CN205151579U - Two horizontal arm hoists - Google Patents

Two horizontal arm hoists Download PDF

Info

Publication number
CN205151579U
CN205151579U CN201520777322.7U CN201520777322U CN205151579U CN 205151579 U CN205151579 U CN 205151579U CN 201520777322 U CN201520777322 U CN 201520777322U CN 205151579 U CN205151579 U CN 205151579U
Authority
CN
China
Prior art keywords
arm
tower
basis
crane
covers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520777322.7U
Other languages
Chinese (zh)
Inventor
王建军
米成宏
郑怀鹏
周雪丰
汤争争
侯万里
李岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Construction Machinery Group Co Ltd XCMG
Original Assignee
Xuzhou Construction Machinery Group Co Ltd XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Construction Machinery Group Co Ltd XCMG filed Critical Xuzhou Construction Machinery Group Co Ltd XCMG
Priority to CN201520777322.7U priority Critical patent/CN205151579U/en
Application granted granted Critical
Publication of CN205151579U publication Critical patent/CN205151579U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a two horizontal arm hoists, including the body of the tower, the basis, control and monitored control system, hoisting mechanism, the jib loading boom, the flexibility of moving about is adhered to and is turned around the assembly, the body of the tower bottom is connected with the basis, the jib loading boom has two sets, bilateral symmetry's setting is in the both sides of body of the tower, hoisting mechanism has two sets, all set up subaerial, the crossing the rope sheave roof beam and will play to rise wire rope and be connected with the jib loading boom of universal wheel and the body of the tower upper portion of hoisting mechanism on through the basis, the setting of gyration assembly lies in the jib loading boom below on the body of the tower, the jib loading boom is connected with the top of the tower through flexible pull rod, control and monitored control system are connected with the hoisting mechanism electricity. Have two sets and independent rise to rise and luffing system, and by same operating system centralized control, the event is nimble bilateral synchronous, asynchronous operation, the improvement work efficiency of realizing as required, jib loading boom symmetrical arrangement and operation simultaneously can obtain higher operating efficiency to being the centrosymmetric engineering construction structure.

Description

Double horizontal arm hoisting crane
Technical field
The utility model relates to a kind of hoisting crane, particularly relates to a kind of double horizontal arm hoisting crane.
Background technology
Along with the development that National Industrial is built, various places start the heavy construction structure occurring the hollow symmetrical such as some large-scale chimney, high-voltage power transmission tower, large cooling columns.These engineering structures often lack the preparation of construction of specialty when constructing, all utilize existing tower machine to carry out operation, in existing tower machine technology, construction for large-scale hollow symmetrical structure has the following disadvantages: the operation while that the feature that generally cannot adapt to symmetrical structure realizing bilateral, operating efficiency is lower; For the engineering structure that upper space is narrow and small, general tower machine cannot realize can only standing on building side from dismounting, and needs of thus having to install larger erecting equipment to meet larger boom length and to play lifting moment; Foundation for tower crane is generally concrete pouring structure, damages and be difficult to realize transition and repeated usage to place.
Summary of the invention
For above-mentioned prior art Problems existing, the utility model provides a kind of double horizontal arm hoisting crane, can bilateral while operation, efficiency is high.
To achieve these goals, the technical solution adopted in the utility model is: a kind of double horizontal arm hoisting crane, comprise tower body, basis, control and monitored control system, lifting mechanism, crane arm, travelling Upon Flexible Adhesion and rotating assembly, be connected with basis bottom tower body, crane arm has two covers, the symmetrical both sides being arranged on tower body, lifting mechanism has two covers, all arrange on the ground, hoist rope is connected with crane arm by the rope sheave beam of crossing on the cardan wheel on basis and tower body top by lifting mechanism, rotating assembly is arranged on tower body and is positioned at below crane arm, crane arm is connected with tower top by flexible draw bar, control and monitored control system are electrically connected with lifting mechanism.
Further, described basis is combined into by some fritters and assembled underframe.
Further, two described cover cargo boom ends are respectively arranged with receives arm train.
Further, two described cover crane arms have the train that independently hoists, luffing train, loading trolley and suspension hook separately.
Further, described tower top bottom is provided with two covers and hoists guiding train, and is furnished with moment and elevating weight detecting device, and top is provided with two covers and receives arm trains.
Further, described control and monitored control system are arranged on the ground.
The beneficial effects of the utility model are: have two covers and independently hoist and changing-breadth system, and by same operating system centralized control, therefore bilateral synchronous, asynchronous operation can be realized flexibly as required, increase work efficiency; Crane arm is arranged symmetrically with and can simultaneously operation, can obtain higher operating efficiency for the engineering construction structure be centrosymmetric; Basis is pin-connected panel, and can recycle and facilitate transition and destroy little to Active workings, and not need pre-cast concrete, it is short that equipment installs the preparatory period; Flexible draw bar, can supporting that crane arm closes up, and be configured with space-saving dolly and platform, can obtain less working space when tearing tower open, improves this tower machine to the comformability of engineering construction structure.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is that crane arm closes up schematic diagram;
In figure: 1, tower body, 2, basis, 3, control and monitored control system, 4, lifting mechanism, 5, crane arm, 6, flexible draw bar, 7, tower top, 8, travelling Upon Flexible Adhesion, 9, rotating assembly.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, this double horizontal arm hoisting crane, comprise tower body 1, basis 2, control and monitored control system 3, lifting mechanism 4, crane arm 5, travelling Upon Flexible Adhesion 8 and rotating assembly 9, control and monitored control system 3 are placed in ground, substantially increase the safety of operation, travelling Upon Flexible Adhesion 8 freely up and down can be moved about with tower body 1, and attachment frame is fixed by flexible cable with surrounding buildings, not only can realize the attachment support of tower body 1 but also can ensure the free jacking of tower machine and decline;
Be connected with basis 2 bottom tower body 1, crane arm 5 has two covers, the symmetrical both sides being arranged on tower body 1, lifting mechanism 4 has two covers, all arrange on the ground, hoist rope is connected with crane arm 5 by the rope sheave beam of crossing on the cardan wheel on basis 2 and tower body 1 top by lifting mechanism 4, rotating assembly 9 is arranged on tower body 1 and is positioned at below crane arm 5, crane arm 5 is connected with tower top 7 by flexible draw bar 6, control and monitored control system 3 are electrically connected with lifting mechanism 4, and crane arm 5, tower top 7, rotating assembly 9 are electrically connected with control and monitored control system 3.
Basis 2 is combined into by some fritters and assembled underframe, can repeated usage, and equipment is shown up after Land leveling and can be installed and used, and it is short to install the preparatory period.
As shown in Figure 2, two cover crane arm 5 arm ends are respectively arranged with receives arm train, when tearing tower open, crane arm 5 can be closed up, two cover crane arms 5 have the train that independently hoists, luffing train, loading trolley and suspension hook separately, control and monitored control system 3 control under can realize two crane arm 5 and to link operation and separate operaton, to control and monitored control system 3 has the function such as monolateral, double-side torque monitoring, hoisting capacity monitoring, double-side torque difference monitoring, air monitoring work data storage.
Tower top 7 bottom is provided with two covers and hoists guiding train, and is furnished with moment and elevating weight detecting device, and top is provided with two covers and receives arm trains, crane arm 5 end can be coordinated to receive arm train and closed up by crane arm 5.
Rotating assembly 9 is made up of slewing tower, upper bracket, undersetting, pivoting support, swing type mechanism, upper brace, for connecting tower body 1, crane arm 5 and tower top 7, and arrange necessary electrical control cabinet etc., rotating assembly 9 upper brace is that space-saving is walked on stage, be characterized as edge chamfer of walking on stage, reduce platform size, the upper space after saving tower machine closes up.

Claims (6)

1. a double horizontal arm hoisting crane, comprise tower body (1), basis (2), control and monitored control system (3), lifting mechanism (4), crane arm (5), travelling Upon Flexible Adhesion (8) and rotating assembly (9), tower body (1) bottom is connected with basis (2), it is characterized in that, crane arm (5) has two covers, the symmetrical both sides being arranged on tower body (1), lifting mechanism (4) has two covers, all arrange on the ground, hoist rope is connected with crane arm (5) by the rope sheave beam of crossing on the cardan wheel on basis (2) and tower body (1) top by lifting mechanism (4), rotating assembly (9) is arranged on tower body (1) and is positioned at crane arm (5) below, crane arm (5) is connected with tower top (7) by flexible draw bar (6), control and monitored control system (3) are electrically connected with lifting mechanism (4).
2. a kind of double horizontal arm hoisting crane according to claim 1, is characterized in that, described basis (2) is combined into by some fritters and assembled underframe.
3. a kind of double horizontal arm hoisting crane according to claim 1, is characterized in that, two described cover crane arm (5) arm ends are respectively arranged with receives arm train.
4. a kind of double horizontal arm hoisting crane according to claim 3, is characterized in that, two described covers crane arm (5) have the train that independently hoists, luffing train, loading trolley and suspension hook separately.
5. a kind of double horizontal arm hoisting crane according to claim 4, is characterized in that, described tower top (7) bottom is provided with two covers and hoists guiding train, and is furnished with moment and elevating weight detecting device, and top is provided with two covers and receives arm trains.
6. a kind of double horizontal arm hoisting crane according to claim 1, is characterized in that, described control and monitored control system (3) are arranged on the ground.
CN201520777322.7U 2015-10-09 2015-10-09 Two horizontal arm hoists Active CN205151579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520777322.7U CN205151579U (en) 2015-10-09 2015-10-09 Two horizontal arm hoists

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520777322.7U CN205151579U (en) 2015-10-09 2015-10-09 Two horizontal arm hoists

Publications (1)

Publication Number Publication Date
CN205151579U true CN205151579U (en) 2016-04-13

Family

ID=55687295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520777322.7U Active CN205151579U (en) 2015-10-09 2015-10-09 Two horizontal arm hoists

Country Status (1)

Country Link
CN (1) CN205151579U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105271009A (en) * 2015-10-09 2016-01-27 徐州建机工程机械有限公司 Double-horizontal-boom crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105271009A (en) * 2015-10-09 2016-01-27 徐州建机工程机械有限公司 Double-horizontal-boom crane

Similar Documents

Publication Publication Date Title
CN101734560B (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN204281108U (en) A kind of transfer crane
CN103848360B (en) A kind of group tower tower crane being provided with packaged type balance weight system
CN203728443U (en) Combined tower crane with main and auxiliary boom structure
CN103832933B (en) A kind of group tower tower crane with auxiliary
CN211226089U (en) Continuous jacking and joint adding operation mechanism of tower crane
CN204342297U (en) A kind of transfer crane with jib structure
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN204588550U (en) A kind of lifting mechanism inhead type lands electric power pole
CN203474311U (en) Insulating boom hoist
CN205151579U (en) Two horizontal arm hoists
CN202744232U (en) Tower crane long suspension arm lifting steel rope supporting device
CN103434944A (en) Insulation arm crane
CN105271009A (en) Double-horizontal-boom crane
CN206735669U (en) Safety rotating formula builds loop wheel machine
CN202729645U (en) Tower crane with elevator
CN205312920U (en) Small -size tower machine
CN201645413U (en) Simple gin-pole mechanism for demolishing internal climbing tower crane
CN104355238A (en) Portal crane with jib structure
CN204251234U (en) For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance
CN208135763U (en) Assembled architecture equipment boom hoisting
CN205419582U (en) Floor hoist
CN201660377U (en) Special gantry crane for overlength and large-tonnage parts
CN204297984U (en) Syllogic arm crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant