the longitudinal connecting rod 2 is vertical to the transverse connecting rod 3, the mounting base 1 comprises an upright post 6, the outer side of the upright post 6 is provided with a connecting cylinder 7, and the inboard of connecting cylinder 7 is provided with internal thread 8, and chassis 9 is installed to the lower extreme of stand 6, and the upper end of chassis 9 is provided with mounting hole 10, with longitudinal tie rod 2 and transverse tie rod 3 respectively with mounting base 1 threaded connection, longitudinal tie rod 2 and transverse tie rod 3 can all be installed to 1 four directions of mounting base, can accomplish the large tracts of land fast and mat formation.
Further, safety net stop gear 4 includes snap ring 11, the inboard of snap ring 11 is provided with damping pad 12, and damping pad 12 is connected with 11 splices of snap ring, one side of 11 upper ends of snap ring is provided with first elastic retaining piece 13, the opposite side of 11 upper ends of snap ring is provided with second elastic retaining piece 14, and second elastic retaining piece 14 equals with first elastic retaining piece 13 size, first elastic retaining piece 13 and second elastic retaining piece 14 are bent off with the fingers and thumb manually, first elastic retaining piece 13 and second elastic retaining piece 14 rely on the high tenacity of self, can carry on spacingly to the safety net, make safety net and wall fastening, improve the safety in utilization.
Further, a wind-up roll fixing cylinder 15 is connected with the safety net wind-up roll 5 through a bearing 17, a connecting shaft 16 is installed at the lower end of the wind-up roll fixing cylinder 15, the connecting shaft 16 is connected with the wind-up roll fixing cylinder 15 in a welded mode, the connecting shaft 16 is embedded into the upright post 6, the upright post 6 is in interference fit with the connecting shaft 16, the connecting shaft 16 at the lower end of the wind-up roll fixing cylinder 15 is embedded into the upright post 6, and installation between the wind-up roll fixing cylinder 15 and the installation base 1 can be completed.
Further, the two ends of the longitudinal connecting rod 2 and the transverse connecting rod 3 are both provided with connectors 18, the outer sides of the connectors 18 are provided with external threads 19, the connectors 18, the longitudinal connecting rod 2 and the transverse connecting rod 3 are both arranged into an integrally formed structure, and the longitudinal connecting rod 2 and the transverse connecting rod 3 can be in threaded connection with the mounting base 1.
Further, the connecting cylinders 7 are four in number, the connecting cylinders 7 are connected with the stand columns 6 in a welding mode, the air tightness and the water tightness of the welding connection are good, the structural rigidity is also large, and the structural integrity is good.
Further, the longitudinal connecting rod 2 and the transverse connecting rod 3 are in threaded connection with the mounting base 1, the connection mode is simple, and the mounting and dismounting are convenient and quick.
The working principle is as follows: when in use, the longitudinal connecting rods 2 and the transverse connecting rods 3 are respectively in threaded connection with the mounting base 1, the longitudinal connecting rods 2 and the transverse connecting rods 3 can be mounted on the mounting base 1 in four directions, large-area pavement can be quickly completed, the mounting holes 10 are formed in the upper end of the chassis 9 at the lower end of the mounting base 1, the mounting base 1 can be fixed with an outer wall through bolts, the pavement of the safety net protection frame can be completed, the pavement is quick, the assembly and disassembly are simple, after the pavement is completed, the connecting shafts 16 at the lower ends of the winding roller fixing cylinders 15 are embedded into the upright posts 6, the installation between the winding roller fixing cylinders 15 and the mounting base 1 can be completed, then the safety net winding roller 5 is mounted between the two winding roller fixing cylinders 15, the fixation of the safety net winding roller 5 can be completed, the safety net is lengthened from top to bottom, and large-area rapid pavement of the safety net can be realized, first elastic retaining piece 13 and second elastic retaining piece 14 are bent with fingers and thumb manually, first elastic retaining piece 13 and second elastic retaining piece 14 rely on the high tenacity of self, can carry on spacingly to the safety net, make safety net and wall fastening, improve the safety in utilization, when dismantling the safety net, only need rotate safety net wind-up roll 5, can realize the rolling to the safety net, the rolling is quick, the safety net after the rolling is accomplished is convenient for the case transportation, and is not fragile, the reuse ratio to the safety net has been improved greatly.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. The utility model provides an outer wall protector for building engineering, includes mounting base (1), safety net wind-up roll (5) and the fixed section of thick bamboo of wind-up roll (15), its characterized in that: two install longitudinal tie rod (2) and transverse tie rod (3) between mounting base (1) respectively, the externally mounted of longitudinal tie rod (2) has safety net stop gear (4), and safety net stop gear (4) and longitudinal tie rod (2) sliding connection, and longitudinal tie rod (2) and transverse tie rod (3) mutually perpendicular, mounting base (1) includes stand (6), connecting cylinder (7) are installed in the outside of stand (6), and the inboard of connecting cylinder (7) is provided with internal thread (8), chassis (9) are installed to the lower extreme of stand (6), the upper end of chassis (9) is provided with mounting hole (10).
2. An exterior wall protection device for building engineering according to claim 1, wherein: safety net stop gear (4) include snap ring (11), the inboard of snap ring (11) is provided with damping pad (12), and damping pad (12) and snap ring (11) splice joint are connected, one side of snap ring (11) upper end is provided with first elastic separation blade (13), the opposite side of snap ring (11) upper end is provided with second elastic separation blade (14), and second elastic separation blade (14) and first elastic separation blade (13) size equal.
3. An exterior wall protection device for building engineering according to claim 1, wherein: the safety net winding device is characterized in that the winding roller fixing cylinder (15) is connected with the safety net winding roller (5) through a bearing (17), a connecting shaft (16) is installed at the lower end of the winding roller fixing cylinder (15), the connecting shaft (16) is connected with the winding roller fixing cylinder (15) in a welding mode, the connecting shaft (16) is embedded into the stand column (6), and the stand column (6) is in interference fit with the connecting shaft (16).
4. An exterior wall protection device for building engineering according to claim 1, wherein: the connecting head (18) is arranged at the two ends of the longitudinal connecting rod (2) and the transverse connecting rod (3), the outer side of the connecting head (18) is provided with an external thread (19), and the connecting head (18) and the longitudinal connecting rod (2) and the transverse connecting rod (3) are all arranged into an integrated structure.
5. An exterior wall protection device for building engineering according to claim 1, wherein: the connecting cylinders (7) are four in number, and the connecting cylinders (7) are connected with the upright posts (6) in a welding mode.
6. An exterior wall protection device for building engineering according to claim 1, wherein: the longitudinal connecting rod (2) and the transverse connecting rod (3) are in threaded connection with the mounting base (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023159960.2U CN214786176U (en) | 2020-12-24 | 2020-12-24 | A outer wall protector for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023159960.2U CN214786176U (en) | 2020-12-24 | 2020-12-24 | A outer wall protector for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214786176U true CN214786176U (en) | 2021-11-19 |
Family
ID=78721465
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023159960.2U Expired - Fee Related CN214786176U (en) | 2020-12-24 | 2020-12-24 | A outer wall protector for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214786176U (en) |
-
2020
- 2020-12-24 CN CN202023159960.2U patent/CN214786176U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206667730U (en) | A kind of scalable suspension scaffold of socket joint type disk button | |
CN206737563U (en) | A kind of construction guard fender quickly assembled | |
CN214786176U (en) | A outer wall protector for building engineering | |
CN212224668U (en) | System is assembled on super large box steel column regularization ground | |
CN202055617U (en) | Fencing device for construction | |
CN206530144U (en) | Translation component building fencing device for construction | |
CN215485192U (en) | Safety barrier that construction was used | |
CN210827493U (en) | Foundation ditch vertical excavation protector | |
CN205476765U (en) | Disaster area rescue is with portable communication tower | |
CN206308993U (en) | A kind of fast formula single pole of spelling makes somebody a mere figurehead platform | |
CN221423098U (en) | Detachable multifunctional integrated cat ladder | |
CN221095940U (en) | Construction elevator platform protector | |
CN215254794U (en) | Protector for building engineering | |
CN215056117U (en) | Combined enclosure with stable structure and repeated use | |
CN215760621U (en) | Hang and irritate roof beam with hanging basket end and face limit protector convenient to adjust | |
CN220828069U (en) | Municipal works foundation ditch safety device | |
CN214303235U (en) | Building site safety protection rail | |
CN211691816U (en) | Construction is with enclosing fender | |
CN215714783U (en) | Intelligent building site warning device for construction | |
CN221031272U (en) | Building construction frame with safeguard function | |
CN220058983U (en) | Quick-dismantling horizontal safety protection device | |
CN213627020U (en) | Construction engineering construction is with enclosing fender | |
CN211818604U (en) | Fixing plate is used in construction of multi-functional finishing work | |
CN217843407U (en) | Visual monitoring mounting platform of shaft tower | |
CN209837896U (en) | Portable building of easily assembling encloses fender |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211119 |
|
CF01 | Termination of patent right due to non-payment of annual fee |