CN214834582U - Scaffold for building engineering - Google Patents
Scaffold for building engineering Download PDFInfo
- Publication number
- CN214834582U CN214834582U CN202121588133.7U CN202121588133U CN214834582U CN 214834582 U CN214834582 U CN 214834582U CN 202121588133 U CN202121588133 U CN 202121588133U CN 214834582 U CN214834582 U CN 214834582U
- Authority
- CN
- China
- Prior art keywords
- wall
- fixed
- branch
- fixing
- scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims description 11
- 230000006978 adaptation Effects 0.000 claims description 6
- 238000000034 method Methods 0.000 abstract description 6
- 238000006073 displacement reaction Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model provides a scaffold frame for building engineering relates to scaffold frame technical field, including rack, pillar, dead lever, staircase, branch and mobile device, the fixed surface of pillar is connected with branch, the inner wall fixedly connected with dead lever of pillar, the fixed surface of branch is connected with the staircase, the inner wall of branch is provided with the rack, the mobile device sets up the surface at the pillar, the mobile device includes fixed block and runner, the fixed block rotates with the inner wall of pillar to be connected, the runner rotates with the inner wall of fixed block to be connected. The utility model discloses, through setting up the mobile device, remove the equipment principal effectively, and when having avoided traditional equipment to remove, need many people to carry and remove, because the great removal in-process of equipment wastes time and energy, cause the equipment to have the condition of unable normal use, and then reduced workman's work burden, improve equipment's ease for use.
Description
Technical Field
The utility model relates to a scaffold technical field especially relates to a scaffold frame for building engineering.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
Along with the development of society, the scaffold frame is applied to in the building site in a large number, and most equipment need many people to carry the removal when removing at present, because the great removal in-process of equipment wastes time and energy, causes the unable normal use's of equipment existence condition, and then increases workman's work burden, reduces the ease for use of equipment, need improve this.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and having most equipment among the prior art when removing, need many people to carry and remove, because the great removal in-process of equipment wastes time and energy, cause the equipment to have the condition of unable normal use, and then increase workman's work burden, reduce the shortcoming of equipment ease of use, and the scaffold frame for building engineering who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a scaffold for building engineering, includes rack, pillar, dead lever, staircase, branch and mobile device, the fixed surface of pillar is connected with branch, the inner wall fixedly connected with dead lever of pillar, the fixed surface of branch is connected with the staircase, the inner wall of branch is provided with the rack, the mobile device sets up the surface at the pillar, the mobile device includes fixed block and runner, the fixed block rotates with the inner wall of pillar to be connected, the runner rotates with the inner wall of fixed block to be connected, a plurality of equidistance fixed orificess are seted up on the surface of runner, the inner wall of fixed block runs through and sliding connection has the pull rod.
Preferably, the surface of the pull rod is fixedly connected with a tension spring, one side of the tension spring, far away from the pull rod, is fixedly connected with the surface of the fixing block, and the pull rod is matched with the fixing hole.
Preferably, the inner wall of fixed block runs through and sliding connection has the gag lever post, the fixed surface of gag lever post is connected with spacing spring, one side that spacing spring kept away from the gag lever post is connected with the fixed surface of fixed block.
Preferably, the limiting rod is matched with the inner wall of the pull rod, the number of the fixing blocks, the number of the rotating wheels, the number of the limiting rods and the number of the pull rods are two, and the two pairs of fixing blocks, the rotating wheels, the limiting rods and the pull rods are symmetrically arranged by taking the supporting rods as symmetrical axes.
Preferably, the surface of the supporting rod is provided with a fixing device, the fixing device comprises a connecting block and a connecting rod, the connecting block is fixedly connected with the surface of the supporting rod, the connecting rod is connected with the inner wall of the supporting rod in a sliding mode, the connecting rod is matched with the inner wall of the placing frame, and one side of the connecting rod is fixedly connected with a connecting spring.
Preferably, one side of the connecting spring, which is far away from the connecting rod, is fixedly connected with the inner wall of the supporting rod, the inner wall of the connecting block is rotatably connected with a fixed arm, and the fixed arm is matched with the surface of the connecting rod.
Preferably, the inner wall of the connecting block penetrates through and is connected with a fixing column in a sliding mode, a fixing spring is fixedly connected to the surface of the fixing column, one side, far away from the fixing column, of the fixing spring is fixedly connected with the surface of the connecting block, and the fixing column is matched with the inner wall of the fixing arm.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. the utility model discloses in, through setting up the mobile device, the user is when carrying out the mobile device, the pulling gag lever post makes its displacement drive spacing spring displacement deformation and produces elasticity, the gag lever post breaks away from the inner wall of pull rod immediately, the pulling pull rod makes its displacement drive tension spring displacement deformation and produces elasticity immediately, the pull rod breaks away from the connecting hole immediately, loosen the constraint to the gag lever post, spacing spring resets immediately and drives the inner wall looks adaptation of gag lever post displacement and pull rod, accomplish the removal of equipment, through setting up the mobile device, remove the equipment main part effectively, and when having avoided the traditional equipment to remove, need many people to carry the removal, because the great removal in-process of equipment wastes time and energy, cause the equipment to have the unable normal use condition, and then reduced workman's work burden, improve equipment's ease for use.
2. In the utility model, through the arrangement of the fixing device, when the equipment is installed, a user adapts the placing frame with the inner wall of the supporting rod, then pulls the fixing column to displace and drive the fixing spring to displace and deform to generate elasticity, the fixing column is separated from the inner wall of the fixing arm at any time, then the fixing arm loses constraint, the fixing arm is rotated to separate from the surface of the connecting rod, then the connecting rod loses constraint, the connecting spring resets to drive the connecting rod to displace and adapt to the inner wall of the placing frame, the equipment is fixed, through the arrangement of the fixing device, the placing frame is effectively fixed, further the equipment is prevented from being fixedly connected by using a bolt, when the equipment is disassembled and maintained, the bolt needs to be operated by using a large number of tools, the operation is complicated and the efficiency is low, meanwhile, the situation that the equipment has certain potential safety hazard due to the fact that the bolt is stressed and slides when in use is avoided, and furthermore, the usability of the equipment is improved, and the safety of the equipment is improved.
Drawings
Fig. 1 is a schematic perspective view of a scaffold for construction engineering according to the present invention;
fig. 2 is a schematic side view of the scaffold for construction engineering according to the present invention;
fig. 3 is a schematic structural view of a portion a in fig. 2 in the scaffold for construction engineering according to the present invention;
fig. 4 is a schematic structural view of a moving device of a scaffold for construction engineering according to the present invention;
fig. 5 is the utility model provides a fixing device schematic structure of scaffold frame for building engineering.
Illustration of the drawings: 1. placing a rack; 2. a pillar; 3. fixing the rod; 4. an escalator; 5. a strut; 6. a mobile device; 61. a fixed block; 62. a limiting rod; 63. a limiting spring; 64. a pull rod; 65. a tension spring; 66. a rotating wheel; 7. a fixing device; 71. fixing a column; 72. fixing the spring; 73. connecting blocks; 74. a fixed arm; 75. a connecting spring; 76. a connecting rod.
Detailed Description
In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the limitations of the specific embodiments of the present disclosure.
The specific arrangement and function of the moving means 6 and the fixing means 7 will be described in detail below.
As shown in fig. 1 and 3, the moving device 6 includes a fixed block 61 and a rotating wheel 66, the fixed block 61 is rotatably connected with the inner wall of the pillar 2, the rotating wheel 66 is rotatably connected with the inner wall of the fixed block 61, a plurality of equidistant fixing holes are formed in the surface of the rotating wheel 66, the inner wall of the fixed block 61 penetrates through and is slidably connected with a pull rod 64, a tension spring 65 is fixedly connected to the surface of the pull rod 64, one side of the tension spring 65, which is far away from the pull rod 64, is fixedly connected with the surface of the fixed block 61, the pull rod 64 is matched with the fixing holes, the rotating wheel 66 is arranged, and the moving device is convenient to move.
The inner wall of fixed block 61 runs through and sliding connection has gag lever post 62, the fixed surface of gag lever post 62 is connected with spacing spring 63, spacing spring 63 keeps away from one side of gag lever post 62 and the fixed surface of fixed block 61 is connected, gag lever post 62 and pull rod 64's inner wall looks adaptation, fixed block 61, runner 66, gag lever post 62 and pull rod 64's quantity is two, two pairs of fixed blocks 61, runner 66, gag lever post 62 and pull rod 64 all use branch 5 to be the symmetry and establish as the symmetry axis, set up gag lever post 62, be convenient for fix its pull rod 64.
The whole moving device 6 achieves the effect that by arranging the moving device 6, when a user moves the equipment, the limiting rod 62 is pulled to displace to drive the limiting spring 63 to displace and deform to generate elastic force, the limiting rod 62 is separated from the inner wall of the pull rod 64, the pull rod 64 is pulled to displace to drive the tension spring 65 to displace and deform to generate elastic force, the pull rod 64 is separated from the connecting hole, the limitation on the limiting rod 62 is loosened, the limiting spring 63 is reset to drive the limiting rod 62 to displace to be matched with the inner wall of the pull rod 64, and the movement of the equipment is completed, the moving device 6 is arranged to effectively move the equipment main body, thereby avoiding the need of carrying and moving by a plurality of people when the traditional equipment is moved, the equipment is time-consuming and labor-consuming in the large moving process, so that the equipment cannot be normally used, the workload of workers is reduced, and the usability of the equipment is improved.
As shown in fig. 1 and 5, the fixing device 7 includes a connecting block 73 and a connecting rod 76, the connecting block 73 is fixedly connected to the surface of the supporting rod 5, the connecting rod 76 is slidably connected to the inner wall of the supporting rod 5, the connecting rod 76 is adapted to the inner wall of the rack 1, and a connecting spring 75 is fixedly connected to one side of the connecting rod 76 and provided with the connecting rod 76, so that the rack 1 can be conveniently fixed.
One side of connecting spring 75, which is far away from connecting rod 76, is fixedly connected with the inner wall of branch 5, the inner wall of connecting block 73 is rotated and is connected with fixed arm 74, fixed arm 74 and the surperficial looks adaptation of connecting rod 76, the inner wall of connecting block 73 runs through and sliding connection has fixed column 71, the fixed surface of fixed column 71 is fixedly connected with fixed spring 72, one side of fixed spring 72, which is far away from fixed column 71, is fixedly connected with the surface of connecting block 73, fixed column 71 sets up fixed column 71 with the inner wall looks adaptation of fixed arm 74, be convenient for fix fixed arm 74.
The whole fixing device 7 achieves the effects that through the arrangement of the fixing device 7, when equipment is installed, a user adapts the placing rack 1 to the inner wall of the support rod 5, immediately pulls the fixing column 71 to displace and drive the fixing spring 72 to displace and deform to generate elasticity, the fixing column 71 is separated from the inner wall of the fixing arm 74 at any time, immediately the fixing arm 74 loses constraint, the fixing arm 74 is rotated to be separated from the surface of the connecting rod 76, immediately the connecting rod 76 loses constraint, the connecting spring 75 resets to drive the connecting rod 76 to displace and adapt to the inner wall of the placing rack 1, the equipment is fixed, through the arrangement of the fixing device 7, the placing rack 1 is effectively fixed, further, the equipment is prevented from being fixedly connected by using bolts, when the equipment is detached and maintained, the bolts need to be operated by using a large number of tools, the situations of complicated operation and low efficiency exist, and meanwhile, the bolts are prevented from being stressed and slippery in use, the equipment has certain potential safety hazard, so that the usability of the equipment is improved, and the safety of the equipment is improved.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in other forms, and any person skilled in the art may use the above-mentioned technical contents to change or modify the equivalent embodiment into equivalent changes and apply to other fields, but any simple modification, equivalent change and modification made to the above embodiments according to the technical matters of the present invention will still fall within the protection scope of the technical solution of the present invention.
Claims (7)
1. The utility model provides a scaffold for building engineering, includes rack (1), pillar (2), dead lever (3), staircase (4), branch (5) and mobile device (6), its characterized in that: the fixed surface of pillar (2) is connected with branch (5), the inner wall fixedly connected with dead lever (3) of pillar (2), the fixed surface of branch (5) is connected with staircase (4), the inner wall of branch (5) is provided with rack (1), mobile device (6) set up the surface at pillar (2), mobile device (6) are including fixed block (61) and runner (66), fixed block (61) rotate with the inner wall of pillar (2) and are connected, runner (66) rotate with the inner wall of fixed block (61) and are connected, the fixed orifices of a plurality of equidistance are seted up on the surface of runner (66), the inner wall of fixed block (61) runs through and sliding connection has pull rod (64).
2. A scaffold for construction engineering according to claim 1, characterized in that: the surface of the pull rod (64) is fixedly connected with a tension spring (65), one side, far away from the pull rod (64), of the tension spring (65) is fixedly connected with the surface of the fixing block (61), and the pull rod (64) is matched with the fixing hole.
3. A scaffold for construction engineering according to claim 2, wherein: the inner wall of fixed block (61) runs through and sliding connection has gag lever post (62), the fixed surface of gag lever post (62) is connected with spacing spring (63), one side that gag lever post (62) was kept away from in spacing spring (63) is connected with the fixed surface of fixed block (61).
4. A scaffold for construction engineering according to claim 3, wherein: the utility model discloses a spacing pole, including the gag lever post (62), the inner wall looks adaptation of pull rod (64), the quantity of fixed block (61), runner (66), gag lever post (62) and pull rod (64) is two, two pairs of fixed blocks (61), runner (66), gag lever post (62) and pull rod (64) all use branch (5) to be the symmetry setting as the symmetry axis.
5. A scaffold for construction engineering according to claim 1, characterized in that: the utility model discloses a rack, including branch (5), fixing device (7) include connecting block (73) and connecting rod (76), the fixed surface of connecting block (73) and branch (5) is connected, the inner wall sliding connection of connecting rod (76) and branch (5), the inner wall looks adaptation of connecting rod (76) and rack (1), one side fixedly connected with connecting spring (75) of connecting rod (76).
6. A scaffolding for building engineering according to claim 5, wherein: one side of the connecting spring (75) far away from the connecting rod (76) is fixedly connected with the inner wall of the support rod (5), the inner wall of the connecting block (73) is rotatably connected with a fixed arm (74), and the fixed arm (74) is matched with the surface of the connecting rod (76).
7. A scaffold for construction engineering according to claim 6, characterized in that: the inner wall of the connecting block (73) penetrates through and is connected with a fixing column (71) in a sliding mode, a fixing spring (72) is fixedly connected to the surface of the fixing column (71), one side, far away from the fixing column (71), of the fixing spring (72) is fixedly connected with the surface of the connecting block (73), and the fixing column (71) is matched with the inner wall of the fixing arm (74).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121588133.7U CN214834582U (en) | 2021-07-13 | 2021-07-13 | Scaffold for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121588133.7U CN214834582U (en) | 2021-07-13 | 2021-07-13 | Scaffold for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214834582U true CN214834582U (en) | 2021-11-23 |
Family
ID=78814402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121588133.7U Expired - Fee Related CN214834582U (en) | 2021-07-13 | 2021-07-13 | Scaffold for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214834582U (en) |
-
2021
- 2021-07-13 CN CN202121588133.7U patent/CN214834582U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110185247A (en) | Mobile outrigger platform | |
CN214834582U (en) | Scaffold for building engineering | |
CN107013030B (en) | Hoisting type elevator shaft construction platform device and elevator shaft construction method | |
CN210482966U (en) | Multistage assembled lattice frame building structure | |
CN209799310U (en) | Building scaffold convenient to dismantle transportation | |
CN217631128U (en) | Building scaffold | |
CN206646836U (en) | A kind of exterior wall, inner partition plate movement lifting frame | |
CN212249184U (en) | Electric creeping formwork device for building construction | |
CN211080951U (en) | Building climbing frame for building | |
CN212078621U (en) | Civil engineering safety scaffold | |
CN220100561U (en) | Steel construction rack with anti-skidding mechanism | |
CN210888118U (en) | Building faces limit structure post construction protection frame | |
CN218912156U (en) | Movable scaffold for building construction | |
CN217602019U (en) | Be applied to safe subassembly of scaffold frame | |
CN216157124U (en) | High altitude faces limit post construction operating means | |
CN218562973U (en) | Attached movable concrete guardrail construction operation platform | |
CN215976843U (en) | Light bridge outlet construction work platform | |
CN215167826U (en) | Construction operation platform for municipal construction | |
CN218406592U (en) | Movable I-steel dismantlement platform that encorbelments | |
CN219691034U (en) | Building construction frame with anti-drop | |
CN214692997U (en) | Safe suspension structure for high-altitude construction of building | |
CN215368654U (en) | Building outrigger safety protective guard | |
CN219885612U (en) | Lifting frame for building engineering | |
CN217557575U (en) | Lifting type building scaffold | |
CN211396524U (en) | Scaffold frame that can dismantle fast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211123 |