CN214834778U - Beam formwork supporting device - Google Patents

Beam formwork supporting device Download PDF

Info

Publication number
CN214834778U
CN214834778U CN202121504863.4U CN202121504863U CN214834778U CN 214834778 U CN214834778 U CN 214834778U CN 202121504863 U CN202121504863 U CN 202121504863U CN 214834778 U CN214834778 U CN 214834778U
Authority
CN
China
Prior art keywords
jack
rod
bracing piece
block
supporting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121504863.4U
Other languages
Chinese (zh)
Inventor
成建新
涂珉
招伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Dingji Construction Engineering Co ltd
Original Assignee
Wuhan Dingji Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Dingji Construction Engineering Co ltd filed Critical Wuhan Dingji Construction Engineering Co ltd
Priority to CN202121504863.4U priority Critical patent/CN214834778U/en
Application granted granted Critical
Publication of CN214834778U publication Critical patent/CN214834778U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a roof beam template strutting arrangement relates to the field of construction technology, its include the bracing piece and with but the backup pad of bracing piece top disconnect, the lower fixed surface of backup pad is connected with the inserted block, the inserted block keep away from in the one end of backup pad is provided with the confession the spliced eye that the bracing piece was pegged graft, the bracing piece with be provided with between the inserted block and be used for locking mounting between them, be provided with on the inserted block and be used for the piece that resets that the mounting resets. This application has the effect of being convenient for install and dismantle between backup pad and the bracing piece, is favorable to transporting bracing piece and backup pad, has improved the construction efficiency.

Description

Beam formwork supporting device
Technical Field
The application relates to the field of building construction technology, in particular to a beam formwork supporting device.
Background
In the construction process of a main structure of a building engineering, the construction quality of a beam template is directly related to the construction quality of a beam concrete engineering, and a fastener type steel pipe scaffold is generally adopted as a beam bottom template support in the actual operation of the engineering.
The conventional Chinese patent with the publication number of CN106121222B provides an adjustable beam bottom template supporting device and a beam bottom template supporting method, and the adjustable beam bottom template supporting device comprises a beam bottom template supporting unit, beam side template supporting units and supporting rods, wherein the two beam side template supporting units are arranged on the beam bottom template supporting unit at intervals, the beam side template supporting units are connected with an interval adjusting mechanism for adjusting the interval between the two beam side template supporting units, the supporting rods are vertically fixed in the middle of the lower sides of the beam bottom template supporting units, the height of the supporting rods is adjustable, and the lower parts of the supporting rods are fixedly connected with a fixing frame.
In view of the above-mentioned related technologies, the inventor thinks that the beam-side formwork support unit is fixed on the support rod, and the beam-side formwork support unit and the support rod are integrated, so that when the support rod is carried, the support rod and the beam-side formwork support unit can only be transported together, which is inconvenient to carry, consumes manpower, and affects the construction process.
SUMMERY OF THE UTILITY MODEL
In order to improve the problem of being not convenient for dismantle between bracing piece and the backup pad, this application provides a roof beam template strutting arrangement.
The application provides a roof beam template strutting arrangement adopts following technical scheme:
the utility model provides a roof beam template strutting arrangement, including the bracing piece and with but the backup pad of bracing piece top disconnect, the lower fixed surface of backup pad is connected with the inserted block, the inserted block keep away from in the one end of backup pad is provided with the confession the spliced eye that the bracing piece was pegged graft, the bracing piece with be provided with between the inserted block and be used for locking mounting between them, be provided with on the inserted block and be used for the piece that resets that the mounting resets.
By adopting the technical scheme, the support rod is inserted into the plug hole by a worker, the support rod and the plug block are locked under the action of the fixing piece, namely, the beam template supporting device is installed, after the beam template supporting device is used, the fixing rod is inserted into the plug hole under the reset action of the reset piece, the support rod is separated from the plug block, namely, the beam template supporting device is disassembled, the installation and disassembly time is saved, and the construction efficiency is improved.
Optionally, the fixing member is a fixing rod, a first jack is arranged on a side wall of the insertion block, a second jack corresponding to the first jack is arranged on an outer wall of the top end of the supporting rod, and the fixing rod penetrates through the first jack and then is inserted into the second jack.
Through adopting above-mentioned technical scheme, peg graft in the second jack after the dead lever passes first jack and realized the locking to inserted block and bracing piece, improved factor of safety, ensure construction safety.
Optionally, one end of the fixing rod, which is far away from the first jack, is fixedly connected with a handle.
Through adopting above-mentioned technical scheme, the staff exerts the effort of keeping away from the inserted block to the handle for bracing piece and inserted block separation make things convenient for the staff to operate.
Optionally, the reset piece is a spring, the spring is sleeved outside the fixing rod, one end of the spring is fixedly connected to the insert block, and the other end of the spring is fixedly connected to the handle.
Through adopting above-mentioned technical scheme, when the bracing piece inserts the in-process of spliced eye, exert the effort of keeping away from the inserted block to the dead lever, the spring is by tensile deformation, and when the dead lever moved to the second jack, under the spring action of recovering the original shape, the dead lever inserted in the second jack, realized the locking effect to bracing piece and inserted block, did not need staff's operation can realize the restoration to the dead lever, had saved the manpower.
Optionally, one end of the fixing rod penetrating through the first insertion hole is provided with an inclined surface and inclines towards the direction of the supporting rod.
Through adopting above-mentioned technical scheme, the one end that the handle was kept away from to the dead lever is established to the inclined plane, and at the in-process that the spliced eye was inserted to the bracing piece, the effort of keeping away from the second jack direction was exerted towards to the dead lever to the bracing piece.
Optionally, a hemisphere is welded at the top end of the supporting rod.
By adopting the technical scheme: in the process that the supporting rod is inserted into the inserting hole, the supporting rod acts on the fixing rod, the contact area of the hemispheroid on the top end of the supporting rod and the inclined end of the fixing rod is reduced, so that the friction force between the supporting rod and the fixing rod is reduced, and the supporting rod is convenient to drive the fixing rod.
Optionally, reinforcing rods are welded on two side walls of the insertion block, and one ends of the reinforcing rods, far away from the insertion block, are welded on the supporting plate.
Through adopting above-mentioned technical scheme, two liang of welding of stiffener, backup pad and inserted block enclose and become triangle-shaped for the fixed connection of backup pad and inserted block is firm.
Optionally, an annular positioning plate abutted against the insertion block is fixed on an outer wall of one end of the support rod, which is close to the support plate.
Through adopting above-mentioned technical scheme, when the bracing piece inserted in the spliced eye of inserted block, annular positioning disk and inserted block butt have realized fixed the location to the inserted block bottom for the difficult skew that produces of backup pad, thereby the stability that the guarantee backup pad was placed has ensured staff's safety.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the supporting rod is inserted into the inserting hole, the supporting rod and the inserting block are locked under the action of the fixing rod, namely, the mounting of the beam formwork supporting device is completed, and the supporting rod is separated from the inserting block under the reset action of the reset piece, namely, the dismounting of the beam formwork supporting device is completed, so that the time is saved, and the construction efficiency is improved;
2. when the support rod applies acting force to the fixed rod, the spring deforms, the fixed rod is inserted into the second insertion hole under the elastic force action of the spring restoring to the original shape, the locking effect of the support rod and the insertion block is achieved, when the handle is pulled, the spring deforms, the fixed rod is separated from the second insertion hole, and the beam template support device is detached;
3. when the bracing piece was inserted in the spliced eye of inserted block, annular positioning disk and the bottom butt of inserted block had realized fixed the location of inserted block bottom, had ensured the stability that the backup pad was placed.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
fig. 2 is an enlarged schematic view of a portion a in fig. 1.
Reference numerals: 1. a support plate; 2. inserting a block; 3. inserting holes; 4. a support bar; 5. a first jack; 6. a second jack; 7. a hemisphere; 8. a reinforcing bar; 9. fixing the rod; 10. a spring; 11. a handle; 12. an annular positioning disc.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses beam formwork support device. Referring to fig. 1 and 2, beam formwork support device includes a plurality of bracing pieces 4 and with bracing piece 4 top detachable's backup pad 1, the top surface of backup pad 1 is used for bearing the template when pouring the bottom of the beam, the bottom surface fixedly connected with inserted block 2 of backup pad 1, the welding has 4 stiffener 8 on the outer wall of inserted block 2, the one end welding that inserted block 2 was kept away from to stiffener 8 is on backup pad 1, stiffener 8, backup pad 1 and two liang of welding of inserted block 2 and enclose and establish into triangle-shaped, inserted block 2 is kept away from the one end of backup pad 1 and is provided with the spliced eye 3 that supplies bracing piece 4 to peg graft, be fixed with annular positioning disk 12 with 2 bottom butt of inserted block on the outer wall of bracing piece 4 near backup pad 1 one end, annular positioning disk 12 is used for the support of inserted block 2.
Be provided with the mounting that is used for the locking between bracing piece 4 and inserted block 2, the mounting sets up to dead lever 9, the lateral wall of inserted block 2 is provided with first jack 5, be provided with on the top outer wall of bracing piece 4 with the corresponding second jack 6 of first jack 5, peg graft in second jack 6 behind the dead lever 9 passing first jack 5, the terminal surface size that the dead lever 9 was kept away from 2 one end of inserted block is the same with the terminal surface size of first jack 5, the terminal surface size of first jack 5 is the same with the terminal surface size of second jack 6.
Be provided with the piece that resets that is used for dead lever 9 to reset on inserted block 2, the piece that resets sets up to spring 10, and spring 10 cover is established in the dead lever 9 outside, and the dead lever 9 is kept away from the one end fixedly connected with of bracing piece 4 and the handle 11 of dead lever 9 quadrature, and handle 11 sets up to the cylinder, has increased lifting surface area, and the one end fixed connection of spring 10 is on inserted block 2, and the other end fixed connection of spring 10 is on handle 11.
The welding of the top of bracing piece 4 has hemisphere 7, the dead lever 9 passes the one end of first jack 5 and is equipped with the inclined plane and takes place the slope towards the direction of bracing piece 4, the hemisphere 7 on bracing piece 4 top when bracing piece 4 acts on dead lever 9 diminishes with the area of contact of dead lever 9 tip, make the frictional force between dead lever 9 and bracing piece 4 reduce, when spring 10 is in the original shape, dead lever 9 is located spliced eye 3, when bracing piece 4 pegs graft in spliced eye 3, hemisphere 7 on the bracing piece 4 applys the effort of keeping away from 6 directions of second jack towards dead lever 9, be convenient for bracing piece 4 peg graft in spliced eye 3, and be convenient for dead lever 9 automatic re-setting peg graft in second jack 6.
The implementation principle of the beam formwork supporting device in the embodiment of the application is as follows: inserting the support rod 4 into the inserting hole 3 of the inserting block 2, in the process of inserting the support rod 4 into the inserting hole 3, the hemisphere 7 on the support rod 4 applies resultant force in the direction far away from the second inserting hole 6 to the inclined end of the fixing rod 9, so that the support rod 4 pushes the fixing rod 9 to move in the direction far away from the second inserting hole 6, the spring 10 is stretched and deformed, when the top of the hemisphere 7 on the support rod 4 is abutted against the inserting hole 3, the fixing rod 9 is inserted into the second inserting hole 6, the spring 10 is deformed and restored, the annular positioning disc 12 is abutted against the bottom end of the inserting block 2, namely, the installation of the beam formwork supporting device is completed, after the beam formwork supporting device is used, the handle 11 is pulled in the direction far away from the inserting block 2, the spring 10 is stretched and deformed, the support rod 4 moves in the direction far away from the inserting block 2, the fixing rod 9 is pulled out from the second inserting hole 6, the support rod 4 is separated from the inserting block 2, and the acting force on the handle 11 is removed, the stretching deformation of the spring 10 is recovered, and the fixing rod 9 is inserted into the inserting hole 3, so that the beam formwork supporting device is detached.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a roof beam template strutting arrangement which characterized in that: the fixing device comprises a supporting rod (4) and a supporting plate (1) detachably connected to the top end of the supporting rod (4), wherein an inserting block (2) is fixedly connected to the lower surface of the supporting plate (1), the inserting block (2) is far away from one end of the supporting plate (1) and is provided with an inserting hole (3) for the supporting rod (4) to be inserted, a fixing piece for locking the supporting rod (4) and the inserting block (2) is arranged between the supporting rod (4) and the inserting block (2), and a resetting piece for resetting the fixing piece is arranged on the inserting block (2).
2. The beam formwork support apparatus of claim 1, wherein: the fixing piece is arranged to be a fixing rod (9), a first jack (5) is arranged on the side wall of the inserting block (2), a second jack (6) corresponding to the first jack (5) is arranged on the outer wall of the top end of the supporting rod (4), and the fixing rod (9) penetrates through the first jack (5) and then is inserted into the second jack (6).
3. The beam formwork support apparatus of claim 2, wherein: and one end of the fixing rod (9) far away from the first jack (5) is fixedly connected with a handle (11).
4. The beam formwork support apparatus of claim 3, wherein: the reset piece is set as a spring (10), the spring (10) is sleeved on the outer side of the fixing rod (9), one end of the spring (10) is fixedly connected to the insert block (2), and the other end of the spring (10) is fixedly connected to the handle (11).
5. The beam formwork support apparatus of claim 2, wherein: one end of the fixing rod (9) penetrating through the first insertion hole (5) is provided with an inclined plane and inclines towards the direction of the supporting rod (4).
6. The beam formwork support apparatus of claim 1, wherein: the top end of the supporting rod (4) is welded with a hemisphere (7).
7. The beam formwork support apparatus of claim 1, wherein: all welded on the both sides wall of inserted block (2) has stiffener (8), stiffener (8) are kept away from the one end welding of inserted block (2) is in on backup pad (1).
8. The beam formwork support apparatus of claim 1, wherein: the supporting rod (4) is close to the outer wall of one end of the supporting plate (1) and is fixedly provided with an annular positioning plate (12) which is abutted to the inserting block (2).
CN202121504863.4U 2021-07-02 2021-07-02 Beam formwork supporting device Expired - Fee Related CN214834778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121504863.4U CN214834778U (en) 2021-07-02 2021-07-02 Beam formwork supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121504863.4U CN214834778U (en) 2021-07-02 2021-07-02 Beam formwork supporting device

Publications (1)

Publication Number Publication Date
CN214834778U true CN214834778U (en) 2021-11-23

Family

ID=78812295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121504863.4U Expired - Fee Related CN214834778U (en) 2021-07-02 2021-07-02 Beam formwork supporting device

Country Status (1)

Country Link
CN (1) CN214834778U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114525925A (en) * 2022-03-25 2022-05-24 福州市第三建筑工程公司 Template supporting device for floor slab and assembling and disassembling process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114525925A (en) * 2022-03-25 2022-05-24 福州市第三建筑工程公司 Template supporting device for floor slab and assembling and disassembling process
CN114525925B (en) * 2022-03-25 2023-09-19 福州市第三建筑工程公司 Template supporting device for floor slab and disassembling and assembling process

Similar Documents

Publication Publication Date Title
CN214834778U (en) Beam formwork supporting device
CN217651988U (en) Steel structure beam column connection structure of prefabricated building
CN210032663U (en) Positioning device for steel embedded part of batter post
CN105201208B (en) Y type pier stud oblique fulcrum bars punching block removes system
CN214658813U (en) Template reinforced structure for construction
CN212388363U (en) A auxiliary device for construction of hollow mound cross slab of bridge
CN215210476U (en) Capping beam unloading support
CN212001320U (en) Device for recovering pile bearing capacity of building after pile cutting and deviation rectification
CN213226007U (en) Bearing dismounting device
CN204940866U (en) Y type pier stud oblique fulcrum bar punching block removes system
CN212078772U (en) Cutting unloading device for building steel structure engineering
CN217439624U (en) Building structure supports steelframe
CN214246567U (en) Reusable wall connecting component
CN215368871U (en) Shear force wall reinforced structure
CN221143574U (en) Simple and easy dismantlement formula building templates demolishs device
CN216641474U (en) Safety auxiliary device for flatting truss
CN221742599U (en) Counterforce frame for pipe jacking construction
CN216504864U (en) Sliding surface replacing device of elastic sliding plate support
CN218862287U (en) Construction is with safety protection fence convenient to accomodate
CN215669081U (en) Bridge cantilever pouring construction hanging basket
CN221095835U (en) Constructional column template convenient to dismouting
CN211145603U (en) Pipeline antidetonation hoisting machine constructs
CN211368613U (en) Gate pier bracket formwork braced system that encorbelments
CN218234298U (en) Scaffold connecting structure for constructional engineering
CN215948929U (en) Basement side wall quick detach formula outer support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211123

CF01 Termination of patent right due to non-payment of annual fee