CN218453060U - Distributing device for pouring concrete prefabricated member - Google Patents
Distributing device for pouring concrete prefabricated member Download PDFInfo
- Publication number
- CN218453060U CN218453060U CN202222357612.9U CN202222357612U CN218453060U CN 218453060 U CN218453060 U CN 218453060U CN 202222357612 U CN202222357612 U CN 202222357612U CN 218453060 U CN218453060 U CN 218453060U
- Authority
- CN
- China
- Prior art keywords
- distributing device
- group
- fixed mounting
- pouring
- cloth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to the technical field of precast concrete components, and discloses a distributing device for pouring precast concrete components, which comprises two groups of supporting columns, wherein a supporting plate is fixedly arranged on one side surface of each group of supporting columns which are close to each other, a supporting frame is fixedly arranged on the upper surface of each supporting plate, a guide rail is arranged on one side surface of each group of supporting columns which are close to each other, movers are slidably connected inside the guide rails, and a first distributing hopper is fixedly arranged on the output ends of the two movers; the utility model discloses a set up support column, backup pad, support frame, guide rail and shifter, can realize moving the purpose that the second cloth was fought the top with first cloth fill, through setting up controller and bleeder valve, make it can realize fighting the inside concrete of first cloth and carry out the purpose of exporting, the distributing device who avoids original some concrete prefabs to pour as far as possible carries out two prefabs simultaneously and pours, and then causes the problem of dragging slow job schedule.
Description
Technical Field
The utility model relates to a concrete prefab technical field specifically is a concrete prefab is pour and is used distributing device.
Background
The precast concrete component is a foundation for realizing the prefabrication of a main body structure, such as a precast foundation, has good structural performance, can effectively ensure the structural mechanics by adopting factory manufacturing, has small discreteness, high construction speed, good product quality and high surface smoothness, can achieve the decorative effect of the fair-faced concrete, enables the structure and the building to be unified and coordinated, and can use a material distribution device when the precast concrete component is poured.
The utility model of the prior art, which is entitled as the public number CN215790674U, discloses a distributing device for precast concrete, which can control a slide block on a screw rod to move and a baffle to move through a servo motor fixedly connected to one end of a supporting plate, so that the position of the baffle can be conveniently adjusted according to the size of the precast concrete, and the precast concrete can be conveniently conveyed into precast concrete with different specifications and sizes; no. two motor control dead levers through fixed connection in backup pad one side rotate to be convenient for control stirring leaf stirs the concrete between fixed frame and the backup pad, thereby be convenient for with even the carrying prefab of concrete in, reduce follow-up workman's intensity of labour, but the device is when carrying the concrete, can't pour two prefabs simultaneously, thereby cause the slow problem of job schedule.
Disclosure of Invention
Technical problem to be solved
Not enough to prior art, the utility model provides a concrete prefabricated member pours and uses distributing device possesses and to pour a plurality of prefabs, has shortened the advantage of job schedule.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a precast concrete is pour and is used distributing device, includes two sets of support columns, every group the common fixed mounting in a side that the support column is close to each other has a backup pad, every the equal fixed mounting in upper surface of backup pad has a support frame, two the guide rail has all been seted up to a side that the support frame is close to each other, every the equal sliding connection in inside of guide rail has a shifter, two the common fixed mounting in output of shifter has first cloth to fight, the discharge gate has been seted up to the inner bottom wall that first cloth was fought, the fixed intercommunication of inner wall of discharge gate has the bleeder valve, one of them the positive fixed mounting of support frame has the controller, and is two sets of the common fixed mounting in a side that the support column is close to each other has two second cloth to fight, the controller passes through the wire and is connected with the bleeder valve electricity.
Preferably, the upper surface of each group of support columns is fixedly provided with a support rod, and the top end of each group of support rods is fixedly connected with the bottom surface of the support frame.
Preferably, two fixed blocks are fixedly mounted on two side faces of each group of supporting columns, and four groups of fixed blocks are fixedly connected with the front and the back of the two second material hoppers respectively at one side face close to each other.
Preferably, two side faces of each support frame are fixedly provided with blocking plates, and each blocking plate is located at the guide rail.
Preferably, antiskid plates are arranged below each group of support columns, and the upper surfaces of the antiskid plates of each group are fixedly connected with the bottom surfaces of the support columns.
Preferably, a supporting block is arranged below each supporting plate, and the upper surface of each supporting block is fixedly connected with the bottom surface of each supporting plate.
Preferably, the outer fixed surface of bleeder valve installs the sealing ring, the upper surface of sealing ring and the bottom surface fixed connection of first cloth fill.
(III) advantageous effects
Compared with the prior art, the utility model provides a precast concrete pours and uses distributing device possesses following beneficial effect:
this distributing device for concrete prefabricated member pouring, through setting up the support column, a supporting plate, and a support frame, guide rail and shifter, play and carry out the effect of round trip movement with first cloth fill, make it can realize moving the first cloth fill the purpose that second cloth fought the top, then through setting up controller and bleeder valve, play and open and the effect of closing the bleeder valve, make it can realize carrying out the purpose of exporting the inside concrete of first cloth fill, reach the effect that can pour two prefabs simultaneously, avoid the distributing device that original some concrete prefabricated members were pour as far as possible, only can realize pouring a prefab, can't carry out two prefabs simultaneously and pour, and then cause the pouring time to increase, drag the problem of slow job schedule.
Drawings
FIG. 1 is a schematic three-dimensional structure of a material distribution device of the present invention;
FIG. 2 is a three-dimensional structural diagram of the support frame of the present invention;
fig. 3 is a schematic three-dimensional structure diagram of the first material distributing hopper of the present invention;
fig. 4 is a schematic structural view of a first cloth bucket in a bottom perspective view.
In the figure: 1. a support pillar; 2. an anti-skid plate; 3. a controller; 4. a support block; 5. a support plate; 6. a fixed block; 7. a second hopper; 8. a blocking plate; 9. a guide rail; 10. a first cloth hopper; 11. a support frame; 12. a support bar; 13. a mover; 14. a discharge port; 15. a discharge valve; 16. and (6) sealing rings.
Detailed Description
In order to understand the utility model discloses a purpose, structure and function better, combine the figure below, it is right the utility model relates to a concrete prefabricated component is pour and is done further detailed description with distributing device.
Referring to fig. 1-4, the present invention: the utility model provides a precast concrete is pour and is used distributing device, including two sets of support columns 1, the common fixed mounting in a side that every group support column 1 is close to each other has backup pad 5, the equal fixed mounting in upper surface of every group support column 1 has bracing piece 12, the top of every group bracing piece 12 all with the bottom surface fixed connection of support frame 11, through setting up bracing piece 12, can realize carrying out the purpose of supporting to support frame 11, reach the better effect of using of support frame 11, avoid support frame 11 when using as far as possible, the problem of slope can appear.
Equal fixed mounting of upper surface of every backup pad 5 has support frame 11, guide rail 9 has all been seted up to a side that two support frames 11 are close to each other, the equal fixed mounting of both sides face of every group support column 1 has two fixed blocks 6, four groups of fixed blocks 6 a side that is close to each other are respectively with two second cloth 7 front and back fixed connection of fighting, through setting up fixed block 6, can realize fighting 7 positions to the second cloth and carry out the purpose of fixing, it fights 7 can be better to the effect of carrying out the material to reach the second cloth, avoid the second cloth to fight 7 when carrying the material as far as possible, the problem of skew can appear.
Equal sliding connection in inside of every guide rail 9 has a shifter 13, and the common fixed mounting of the output of two shifters 13 has first cloth fill 10, and the equal fixed mounting of both sides face of every support frame 11 has barrier plate 8, and every barrier plate 8 of group all is located in guide rail 9 department, through setting up barrier plate 8, can realize carrying out the purpose that blocks to guide rail 9 position, prevents that shifter 13 when removing, the problem that shifts out can appear.
The controller 3 is fixedly mounted on the front surface of one of the support frames 11, the support block 4 is arranged below each support plate 5, the upper surface of each support block 4 is fixedly connected with the bottom surface of each support plate 5, and the controller 3 is in a model type: HT-FQF1 through setting up supporting shoe 4, can realize carrying out the purpose that supports to backup pad 5, reaches backup pad 5 and better carries out the effect of support work, avoids backup pad 5 when carrying out support work as far as possible, can appear the problem of landing.
Two sets of support column 1 a common fixed mounting that is close to each other has two second cloth hoppers 7, controller 3 is connected with bleeder valve 15 electricity through the wire, bleeder valve 15's fixed surface installs sealing ring 16, the upper surface of sealing ring 16 and the bottom surface fixed connection of first cloth hopper 10, through setting up sealing ring 16, play and carry out sealed effect to bleeder valve 15 and first cloth hopper 10 junction, can realize that bleeder valve 15 carries out the purpose of carrying the material better, avoid when carrying the material as far as possible, the material can follow the problem that the junction flows.
The utility model discloses a theory of operation is: when the precast concrete is required to be distributed, a worker firstly connects the shifter 13 and the controller 3 with a power supply, after the connection, the precast concrete is conveyed into the first distributing hopper 10, after the conveying is completed, the first distributing hopper 10 is driven to move in a track provided by the guide rail 9 by power provided by the shifter 13, so that the first distributing hopper 10 can be moved to the upper side of one of the two second distributing hoppers 7, after the moving is completed, the discharge valve 15 can be controlled to be opened by the controller 3, so that the precast concrete in the first distributing hopper 10 can be conveyed into one of the second distributing hoppers 7, the precast concrete in the second distributing hopper 7 can be conveyed into the interior by the second distributing hopper 7, after the precast concrete is completely poured, the discharge valve 15 can be controlled to be closed by the controller 3, then the power provided by the shifter 13 can be used again to drive the first distributing hopper 10 to move in the track provided by the guide rail 9, so that the first distributing hopper 10 can be moved to the upper side of the other second distributing hopper 7, then the controller 3 controls the discharge valve 15 to open, so that the other second distributing hopper 10 can be conveyed into the other precast concrete, and the other precast concrete can be poured into the other precast concrete hopper 7.
It is to be understood that the present invention has been described with reference to certain embodiments, and that various changes or equivalents may be substituted for elements thereof by those skilled in the art without departing from the spirit and scope of the invention. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the invention without departing from the essential scope thereof. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of the present application are intended to be covered by the present invention.
Claims (7)
1. The utility model provides a concrete precast element pours and uses distributing device, includes two sets of support columns (1), its characterized in that: every group the common fixed mounting in a side that support column (1) are close to each other has backup pad (5), every the equal fixed mounting in upper surface of backup pad (5) has support frame (11), two guide rail (9), every have all been seted up to a side that support frame (11) are close to each other the equal sliding connection in inside of guide rail (9) has shifter (13), two the common fixed mounting in output of shifter (13) has first cloth fill (10), discharge gate (14) have been seted up to the inner bottom wall of first cloth fill (10), the fixed intercommunication in inner wall of discharge gate (14) has bleeder valve (15), one of them the positive fixed mounting of support frame (11) has controller (3), and is two sets of the common fixed mounting in a side that support column (1) are close to each other has two second cloth fill (7), controller (3) are connected through wire and bleeder valve (15) electricity.
2. The distributing device for pouring the concrete precast element according to claim 1, wherein: every group the equal fixed mounting of upper surface of support column (1) has bracing piece (12), every group the top of bracing piece (12) all with the bottom surface fixed connection of support frame (11).
3. The distributing device for pouring the concrete precast element according to claim 1, wherein: every group the both sides face of support column (1) is equal fixed mounting has two fixed blocks (6), four groups a side that fixed block (6) are close to each other respectively with the front and the back fixed connection of two second cloth fill (7).
4. The distributing device for pouring the concrete precast member according to claim 1, characterized in that: two side surfaces of each support frame (11) are fixedly provided with blocking plates (8), and each blocking plate (8) is positioned at the guide rail (9).
5. The distributing device for pouring the concrete precast member according to claim 1, characterized in that: and each group of anti-skid plates (2) are arranged below the support columns (1), and the upper surfaces of the anti-skid plates (2) are fixedly connected with the bottom surfaces of the support columns (1).
6. The distributing device for pouring the concrete precast member according to claim 1, characterized in that: supporting blocks (4) are arranged below the supporting plates (5), and the upper surfaces of the supporting blocks (4) are fixedly connected with the bottom surfaces of the supporting plates (5).
7. The distributing device for pouring the concrete precast element according to claim 1, wherein: the outer fixed surface of bleeder valve (15) installs sealing ring (16), the upper surface of sealing ring (16) and the bottom surface fixed connection of first cloth fill (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222357612.9U CN218453060U (en) | 2022-09-06 | 2022-09-06 | Distributing device for pouring concrete prefabricated member |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222357612.9U CN218453060U (en) | 2022-09-06 | 2022-09-06 | Distributing device for pouring concrete prefabricated member |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218453060U true CN218453060U (en) | 2023-02-07 |
Family
ID=85125162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222357612.9U Active CN218453060U (en) | 2022-09-06 | 2022-09-06 | Distributing device for pouring concrete prefabricated member |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218453060U (en) |
-
2022
- 2022-09-06 CN CN202222357612.9U patent/CN218453060U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4784821A (en) | Method for manufacturing a building block imitating a pile of dry stones | |
CN111037708B (en) | Preparation process of prefabricated composite floor slab for fabricated building | |
US3892516A (en) | Battery molding apparatus with trolley transporting means | |
CN206784840U (en) | Modified automatic plastering machine | |
CN210308385U (en) | Automatic pouring device for cement precast block | |
CN104358415A (en) | Reconfigurable moving type production system and production method for concrete prefabricated component | |
CN107336343B (en) | Automatic material cloth integrated device that changes of concrete | |
CN206408909U (en) | A kind of automatic plastering machine | |
CN108556129B (en) | Automatic casting vehicle for cement precast block | |
CN211314235U (en) | Tunnel inverted arch and filling concrete paver | |
CN110000891B (en) | Integrated distributing machine for concrete | |
CN218453060U (en) | Distributing device for pouring concrete prefabricated member | |
CN206030206U (en) | Prefab production line | |
CN206186077U (en) | Prefab production line | |
CN104118035B (en) | Material distributing device for gypsum block production device | |
CN206030207U (en) | Prefab production line | |
CN206186075U (en) | Prefab production line | |
CN106393418B (en) | A kind of combined wall board material distributing machine | |
CN204094934U (en) | A kind of distribution device for gypsum block production equipment | |
CN211466782U (en) | Prefabricated plate body production system | |
CN211666282U (en) | Concrete spreader | |
CN212045293U (en) | Full precast wallboard concrete placement device | |
CN210828359U (en) | Concrete pouring equipment for construction equipment | |
CN209775060U (en) | Distributing machine for producing PC building components | |
CN206030164U (en) | Prefab production line |