CN216865118U - High-strength concrete pipe pile - Google Patents

High-strength concrete pipe pile Download PDF

Info

Publication number
CN216865118U
CN216865118U CN202123246557.8U CN202123246557U CN216865118U CN 216865118 U CN216865118 U CN 216865118U CN 202123246557 U CN202123246557 U CN 202123246557U CN 216865118 U CN216865118 U CN 216865118U
Authority
CN
China
Prior art keywords
wall
tubular pile
block
pile
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123246557.8U
Other languages
Chinese (zh)
Inventor
刘松
张世银
张立峰
张瑞康
牛瑞强
贾哲
贺肖成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202123246557.8U priority Critical patent/CN216865118U/en
Application granted granted Critical
Publication of CN216865118U publication Critical patent/CN216865118U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of concrete pipe piles, in particular to a high-strength concrete pipe pile, which comprises a first pipe pile and a second pipe pile, wherein the second pipe pile is arranged at the top of the first pipe pile, the surface of the second pipe pile is provided with a connecting device, the connecting device comprises a first sleeve block and a second sleeve block, the outer wall of the first pipe pile is provided with a stabilizing device, the stabilizing device comprises a supporting rod and a resisting block, the resisting block is arranged at one end of the supporting rod, and an inserting component is arranged between the first pipe pile and the second pipe pile. Influence the bearing effect, promoted the stability of equipment to this effectively.

Description

High-strength concrete pipe pile
Technical Field
The utility model relates to the technical field of concrete pipe piles, in particular to a high-strength concrete pipe pile.
Background
The concrete pipe pile is widely used in foundation engineering of hydraulic buildings, industrial buildings, civil buildings and bridges, and is also commonly used for anti-sliding or water-resisting construction operation of side slope and foundation pit support.
However, the pipe pile in the prior art has the following problems:
the condition that tubular pile length is not enough easily appears in the work progress, needs to lengthen the tubular pile this moment, and current inconvenient operation to tubular pile extension's measure, and the tubular pile reliability after the extension is not enough, causes the construction to have certain potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a high-strength concrete pipe pile to solve the problems in the background technology.
The technical scheme of the utility model is as follows: the utility model provides a high strength concrete pipe pile, includes tubular pile one and tubular pile two, tubular pile two sets up the top that is located tubular pile one, the surface of tubular pile two is provided with connecting device, connecting device includes nested piece one and nested piece two, the outer wall of tubular pile one is provided with stabilising arrangement, stabilising arrangement includes the bracing piece and supports the piece, support the one end that the piece setting is located the bracing piece, be provided with grafting subassembly between tubular pile one and the tubular pile two.
Preferably, the grafting subassembly is including offering the trepanning of a tubular pile top outer wall, the bottom outer wall fixed mounting of tubular pile two has the connecting pile, the connecting pile is pegged graft in the inner wall of trepanning.
Preferably, connecting device includes the dead lever of fixed mounting in two one side outer walls of tubular pile, the outer wall of dead lever is all cup jointed in pocket one and pocket two, the one end of pocket one and pocket two is provided with locking mechanism.
Preferably, locking mechanism includes the connecting block, one side outer wall fixed mounting of connecting block has the bolt, bolt and two plug-in connections of cover block, the spring groove has been seted up to the one end of cover block two, the inner wall fixed mounting in spring groove has the tight spring of inserting, the one end of inserting tight spring and one side outer wall fixed connection of connecting block.
Preferably, the locking mechanism comprises a sliding rod, a mounting groove is formed in one end of the sleeve block I, the sliding rod is inserted into the inner wall of the mounting groove in a sliding mode, a fixing block is fixedly mounted at one end of the sliding rod, a shifting block is fixedly mounted at one end of the sliding rod, the number of the sliding rod is two, and a fixing spring is fixedly mounted at one end, adjacent to the two sliding rods, of the two sliding rods.
Preferably, the outer wall of the fixing block is provided with a through hole matched with the bolt.
Preferably, the securing device is including seting up the spout in a tubular pile circumference outer wall, the one end of bracing piece is provided with the slider, the slip of slider is pegged graft in the inner wall of spout, the device chamber has been seted up to the inner wall of bracing piece, and the inner wall in device chamber slides and pegs graft and have the connecting rod, the one end of connecting rod and the inner wall fixed mounting in device chamber have supporting spring, the other end fixed mounting of connecting rod has the fixed plate, the top outer wall fixed mounting of fixed plate has the pull block, and the one end fixed mounting of fixed plate has the locating lever, the locating hole has been seted up to the circumference outer wall of tubular pile one, the locating lever is pegged graft in the inner wall of locating hole.
The utility model provides a high-strength concrete pipe pile by improvement, which has the following improvements and advantages compared with the prior art:
according to the utility model, the connecting device is arranged, so that the connecting end of the first tubular pile and the second tubular pile can be conveniently reinforced, the length of the tubular piles can be conveniently controlled, the compatibility of equipment is improved, the potential safety hazard in the construction process is reduced, the usability of the equipment is improved, when the tubular piles are buried, the phenomenon that the existing tubular piles are prone to inclination due to uneven stress when buried can be avoided through the arranged stabilizing device, the bearing effect is influenced, and the stability of the equipment is effectively improved.
Drawings
The utility model is further explained below with reference to the figures and examples:
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a perspective view of a portion of the connection device of the present invention;
FIG. 3 is a disassembled perspective view of the coupling device portion of the present invention;
FIG. 4 is a perspective view of a portion of the stabilizer of the present invention;
figure 5 is a disassembled perspective view of portions of the binding of the present invention.
Description of reference numerals:
1. a first tubular pile; 2. a second tubular pile; 3. connecting piles; 4. trepanning; 5. a connecting device; 51. fixing the rod; 52. sleeving a first sleeve block; 53. a second sleeve block; 54. connecting blocks; 55. a bolt; 56. a slide bar; 57. a fixed block; 58. a fixed spring; 59. shifting blocks; 6. a securing device; 61. a slider; 62. a support bar; 63. a resisting block; 64. a support spring; 65. a connecting rod; 66. a fixing plate; 67. pulling the block; 68. and (7) positioning the rod.
Detailed Description
The present invention is described in detail below, and technical solutions in the embodiments of the present invention are clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The utility model provides a high-strength concrete pipe pile through improvement, and the technical scheme of the utility model is as follows:
as shown in fig. 1-5, a high strength concrete pipe pile, including first tubular pile 1 and second tubular pile 2, second tubular pile 2 sets up the top that is located first tubular pile 1, and the surface of second tubular pile 2 is provided with connecting device 5, and connecting device 5 includes pocket block one 52 and pocket block two 53, and the outer wall of first tubular pile 1 is provided with stabilising arrangement 6, and stabilising arrangement 6 includes bracing piece 62 and supports the piece 63, supports the one end that the piece 63 set up and is located bracing piece 62, is provided with the grafting subassembly between first tubular pile 1 and the second tubular pile 2.
Furtherly, the grafting subassembly is including offering the trepanning 4 of 1 top outer wall of tubular pile, and the bottom outer wall fixed mounting of two 2 tubular piles has connecting pile 3, and connecting pile 3 pegs graft in the inner wall of trepanning 4 for tubular pile 1 is connected with two 2 tubular piles.
Further, connecting device 5 includes the dead lever 51 of fixed mounting in the second 2 one side outer walls of tubular pile, and a set of piece 52 and a set of piece two 53 all cup joint in the outer wall of dead lever 51, the one end of a set of piece 52 and a set of piece two 53 is provided with locking mechanism.
Further, locking mechanism includes connecting block 54, and one side outer wall fixed mounting of connecting block 54 has bolt 55, and bolt 55 and two 53 plug-in connections of cover block have been seted up to the one end of two 53 cover blocks, and the inner wall fixed mounting in spring groove has the tight spring of inserting, and the one end of inserting the tight spring and one side outer wall fixed connection of connecting block 54 possess the potential energy of inside male under the effect of inserting the tight spring.
Further, the locking mechanism comprises a sliding rod 56, one end of the first sleeve block 52 is provided with a mounting groove, the sliding rod 56 is inserted into the inner wall of the mounting groove in a sliding mode, one end of the sliding rod 56 is fixedly provided with a fixing block 57, one end of the sliding rod 56 is fixedly provided with a shifting block 59, the two sliding rods 56 are provided, and one adjacent ends of the two sliding rods 56 are fixedly provided with fixing springs 58.
Furthermore, the outer wall of the fixing block 57 is provided with a through hole adapted to the pin 55, and after the pin 55 is inserted into the through hole formed in the outer wall of the fixing block 57, the first tubular pile 1 and the second tubular pile 2 are connected and fixed.
Further, securing device 6 is including seting up the spout in 1 circumference outer wall of tubular pile, the one end of bracing piece 62 is provided with slider 61, slider 61's slip is pegged graft in the inner wall of spout, the device chamber has been seted up to bracing piece 62's inner wall, the inner wall slip of device chamber is pegged graft and is had connecting rod 65, the one end of connecting rod 65 and the inner wall fixed mounting in device chamber have supporting spring 64, the other end fixed mounting of connecting rod 65 has fixed plate 66, the top outer wall fixed mounting of fixed plate 66 has the piece 67 that draws, and the one end fixed mounting of fixed plate 66 has locating lever 68, the locating hole has been seted up to the circumference outer wall of tubular pile 1, locating lever 68 is pegged graft in the inner wall of locating hole, bracing piece 62 and support piece 63 and be provided with four, also can set up to a plurality ofly, the interval of locating hole can be seted up according to actual conditions, satisfy the user demand under the different scenes.
The working principle is as follows: when in use, the connecting pile 3 is inserted into the trepanning 4 to realize the connection between the tubular pile I1 and the tubular pile II 2, then the first sleeve block 52 and the second sleeve block 53 are rotated by the fixing rod 51, when the first sleeve block 52 is abutted against one end of the second sleeve block 53, the connecting block 54 is pulled immediately, the bolt 55 is forced to be separated from the inner wall of the second sleeve block 53 at the same time, the shifting block 59 is pulled immediately, the fixed spring 58 is forced to deform at the same time and then expands, when the first sleeve block 52 abuts against the second sleeve block 53, the fixed spring 58 is released by releasing the shifting block 59 and rebounds after losing the constraint, the fixed block 57 is sequentially forced to be inserted into the inner wall of the second sleeve block 53, the connecting block 54 is pressed immediately, the bolt 55 is sequentially forced to be inserted into the surface of the fixed block 57, the connecting device 5 is arranged, so that the connecting end of the first tubular pile 1 and the second tubular pile 2 can be conveniently reinforced, the length of the tubular piles can be conveniently controlled, the compatibility of equipment is improved, the potential safety hazard in the construction process is reduced, and the usability of the equipment is improved; when the tubular pile is buried, the pulling block 67 is pulled, the fixing plate 66 is stressed to push the connecting rod 65, the supporting spring 64 is stressed and deformed and then tightened, the positioning rod 68 is stressed to be separated from the surface of the tubular pile 1, the tubular pile 1 is buried immediately, when the tubular pile 1 is buried to a proper position, the supporting spring 64 of the pulling block 67 is loosened and rebounded after losing the constraint, the connecting rod 65 is pushed, the positioning rod 68 is inserted into the surface of the tubular pile 1 by the fixing plate 66 under the stress, the tubular pile 1 is further reinforced by the aid of the stabilizing device 6, the problem that the existing tubular pile is prone to being stressed unevenly inclined when being buried is avoided, the bearing effect is affected, and the stability of equipment is effectively improved.

Claims (7)

1. The utility model provides a high strength concrete pipe pile which characterized in that: including tubular pile one (1) and two (2) of tubular pile, two (2) of tubular pile set up the top that is located tubular pile one (1), the surface of two (2) of tubular pile is provided with connecting device (5), connecting device (5) are including nest block one (52) and nest block two (53), the outer wall of tubular pile one (1) is provided with stabilising arrangement (6), stabilising arrangement (6) are including bracing piece (62) and support piece (63), support the one end that piece (63) set up and are located bracing piece (62), be provided with grafting subassembly between tubular pile one (1) and two (2) of tubular pile.
2. The high-strength concrete pipe pile of claim 1, wherein: the grafting subassembly is including offering trepanning (4) in tubular pile one (1) top outer wall, the bottom outer wall fixed mounting of tubular pile two (2) has connecting pile (3), connecting pile (3) are pegged graft in the inner wall of trepanning (4).
3. The high-strength concrete pipe pile of claim 1, wherein: connecting device (5) are including fixed mounting in dead lever (51) of two (2) one side outer walls of tubular pile, the outer wall of dead lever (51) is all cup jointed in nested piece one (52) and nested piece two (53), the one end of nested piece one (52) and nested piece two (53) is provided with locking mechanism.
4. The high-strength concrete pipe pile according to claim 3, characterized in that: locking mechanism includes connecting block (54), one side outer wall fixed mounting of connecting block (54) has bolt (55), bolt (55) and two (53) grafting connections of cover block, the spring groove has been seted up to the one end of two (53) of cover block, the inner wall fixed mounting in spring groove has the tight spring of inserting, the one end of inserting tight spring and one side outer wall fixed connection of connecting block (54).
5. The high-strength concrete pipe pile according to claim 4, characterized in that: the locking mechanism comprises a sliding rod (56), a mounting groove is formed in one end of the first sleeve block (52), the sliding rod (56) is inserted into the inner wall of the mounting groove in a sliding mode, a fixing block (57) is fixedly mounted at one end of the sliding rod (56), a shifting block (59) is fixedly mounted at one end of the sliding rod (56), two sliding rods (56) are arranged, and a fixing spring (58) is fixedly mounted at one adjacent end of each sliding rod (56).
6. The high-strength concrete pipe pile of claim 5, wherein: the outer wall of the fixing block (57) is provided with a through hole matched with the bolt (55).
7. The high-strength concrete pipe pile of claim 1, wherein: securing device (6) is including seting up in the spout of a tubular pile (1) circumference outer wall, the one end of bracing piece (62) is provided with slider (61), the slip of slider (61) is pegged graft in the inner wall of spout, the device chamber has been seted up to the inner wall of bracing piece (62), and the inner wall in device chamber slides and pegs graft and have connecting rod (65), the one end of connecting rod (65) and the inner wall fixed mounting in device chamber have supporting spring (64), the other end fixed mounting of connecting rod (65) has fixed plate (66), the top outer wall fixed mounting of fixed plate (66) has pull block (67), and the one end fixed mounting of fixed plate (66) has locating lever (68), the locating hole has been seted up to the circumference outer wall of a tubular pile (1), locating lever (68) are pegged graft in the inner wall of locating hole.
CN202123246557.8U 2021-12-22 2021-12-22 High-strength concrete pipe pile Active CN216865118U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123246557.8U CN216865118U (en) 2021-12-22 2021-12-22 High-strength concrete pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123246557.8U CN216865118U (en) 2021-12-22 2021-12-22 High-strength concrete pipe pile

Publications (1)

Publication Number Publication Date
CN216865118U true CN216865118U (en) 2022-07-01

Family

ID=82147475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123246557.8U Active CN216865118U (en) 2021-12-22 2021-12-22 High-strength concrete pipe pile

Country Status (1)

Country Link
CN (1) CN216865118U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115710900A (en) * 2023-01-10 2023-02-24 天津和兴源建筑工程有限公司 Concrete tubular pile reinforced structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115710900A (en) * 2023-01-10 2023-02-24 天津和兴源建筑工程有限公司 Concrete tubular pile reinforced structure

Similar Documents

Publication Publication Date Title
CN216865118U (en) High-strength concrete pipe pile
CN111101985B (en) Umbrella-shaped point column type temporary support for coal mine tunnel
CN104674858A (en) Foundation pit anti-floating anchor rod pull-out test tool
CN209781982U (en) Quick fixing device of three way connection
CN210422618U (en) Supporting structure of trenchless pipeline repairing operation well
CN102444273A (en) Connecting member of socket and spigot type tenon-mortise self-locked steel pipe scaffold
CN215290085U (en) Prestressed high-strength concrete pipe pile
CN210770986U (en) Be used for prosthetic strutting arrangement of drainage pipe
CN116657770B (en) Assembly building connecting device with damping function and application method thereof
KR102073526B1 (en) Pullout tester for steel pipe reinforced multistate grouting
CN213204103U (en) Detachable steel sleeve
CN213812478U (en) Water conservancy degree of depth measuring stick that joint is connected
CN210917325U (en) Anti-slide pile with cross beam on pile body
CN109750852B (en) Wall dismantling and reinforcing structure
CN220225731U (en) Concrete embedded part reinforcing mechanism
CN218234298U (en) Scaffold connecting structure for constructional engineering
CN215978548U (en) Portable reinforcing apparatus for steel column is set up
CN220301330U (en) Steel pipe anchor rod static pressure pile for building reinforcement
CN214575333U (en) Assembled ceramic tile is with articulating subassembly fast
CN220598461U (en) Inclined pile vertical anchor rod supporting structure for foundation pit supporting
CN218623648U (en) Tent supporting and binding positioning assembly
CN213898107U (en) Template back edge
CN113931484B (en) Supporting structure for floor construction and installation
CN218091975U (en) Connect stable steel construction installation mosaic structure
CN216690321U (en) Wall connecting piece of external scaffold for residential building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant