CN218231613U - Tower crane passageway and climbing frame - Google Patents

Tower crane passageway and climbing frame Download PDF

Info

Publication number
CN218231613U
CN218231613U CN202221783126.7U CN202221783126U CN218231613U CN 218231613 U CN218231613 U CN 218231613U CN 202221783126 U CN202221783126 U CN 202221783126U CN 218231613 U CN218231613 U CN 218231613U
Authority
CN
China
Prior art keywords
tower crane
bottom plate
frame
passageway
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221783126.7U
Other languages
Chinese (zh)
Inventor
钟运平
严强
朱珍瑶
李经伟
温云海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huashi Enterprises Co Ltd
Original Assignee
China Huashi Enterprises Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huashi Enterprises Co Ltd filed Critical China Huashi Enterprises Co Ltd
Priority to CN202221783126.7U priority Critical patent/CN218231613U/en
Application granted granted Critical
Publication of CN218231613U publication Critical patent/CN218231613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model belongs to the technical field of the construction, a tower crane passageway and frame of climbing is disclosed. The tower crane channel is arranged at an opening on the outer side of the climbing frame, is integrated with the climbing frame and is lifted synchronously along with the lifting of the climbing frame; comprises a channel bottom plate, a channel side wall and a turning plate; the access bottom plate is vertically installed on a climbing frame, the extending direction of the access bottom plate is over against a tower crane, the access side wall comprises a first side fence rod, a second side fence rod, a first side fence net and a second side fence net, the first side fence rod and the second side fence rod are fixedly connected to two sides of the access bottom plate respectively, the first side fence rod is covered by the first side fence net, the second side fence rod is covered by the second side fence net, the turning plate is installed on the access bottom plate, the turning plate is opened in a rotating mode during use, and the access bottom plate and the tower crane are connected; when the climbing frame is lifted, the turning plate is rotated and stored and is attached to the upper part of the channel bottom plate. This tower crane passageway has improved the protection reliability of side, satisfies the use of climbing multiple distance between frame and the tower crane, prevents to climb the time and interferes with the tower crane bulge.

Description

Tower crane passageway and climbing frame
Technical Field
The utility model relates to a construction technical field especially relates to a tower crane passageway and climb frame.
Background
The tower crane is the most common hoisting equipment on a construction site, is built by a plurality of standard sections, is used for hoisting raw materials such as reinforcing steel bars, wooden ridges, concrete, steel pipes and the like for construction, and is indispensable equipment on the construction site. On the building construction site, along with the increase of the number of layers of the tower main body structure, a tower crane channel which is arranged between the tower and the tower crane and used for a driver to walk also needs to be repeatedly erected for multiple times along with the progress of the construction of the tower main body. The constructor sets up the tower crane passageway many times in the high altitude has certain danger, and takes repeatedly and tear open the tower crane passageway and can waste a large amount of time, and the economic nature is relatively poor. In order to solve the problems, the danger coefficient of a tower crane channel erected in high-altitude operation is reduced, meanwhile, the cost of the tower crane channel generated in the repeated erecting and dismantling process is reduced, the prior art provides a tower crane channel attached to a climbing frame, the tower crane channel is located between the climbing frame and a tower crane and fixed on a low-layer walkway and a high-layer walkway of the climbing frame, synchronous lifting can be carried out along with lifting of the climbing frame, and high-altitude operation is avoided being repeatedly carried out for many times. But above-mentioned tower crane passageway of being attached to and climbing frame only adopts the railing as the protection of tower crane passageway both sides, and its barrier propterty is lower. Simultaneously, set up the fixed channel plate of length between climbing frame and the tower crane, only be applicable to and climb the scene that the distance is confirmed between frame and the tower crane, when climbing the distance between frame and the tower crane and change, need change the channel plate in order to satisfy the distance demand, can't satisfy many scenes demand, and the fixed channel plate of length is climbing frame promotion in-process easily and is forming with the tower crane bulge.
Therefore, a tower crane passageway and a climbing frame are needed to solve the above problems.
SUMMERY OF THE UTILITY MODEL
According to the utility model discloses an aspect, aim at provides a tower crane passageway, and this tower crane passageway has improved the protection reliability of side direction, can satisfy the use of climbing multiple distance between frame and the tower crane to interference appears with the bulge of tower crane when preventing to climb.
To achieve the purpose, the utility model adopts the following technical proposal:
a tower crane channel comprises a channel bottom plate, a channel side wall and a turning plate; the channel bottom plate is mounted on a climbing frame and can be lifted synchronously with the climbing frame, the extending direction of the channel bottom plate is over against a tower crane, the channel side wall comprises a first side fence rod, a second side fence rod, a first side fence net and a second side fence net, the first side fence rod and the second side fence rod are fixedly connected to two sides of the channel bottom plate respectively along the extending direction of the channel bottom plate, the first side fence rod is covered and arranged on the first side fence rod, and the second side fence net is covered and arranged on the second side fence rod; the turning plate is rotatably installed on the channel bottom plate, the turning plate is opened in a rotating mode and connected with the channel bottom plate and the tower crane, and the turning plate is rotatably stored and can be attached to the upper portion of the channel bottom plate.
Optionally, the tower crane passageway still includes the reinforcement rope, the one end of reinforcement rope is the stiff end, the stiff end link firmly in climb the frame, the other end is the link, the link firmly in the passageway bottom plate, the mounted position of stiff end is higher than the passageway bottom plate is in climb the mounted position of frame.
Optionally, the reinforcing cords are made of several steel wires.
Optionally, the channel bottom plate includes a walkway plate and a walkway frame, the walkway frame is fixedly connected to the climbing frame, and the walkway plate is installed on the walkway frame.
Optionally, the channel bottom plate further includes a plurality of reinforcing rods, the plurality of reinforcing rods are parallel to the side portions of the climbing frame and fixed to the walkway frame at intervals, and the walkway plate is installed on the plurality of reinforcing rods and the walkway frame.
Optionally, the walkway plate is made of steel, and the walkway frame and the reinforcing rod part are made of steel pipes.
Optionally, the first side rail comprises a plurality of first side bars and a plurality of second side bars, the plurality of first side bars are parallel to the height direction of the climbing frame, are arranged at intervals and parallel to each other, and are fixedly connected to the climbing frame, the plurality of second side bars are perpendicular to the height direction of the climbing frame, are arranged at intervals and parallel to each other, and are fixedly connected to the channel bottom plate, and the first side bars and the second side bars are arranged in a crossed manner;
the second side rail comprises a plurality of third side bars and a plurality of fourth side bars, the third side bars are parallel to the height direction of the climbing frame, are arranged in parallel at intervals and fixedly connected with the climbing frame, the fourth side bars are perpendicular to the height direction of the climbing frame, are arranged in parallel at intervals and fixedly connected with the channel bottom plate, and the third side bars and the fourth side bars are arranged in a crossed manner.
Optionally, a hook is arranged at the end of the turning plate, and the hook can be hooked on the channel bottom plate or the tower crane.
Optionally, the tower crane passageway still includes the warning subassembly, the warning subassembly set up in turn over the board.
According to the utility model discloses a another aspect, aim at provides a climb frame, climb frame is including fixed support body and climbing device, still includes that above-mentioned scheme is arbitrary the tower crane passageway, fixed support body sets up in ground, climbing device install in fixed support body can be followed the direction of height of fixed support body climbs or descends, the tower crane passageway link firmly in climbing device.
The utility model has the advantages that:
the utility model provides a tower crane passageway sets up the passageway bottom plate and supplies personnel's walking. Set up the passageway side wall and be used for protecting the personnel of walking on the passageway bottom plate, this passageway side wall includes first side rail, second side rail, first side purse net and second side purse net, first side rail and second side rail are installed respectively in the both sides of passageway bottom plate, this first side purse net and second side purse net cover respectively and install in first side rail and second side rail, further improve the factor of safety of passageway side wall on the protection basis of first side rail and second side rail. The tip at the passageway bottom plate rotates and is provided with and turns over the board, should turn over the board and rotate when opening, can connect passageway bottom plate and tower crane, should turn over the board and rotate and accomodate, can laminate in the upper portion of passageway bottom plate, when climbing frame and tower crane distance are near, need not to open and should turn over the board, when climbing frame and tower crane distance are far away, rotate and open and should turn over the board, connect passageway bottom plate and tower crane, can satisfy the use of multiple distance between frame and the tower crane of climbing, and, rotate before this tower crane passageway goes up and down to accomodate this board and can effectively avoid climbing the problem that appears interfering with the bulge of tower crane when going up.
Drawings
FIG. 1 is a top view of a climbing frame, a tower crane and a tower crane passageway provided by an embodiment of the present invention;
FIG. 2 is a side view of a climbing frame, a tower crane and a tower crane passageway provided by an embodiment of the present invention;
fig. 3 is a schematic partial structural view of a channel bottom plate provided in an embodiment of the present invention;
in the figure:
10. tower crane;
100. a channel floor; 110. a walkway plate; 120. a walkway frame; 130. a reinforcing rod portion;
200. a channel side wall; 210. a first side rail bar; 211. a first side bar; 212. a second side bar; 220. a first side seine;
300. turning over a plate;
400. and reinforcing the ropes.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. It should be further noted that, for the convenience of description, only some of the structures related to the present invention are shown in the drawings, not all of the structures.
In the description of the present invention, unless expressly stated or limited otherwise, the terms "connected," "connected," and "fixed" are to be construed broadly, e.g., as meaning permanently connected, detachably connected, or integral to one another; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
In the description of the present embodiment, the terms "upper", "lower", "right", "left", and the like are used in the orientation or positional relationship shown in the drawings only for convenience of description and simplicity of operation, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used only for descriptive purposes and are not intended to have a special meaning.
Reference will now be made in detail to the embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
Fig. 1 is a top view of a climbing frame, a tower crane and a tower crane passage provided by an embodiment of the present invention; fig. 2 is a side view of a climbing frame, a tower crane and a tower crane passageway provided by the embodiment of the present invention; fig. 3 shows a schematic partial structural diagram of a channel bottom plate provided by an embodiment of the present invention. Referring to fig. 1-3, this embodiment provides a tower crane passageway and a frame of climbing, should climb the frame and include fixed support body and climbing device, still include the tower crane passageway that this embodiment provided. This fixed support body sets up in ground, and this climbing device is installed in this fixed support body, can follow the direction of height of this fixed support body and climb or descend, and this tower crane passageway links firmly in this climbing device. This tower crane passageway can climb or descend along with this climbing device on the mount body, need not to take repeatedly and tear the tower crane passageway open at the in-process of building subject height increase, can realize the adjustment of tower crane passageway height.
Specifically, the tower crane passageway comprises a passageway bottom plate 100, a passageway side wall 200 and a turning plate 300. The channel bottom plate 100 is vertically installed on the climbing device and can move along the height direction of the fixed frame body, and the extending direction of the channel bottom plate 100 is opposite to the tower crane 10. The channel side wall 200 includes a first side rail 210, a second side rail, a first side fence 220 and a second side fence, the first side rail 210 and the second side rail are respectively fixed on both sides of the channel bottom plate 100 along the extending direction of the channel bottom plate 100, the first side fence 220 is covered on the first side rail 210, and the second side fence is covered on the second side rail. This turn over board 300 rotates to be installed in this passageway bottom plate 100, and this turn over board 300 rotates to be opened, connects this passageway bottom plate 100 and this tower crane 10, and this turn over board 300 rotates to be accomodate, can laminate in the upper portion of this passageway bottom plate 100. This passageway bottom plate 100 can supply personnel to walk, and this first side purse net 220 and second side purse net can further improve the factor of safety of passageway side wall on the protection basis of first side rail 210 and second side rail. When climbing frame and tower crane 10 distance near, need not to open this board 300 that turns over, when climbing frame and tower crane 10 distance far away, rotate and open this board 300 that turns over, connect the passageway bottom plate 100 with the use of multiple distance between frame and the tower crane 10 can be satisfied to, before this tower crane passageway goes up and down along with climbing device, should turn over board 300 is accomodate in the rotation, can effectively avoid the tower crane passageway when climbing to appear the problem of interfering with the bulge parts of tower crane 10.
More specifically, the shaft floor 100 includes a walkway plate 110 and a walkway frame 120, the walkway frame 120 is fixedly connected to the climbing device, and the walkway plate 110 is mounted on the walkway frame 120. The walkway frame 120 can enhance the stability of the walkway plate 110 and improve the reliability of the connection of the walkway plate 110 with the climbing device.
More specifically, referring to fig. 3, the channel bottom plate 100 further includes a plurality of reinforcing rods 130, the plurality of reinforcing rods 130 are parallel to the sides of the fixing frame and are fixedly connected to the walkway frame 120 at intervals, and the walkway plate 110 is installed on the plurality of reinforcing rods 130 and the walkway frame 120. The stiffener 130 can provide stable support for the walkway plate 110, improving the load-bearing capacity of the walkway plate 110.
Preferably, the walkway plate 110 is made of steel, and the walkway frame 120 and the reinforcing rod part 130 are made of steel pipe. Utilize steel to make each part and can ensure the life of tower crane passageway, prevent that environmental factor from causing the erosion or damaging to this tower crane passageway.
Preferably, this tower crane passageway still includes reinforcing rope 400, and this reinforcing rope 400's one end is the stiff end, and this stiff end links firmly in this climbs the frame, and the other end is the link, and this link links firmly in this passageway bottom plate 100, and the mounted position of this stiff end is higher than this passageway bottom plate 100 at the mounted position of this climbs the frame. The reinforcing ropes 400 form a triangular stabilizing structure with the sides of the walkway frame 120 and the sides of the climbing device, ensuring stability of the walkway floor 100. The reinforcing rope 400 is made of a plurality of steel wires. The steel wire stock is readily available and provides sufficient tensile strength to the channel floor 100.
Referring to fig. 2, the first side rail 210 includes a plurality of first side bars 211 and a plurality of second side bars 212, the plurality of first side bars 211 are parallel to the height direction of the climbing frame and are spaced apart from each other and are fixed to the climbing frame, the plurality of second side bars 212 are perpendicular to the height direction of the climbing frame and are spaced apart from each other and are fixed to the channel bottom board 100, and the first side bars 211 and the second side bars 212 are arranged in a crossing manner. Similarly, the second side rail comprises a plurality of third side bars and a plurality of fourth side bars, the third side bars are parallel to the height direction of the climbing frame, arranged at intervals parallel to each other and fixedly connected to the climbing frame, the fourth side bars are perpendicular to the height direction of the climbing frame, arranged at intervals parallel to each other and fixedly connected to the channel bottom plate 100, and the third side bars and the fourth side bars are arranged in a crossed manner. The first side rail 210 and the second side rail can provide foundation protection for people walking on the aisle floor 100, the first side bar 211 and the second side bar 212 can provide a mounting location for the first side seine 220, and the third side bar and the fourth side bar can provide a mounting location for the second side seine.
Preferably, the turning plate 300 is rotatably connected to the end of the walkway frame 120 far from the climbing device, and the end of the turning plate 300 far from the walkway frame 120 is provided with a hook capable of hooking to the walkway base plate 100 or the tower crane 10. This hook hanging piece can be the metal couple among the prior art, can the hang-on in tower crane 10, and the security that improves personnel's use is connected the board 300 that turns over that tower crane 10 and rotation are opened. This hook member can also hang in passageway bottom plate 100, turns over board 300 to be connected passageway bottom plate 100 and rotation are accomodate, prevents that this tower crane passageway from turning over board 300 and opening and causing the part to collide with in the lift in-process. The pivotal connection between the flap 300 and the walkway frame 120 may be achieved by using a hinge or a pivot in the prior art, and the embodiment is not limited herein.
Preferably, the tower crane passageway further comprises a warning component, and the warning component is arranged on the turning plate 300. This warning subassembly can be the sticker among the prior art, pastes the border position of locating the board 300 that turns over for warn the walking personnel, improve the security of this tower crane passageway. This warning subassembly also can select the infrared induction alarm among the prior art, and this infrared induction alarm sets up in the border position that turns over board 300 equally, and when this infrared induction alarm sensed personnel and is close to, send light and whistle, remind the walking personnel to pay attention to safety.
It is obvious that the above embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Numerous obvious variations, rearrangements, and substitutions will now occur to those skilled in the art without departing from the scope of the invention. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (10)

1. A tower crane passageway, its characterized in that includes:
the channel bottom plate (100) is vertically arranged on the climbing frame and can be lifted synchronously along with the lifting of the climbing frame, the extending direction of the channel bottom plate (100) is just opposite to the tower crane (10),
the channel side wall (200) comprises a first side rail (210), a second side rail, a first side fence (220) and a second side fence, wherein the first side rail (210) and the second side rail are fixedly connected to two sides of the channel base plate (100) along the extending direction of the channel base plate (100), the first side fence (220) is arranged on the first side rail (210) in a covering manner, and the second side fence is arranged on the second side fence in a covering manner;
turning plate (300), turning plate (300) rotate install in passageway bottom plate (100), turning plate (300) rotate to open, connect passageway bottom plate (100) with tower crane (10), turning plate (300) rotate to accomodate, can laminate in the upper portion of passageway bottom plate (100).
2. The tower crane channel according to claim 1, further comprising a reinforcing rope (400), wherein one end of the reinforcing rope (400) is a fixed end, the fixed end is fixedly connected to the climbing frame, the other end of the reinforcing rope is a connecting end, the connecting end is fixedly connected to the channel bottom plate (100), and the installation position of the fixed end is higher than the installation position of the channel bottom plate (100) on the climbing frame.
3. The tower crane passageway according to claim 2, wherein the reinforcing rope (400) is made of a plurality of steel wires.
4. The tower crane passageway according to claim 1, wherein the passageway bottom plate (100) comprises a walkway plate (110) and a walkway frame (120), the walkway frame (120) is fixedly connected to the climbing frame, and the walkway plate (110) is installed on the walkway frame (120).
5. The tower crane passageway according to claim 4, characterized in that the passageway bottom plate (100) further comprises a plurality of reinforcing rod parts (130), the plurality of reinforcing rod parts (130) are parallel to the side parts of the climbing frame and fixed in the walkway frame (120) at intervals, and the walkway plate (110) is installed on the plurality of reinforcing rod parts (130) and the walkway frame (120).
6. The tower crane passageway according to claim 5, wherein the walkway plates (110) are made of steel, and the walkway frame (120) and the reinforcing rod portion (130) are made of steel pipes.
7. The tower crane passageway according to claim 1, wherein the first side rail bars (210) comprise a plurality of first side bars (211) and a plurality of second side bars (212), the plurality of first side bars (211) are parallel to the height direction of the climbing frame, are arranged in parallel and spaced mode, are fixedly connected to the climbing frame, the plurality of second side bars (212) are perpendicular to the height direction of the climbing frame, are arranged in parallel and spaced mode, are fixedly connected to the passageway bottom plate (100), and the first side bars (211) and the second side bars (212) are arranged in a crossed mode;
the second side rail comprises a plurality of third side bars and a plurality of fourth side bars, the third side bars are parallel to the height direction of the climbing frame, are arranged in parallel at intervals and fixedly connected with the climbing frame, the fourth side bars are perpendicular to the height direction of the climbing frame, are arranged in parallel at intervals and fixedly connected with the channel bottom plate (100), and the third side bars and the fourth side bars are arranged in a crossed mode.
8. The tower crane passageway according to any one of claims 1 to 7, wherein a hook is arranged at the end of the turning plate (300) and can be hooked on the passageway bottom plate (100) or the tower crane (10).
9. The tower crane passageway according to any one of claims 1 to 7, further comprising a warning assembly disposed on the flap (300).
10. A climbing frame, characterized by comprising a fixing frame body, a climbing device and the tower crane channel of any one of claims 1-9, wherein the fixing frame body is arranged on the ground, the climbing device is arranged on the fixing frame body and can climb or descend along the height direction of the fixing frame body, and the tower crane channel is fixedly connected with the climbing device.
CN202221783126.7U 2022-07-11 2022-07-11 Tower crane passageway and climbing frame Active CN218231613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221783126.7U CN218231613U (en) 2022-07-11 2022-07-11 Tower crane passageway and climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221783126.7U CN218231613U (en) 2022-07-11 2022-07-11 Tower crane passageway and climbing frame

Publications (1)

Publication Number Publication Date
CN218231613U true CN218231613U (en) 2023-01-06

Family

ID=84675627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221783126.7U Active CN218231613U (en) 2022-07-11 2022-07-11 Tower crane passageway and climbing frame

Country Status (1)

Country Link
CN (1) CN218231613U (en)

Similar Documents

Publication Publication Date Title
US9382099B2 (en) Motorized height access device for tower cranes
CN215291318U (en) Mounting structure of attached lifting scaffold
CN206408920U (en) A kind of collapsible operating platform for narrow space
CN108996421B (en) Finished furniture hoisting machine and finished furniture hoisting method
CN113719163A (en) Modular maintenance platform structure
CN218231613U (en) Tower crane passageway and climbing frame
CN102287045B (en) Square steel tube lifting outside scaffold
CN212103679U (en) A construction platform for installation of assembled tower
CN217979067U (en) Window structure that wafts convenient to outer machine of installation maintenance air conditioner
CN207511723U (en) A kind of flat arm tower crane supporting beam transporting device of new construction inner climbing type
KR200413596Y1 (en) Building repair SSP device
CN208618907U (en) A kind of inside is equipped with three towers of operating platform
CN209211920U (en) A kind of protective platform of steel platform hoistway
WO2003002447A1 (en) Lift especially for mounting on a substantially vertical building and security arrangement for said lift
CN114439213A (en) Shaft operation platform device and construction method thereof
CN211691392U (en) Climbing frame
CN209875130U (en) Oil pumping unit
CN107814318A (en) Loop wheel machine
CN106081947A (en) Possess safety and enter the derrick crane of passage
CN207032835U (en) A kind of construction lifting platform
CN107288361B (en) High-rise falling-prevention backward anchoring self-hanging double-layer horizontal safety net device and construction method thereof
CN107055275B (en) A kind of circulation building hoist system and implementation method
CN218346774U (en) Two-stage turnover plate splicing structure
CN206636153U (en) Indoor individual layer scaffold
KR100508125B1 (en) A safety way equipment for a tower crane and installing methods thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant