CN218454344U - Urban bridge sectional shelf-unit demolishs bracket - Google Patents

Urban bridge sectional shelf-unit demolishs bracket Download PDF

Info

Publication number
CN218454344U
CN218454344U CN202121953993.6U CN202121953993U CN218454344U CN 218454344 U CN218454344 U CN 218454344U CN 202121953993 U CN202121953993 U CN 202121953993U CN 218454344 U CN218454344 U CN 218454344U
Authority
CN
China
Prior art keywords
bracket
connecting rod
helical gear
mounting plate
panel beating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121953993.6U
Other languages
Chinese (zh)
Inventor
刘海宁
资亚平
周伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Suzhou Urban Construction And Development Co ltd
Original Assignee
Suzhou Zhonghengtong Road And Bridge Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zhonghengtong Road And Bridge Group Co ltd filed Critical Suzhou Zhonghengtong Road And Bridge Group Co ltd
Priority to CN202121953993.6U priority Critical patent/CN218454344U/en
Application granted granted Critical
Publication of CN218454344U publication Critical patent/CN218454344U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bracket is demolishd to urban bridge roof beam sectional shelf-unit, including the bracket, be equipped with on the bracket with fork truck cooperation male slot, be equipped with a plurality of landing legs on the bracket, the landing leg inserts in the landing leg and can be in the ascending free activity of male direction, it fixes the upper mounting plate bottom to go up the landing leg, the upper mounting plate bottom still is fixed with the threaded rod, threaded rod and the spliced pole screw-thread fit who locates on the bracket are equipped with the helical gear on the threaded rod, still be equipped with L type panel beating on the spliced pole, be equipped with the connecting rod on the L type panel beating, the connecting rod is rotatory with the bearing cooperation of fixing in the supporting seat on L type panel beating, be equipped with on the connecting rod with the helical gear of the mutual interlock of helical gear one, connecting rod one end still is fixed with the carousel, realizes the lift of upper mounting plate through rotatory carousel, the utility model discloses a fork truck lifts the support, slowly shifts out the bei lei roof beam on the pier, prevents that bei roof beam damage is out of bei, reduces the traffic control time.

Description

Urban bridge sectional shelf-unit demolishs bracket
Technical Field
The utility model relates to a dismantling equipment technical field of materials such as city bailey roof beam, I-steel especially relates to a bracket is demolishd to city bridge sectional shelf-unit.
Background
In urban bridge construction, materials such as Bailey beams and I-beams are often used as longitudinal beams in a supporting system, temporary supporting frame bodies need to be dismantled after pouring of plate beams on the upper portion of a bridge is completed, when a bridge runs into low clearance, traffic is closed in the past, the temporary supporting frame bodies are directly dismantled through equipment such as a loader, an excavator and a crane, the traffic needs to be closed in the dismantling mode, the Bailey beams and the I-beams are prone to damage and deformation after dismantling, and later-stage use is affected.
SUMMERY OF THE UTILITY MODEL
The utility model relates to a bracket is demolishd to city bridge sectional shelf-unit, lifts the support through fork truck, slowly shifts out the bailey beam on the pier, prevents that the bailey beam is damaged and warp, has changed the tradition and has built the scaffold frame, perhaps directly use the crane, dig and destroy the traffic when the machine is demolishd, destroy bailey beam problem.
The specific technical scheme is as follows: the utility model provides a city bridge sectional shelf-unit demolishs bracket, including the bracket, be equipped with on the bracket with fork truck cooperation male slot, be equipped with a plurality of landing legs on the bracket, the landing leg inserts in the upper leg and can be in the free activity in male direction, the upper mounting leg is fixed to the upper mounting plate bottom, the upper mounting plate bottom still is fixed with the threaded rod, the threaded rod with locate the spliced pole screw-thread fit on the bracket, be equipped with the helical gear on the threaded rod, still be equipped with L type panel beating on the spliced pole, be equipped with the connecting rod on the L type panel beating, the connecting rod is rotatory with the bearing cooperation of fixing in the supporting seat on L type panel beating, be equipped with the helical gear one with the mutual interlock of helical gear on the connecting rod, connecting rod one end still is fixed with the carousel, realizes the lift of upper mounting plate through rotatory carousel.
According to the further technical scheme, a threaded hole is formed in the bracket above the slot and communicated with the slot.
According to a further technical scheme, the threaded rod is arranged on a symmetry line of the upper platform.
The beneficial effects of the utility model
The fork truck suspends the bracket on the fork truck through the slot, the landing leg inserts in the landing leg and can be in the free activity of male orientation, go up the landing leg and fix the platform bottom, this technical scheme guarantees that the upper mounting plate can freely go up and down in vertical orientation, the upper mounting plate bottom still is fixed with the threaded rod, the threaded rod with locate the spliced pole screw-thread fit on the bracket, be equipped with the helical gear on the threaded rod, still be equipped with L type panel beating on the spliced pole, be equipped with the connecting rod on the L type panel beating, the connecting rod is rotatory with the bearing cooperation of fixing in the support seat on the L type panel beating, be equipped with the helical gear one with the mutual interlock of helical gear on the connecting rod, connecting rod one end still is fixed with the carousel, through rotatory carousel, the carousel drives the connecting rod rotatory, helical gear one on the connecting rod and the helical gear on the threaded rod turn into the horizontal motion of connecting rod and move in the vertical orientation of threaded rod, and then make the platform lift on the connecting rod, and then under the fork truck power promotion, the bracket jack-up the bailey beam, hoisting with the help of external crane, protect the bailey beam not damaged, demolish efficiently, time to the traffic control reduces greatly.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic diagram of the structure of the bracket of the present invention;
fig. 3 is a schematic view of a mounting structure of the helical gear of fig. 2 according to the present invention.
In the figure: the bridge comprises a bridge pier 1, a Bailey beam 2, a bracket 3, a slot 4, a support leg 5, a threaded rod 6, a bevel gear 7, an upper platform 8, a metal plate 9L, a turntable 10, a connecting rod 11, a bevel gear 12I, an upper support leg 13, a connecting column 14 and a threaded hole 15.
Detailed Description
The essential features and advantages of the invention will be further explained below with reference to examples, but the invention is not limited to the embodiments listed.
Referring to fig. 2-3, the urban bridge combined support dismantling bracket comprises a bracket 3, wherein a slot 4 matched with a forklift is formed in the bracket 3, four support legs 5 are arranged on the bracket 3, the 4 support legs 5 are inserted into four upper support legs 13 and can freely move in the inserting direction, and the 4 upper support legs 13 are fixed at the bottom of an upper platform 8, so that the technical scheme ensures that the upper platform 8 can freely lift in the vertical direction, and the support legs 5 are matched with the upper support legs 13 to play a role in guiding;
the bottom of the upper platform 8 is also fixedly provided with a threaded rod 6, the threaded rod 6 is in threaded fit with a connecting column 14 arranged on the bracket 3, specifically, a threaded hole is formed in the connecting column 14, one end of the threaded rod 6 is in matched rotation with the threaded hole, a helical gear 7 is arranged on the threaded rod 6, an L-shaped metal plate 9 is further arranged on the connecting column 14, a connecting rod 11 is arranged on the L-shaped metal plate 9, the connecting rod 11 is in matched rotation with a bearing in a supporting seat fixed on the L-shaped metal plate 9, a helical gear I12 meshed with the helical gear 7 is arranged on the connecting rod 11, and a turntable 10 is further fixed at one end of the connecting rod 11; in order to better fix the bracket 3 with the forklift, a threaded hole 15 is formed in the bracket 3 above the slot 4, the threaded hole 15 is communicated with the slot 4, a bolt is inserted into the threaded hole 15, the forklift is screwed and fixed, and in order to enable the upper platform 8 to lift stably, the threaded rod 6 is arranged on a symmetrical line of the upper platform 8 to ensure that the upper platform 8 is synchronous when being lifted. When the bailey beam 2 on the pier 1 needs to be dismantled, the bracket 3 is lifted to a proper height by manually rotating the turntable 10, the height of the bailey beam 2 on the actual pier 1 is determined, the adjustment is performed by the skilled person, the forklift is started at the moment, the bailey beam 2 is jacked up by the bracket 3 under the driving of the forklift, in order to enable jacking to be stable, as shown in fig. 1, the two brackets 3 are placed below the bailey beam 2 and are jacked synchronously, the bailey beam 2 moves transversely when jacked up, the bailey beam 2 is moved out of the pier 1 and is hoisted through an external crane, and the dismantling operation of the bailey beam 2 is completed. This practicality lifts the support through fork truck, slowly shifts out bailey roof beam on the pier, prevents that bailey roof beam is damaged and warp, has changed the tradition and has built the scaffold frame, perhaps directly use the crane, dig that destroy the traffic when the machine demolishs, destroy bailey roof beam problem.
It should be noted that the above-mentioned preferred embodiments are only for illustrating the technical concepts and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and to implement the present invention accordingly, and the protection scope of the present invention cannot be limited thereby. All equivalent changes and modifications made according to the spirit of the present invention should be covered by the protection scope of the present invention.

Claims (3)

1. The utility model provides a city bridge sectional shelf-unit demolishs bracket, including the bracket, be equipped with on the bracket with fork truck cooperation male slot, its characterized in that, be equipped with a plurality of landing legs on the bracket, the landing leg inserts in the last landing leg and can be in the free activity in male direction, it fixes the upper mounting plate bottom to go up the landing leg, the upper mounting plate bottom still is fixed with the threaded rod, threaded rod and the spliced pole screw-thread fit on locating the bracket are equipped with the helical gear on the threaded rod, still be equipped with L type panel beating on the spliced pole, be equipped with the connecting rod on the L type panel beating, the connecting rod is rotatory with the bearing cooperation of fixing in the supporting seat on L type panel beating, be equipped with on the connecting rod with the helical gear of the mutual interlock of helical gear one, connecting rod one end still is fixed with the carousel, realizes the lift of upper mounting plate through rotatory carousel.
2. The urban bridge combination support dismantling bracket as set forth in claim 1, wherein the bracket above the slot is provided with a threaded hole, and the threaded hole is communicated with the slot.
3. The urban bridge combination support demolition bracket according to claim 1, wherein the threaded rods are provided on a line of symmetry of the upper platform.
CN202121953993.6U 2021-08-19 2021-08-19 Urban bridge sectional shelf-unit demolishs bracket Active CN218454344U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121953993.6U CN218454344U (en) 2021-08-19 2021-08-19 Urban bridge sectional shelf-unit demolishs bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121953993.6U CN218454344U (en) 2021-08-19 2021-08-19 Urban bridge sectional shelf-unit demolishs bracket

Publications (1)

Publication Number Publication Date
CN218454344U true CN218454344U (en) 2023-02-07

Family

ID=85122697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121953993.6U Active CN218454344U (en) 2021-08-19 2021-08-19 Urban bridge sectional shelf-unit demolishs bracket

Country Status (1)

Country Link
CN (1) CN218454344U (en)

Similar Documents

Publication Publication Date Title
WO2020238984A1 (en) Vehicle-group-based apparatus for large-height lifting and shifting of bridge, and implementation method therefor
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN112709264B (en) Intelligent anti-seismic device of shallow-foundation ancient building and construction method thereof
CN218454344U (en) Urban bridge sectional shelf-unit demolishs bracket
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
JPH08311819A (en) Rotary construction method of bridge having high bridge pier
CN111809654A (en) Assembled tower crane foundation structure
CN108625292B (en) Template assembling platform of prefabricated stand column
CN206828012U (en) The central jack-up system of internally climbing tower crane
CN216549362U (en) Assembling and hoisting device for components above foundation pit
CN206328064U (en) A kind of device that walking mechanism steering during dress is rolled for high pedestal jib crane
CN214994020U (en) Combined tower crane foundation pre-embedded structure
CN202131602U (en) Steel sheet pile cofferdam structure
CN212295636U (en) High strength building templates's strutting arrangement
CN210914996U (en) High-strength suspension frame for automobile chassis
CN210459958U (en) Wind-resistant anti-tilt safety device of steel platform formwork system
CN219710235U (en) Construction platform for underwater bored pile
CN219138293U (en) Lifting device for be used for concrete to support demolishs
CN218290167U (en) Safe hoisting high-precision hovering positioning installation equipment of movable gantry crane
CN211283556U (en) Precast concrete post jacking device
CN212425196U (en) Auxiliary installation fan foundation ring installation bracket
CN217352146U (en) Hoisting platform and equipment for steel cover beam of single-column pier of bridge
CN217203627U (en) Temporary support leg capable of automatically stretching and retracting for bridge erecting machine
CN221027356U (en) Reverse hanging bracket
CN219585759U (en) Tank body safety supporting device for replacing bottom plate of large storage tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215000 No.1, Nanhuan East Road, Suzhou City, Jiangsu Province

Patentee after: Zhongyifeng (Suzhou) Urban Construction and Development Co.,Ltd.

Address before: 215000 No.1, Nanhuan East Road, Suzhou City, Jiangsu Province

Patentee before: SUZHOU ZHONGHENGTONG ROAD AND BRIDGE GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder