CN218292736U CN202222466747.9U CN202222466747U CN218292736U CN 218292736 U CN218292736 U CN 218292736U CN 202222466747 U CN202222466747 U CN 202222466747U CN 218292736 U CN218292736 U CN 218292736U
Authority
CN
China
Prior art keywords
pull rod
oblique pull
operating platform
basket
secondary structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222466747.9U
Other languages
Chinese (zh)
Inventor
刘刚
李艳宾
徐磊
朱鹏举
李俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202222466747.9U priority Critical patent/CN218292736U/en
Application granted granted Critical
Publication of CN218292736U publication Critical patent/CN218292736U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an operation platform technical field specifically is a secondary structure operation platform encorbelments in basket of flowers pull rod formula, two the upper surface of shaped steel roof beam all is fixed with two second mountings, the second mounting inboard all rotates and is connected with first oblique pull rod, the other end of first oblique pull rod all is to having the second to draw the pull rod to one side, the other end of second oblique pull rod all rotates through first mounting and connects in the outside of last floor, and links to each other through adjusting part between second oblique pull rod and the first oblique pull rod. The utility model discloses a basket of flowers formula is encorbelmented, has also improved the steadiness in save material, also avoids unnecessary shaped steel to cause the potential safety hazard to building subject inside, and operation platform uses four oblique pull rods to stabilize, and is more firm than ordinary operation platform, and the adjusting part between the oblique pull rod can adjust the length of oblique pull rod, conveniently with the building subject of high difference, has very extensive practicality when to the construction.

Description

Secondary structure operation platform encorbelments in basket of flowers pull rod formula
Technical Field
The utility model relates to an operation platform technical field specifically is a secondary structure operation platform encorbelments in basket of flowers pull rod formula.
Background
Various temporary operation platforms or operation frames are often erected on a construction site to perform various operations such as masonry, decoration, painting and the like, and generally, a framework type platform which can be used for bearing materials and performing various operations therein within a certain construction period is called an operation platform. Before the operation platform is manufactured, professional technicians design the operation platform according to the used materials and the current corresponding specifications, a calculation book or a drawing is programmed into a construction organization design, and the allowed load value of the operation platform is marked on the operation platform obviously.
However, the existing cantilever type operating platform needs to embed the section steel into the building main body in a pre-embedding manner, is inconvenient to install and cannot be applied to building main bodies with different heights. Therefore, the technical personnel in the field provide a flower basket pull rod type inner cantilever secondary structure operating platform to solve the problems in the background technology.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a secondary structure operation platform encorbelments in basket of flowers pull rod formula to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a flower basket pull rod type inner cantilever secondary structure operating platform comprises an operating platform, a lower floor and an upper floor, wherein section steel beams are fixed on two sides of the operating platform, a guardrail in a shape of Contraband is fixed on the upper surface of the operating platform, and one end of each of the two section steel beams is connected with the outer side of the lower floor;
two the upper surface of shaped steel roof beam all is fixed with two second mountings, the second mounting inboard all rotates and is connected with first oblique pull rod, the other end of first oblique pull rod all is to the second oblique pull rod, the other end of second oblique pull rod all rotates through first mounting and connects in the outside of upper floor, and links to each other through adjusting part between second oblique pull rod and the first oblique pull rod.
As a further aspect of the present invention: the adjusting component comprises a pull rod connecting piece, and a forward pipe thread and a backward pipe thread which are respectively arranged at the connecting ends of the second diagonal draw bar and the first diagonal draw bar, adjusting cavities are respectively arranged at the two ends of the pull rod connecting piece, and a forward inner thread sleeve and a backward inner thread sleeve which are respectively in one-to-one correspondence with the forward pipe thread and the backward pipe thread are respectively embedded and fixed in the adjusting cavities.
As a further aspect of the present invention: the first diagonal draw bar and the second diagonal draw bar are both members made of round steel materials.
As a further aspect of the present invention: and the first fixing piece and the upper floor slab and the section steel beam and the lower floor slab are fastened and connected through expansion bolts.
As a further aspect of the present invention: the length of the operating platform and the section steel beam is required to be less than or equal to 5M.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a basket of flowers formula is encorbelmented, has also improved the steadiness in save material, also avoids unnecessary shaped steel to cause the potential safety hazard to building subject inside, and operation platform uses four oblique pull rods to stabilize, and is more firm than ordinary operation platform, and the adjusting part between the oblique pull rod can adjust the length of oblique pull rod, conveniently with the building subject of high difference, has very extensive practicality when to the construction.
Drawings
FIG. 1 is a schematic structural view of a basket pull rod type inner cantilever secondary structure operating platform;
FIG. 2 is a structural schematic diagram of a basket pull rod type inner cantilever secondary structure operating platform with a removed guardrail;
fig. 3 is a schematic structural view of the interior of a pull rod connecting piece in a basket pull rod type inner cantilever secondary structure operating platform.
In the figure: 1. an operating platform; 2. a guardrail; 3. a section steel beam; 4. a lower floor slab; 5. a first diagonal member; 6. a first fixing member; 7. an upper floor slab; 8. a second diagonal member; 9. a tie rod attachment; 10. a positive internal thread sleeve and a negative internal thread sleeve; 11. a second fixing member; 12. an expansion bolt.
Detailed Description
Referring to fig. 1 to 3, in an embodiment of the present invention, a basket pull rod type inner cantilever secondary structure operation platform includes an operation platform 1, a lower floor 4 and an upper floor 7, wherein the lower floor 4 and the upper floor 7 are both outside of a building wall, both sides of the operation platform 1 are fixed with section steel beams 3, the lengths of the operation platform 1 and the section steel beams 3 need to be less than or equal to 5M, so as to ensure the whole usable area;
the upper surface of the operating platform 1 is fixedly provided with a guardrail 2 in a shape of Contraband, and one end of each of two section steel beams 3 is connected with the outer side of the lower floor plate 4;
the upper surface of two shaped steel roof beams 3 all is fixed with two second mounting 11, and second mounting 11 inboard all rotates and is connected with first oblique pull rod 5, and the other end of first oblique pull rod 5 all is docked the oblique pull rod 8 of second, and the other end of second oblique pull rod 8 all rotates through first mounting 6 and connects in the outside of upper floor 7, and first oblique pull rod 5 is the component of round steel material with the oblique pull rod 8 of second.
The first fixing piece 6 and the upper floor slab 7 and the section steel beam 3 and the lower floor slab 4 are fastened and connected through expansion bolts 12, so that the overall stability is improved;
link to each other through the adjusting part between the oblique pull rod 8 of second and the first oblique pull rod 5, the adjusting part includes pull rod connecting piece 9 and sets up respectively in the oblique pull rod 8 of second and the connection of first oblique pull rod 5, the pipe thread of turning over, the regulation cavity has all been seted up at the both ends of pull rod connecting piece 9, it is fixed with respectively with just to all imbed in two regulation cavities, the pipe thread one-to-one is just turned over, anti-internal thread cover 10, during the installation, with the oblique pull rod 8 of second and the first oblique pull rod 5 of first alignment pull rod connecting piece 9 both ends just, anti-internal thread cover 10, and then rotate pull rod connecting piece 9 again, through the screw thread characteristic, the oblique pull rod 8 of second and first oblique pull rod 5 can be simultaneously to precession in the regulation cavity of pull rod connecting piece 9 inside, after reaching suitable position stall pull rod connecting piece 9 can, can satisfy different floor height, the installation on the lower floor, the installation degree of difficulty has been reduced, installation efficiency has been improved.
The utility model discloses a theory of operation is: during construction operation, the distance between an upper floor and a lower floor of a building main body is measured, the first fixing piece 6 and the section steel beams 3 are respectively fixed on the lower floor 4 and the upper floor 7 through expansion bolts 12, the operation platform 1 slides into the inner sides of the two section steel beams 3 and is fixed through the bolts, and the guardrail 2 is further installed, so that the safety during construction is ensured;
secondly with the second diagonal draw bar 8 and the first diagonal draw bar 5 aim at the tie connecting piece 9 both ends just, anti-internal thread cover 10, and then rotate tie connecting piece 9 again, through the screw thread characteristic, the second diagonal draw bar 8 and the first diagonal draw bar 5 can be simultaneously to precession in the regulation cavity of tie connecting piece 9 inside, after reaching suitable position stall tie connecting piece 9 can, can satisfy not high on the floor, the installation on the lower floor, the installation degree of difficulty has been reduced, the installation effectiveness has been improved.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The flower basket pull rod type inner cantilever secondary structure operating platform comprises an operating platform (1), a lower floor (4) and an upper floor (7), and is characterized in that section steel beams (3) are fixed on two sides of the operating platform (1), a guardrail (2) in a shape of Contraband is fixed on the upper surface of the operating platform (1), and one end of each of the two section steel beams (3) is connected with the outer side of the lower floor (4);
two the upper surface of shaped steel roof beam (3) all is fixed with two second mounting (11), second mounting (11) inboard all rotates and is connected with first oblique pull rod (5), the other end of first oblique pull rod (5) all is to the butt joint has second oblique pull rod (8), the other end of second oblique pull rod (8) all rotates through first mounting (6) and connects in the outside of last floor (7), and links to each other through adjusting part between second oblique pull rod (8) and first oblique pull rod (5).
2. The basket pull rod type inner cantilever secondary structure operating platform as claimed in claim 1, wherein the adjusting assembly comprises a pull rod connecting piece (9) and forward and backward pipe threads respectively arranged at the connecting ends of the second diagonal pull rod (8) and the first diagonal pull rod (5), adjusting cavities are respectively arranged at two ends of the pull rod connecting piece (9), and forward and backward inner thread sleeves (10) respectively corresponding to the forward and backward pipe threads in a one-to-one manner are embedded and fixed in the two adjusting cavities.
3. The basket draw bar type inner cantilever secondary structure operating platform as claimed in claim 1, wherein the first diagonal draw bar (5) and the second diagonal draw bar (8) are both members made of round steel.
4. The basket draw bar type inner cantilever secondary structure operating platform of claim 1, wherein the first fixing member (6) and the upper floor (7) and the section steel beam (3) and the lower floor (4) are fixedly connected through expansion bolts (12).
5. The basket draw bar type inner cantilever secondary structure operating platform of claim 1, wherein the length of the operating platform (1) and the section steel beam (3) is required to be less than or equal to 5M.
CN202222466747.9U 2022-09-19 2022-09-19 Secondary structure operation platform encorbelments in basket of flowers pull rod formula Active CN218292736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222466747.9U CN218292736U (en) 2022-09-19 2022-09-19 Secondary structure operation platform encorbelments in basket of flowers pull rod formula

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222466747.9U CN218292736U (en) 2022-09-19 2022-09-19 Secondary structure operation platform encorbelments in basket of flowers pull rod formula

Publications (1)

Publication Number Publication Date
CN218292736U true CN218292736U (en) 2023-01-13

Family

ID=84816888

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222466747.9U Active CN218292736U (en) 2022-09-19 2022-09-19 Secondary structure operation platform encorbelments in basket of flowers pull rod formula

Country Status (1)

Country Link
CN (1) CN218292736U (en)

Similar Documents

Publication Publication Date Title
CN102733606B (en) The construction method of High Large Cantilever structure
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN210316454U (en) Large-span roof overhanging support system
CN218292736U (en) Secondary structure operation platform encorbelments in basket of flowers pull rod formula
JP2924626B2 (en) Bridge pier construction method by self-elevating formwork method
KR0140904B1 (en) Scaffolding for an elevator pit
CN112227688A (en) Stiffening plate bearing type outer frame-free construction platform for residential building and construction method
CN107338965A (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN208347296U (en) A kind of belt lacing rod piece
CN213268820U (en) Pull rod type I-steel cantilever beam
CN212336879U (en) Modular holding pole
CN212026701U (en) Prefabricated shear wall horizontal connection structure with W-shaped joint
CN112443052A (en) Indoor wall frame connection structure of assembly type building
CN209907886U (en) Adjustable assembled stair construction platform
CN208167762U (en) The house foundation of fast demountable
CN208733817U (en) A kind of assembling type steel structure building Special-Shaped Column
JP2812178B2 (en) Bridge pier construction method by self-elevating formwork method
CN111155657A (en) Beam-plate connecting node structure of fabricated framework plate building and connecting method thereof
CN112609979A (en) Wall connecting piece erecting method for connecting ultrahigh external frame of external wall
CN207110500U (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN205369690U (en) Prefabricated wallboard of assembly type structure
CN217054477U (en) Y-shaped supporting device for temporary support of prefabricated wall
CN110230352B (en) Novel inner octagonal bolt frame structure node and construction method
CN109518981B (en) Shaping protection device at building ladder conversion platform of fabricated building operation and construction method thereof
CN216239024U (en) Wall connecting piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant