CN214531921U - Tool type mould hanging device - Google Patents
Tool type mould hanging device Download PDFInfo
- Publication number
- CN214531921U CN214531921U CN202120151180.9U CN202120151180U CN214531921U CN 214531921 U CN214531921 U CN 214531921U CN 202120151180 U CN202120151180 U CN 202120151180U CN 214531921 U CN214531921 U CN 214531921U
- Authority
- CN
- China
- Prior art keywords
- screw rod
- hole
- bolt
- reserved
- penetrating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a tool type mould hanging device, which comprises a crossbeam and a steel mould which are connected into a whole by welding, wherein a screw rod hole is reserved on the crossbeam and the steel mould; screwing a bolt into the bottom of the screw rod, penetrating the bolt into the gasket, and penetrating the screw rod into the screw rod hole reserved in the cross beam and the steel die; the supporting beam is transversely placed on a reserved hole on the structural floor slab, a screw rod penetrating from the lower part of the hole to the upper part of the hole penetrates into the supporting beam, a gasket is penetrated and then a bolt is screwed for fastening, and the adjusting bolt is used for applying prestress to enable the steel mould to be tightly contacted with the structural floor slab so as to prevent slab staggering and slurry leakage. The utility model is simple in operation, the shaping is of high quality, used repeatedly, has practiced thrift engineering cost when having guaranteed the shaping quality greatly.
Description
Technical Field
The utility model relates to a concrete structure reserves entrance to a cave construction technical field, concretely relates to mould device is hung to instrument formula.
Background
In the construction process of the building engineering, holes such as a pump pipe hole, a wire releasing hole and the like of the ground can be reserved for meeting construction requirements, and plugging is carried out after the structure construction is finished. According to the traditional method for plugging the hole, a support frame is erected at the bottom of the hole, a template is paved, then concrete is poured, the operation is complex, the forming is easy to stagger, and the turnover utilization rate is low; the tool type die lifting device is invented by research and experiments aiming at the practical problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a mould device is hung to instrument formula, easy operation, the shaping is of high quality, and used repeatedly has practiced thrift engineering cost when having guaranteed the shaping quality greatly.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a tool type mould hanging device comprises a cross beam and a steel mould which are connected into a whole through welding, wherein a screw rod hole is reserved on the cross beam and the steel mould; screwing a bolt into the bottom of the screw rod, penetrating the bolt into the gasket, and penetrating the screw rod into the screw rod hole reserved in the cross beam and the steel die; the supporting beam is transversely placed on a reserved hole on the structural floor slab, a screw rod penetrating from the lower part of the hole to the upper part of the hole penetrates into the supporting beam, a gasket is penetrated and then a bolt is screwed for fastening, and the adjusting bolt is used for applying prestress to enable the steel mould to be tightly contacted with the structural floor slab so as to prevent slab staggering and slurry leakage.
Further, a sleeve is sleeved on the section of the screw rod between the steel die and the support beam, and a release agent is coated on the periphery of the sleeve.
By last, the utility model discloses a mould device is hung to instrument formula possesses following beneficial effect at least: the method is simple to operate, good in forming quality and capable of being used repeatedly, and engineering cost is saved while forming quality is greatly guaranteed.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the application and together with the description serve to explain the application and not to limit the application. In the drawings:
fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic diagram of the utility model after the installation.
In the figure: 1-structural floor slab; 2-a cross beam; 3-a support beam; 4-a gasket; 5-bolt; 6-a screw rod; 7-a sleeve; 8-steel molding;
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, embodiments of the present invention will be described in further detail with reference to fig. 1-2.
As shown in fig. 1-2, a tool type die hanging device comprises a cross beam 2 and a steel die 8 which are connected into a whole by welding, all loads are borne by an original structure floor 1, and screw rod holes are reserved on the cross beam 2 and the steel die 8; the bottom of the screw rod 6 is screwed in a bolt 5 and then penetrates into the gasket 4, and then the screw rod 6 penetrates into a screw rod hole reserved between the cross beam 2 and the steel die 8; a supporting beam 3 is transversely placed on a reserved hole on the structural floor slab 1, a screw rod 6 penetrating to the upper side of the hole from the lower side of the hole penetrates the supporting beam 3, a gasket 4 is penetrated and then a bolt 5 is screwed for fastening, and the device applies prestress through an adjusting bolt 5 to enable a steel mould 8 to be tightly contacted with the structural floor slab 1, so that slab staggering and slurry leakage are prevented.
The utility model discloses the cover is equipped with sleeve pipe 7 on this section lead screw 6 that is located between steel mould 8 and a supporting beam 3 to brush the release agent in sleeve pipe 7 periphery.
Instrument formula hang mould device, concrete implementation step as follows:
step 1, adhering foam rubber to the periphery of the bottom surface of the hole;
step 4, welding and connecting the beam 2 and the steel die 8 into a whole;
step 6, screwing the bottom of a screw rod 6 into a bolt 5, penetrating the screw rod into a gasket 4, penetrating the screw rod 6 into a screw rod hole reserved in the cross beam 2 and a steel die 8, penetrating a sleeve 7, and coating a release agent;
step 8, penetrating the screw rod 6 into the support beam 3, penetrating the gasket 4, screwing the bolt 5, tightening and applying prestress, and finishing the installation as shown in fig. 2;
and 9, pouring concrete.
It should be noted that the embodiments described in this application are only examples to illustrate the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described may be made by those skilled in the art without departing from the spirit of the invention or exceeding the scope of the invention as defined in the accompanying claims.
Claims (2)
1. A tool type die hanging device is characterized by comprising a cross beam (2) and a steel die (8) which are connected into a whole through welding, wherein screw rod holes are reserved on the cross beam (2) and the steel die (8); a bolt (5) is screwed into the bottom of the screw rod (6), then the screw rod (6) penetrates into the gasket (4), and then the screw rod (6) penetrates into a screw rod hole reserved in the cross beam (2) and the steel die (8); a supporting beam (3) is transversely placed on a reserved hole on a structural floor slab (1), a screw rod (6) penetrating to the upper side of the hole from the lower side of the hole penetrates the supporting beam (3), a gasket (4) is penetrated and then a bolt (5) is screwed in for fastening, and prestress is applied through the adjusting bolt (5) to enable a steel die (8) to be tightly contacted with the structural floor slab (1), so that slab staggering and slurry leakage are prevented.
2. The tool type die lifting device according to claim 1, wherein a sleeve (7) is sleeved on the section of the screw rod (6) between the steel die (8) and the support beam (3), and a release agent is coated on the periphery of the sleeve (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120151180.9U CN214531921U (en) | 2021-01-20 | 2021-01-20 | Tool type mould hanging device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120151180.9U CN214531921U (en) | 2021-01-20 | 2021-01-20 | Tool type mould hanging device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214531921U true CN214531921U (en) | 2021-10-29 |
Family
ID=78345998
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120151180.9U Active CN214531921U (en) | 2021-01-20 | 2021-01-20 | Tool type mould hanging device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214531921U (en) |
-
2021
- 2021-01-20 CN CN202120151180.9U patent/CN214531921U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103233479B (en) | Method for pouring concrete cup foundation | |
CN208792737U (en) | For hanging the detachable connecting part of external platform hanging girder steel | |
CN111827670B (en) | Reinforcing tool for floor hole hanging die and construction method thereof | |
CN214531921U (en) | Tool type mould hanging device | |
CN215254592U (en) | Portable opening template fastening and sealing device | |
CN204800838U (en) | A built -up plate for parapet production | |
CN205822780U (en) | Floor setting-out hole is reserved and blocks mould | |
CN205024827U (en) | Prefabricated plate and roof beam connection structure | |
CN203499212U (en) | Hoisting structure for curved aluminum circular tube | |
CN213971755U (en) | Lintel integrated prefabricated combined type water and electricity switch control box die | |
CN213233548U (en) | Control device for improving flatness of appearance of basement exterior wall construction joint | |
CN218438232U (en) | Drainage riser combination hangs hole mould | |
CN204645627U (en) | A kind of un-bonded prestressed steel strand Special hole mold | |
CN211286666U (en) | Die adjusting embedded part and aluminum alloy template diagonal bracing device | |
CN207063528U (en) | Hang die device in antiseep hole | |
CN216340983U (en) | Construction hangs template installation limiter | |
CN2893057Y (en) | Construction pipeline headhole casing | |
CN204435867U (en) | Air-conditioning duct preformed hole exempts from form removal tool | |
CN204152205U (en) | Decoration exposed concrete construction method split bolt punch die used | |
CN204662885U (en) | European Architecture concrete decoration carved on paste moulding construction equipment | |
CN2394990Y (en) | Prefabricate hole die for high stored building pipeline | |
CN215907411U (en) | Finished product mould for plugging floor slab hanging hole | |
CN214739003U (en) | Prefabricated heat preservation decorates integration wallboard | |
CN217949740U (en) | Bathroom hangs mould and props reinforcement instrument to propping | |
CN210685404U (en) | Anti-leakage turnover eccentric sleeve applied to construction of concrete shear wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |