CN218438232U - Drainage riser combination hangs hole mould - Google Patents

Drainage riser combination hangs hole mould Download PDF

Info

Publication number
CN218438232U
CN218438232U CN202222408530.2U CN202222408530U CN218438232U CN 218438232 U CN218438232 U CN 218438232U CN 202222408530 U CN202222408530 U CN 202222408530U CN 218438232 U CN218438232 U CN 218438232U
Authority
CN
China
Prior art keywords
hanging hole
flat plate
vertical pipe
hole flat
drainage vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222408530.2U
Other languages
Chinese (zh)
Inventor
孟鑫帝
薛子华
靳光旭
赵日丽
高乔超
魏佳鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202222408530.2U priority Critical patent/CN218438232U/en
Application granted granted Critical
Publication of CN218438232U publication Critical patent/CN218438232U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

A drainage vertical pipe combined hanging hole die belongs to the technical field of template engineering of building engineering and comprises a hanging hole flat plate (1), a hoop (2), screws (3) and nuts (4); the hanging hole flat plate (1) is composed of two L-shaped plates with semicircular top surfaces; one half of the hanging hole flat plate (1) is abutted against the opening of the drainage vertical pipe, the side face of the hanging hole flat plate is tightly attached to the drainage vertical pipe, the other half of the hanging hole flat plate (1) is abutted against the opening of the drainage vertical pipe, the side face of the hanging hole flat plate is tightly attached to the drainage vertical pipe, the anchor ear (2) penetrates through the screw (3) and surrounds the side face L of the hanging hole flat plate (1) in trisection to be fixed by 2 anchor ears, and the nut (4) is fastened on the screw (3). The method has the advantages of being simple in processing and easy to operate in construction, and solving the quality problems of hole plugging deformation, cracking and the like in the common drainage riser hole plugging construction method.

Description

Drainage riser combination hangs hole mould
Technical Field
The utility model belongs to the technical field of building engineering's template engineering, especially, a hole mould is hung in drainage riser combination is provided, utilize plastic products to hang that the hole is dull and stereotyped and staple bolt nut and the high quality of screw accomplish drainage riser entrance to a cave shutoff process.
Background
In the building engineering, the construction joint for plugging the hole of the drainage vertical pipe is completed by utilizing a conventional support system and template installation or by adopting an iron wire, a support rod and a multi-layer plate template to hoist the hole. Particularly, in the construction of the current industry, a lot of people use iron wires, support rods and multi-layer plate templates to hang holes to finish the hole plugging construction of the drainage vertical pipe. The method comprises the following steps that an operator conducts hole plugging construction on a drainage vertical pipe, firstly, cross supporting rods on a hole to be plugged, installing a multi-layer plate template below the hole, supporting the supporting rods at the bottom of the multi-layer plate template, then, connecting the upper supporting rods and the lower supporting rods of the hole through iron wires penetrating through the template, fastening the iron wires, and finally, pouring concrete.
In the general method, through the construction of the template process and the pouring of concrete, the quality problems of uneven bottom plate of a drainage vertical pipe hole, slurry leakage and the like can occur at a high probability, so that the potential danger of leakage is greatly caused, the construction of the next process is influenced, and a large amount of repairing work is increased.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hole mould is hung in drainage riser combination has overcome the entrance to a cave shutoff that can appear in the general drainage riser entrance to a cave shutoff construction way and has warp, quality problems such as fracture, seepage. The construction is convenient, the quality is good, the leakage is prevented, the deformation is prevented, and the later-stage maintenance manpower and material resource investment is reduced.
The utility model comprises a hanging hole flat plate 1, a hoop 2, a screw 3 and a nut 4; the hanging hole flat plate 1 consists of two L-shaped plates with semicircular top surfaces; firstly, the flat surface of one half of the hanging hole flat plate 1 is propped against the hole of the drainage vertical pipe, the side surface is clung to the drainage vertical pipe, the flat surface of the other half of the hanging hole flat plate 1 is propped against the hole of the drainage vertical pipe, the side surface is clung to the drainage vertical pipe, the fastened holes are opposite, then the anchor ear 2 passes through the screw 3 and is trisected around the side surface L of the hanging hole flat plate 1 for carrying out 2 times of anchor ear fixing, and the nut 4 is fastened on the screw 3. And finishing plugging the hole of the vertical drainage pipe.
When the drainage vertical pipe hole plugging device is used, the flat plate surface of one half of the hanging hole flat plate 1 is firstly propped against the drainage vertical pipe hole, the side surface is tightly attached to the drainage vertical pipe, the flat plate surface of the other half of the hanging hole flat plate 1 is propped against the drainage vertical pipe hole, the side surface is tightly attached to the drainage vertical pipe, the anchor ear 2 penetrates through the screw 3 and is fixed by 2 anchor ears in a trisection mode around the side surface L of the hanging hole flat plate 1, and finally the nut 4 is fastened to achieve the advantages of deformation prevention, cracking prevention and leakage prevention. The construction process for plugging the hole of the vertical drainage pipe is high in quality, standard and requirement.
The utility model has the advantages that:
1. the advancement is as follows: has the characteristics of simple manufacture and easy operation.
2. The necessity: the quality problems of deformation, cracking and the like are reduced when the hole of the vertical drainage pipe is plugged, and the leakage risk is reduced.
3. The cost is saved: the application of the drainage vertical pipe combined hanging hole mold greatly improves the construction quality, greatly reduces the leakage risk and reduces the later-stage manual maintenance cost.
The utility model has the advantages of, improve efficiency of construction, control construction quality, reduce construction cost, reduce drainage riser entrance to a cave shutoff deformation, the fracture problem, reduce the seepage risk, practice thrift artifical cost of maintenance.
Drawings
Fig. 1 is a schematic structural view (top view) of the present invention.
Fig. 2 is a schematic structural view (front view) of the present invention.
Wherein, hang hole flat board 1, staple bolt 2, screw 3, nut 4.
Detailed Description
The utility model discloses a hang dull and stereotyped 1 in hole, staple bolt 2, screw 3, nut 4. The hanging hole flat plate 1 is composed of two L-shaped plates with semicircular top surfaces; the method comprises the steps of chiseling the hole of a drainage vertical pipe, cleaning garbage, finishing the treatment of problems such as floating pulp flow drop at the fastening position of a drainage vertical pipe hanging hole die, manufacturing a drainage vertical pipe finished hanging hole die, enabling the inner diameter of the drainage vertical pipe finished hanging hole die to be consistent with the diameter of the drainage vertical pipe, designing different hanging hole dies according to the size of a field drainage vertical pipe, firstly jacking the flat surface of one half of hanging hole flat plates 1 at the hole of the drainage vertical pipe, enabling the side surfaces of the other half of hanging hole flat plates 1 to be tightly attached to the drainage vertical pipe, jacking the flat surface of the other half of hanging hole flat plates 1 at the hole of the drainage vertical pipe, enabling the anchor ear 2 to be tightly attached to the drainage vertical pipe, penetrating a screw 3 and fixing the anchor ear 2 times around the side surface L of the hanging hole flat plates 1 in a trisection mode, and finally fastening a nut 4. And completing the plugging of the hole of the vertical drainage pipe. And finally, pouring concrete from the upper surface of the floor slab into the gap of the reserved hole, compacting and leveling, wherein the grade of the concrete is not less than that of a drawing (micro-expansion and waterproof additives are added in proportion). And after the strength of the concrete meets the dismantling condition, loosening the screws, taking down the die and recycling.

Claims (1)

1. A drainage vertical pipe combined hanging hole die is characterized by comprising a hanging hole flat plate (1), a hoop (2), screws (3) and nuts (4); the hanging hole flat plate (1) is formed by two L-shaped plates with semicircular top surfaces; one half of the hanging hole flat plate (1) is propped against the opening of the drainage vertical pipe, the side surface of the hanging hole flat plate is tightly attached to the drainage vertical pipe, the other half of the hanging hole flat plate (1) is propped against the opening of the drainage vertical pipe, the side surface of the hanging hole flat plate is tightly attached to the drainage vertical pipe, the anchor ear (2) penetrates through the screw (3) and surrounds the side surface L of the hanging hole flat plate (1) in trisection to be fixed by 2 anchor ears, and the nut (4) is fastened on the screw (3).
CN202222408530.2U 2022-09-10 2022-09-10 Drainage riser combination hangs hole mould Active CN218438232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222408530.2U CN218438232U (en) 2022-09-10 2022-09-10 Drainage riser combination hangs hole mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222408530.2U CN218438232U (en) 2022-09-10 2022-09-10 Drainage riser combination hangs hole mould

Publications (1)

Publication Number Publication Date
CN218438232U true CN218438232U (en) 2023-02-03

Family

ID=85104664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222408530.2U Active CN218438232U (en) 2022-09-10 2022-09-10 Drainage riser combination hangs hole mould

Country Status (1)

Country Link
CN (1) CN218438232U (en)

Similar Documents

Publication Publication Date Title
CN111535579A (en) Construction method for support-free mold hanging tool for horizontal post-pouring belt
CN206616862U (en) Formwork root bracing means
CN111827670B (en) Reinforcing tool for floor hole hanging die and construction method thereof
CN204081445U (en) To encorbelment i iron anchor device
CN206667680U (en) A kind of residential construction gas flue structure
CN218438232U (en) Drainage riser combination hangs hole mould
CN109518960B (en) Shaping mold capable of realizing turnover of reserved hole of cast-in-situ roof and construction method of shaping mold
CN215760469U (en) Building structure movement joint position shear force wall aluminum mould board location reinforcement device
CN112412013A (en) Construction method for plugging reserved hole of structural outer wall
CN110118015A (en) The embedding casing methods of aperture on a kind of concrete floor
CN205476491U (en) Outer wall post template bottom consolidates uses pre -cast screw
CN106522544A (en) Root-rotting-preventing compensating device for formwork
CN204800838U (en) A built -up plate for parapet production
CN203701597U (en) Outer wall formwork supporting and bearing device
CN206616842U (en) Recyclable pre-embedded bolt for builder's jack
CN205677156U (en) Hang mould special utility supporting steel bar
CN205529917U (en) A support fixing device that is used for high mound, U type abutment form setting
CN207063528U (en) Hang die device in antiseep hole
CN204040457U (en) Wood frame plastic formwork system
CN216664977U (en) Floor falls mould structure that hangs of board
CN217500581U (en) Fixing device for suspension pipeline
CN205531285U (en) Scaffold frame is encorbelmented shaped steel and is reserved bolt hole and establish structure
CN214531921U (en) Tool type mould hanging device
CN2394990Y (en) Prefabricate hole die for high stored building pipeline
CN206458090U (en) A kind of balcony, tool for kitchen use hang mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant