CN218234298U - Scaffold connecting structure for constructional engineering - Google Patents

Scaffold connecting structure for constructional engineering Download PDF

Info

Publication number
CN218234298U
CN218234298U CN202222578882.2U CN202222578882U CN218234298U CN 218234298 U CN218234298 U CN 218234298U CN 202222578882 U CN202222578882 U CN 202222578882U CN 218234298 U CN218234298 U CN 218234298U
Authority
CN
China
Prior art keywords
buckle
plate
block
fixedly connected
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222578882.2U
Other languages
Chinese (zh)
Inventor
钱海波
陆海锋
童小龙
耿哲
董毓广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tonghe Construction Technology Co ltd
Original Assignee
Shanghai Tonghe Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tonghe Construction Technology Co ltd filed Critical Shanghai Tonghe Construction Technology Co ltd
Priority to CN202222578882.2U priority Critical patent/CN218234298U/en
Application granted granted Critical
Publication of CN218234298U publication Critical patent/CN218234298U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to the technical field of scaffold connection installation, a scaffold connection structure for building engineering is disclosed, including the scaffold steel pipe, first buckle has been cup jointed to the outside symmetry of scaffold steel pipe, and the bottom face fixedly connected with backing plate of first buckle, connect through second fixed establishment between two first buckles, the second buckle has been cup jointed to the outside symmetry of two first buckles, the inside of inserted bar is provided with second spring and second gag lever post, the left end fixedly connected with limiting plate of inserted bar, first fixed establishment includes second buckle outside symmetry fixed connection's fixed block, first jack has been seted up to the symmetry on the fixed block, the inside of first jack is inserted and is equipped with the U template, the inside of U template is provided with first spring and first gag lever post, the outside fixedly connected with annular block of first buckle, the ring channel has been seted up to the internal surface of second buckle, the prior art is not convenient for follow-up effect of dismantling the base of pad to this application, the problem of dismantlement efficiency has been reduced.

Description

Scaffold connecting structure for constructional engineering
Technical Field
The application relates to the technical field of scaffold connection and installation, in particular to a scaffold connection structure for constructional engineering.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation activities of lines, pipelines and equipment matched with the building constructions, and the scaffold is a working platform which is set up for ensuring the smooth proceeding of each construction process, and the connection structure for the scaffold in the prior art still has certain problems, such as:
publication (announcement) No. CN217268779U discloses a scaffold connecting structure convenient for connection and fixation, which includes a buckle plate, a connecting plate is arranged on the surface of the buckle plate, and a preformed hole is formed on the surface of the connecting plate; the installation structure comprises a base plate and a fastening plate, wherein the base plate is arranged at the bottom end of the fastening plate, reinforcing rib plates are arranged on the surface of the base plate, the reinforcing rib plates are 8230, the fastening plate is installed on the outer side of a scaffold upright post by bolts, and after the installation is completed, the scaffold upright post can move downwards when being stressed, so that the bolts connecting the fastening plate and the scaffold upright post can be damaged, the subsequent detachment of a cushion seat is inconvenient, and the detachment efficiency is reduced.
In order to solve the above problems, the present application provides a scaffold connection structure for construction engineering.
SUMMERY OF THE UTILITY MODEL
The application provides the following technical scheme: the utility model provides a scaffold connection structure for building engineering, includes the scaffold steel pipe, the outside symmetry of scaffold steel pipe has cup jointed first buckle, and the bottom face fixedly connected with backing plate of first buckle, two connect through second fixed establishment between the first buckle, two the outside symmetry of first buckle has cup jointed the second buckle, two connect through first fixed establishment between the second buckle, second fixed establishment includes first arc piece and second arc piece, the first arc piece of the first buckle outside symmetry fixedly connected with of scaffold steel pipe left, the first buckle outside symmetry fixedly connected with second arc piece on scaffold steel pipe right side, the relative side difference first rectangle piece of fixedly connected with and the second rectangle piece of first arc piece and second arc piece, all seted up the second jack on first arc piece, second rectangle piece and the second arc piece, the inside of second jack is inserted and is equipped with the inserted bar, the inside of inserted bar is provided with second spring and second gag lever arm, the left end fixedly connected with limiting plate of inserted bar, the first fixed establishment includes that the second buckle outside fixed establishment has all seted up the second jack, the inside symmetry of the connection of first buckle is provided with the first jack and the first jack, the inside fixed block of first buckle is provided with the limiting plate, the U-shaped fixing block of first jack, the U-shaped plate, the inside fixed plate is provided with the second jack, the first jack, the U-shaped plate is provided with the inside fixed block of the U-shaped plate, the first jack, the U-shaped plate is provided with the first jack, the limiting plate, the U-shaped plate is provided with the limiting plate, the U-shaped plate is provided with the U-shaped plate, the U-shaped plate is provided with the limiting plate.
Through above-mentioned technical scheme, solved prior art and be not convenient for follow-up effect of dismantling the cushion, reduced the problem of dismantling efficiency.
Furthermore, a second groove is symmetrically formed in the outer portion of the inserted rod, one end of the second spring is fixedly connected with the inner bottom wall of the second groove, the other end of the second spring is fixedly connected with the second limiting rod, and one end, far away from the second spring, of the second limiting rod extends to the outer portion of the inserted rod.
Through above-mentioned technical scheme, it is convenient to connect two first buckles fixedly.
Furthermore, first recess has been seted up to the outside symmetry of U template, the one end of first spring and the interior diapire fixed connection of first recess, and the other end and the first gag lever post fixed connection of first spring, and the one end that first spring was kept away from to first gag lever post extends to the outside of U template.
Through the technical scheme, the two second buckling plates are conveniently and fixedly connected.
Furthermore, a third inserting hole is symmetrically formed in the outer surface of the first buckling plate, and an inserting block is symmetrically and fixedly connected to the inner surface of the second buckling plate.
Through above-mentioned technical scheme, with further being connected spacing between second buckle and the first buckle, avoid the second buckle to rotate in the outside of first buckle.
Further, the inner diameter of the base plate is smaller than that of the first buckling plate, and the bottom end face of the scaffold steel pipe is abutted to the top end face of the base plate.
Through the technical scheme, the effect of carrying the bottom of the scaffold steel pipe is achieved.
Furthermore, the backing plate is symmetrically provided with four mounting holes.
Through above-mentioned technical scheme, utilize ground connection expansion pipe to pass the mounting hole, fix the backing plate subaerial.
Furthermore, one side of the limiting plate close to the first arc-shaped block is abutted to the outer surface of the first arc-shaped block, and the inner side wall of the U-shaped plate is abutted to the outer surface of the fixed block.
To sum up, the application comprises the following beneficial technical effects:
1. this application utilizes the effect of first fixed establishment, second fixed establishment, two first buckles and two second buckles to form the strutting to scaffold steel pipe bottom, forms the fixed effect of secondary, has promoted the bottom of pad seat to scaffold steel pipe and has strutted the effect, can not receive scaffold steel pipe torsional influence simultaneously, and then can not cause the damage to U template and inserted bar, and convenient follow-up dismantlement to the pad seat is changed.
2. Extend to the inside that the outside part of U template was pressed first recess with first gag lever post, first spring is the quilt and is pressed the shrink this moment, then push up the U template backward, take the inside of first jack out the U template, thereby can remove the spacing fixed to two fixed blocks, can separate two second buckles, then press the inside of second recess with the second gag lever post again, the second spring is pressed the shrink this moment, then the inserted bar is taken out to the left side top, take out the inserted bar from the inside of second jack, thereby remove the connection between two first buckles, can dismantle two first buckles from the outside of scaffold steel pipe, be convenient for dismantle the change to first buckle and backing plate.
Drawings
FIG. 1 is a schematic structural diagram of the present application;
FIG. 2 is a partial schematic structural view of the present application;
FIG. 3 is a schematic structural view of a second securing mechanism of the present application;
FIG. 4 is a top cross-sectional view of the plunger of the present application;
FIG. 5 is a schematic view of the ring block and third receptacle configuration of the present application;
FIG. 6 is a cross-sectional view of a second gusset of the subject application;
figure 7 is a side cross-sectional view of a U-shaped plate of the present application.
The reference numbers in the figures illustrate:
1. scaffold steel pipes; 2. a first buckle plate; 21. a ring block; 22. a third jack; 3. a first fixing mechanism; 31. a fixed block; 32. a first jack; 33. a U-shaped plate; 34. a first limit rod; 35. a first groove; 36. a first spring; 4. mounting holes; 5. a second buckle plate; 51. inserting a block; 52. an annular groove; 6. a base plate; 7. a second fixing mechanism; 71. a first arc-shaped block; 72. a first rectangular block; 73. a second rectangular block; 74. a second arc-shaped block; 75. a second jack; 76. a second spring; 77. inserting a rod; 771. a second groove; 78. a limiting plate; 79. a second limiting rod.
Detailed Description
The technical solution in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application; it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all embodiments, and all other embodiments obtained by those of ordinary skill in the art without any inventive work based on the embodiments in the present application belong to the protection scope of the present application.
In the description of the present application, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present application. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present application, it should be noted that, unless otherwise explicitly stated or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like, are to be interpreted broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood in a specific case by those of ordinary skill in the art.
Example (b):
referring to fig. 1, 2, 3, 4, 5, 6 and 7, an embodiment of the present application discloses a scaffold connecting structure for building engineering, including a scaffold steel pipe 1, first buckle plates 2 are symmetrically sleeved on the outer sides of the scaffold steel pipe 1, a backing plate 6 is fixedly connected to the bottom end face of the first buckle plate 2, the two first buckle plates 2 are connected through a second fixing mechanism 7, second buckle plates 5 are symmetrically sleeved on the outer sides of the two first buckle plates 2, the two second buckle plates 5 are connected through a first fixing mechanism 3, the second fixing mechanism 7 includes a first arc-shaped block 71 and a second arc-shaped block 74, the first arc-shaped block 71 is symmetrically and fixedly connected to the outer side of the first buckle plate 2 on the left side of the scaffold steel pipe 1, the first arc-shaped block 71 is in an "L" shape structure, the first arc-shaped block 71 and the first rectangular block 72 can bear the weight of the second rectangular block 73 and the second arc-shaped block 74, so that the two first arc-shaped blocks 2 move downward when being under pressure, the first arc-shaped block 71 and the second arc-shaped block 73 and the second rectangular block 72 are connected to a spring insert hole 77, a retaining plate 77 is provided on the inner side of the second buckle plate, a second rectangular bar 75 is provided with a second rectangular bar 75, the second rectangular bar 75 and a second rectangular bar 75, the second insert 7 are respectively, the first fixing mechanism 3 comprises fixing blocks 31 which are symmetrically and fixedly connected with the outer side of the second buckling plate 5, first inserting holes 32 are symmetrically formed in the fixing blocks 31, a U-shaped plate 33 is inserted into the first inserting holes 32, a first spring 36 and a first limiting rod 34 are arranged inside the U-shaped plate 33, a ring-shaped block 21 is fixedly connected to the outer side of the first buckling plate 2, and a ring-shaped groove 52 is formed in the inner surface of the second buckling plate 5. The first fixing mechanism 3 and the two second buckling plates 5 are used for fixing the two first buckling plates 2 again, so that when the scaffold steel pipe 1 is subjected to left and right torsion, the first fixing mechanism 3 and the two second buckling plates 5 are matched to fix the two first buckling plates 2 again, and the two first buckling plates 2 can be prevented from being skewed and separated due to the left and right torsion of the scaffold steel pipe 1; simultaneously when receiving scaffold steel pipe 1 fore-and-aft torsion, because two second buckle 5 again with two first buckle 2 fixed actions, the limiting displacement of deuterogamy annular piece 21 and ring channel 52, the effect of inserted block 51 and third jack 22 also can not make two first buckle 2 receive scaffold steel pipe 1 fore-and-aft torsion and crooked separation, and then can not cause the damage to U template 33 and inserted bar 77, convenient follow-up change to the base, the base is strutted the effect to scaffold steel pipe 1's bottom to the while also promoted the base.
Referring to fig. 1, 2, 3, 4, 6 and 7, the outer portion of the inserting rod 77 is symmetrically provided with second grooves 771, one end of the second spring 76 is fixedly connected with the inner bottom wall of the second groove 771, the other end of the second spring 76 is fixedly connected with the second limiting rod 79, and one end of the second limiting rod 79 far away from the second spring 76 extends to the outer portion of the inserting rod 77, when the first buckle plate 2 is installed, the two first buckle plates 2 cover the outer side of the scaffold steel tube 1, the second rectangular block 73 and the second arc-shaped block 74 are arranged on the top of the first arc-shaped block 71 and the first rectangular block 72, the second limiting rod 79 is pressed into the second groove 771, at this time, the second spring 76 is pressed to be in a contracted state, then the inserting rod 77 is inserted into the inner portion of the second inserting hole 75, when the limiting plate 78 is abutted against the outer surface of the first arc-shaped block 71, second spring 76 resets, second gag lever post 79 pops out, thereby accomplish the installation work of two first buckle 2, then correspond inserted block 51 and third jack 22, make inserted block 51 insert the inside of third jack 22, with the cladding of second buckle 5 in the outside of two first buckle 2, further consolidate two first buckle 2, ring channel 52 also can the cladding in the outside of ring channel 21 simultaneously, then press first gag lever post 34 to the inside of first recess 35, first spring 36 is the shrink state by the extrusion this moment, then insert the inside of first jack 32 with U-shaped board 33, when the medial surface of U-shaped board 33 and the lateral surface butt of fixed block 31, first spring 36 resets, first gag lever post 34 pops out, and then realize the limiting displacement to two fixed blocks 31, accomplish the erection joint of two second buckle 5.
Referring to fig. 1, 2, 3, 4, 6 and 7, the first grooves 35 are symmetrically formed on the outer portion of the U-shaped plate 33, one end of the first spring 36 is fixedly connected to the inner bottom wall of the first groove 35, the other end of the first spring 36 is fixedly connected to the first stopper rod 34, and one end of the first stopper rod 34, which is far away from the first spring 36, extends to the outer portion of the U-shaped plate 33, when the base needs to be removed and replaced, the portion of the first stopper rod 34 extending to the outer portion of the U-shaped plate 33 is pressed into the first groove 35, at this time, the first spring 36 is compressed and contracted, and then the U-shaped plate 33 is pushed backwards, the U-shaped plate 33 is pulled out of the inner portion of the first insertion hole 32, so that the fixing of the two fixing blocks 31 can be released, the two second clip plates 5 can be separated, then the second stopper rod 79 is pressed into the inner portion of the second groove 771, at this time, the second spring 76 is compressed and contracted, then the insertion rod 77 is pushed leftwards, the insertion rod 77 is pulled out of the second insertion hole 75, so that the connection between the two first clip plates 2 can be removed, and the first clip plate 2 can be conveniently removed from the scaffold, and the first clip plate 2 can be removed from the scaffold.
Referring to fig. 5 and 6, the outer surface of the first buckle plate 2 is symmetrically provided with third insertion holes 22, the inner surface of the second buckle plate 5 is symmetrically and fixedly connected with insertion blocks 51, and the second buckle plate 5 is further connected with the first buckle plate 2 for limiting, so that the second buckle plate 5 is prevented from rotating on the outer side of the first buckle plate 2.
Referring to fig. 2, the inner diameter of the backing plate 6 is smaller than the inner diameter of the first buckle plate 2, and the bottom end face of the scaffold steel tube 1 abuts against the top end face of the backing plate 6, so as to support the bottom of the scaffold steel tube 1.
Referring to fig. 1, the backing plate 6 is symmetrically provided with four mounting holes 4, and the backing plate 6 is fixed on the ground by penetrating the mounting holes 4 through the ground expansion pipes.
Referring to fig. 1, 2 and 3, one side of the limiting plate 78 close to the first arc-shaped block 71 abuts against the outer surface of the first arc-shaped block 71, the second limiting rod 79 abuts against an opposite side of the second arc-shaped block 74, the inner side wall of the U-shaped plate 33 abuts against the outer surface of the fixing block 31, and the first limiting rod 34 abuts against an opposite side of the fixing block 31.
The implementation principle of the embodiment of the application is as follows: because the effect of first fixed establishment 3 cooperation second fixed establishment 7 can not cause the damage to inserted bar 77 and U template 33, and then be convenient for dismantle the change to the pad seat, it is concrete, when dismantling the pad seat, press the inside of first recess 35 with the outside part that extends to U template 33 with first gag lever post 34, first spring 36 is the shrink by being pressed this moment, then jack U template 33 backward, take the inside of first jack 32 out with U template 33, thereby can relieve the spacing fixed to two fixed blocks 31, can separate two second buckle 5, then press second gag lever post 79 to the inside of second recess 771, second spring 76 is the shrink by being pressed this moment, then jack inserted bar 77 to the left side, take inserted bar 77 out from the inside of second jack 75, thereby relieve the connection between two first buckle 2, can dismantle two first buckle 2 from the outside of scaffold steel pipe 1, be convenient for dismantle the change to first buckle 2 and backing plate 6.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (7)

1. A scaffold connection structure for building engineering, includes scaffold steel pipe (1), its characterized in that: the outer side of the scaffold steel pipe (1) is symmetrically sleeved with a first buckle plate (2), a base plate (6) is fixedly connected to the bottom end face of the first buckle plate (2), the two first buckle plates (2) are connected through a second fixing mechanism (7), the two outer side of the first buckle plate (2) is symmetrically sleeved with a second buckle plate (5), the two second buckle plates (5) are connected through a first fixing mechanism (3), the second fixing mechanism (7) comprises a first arc-shaped block (71) and a second arc-shaped block (74), a first arc-shaped block (71) is symmetrically and fixedly connected to the outer side of the first buckle plate (2) on the left side of the scaffold steel pipe (1), a second arc-shaped block (74) is symmetrically and fixedly connected to the outer side of the first buckle plate (2) on the right side of the scaffold steel pipe (1), a first rectangular block (72) and a second rectangular block (73) are fixedly connected to opposite side faces of the first arc-shaped block (71) and the second arc-shaped block (74), a second rectangular block (77) is fixedly connected to an inner inserting rod (77), and a second inserting rod (77) is fixedly connected to the inner side of the first arc-inserting block (71), first fixed establishment (3) include second buckle (5) outside symmetry fixed connection's fixed block (31), first jack (32) have been seted up to the symmetry on fixed block (31), and the inside of first jack (32) is inserted and is equipped with U template (33), the inside of U template (33) is provided with first spring (36) and first gag lever post (34), outside fixedly connected with ring block (21) of first buckle (2), ring channel (52) have been seted up to the internal surface of second buckle (5).
2. A scaffolding connecting structure for construction work as claimed in claim 1, wherein: second recess (771) have been seted up to inserted bar (77) outside symmetry, the one end of second spring (76) and the interior diapire fixed connection of second recess (771), and the other end and second gag lever post (79) fixed connection of second spring (76), and second gag lever post (79) keep away from the one end of second spring (76) and extend to the outside of inserted bar (77).
3. A scaffolding connecting structure for construction work as claimed in claim 1, wherein: first recess (35) have been seted up to the outside symmetry of U template (33), the one end of first spring (36) and the interior diapire fixed connection of first recess (35), and the other end and first gag lever post (34) fixed connection of first spring (36), and first gag lever post (34) keep away from the one end of first spring (36) and extend to the outside of U template (33).
4. A scaffolding coupler structure for building engineering according to claim 1, wherein: third jacks (22) are symmetrically formed in the outer surface of the first buckle plate (2), and inserting blocks (51) are symmetrically and fixedly connected to the inner surface of the second buckle plate (5).
5. A scaffolding connecting structure for construction work as claimed in claim 1, wherein: the inner diameter of the backing plate (6) is smaller than that of the first buckling plate (2), and the bottom end face of the scaffold steel pipe (1) is abutted to the top end face of the backing plate (6).
6. A scaffolding coupler structure for building engineering according to claim 1, wherein: the base plate (6) is symmetrically provided with four mounting holes (4), and the number of the mounting holes (4) is four.
7. A scaffolding connecting structure for construction work as claimed in claim 1, wherein: one side of the limiting plate (78) close to the first arc-shaped block (71) is abutted to the outer surface of the first arc-shaped block (71), and the inner side wall of the U-shaped plate (33) is abutted to the outer surface of the fixing block (31).
CN202222578882.2U 2022-09-28 2022-09-28 Scaffold connecting structure for constructional engineering Active CN218234298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222578882.2U CN218234298U (en) 2022-09-28 2022-09-28 Scaffold connecting structure for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222578882.2U CN218234298U (en) 2022-09-28 2022-09-28 Scaffold connecting structure for constructional engineering

Publications (1)

Publication Number Publication Date
CN218234298U true CN218234298U (en) 2023-01-06

Family

ID=84668020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222578882.2U Active CN218234298U (en) 2022-09-28 2022-09-28 Scaffold connecting structure for constructional engineering

Country Status (1)

Country Link
CN (1) CN218234298U (en)

Similar Documents

Publication Publication Date Title
CN108824807B (en) A kind of building form connection clip
CN212478126U (en) Former bamboo beam column connected node based on novel hoop spare
CN218234298U (en) Scaffold connecting structure for constructional engineering
CN210422618U (en) Supporting structure of trenchless pipeline repairing operation well
JP4936085B2 (en) Construction structure of rod-shaped member
CN216865118U (en) High-strength concrete pipe pile
CN214834778U (en) Beam formwork supporting device
CN213929717U (en) Pipeline supports reinforcing apparatus for coal-fired combustor
CN215107223U (en) Firm in connection's scaffold frame shore
CN213572954U (en) Gable external scaffolding counterfort structure with adjustable pre-buried formula
KR20060061739A (en) Device and method for concrete pile accouplement
CN213927102U (en) Auxiliary device is connected to assembled construction steel bar
CN113431313A (en) External frame structure and construction method thereof
CN221236149U (en) Pipeline supporting device for sewage pipe network construction
CN112459092A (en) Steel sheet pile cofferdam and dismantling method thereof
CN215829406U (en) Tubular pile meshing type quick joint structure
CN221441482U (en) Building engineering pile body structure
CN215948162U (en) Pile head structure of bored pile
CN216305413U (en) Energy-saving building construction steel bar positioning structure
CN214246567U (en) Reusable wall connecting component
CN211421599U (en) Quick connection structure of steel core concrete column
CN219080948U (en) Detachable and convenient-to-mount and recyclable outer frame wall connecting piece
CN217269068U (en) Heavy top stay podotheca hand posture split heads of socket joint convenient to quick adjustment and equipment
CN218061346U (en) Vertical rod support of overhanging scaffold
CN211548731U (en) Cross bar connecting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant