CN218261558U - Beam column handling device of usefulness is built in municipal administration room - Google Patents

Beam column handling device of usefulness is built in municipal administration room Download PDF

Info

Publication number
CN218261558U
CN218261558U CN202222511456.7U CN202222511456U CN218261558U CN 218261558 U CN218261558 U CN 218261558U CN 202222511456 U CN202222511456 U CN 202222511456U CN 218261558 U CN218261558 U CN 218261558U
Authority
CN
China
Prior art keywords
arm
lifting rope
support
beam column
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222511456.7U
Other languages
Chinese (zh)
Inventor
郑进珍
王叶辉
吴航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Tongde Construction Engineering Group Co ltd
Xintai Construction Group Co ltd
Original Assignee
Fujian Tongde Construction Engineering Group Co ltd
Xintai Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Tongde Construction Engineering Group Co ltd, Xintai Construction Group Co ltd filed Critical Fujian Tongde Construction Engineering Group Co ltd
Priority to CN202222511456.7U priority Critical patent/CN218261558U/en
Application granted granted Critical
Publication of CN218261558U publication Critical patent/CN218261558U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to beam column haulage equipment field is used in municipal administration room construction, especially is a beam column handling device that municipal administration room was built and is used, include: the lifting device comprises a mobile vehicle, a supporting arm, a lifting rope and a lifting hook, wherein the supporting arm is connected with a force application arm which is detachably connected to one end, close to or far away from the lifting rope, of the supporting arm, and a lifting frame for lifting adjustment is installed at one end, close to the lifting rope, of the supporting arm; when needs transport beam column, peg graft with afterburning arm on the inserted block of lifting rope one end is kept away from to the support arm, increase the arm of force length of support arm, the lifting rope passes through the lifting hook and lifts the beam column and breaks away from ground, then slide the crane downwards, carry out the stable stay to the beam column through supporting wheel and locomotive, then break away from afterburning arm and peg graft on the inserted block that the support arm is close to lifting rope one side, when device moving as a whole carries the beam column, afterburning arm can not form and shelter from, device moving as a whole, turn to comparatively nimble.

Description

Beam column handling device of usefulness is built in municipal administration room
Technical Field
The utility model relates to a beam column haulage equipment field is used in municipal administration room construction specifically is a beam column handling device of usefulness is built in municipal administration room.
Background
In municipal building, when carrying beam column parts with large volume and weight, special large-scale carrying equipment is required to be used for carrying, and when the space is limited and the large-scale carrying equipment cannot enter, the beam column is required to be carried by using a manual simple carrying device.
The existing simple beam column carrying device realizes that manpower is used for hoisting a beam column through a longer force arm, then the beam column is carried by pushing the beam column through personnel, in the carrying process, the longer force arm occupies a larger space, when the device is moved to a corner position, the longer force arm is easy to collide with the wall surface and interfere, the turning is not flexible enough, and the use space is limited. Accordingly, one skilled in the art provides a beam and column carrying apparatus for municipal building to solve the above problems of the background art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a beam column handling device of usefulness is built in municipal administration room to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a beam column handling device of usefulness is built in municipal administration room, includes:
the moving vehicle is used for moving the supporting device integrally;
the supporting arm is fixed at the top end of the moving vehicle;
the lifting rope is fixed at one end of the supporting arm, and a lifting hook is fixed at the bottom end of the lifting rope;
the lifting device comprises a lifting rope, a supporting arm, a force applying arm, a lifting frame and a supporting wheel, wherein the supporting arm is connected with the force applying arm, the force applying arm is detachably connected to one end, close to or far away from the lifting rope, of the supporting arm, the lifting frame used for lifting adjustment is installed at one end, close to the lifting rope, of the supporting arm, and the bottom end of the lifting frame is rotatably connected with the supporting wheel used for auxiliary supporting.
As a further aspect of the present invention: the locomotive includes back shaft and two walking wheels, two the walking wheel rotates respectively to be connected the both ends of back shaft, the intermediate position department of back shaft is fixed with the support, the support arm is fixed the support top.
As a further aspect of the present invention: the support is V-shaped, and the support arm and the support form a closed triangular support area.
As a further aspect of the present invention: an insert block is fixed on the side wall of one end, close to the lifting rope, of the support arm, an insert block is also fixed on the end face, far away from one end of the lifting rope, of the support arm, the force-adding arm is detachably connected to one end, close to the lifting rope or far away from the lifting rope, of the support arm through the insert block, a slot corresponding to the insert block is formed in the force-adding arm, and the force-adding arm is inserted into the insert block through the slot.
As a further aspect of the present invention: the lifting frame comprises a fixed pipe, a sliding arm and a limiting pin, the fixed pipe is fixed on the end face of the supporting arm, the sliding arm is inserted into the inner wall of the fixed pipe in a sliding mode, the supporting wheel is rotatably connected to the bottom end of the sliding arm, limiting insertion holes are formed in the two ends of the fixed pipe, and the limiting pin is inserted into the limiting insertion holes in one side.
As a further aspect of the present invention: and a limiting plate for limiting is fixed at the top end of the sliding arm.
As a further aspect of the present invention: the lifting rope is a steel wire rope.
Compared with the prior art, the beneficial effects of the utility model are that:
before carrying the beam column, the crane is in the state of sliding to the top, the supporting wheel is also in the top, when needs carry the beam column, peg graft afterburning arm on the inserted block of the lifting rope one end is kept away from to the supporting arm, increase the arm of force length of supporting arm, then the one end downward sloping that is close to the lifting rope with the supporting arm, and be connected the lifting hook of lifting rope bottom with the rope of tying up the beam column, swing the supporting arm to the horizontality through adding the arm of force, at this moment, the lifting rope is through the lifting hook with the beam column lift break away from ground, then slide the crane down, make the supporting wheel support with ground contact, carry out the stable support to the beam column through supporting wheel and locomotive, then break away from afterburning arm and plug in on the inserted block that the supporting arm is close to lifting rope one side, shorten the effective length of adding the arm of force, when the device bodily movement carries the beam column, afterburning arm can not form and shelter from, the device bodily movement, turn to comparatively nimble.
Drawings
FIG. 1 is a schematic structural view of a beam and column handling apparatus for municipal building construction;
FIG. 2 is a schematic view showing a state in which a beam and column handling apparatus for municipal building is handling a beam and column;
FIG. 3 is a schematic structural view of a crane in a beam column handling device for municipal building construction;
FIG. 4 is a schematic diagram of the opening position of a limiting jack in a beam-column conveying device for municipal house construction;
FIG. 5 is a schematic view showing a structure of a trolley in a beam and column carrying apparatus for municipal building;
fig. 6 is a schematic view of a state that a force applying arm and an insert block are connected in a beam column carrying device for municipal house construction.
In the figure: 1. a mobile vehicle; 11. a support shaft; 12. a traveling wheel; 13. a support; 2. a support arm; 21. inserting a block; 3. a lifting rope; 31. a hook; 4. a force application arm; 401. a slot; 5. a lifting frame; 51. a fixed tube; 52. a slide arm; 521. limiting the jacks; 53. a spacing pin; 54. a limiting plate; 6. and supporting the wheels.
Detailed Description
Referring to fig. 1 to 6, in an embodiment of the present invention, a beam column carrying device for municipal building includes:
the mobile vehicle 1 is used for moving the whole supporting device;
the supporting arm 2 is fixed at the top end of the moving vehicle 1;
the lifting rope 3 is fixed at one end of the supporting arm 2, and a lifting hook 31 is fixed at the bottom end of the lifting rope 3;
wherein, be connected with the arm of force 4 on the support arm 2, the one end that the arm of force 4 can be dismantled and connect and be close to the lifting rope 3 or keep away from the lifting rope 3 at support arm 2, and the crane 5 that is used for lift adjustment is installed to the one end that support arm 2 is close to lifting rope 3, and the bottom of crane 5 is rotated and is connected with the supporting wheel 6 that is used for the auxiliary stay.
In this embodiment, before carrying the beam column, the crane 5 is in a state of sliding to the top, the support wheel 6 is also in the top, when the beam column needs to be carried, the force application arm 4 is inserted into the insertion block 21 of the support arm 2 far away from one end of the lifting rope 3, the force arm length of the support arm 2 is increased, then one end of the support arm 2 close to the lifting rope 3 is inclined downwards (as shown in fig. 1), the hook 31 at the bottom end of the lifting rope 3 is connected with the rope binding the beam column, the support arm 2 is swung to the horizontal state through the force application arm 4, at this time, the lifting rope 3 lifts the beam column through the hook 31 to be separated from the ground, then the crane 5 slides downwards, so that the support wheel 6 is in contact with the ground to support the beam column, the beam column is stably supported through the support wheel 6 and the mobile vehicle 1, then the force application arm 4 is separated from and inserted into the insertion block 21 of the support arm 2 close to one side of the lifting rope 3 (as shown in fig. 2), the effective length of the force application arm 4 is shortened, when the device integrally moves the beam column, the force application arm 4 cannot be shielded, and the device integrally moves and the device can be turned flexibly.
In fig. 5: the locomotive 1 includes back shaft 11 and two walking wheels 12, and two walking wheels 12 rotate respectively and connect at the both ends of back shaft 11, and the intermediate position department of back shaft 11 is fixed with support 13, and support arm 2 is fixed on support 13 top, and two walking wheels 12 are connected through back shaft 11, and the device is whole to walk through walking wheel 12, and support 13 carries out the stable stay to support arm 2.
In fig. 1: the support 13 is V-shaped, the support arm 2 and the support 13 form a closed triangular support area, the triangular support effect is good, and the stability is high.
In fig. 1, 2 and 6: support arm 2 is close to the one end lateral wall of lifting rope 3 and is fixed with inserted block 21, the terminal surface that 3 one end of lifting rope was kept away from to support arm 2 also is fixed with inserted block 21, afterburning arm 4 can dismantle the one end of connecting at support arm 2 and being close to lifting rope 3 or keeping away from lifting rope 3 through inserted block 21, offer the slot 401 that corresponds with inserted block 21 on afterburning arm 4, afterburning arm 4 is pegged graft on inserted block 21 through slot 401, afterburning arm 4 switching position that can be nimble fast, the convenience of operation is improved.
In fig. 1, 2, 3 and 4: the lifting frame 5 comprises a fixed pipe 51, a sliding arm 52 and a limiting pin 53, the fixed pipe 51 is fixed on the end surface of the supporting arm 2, the sliding arm 52 is inserted into the inner wall of the fixed pipe 51 in a sliding mode, the supporting wheel 6 is connected to the bottom end of the sliding arm 52 in a rotating mode, limiting insertion holes 521 are formed in two ends of the fixed pipe 51, the limiting pin 53 is inserted into the limiting insertion hole 521 in one side, when the supporting wheel 6 needs to move upwards, the sliding arm 52 slides upwards along the fixed pipe 51 until the limiting insertion hole 521 in the lowest position slides to the upper portion of the fixed pipe 51, then the limiting pin 53 is inserted into the limiting insertion hole 521 in the lowest position to limit the sliding arm 52, when the supporting wheel 6 needs to slide downwards to be supported, the sliding arm 52 slides downwards along the fixed pipe 51 until the limiting insertion hole 521 in the highest position slides to the lower portion of the fixed pipe 51, then the limiting pin 53 is inserted into the limiting insertion hole 521 in the highest position to limit the sliding arm 52, the adjustment process is simple, and convenient operation is achieved.
In fig. 3 and 4: a stopper plate 54 for stopping the sliding arm 52 is fixed to the tip of the sliding arm 52, and the sliding arm 52 is stopped by the stopper plate 54 to prevent the sliding arm 52 from slipping off the fixed tube 51.
In fig. 1: the lifting rope 3 is a steel wire rope, has higher strength and good flexibility, and is convenient for flexible adjustment by personnel.
The utility model discloses a theory of operation is: before carrying the beam column, the lifting frame 5 is in a state of sliding to the top, the support wheel 6 is also positioned above, when the beam column needs to be carried, the stress application arm 4 is inserted into the insertion block 21 at one end of the support arm 2 far away from the lifting rope 3, the force arm length of the support arm 2 is increased, one end of the support arm 2 close to the lifting rope 3 is inclined downwards (as shown in figure 1), the hook 31 at the bottom end of the lifting rope 3 is connected with a rope binding the beam column, the support arm 2 is swung to the horizontal state through the force application arm 4, at the moment, the lifting rope 3 lifts the beam column through the hook 31 to be separated from the ground, the lifting frame 5 slides downwards, the support wheel 6 is in contact with the ground to support, the beam column is stably supported through the support wheel 6 and the moving vehicle 1, the force application arm 4 is separated from and inserted into the insertion block 21 at one side of the support arm 2 close to the lifting rope 3 (as shown in figure 2), the effective length of the force application arm 4 is shortened, when the device integrally moves and carries the beam column, the stress application arm 4 cannot form a shielding effect that the device integrally moves and the device can be turned flexibly.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a beam column handling device that municipal administration room was built and was used which characterized in that includes:
the moving vehicle (1) is used for moving the whole supporting device;
the supporting arm (2) is fixed at the top end of the moving vehicle (1);
the lifting rope (3) is fixed at one end of the supporting arm (2), and a lifting hook (31) is fixed at the bottom end of the lifting rope (3);
wherein, be connected with the arm of force (4) on support arm (2), the connection can be dismantled in the arm of force (4) support arm (2) are close to lifting rope (3) or keep away from the one end of lifting rope (3), support arm (2) are close to lifting rope (3)'s one end is installed and is used for lift adjustment's crane (5), the bottom of crane (5) is rotated and is connected with supporting wheel (6) that are used for the auxiliary stay.
2. The beam column carrying device for the municipal building according to claim 1, wherein the moving vehicle (1) comprises a support shaft (11) and two walking wheels (12), the two walking wheels (12) are respectively and rotatably connected to two ends of the support shaft (11), a support (13) is fixed to the middle of the support shaft (11), and the support arm (2) is fixed to the top end of the support (13).
3. A device for handling beams and columns for civil building according to claim 2, characterized in that the said support (13) is V-shaped, the said support arm (2) and the said support (13) forming a closed triangular support area.
4. The beam column carrying device for the municipal building according to claim 1, wherein an insert block (21) is fixed to a side wall of one end, close to the lifting rope (3), of the support arm (2), an insert block (21) is fixed to an end face, far away from one end of the lifting rope (3), of the support arm (2), the force applying arm (4) is detachably connected to one end, close to the lifting rope (3) or far away from the lifting rope (3), of the support arm (2) through the insert block (21), a slot (401) corresponding to the insert block (21) is formed in the force applying arm (4), and the force applying arm (4) is connected to the insert block (21) through the slot (401).
5. The beam column carrying device for the municipal building according to claim 1, wherein the lifting frame (5) comprises a fixed pipe (51), a sliding arm (52) and a limit pin (53), the fixed pipe (51) is fixed on the end surface of the support arm (2), the sliding arm (52) is inserted into the inner wall of the fixed pipe (51) in a sliding manner, the support wheel (6) is rotatably connected to the bottom end of the sliding arm (52), limit insertion holes (521) are formed in both ends of the fixed pipe (51), and the limit pin (53) is inserted into the limit insertion hole (521) on one side.
6. The device for carrying beams and columns for municipal house construction according to claim 5, characterized in that the top of the sliding arm (52) is fixed with a stop plate (54) for limiting.
7. The beam and column carrying device for municipal house construction according to claim 1, wherein the lifting rope (3) is a steel wire rope.
CN202222511456.7U 2022-09-21 2022-09-21 Beam column handling device of usefulness is built in municipal administration room Active CN218261558U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222511456.7U CN218261558U (en) 2022-09-21 2022-09-21 Beam column handling device of usefulness is built in municipal administration room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222511456.7U CN218261558U (en) 2022-09-21 2022-09-21 Beam column handling device of usefulness is built in municipal administration room

Publications (1)

Publication Number Publication Date
CN218261558U true CN218261558U (en) 2023-01-10

Family

ID=84714962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222511456.7U Active CN218261558U (en) 2022-09-21 2022-09-21 Beam column handling device of usefulness is built in municipal administration room

Country Status (1)

Country Link
CN (1) CN218261558U (en)

Similar Documents

Publication Publication Date Title
CN107990051B (en) It is a kind of to lift auxiliary device and method in place for jacking pipe joints
CN108118950A (en) A kind of double electric pole stringers of standardized Substation rack
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN214326960U (en) Indoor equipment for existing high-rise building hoisting large-scale device
CN218261558U (en) Beam column handling device of usefulness is built in municipal administration room
CN207348480U (en) High-order structural glass erecting device
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN110240075B (en) Plug borer device
CN215978530U (en) Steel beam sliding installation device
CN206941414U (en) The Bridge Erector of the whole two-way erection in hole on a kind of asymmetric framing prefabricated case beam beam of achievable large-tonnage
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN109516409A (en) Flooring construction tower crane turns device for hoisting
CN101264848A (en) Cargo hoister for building
CN208686396U (en) Tunnel inverted arch trestle walking rack
CN215798013U (en) Reinforced concrete roof truss beam conveyor in hole
CN206129292U (en) Novel landing stage platform truck
CN206033062U (en) Shield constructs machine assembly and slags tap dual -purpose portal crane
CN205531262U (en) Steel construction construction platform can rise automatically
CN205151579U (en) Two horizontal arm hoists
CN215101591U (en) A shield constructs quick-witted hoisting structure for secretly dig construction
JPH092780A (en) Jib-type traveling crane provided with jack up device
CN212471370U (en) Construction machinery equipment maintenance platform
CN204917755U (en) Tunnel is leading supports hoisting machine from formula of moving
CN207660271U (en) The movable pulley of movable units supporting rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant