Disclosure of Invention
The utility model provides an outer wall fitment frame for construction engineering, the technical problem of solution be during the construction transmission material, lower floor's staff need lift up fitment mud to the eminence, and the working strength that leads to lower floor's staff is great, and upper strata staff need bend over when transmitting and take the material, the relatively poor problem of security.
In order to solve the technical problem, the utility model provides an external wall decoration frame for construction engineering, which comprises a bottom plate and a lifting mechanism;
the supporting rods are arranged in a plurality of numbers and are vertically and fixedly connected to the upper surface of the bottom plate;
the transverse plate is transversely and fixedly connected to the top end of the supporting rod;
the two protection plates are fixedly connected to the front side and the rear side of the upper surface of the transverse plate respectively;
carry the drawing mechanism and include the backup pad, the vertical fixed connection in of backup pad in diaphragm upper surface one end, the horizontal fixedly connected with support frame in top of backup pad, the one end of support frame rotationally is provided with the leading wheel, one the surface of guard plate has been articulated to connect the rope, the other end of connecting the rope passes through the surface of leading wheel extends to the below of diaphragm, the other end fixedly connected with connecting block of connecting the rope, the fixed rope of bottom fixedly connected with a plurality of connecting block, the other end fixedly connected with coupling hook of fixed rope.
Preferably, one of the upper surface end of the bottom plate is fixedly connected with a guide rod in a vertical direction on one side of the support rod, and the other side of the connecting block is fixedly connected with a sliding sleeve which is slidably sleeved on the surface of the guide rod.
Preferably, the connecting rope is fixedly connected with a hanging hook, and the surface of one of the protection plates is fixedly connected with a hanging ring matched with the hanging hook.
Preferably, a plurality of reinforcing rods are fixedly connected between the opposite surfaces of the two corresponding supporting rods, and a plurality of reinforcing ribs are fixedly connected between the surfaces of the reinforcing rods and the surfaces of the supporting rods.
Preferably, a plurality of reinforcing strips are fixedly connected between the surface of the supporting plate and the upper surface of the transverse plate.
Preferably, the other side surface of the supporting rod, which is located at the other end of the upper surface of the bottom plate, is transversely and fixedly connected with a plurality of fixing rods, the other end of each fixing rod is detachably and vertically provided with a climbing frame, a plurality of climbing rods are fixedly connected to the inner portion of each climbing frame, and the plurality of climbing rods are uniformly distributed at intervals along the length direction of the climbing frame.
Preferably, a plurality of fixing seats matched with the fixing rods are fixedly connected to one side face of the climbing frame, the plurality of fixing seats correspond to the plurality of fixing rods one to one, the fixing rods are clamped and embedded inside the fixing seats, and the fixing rods are detachably connected with the fixing seats through bolts.
Compared with the prior art, the utility model provides an outer wall fitment frame for construction engineering has following beneficial effect:
the utility model provides an outer wall fitment frame for construction engineering, connect behind the hangers department of the apparatus that holds of splendid attire fitment mud through connecting the hook, can connect the rope through the connection of connecting the connecting block through the pulling, stimulate the apparatus that holds of splendid attire fitment mud to the eminence after, the apparatus that holds of splendid attire fitment mud that can take on the diaphragm decorates the construction and use, it lifts fitment mud to the eminence to need not lower floor's staff, reduce lower floor's staff's working strength, and upper staff need not to bow the body when transmitting and take the material, improve upper staff's security, and be convenient for staff scrambles and removes through being provided with climbing frame and climbing rod, and can be connected for dismantling with the bracing piece, the device of being convenient for transports and removes.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1, fig. 2 and fig. 3 in combination, wherein fig. 1 is a schematic structural view of a preferred embodiment of an exterior wall finishing frame for construction engineering according to the present invention; FIG. 2 is an enlarged view of a portion A of FIG. 1; fig. 3 is a partially enlarged view of a portion a shown in fig. 1. An exterior wall decoration frame for construction engineering comprises a bottom plate 1 and a lifting mechanism; a plurality of support rods 2 are arranged, and the plurality of support rods 2 are vertically and fixedly connected to the upper surface of the bottom plate 1; the transverse plate 3 is transversely and fixedly connected to the top end of the support rod 2.
The protection plate 4, protection plate 4 are provided with two, and two protection plates 4 are fixed connection respectively in the front side and the rear side of diaphragm 3 upper surface.
An outer wall decoration scaffold is constituteed to bottom plate 1, bracing piece 2 and diaphragm 3, and guard plate 4 is convenient for protect the staff on upper strata, improves the staff safety of oneself in the staff work progress, and the lower surface fixedly connected with of bottom plate 1 a plurality of is prevented slipping and tiptoe standing 7.
The lifting mechanism comprises a supporting plate 13, the supporting plate 13 is vertically and fixedly connected to one end of the upper surface of the transverse plate 3, a supporting frame 15 is transversely and fixedly connected to the top end of the supporting plate 13, one end of the supporting frame 15 is rotatably provided with a guide wheel 16, and a connecting rope 17 is hung on the surface of one protection plate 4.
The other end of connecting rope 17 passes through the surface extension of leading wheel 16 to the below of diaphragm 3, connects the other end fixedly connected with connecting block 20 of rope 17, the fixed rope 21 of a plurality of bottom fixedly connected with of connecting block 20, the other end fixedly connected with coupling hook 22 of fixed rope 21.
Connecting hook 22 articulates behind the hangers department of the apparatus that holds of splendid attire fitment mud, upper strata staff can connect rope 17 through the connection of connecting block 20 through the pulling, stimulate the apparatus that holds of splendid attire fitment mud to the eminence after, the apparatus that holds of splendid attire fitment mud that can take by the staff on the diaphragm 3 carries out the fitment construction and uses, it lifts to the eminence to need not lower floor's staff to decorate mud, reduce lower floor's staff's working strength, and upper strata staff need not to bow to take the material during the transmission, improve upper strata staff's security.
One side surface of one supporting rod 2 positioned at one end of the upper surface of the bottom plate 1 is vertically and fixedly connected with a guide rod 24, the other side surface of the connecting block 20 is fixedly connected with a sliding sleeve 23, and the sliding sleeve 23 is slidably sleeved on the surface of the guide rod 24.
Connecting block 20 is moving the in-process, and sliding sleeve 23 slides on the surface of guide bar 24, and guide bar 24 leads spacing to connecting block 20 in moving the in-process for connecting block 20 moves the in-process more stably.
The connecting rope 17 is fixedly connected with a hanging hook 19, and the surface of one protection plate 4 is fixedly connected with a hanging ring 18 matched with the hanging hook 19.
When the hook 19 is inserted into the hanging ring 18, one end of the connecting rope 17 is hung on the surface of the protection plate 4 for use.
Fixedly connected with a plurality of stiffener 5 between the 2 opposite faces of two bracing pieces that correspond, fixedly connected with a plurality of strengthening rib 6 between the surface of stiffener 5 and the surface of bracing piece 2.
The support rod 2 and the reinforcing rod 5 are made of high-strength steel.
The joint strength between the support rods 2 is strengthened by the reinforcing ribs 6, so that the upper-layer worker construction process is more stable, and the joint strength between the reinforcing rods 5 and the support rods 2 is strengthened by the reinforcing ribs 6.
A plurality of reinforcing bars 14 are fixedly connected between the surface of the supporting plate 13 and the upper surface of the transverse plate 3.
The plurality of reinforcing bars 14 reinforce the connection strength between the supporting plate 13 and the transverse plate 3, so that the supporting of the supporting plate 13 on the guide wheel 16 is more stable.
The other side of the bracing piece 2 that is located the upper surface other end of bottom plate 1 transversely fixedly connected with a plurality of dead lever 8, the other end detachably of dead lever 8 is vertical to be provided with climbing frame 9, and the inside fixedly connected with a plurality of climbing pole 10 of climbing frame 9, a plurality of climbing pole 10 are along the even interval distribution of the length direction of climbing frame 9 and are arranged.
The climbing frame 9 and the climbing rod 10 are convenient for workers to climb and remove, can be detachably connected with the supporting rod 2, and are convenient for the device to be transported and moved.
Climb a side fixedly connected with fixing base 11 of a plurality of and 8 looks adaptations of dead lever of 9, a plurality of fixing bases 11 and a plurality of dead lever 8 one-to-one, dead lever 8 inlay card in the inside of fixing base 11, dead lever 8 passes through bolt 12 with fixing base 11 and can dismantle and be connected.
All offer the screw hole with bolt 12 looks adaptation on dead lever 8 and the fixing base 11, when dead lever 8 inserts the inside of fixing base 11, can be through the connection of bolt 12, will climb and put up 9 fixed mounting and use.
The utility model provides a working principle of exterior wall fitment frame for construction engineering as follows:
bottom plate 1, bracing piece 2 and diaphragm 3 constitute an outer wall fitment scaffold, guard plate 4 is convenient for protect the staff on upper strata, upper strata personnel's material has used up the back, lower floor's staff accessible coupling hook 22 articulates behind the hangers department of the splendid attire fitment mud that holds the apparatus, upper strata staff can be connected rope 17 through the connection of connecting block 20 through the pulling, the apparatus that holds of splendid attire fitment mud stimulates, stimulate the apparatus that holds of splendid attire fitment mud to the eminence after, the apparatus that holds of splendid attire fitment mud that can take on the staff on the diaphragm 3 carries out fitment construction and use, it lifts fitment mud to the eminence to need not lower floor's staff, reduce lower floor's staff's working strength, and upper strata staff need not to bow when transmitting and takes the material, improve upper strata staff's security.
Compared with the prior art, the utility model provides an outer wall fitment frame for construction engineering has following beneficial effect:
the utility model provides an outer wall fitment frame for construction engineering, articulate behind the hangers department of the apparatus that holds of splendid attire fitment mud through coupling hook 22, can be through the connection of pulling connecting rope 17 through connecting block 20, stimulate the apparatus that holds of splendid attire fitment mud to the eminence after, the apparatus that holds of splendid attire fitment mud that can take on diaphragm 3 is decorated the construction and is used, it lifts up to the eminence to need not lower floor's staff to decorate mud, reduce lower floor's staff's working strength, and upper staff need not to bow when the transmission and take the material, improve upper staff's security, and through being provided with climbing frame 9 and climbing rod 10 staff climbing and removing, and can be connected for dismantling with bracing piece 2, the device of being convenient for transporting and removing.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.