CN210194448U - A hanging flower basket during removal for bridge construction - Google Patents

A hanging flower basket during removal for bridge construction Download PDF

Info

Publication number
CN210194448U
CN210194448U CN201920971640.5U CN201920971640U CN210194448U CN 210194448 U CN210194448 U CN 210194448U CN 201920971640 U CN201920971640 U CN 201920971640U CN 210194448 U CN210194448 U CN 210194448U
Authority
CN
China
Prior art keywords
base
flower basket
hanging flower
guardrail
extension ladder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920971640.5U
Other languages
Chinese (zh)
Inventor
Deqiang Meng
孟德强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920971640.5U priority Critical patent/CN210194448U/en
Application granted granted Critical
Publication of CN210194448U publication Critical patent/CN210194448U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the technical field of hanging flower basket, especially be a hanging flower basket when removing for bridge construction, including base, guardrail and link, the upper surface of base is connected with the guardrail, and the upper surface of guardrail is connected with the link, and the both sides of base all have the connecting rod in sliding connection, and the inside both sides of base have all been seted up the spread groove, and two bases can be dismantled through connecting rod and spread groove and connect, and the upper surface of base is connected with extension ladder; two bases can be in the same place through the connection concatenation of connecting rod and spread groove, reach the effect of adjusting base length, make things convenient for the staff to adjust the length of hanging flower basket according to construction environment, make things convenient for the staff to construct, be provided with the extension ladder on the hanging flower basket, the upper end of extension ladder and one side of bridge floor are fixed, when the hanging flower basket goes up and down in the short distance, the extension ladder can stretch out and draw back thereupon, when the staff need leave the hanging flower basket, only need climb the extension ladder can, need not go up and down the hanging flower basket, make things convenient for the staff to work.

Description

A hanging flower basket during removal for bridge construction
Technical Field
The utility model belongs to the technical field of the hanging flower basket, concretely relates to hanging flower basket during removal for bridge construction.
Background
The hanging basket is a construction machine for high-altitude operation in construction engineering, acts on curtain wall installation, cleans an outer wall, is erected on a building or a structure by an overhanging mechanism, drives a hanging platform by a lifting mechanism, a construction facility which runs up and down along the vertical surface of a building or a structure through a steel wire rope and is also an operation platform arranged for operators, a hanging basket is a construction machine for high-altitude operation in construction engineering and is used for curtain wall installation and outer wall cleaning, the hanging basket is a hanging basket which can replace a traditional scaffold, the novel high-altitude operation equipment which can reduce the labor intensity and improve the working efficiency and can be repeatedly used has gradually become a trend of the use of the construction hanging basket, the method is widely accepted in high-rise operations such as outer wall construction, curtain wall installation, heat insulation construction, maintenance and cleaning of outer walls and the like of high-rise multi-storey buildings, and can be used for the operation of large-scale tank bodies, bridges, dams and other projects.
The prior art has the following problems: .
1. When the existing bridge is constructed, the length of the hanging basket cannot be adjusted according to the length of the environment during construction, and workers need to customize the hanging basket according to the length of the environment, so that the construction is inconvenient for the workers;
2. staff is when the construction, and the meeting of hanging flower basket reciprocates in the space, and the help staff is under construction, and the staff can leave the hanging flower basket in short distance goes up and down, then need climb the ladder of fixed length this moment and go to the bridge floor on, the hanging flower basket can influence placing of ladder in short distance goes up and down, and inconvenient staff leaves the hanging flower basket.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a hanging flower basket during removal for bridge construction has the characteristics that can splice.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hanging flower basket during removal for bridge construction, includes base, guardrail and link, the upper surface of base is connected with the guardrail, the upper surface of guardrail is connected with the link, the equal sliding connection in both sides of base has the connecting rod, the spread groove has all been seted up to the inside both sides of base, two the base passes through the connecting rod with the connection can be dismantled to the spread groove, the upper surface of base is connected with extension ladder, extension ladder locates the inside of guardrail, one side of guardrail is rotated and is connected with the connecting door.
Preferably, the two sides of the guardrail are connected with a tripod, and the upper surface of the tripod is connected with a connecting frame.
Preferably, the base is internally connected with a hydraulic cylinder, and the output end of the hydraulic cylinder is connected with a connecting rod in a sliding manner.
Preferably, the upper end of the extension ladder is connected with a fixed hook.
Preferably, the upper surfaces of the two bases are connected with fixing plates, and the fixing plates are detachably connected to the upper surfaces of the bases through connecting bolts.
Preferably, the upper surface of the fixing plate is provided with a fixing groove, and the connecting bolt is arranged inside the fixing groove.
Preferably, the upper surface of the fixing plate is connected with anti-skid lines.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the two bases can be spliced together through the connection of the connecting rod and the connecting groove, so that the effect of adjusting the length of the bases is achieved, workers can adjust the length of the hanging basket according to the construction environment conveniently, and the workers can construct conveniently;
2. be provided with the extension ladder on the hanging flower basket, one side of the upper end of extension ladder and bridge floor is fixed, when the hanging flower basket goes up and down in the short distance, the extension ladder can stretch out and draw back thereupon, and when the staff need leave the hanging flower basket, only need climb the extension ladder can, need not go up and down the hanging flower basket, make things convenient for the staff to carry out work.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of one side of the guardrail of the present invention;
FIG. 3 is a schematic structural view of the upper part of the base of the present invention;
fig. 4 is a schematic structural view of a fixing plate of the present invention;
in the figure: 1. a base; 2. connecting grooves; 3. a connecting rod; 4. a guardrail; 5. a connecting frame; 6. an extension ladder; 7. a fixed hook; 8. a tripod; 9. a hydraulic cylinder; 10. fixing grooves; 11. a connecting bolt; 12. a fixing plate; 13. a connecting door; 14. and (4) anti-skid lines.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-4, the present invention provides the following technical solutions: the utility model provides a hanging flower basket during removal for bridge construction, the on-line screen storage device comprises a base 1, guardrail 4 and link 5, base 1's upper surface is connected with guardrail 4, guardrail 4's upper surface is connected with link 5, the equal sliding connection in base 1's both sides has connecting rod 3, spread groove 2 has all been seted up to base 1's inside both sides, two bases 1 can dismantle the connection through connecting rod 3 and spread groove 2, base 1's upper surface is connected with extension ladder 6, extension ladder 6 locates guardrail 4's inside, one side of guardrail 4 is rotated and is connected with connecting door 13.
In this embodiment: two bases 1 can be in the same place through the connection concatenation of connecting rod 3 and spread groove 2, reach the effect of adjusting base 1 length, make things convenient for the staff to adjust the length of hanging flower basket according to construction environment, make things convenient for the staff to be under construction, be provided with extension ladder 6 on the hanging flower basket, the upper end of extension ladder 6 is fixed with one side of bridge floor, when the hanging flower basket goes up and down in the short distance, extension ladder 6 can stretch out and draw back thereupon, when the staff need leave the hanging flower basket, only need climb extension ladder 6 can, need not go up and down the hanging flower basket, make things convenient for the staff to carry out work.
Specifically, two sides of the guardrail 4 are connected with a tripod 8, and the upper surface of the tripod 8 is connected with a connecting frame 5; the triangular tripod 8 has high structural stability, and the safety of the hanging basket is improved.
Specifically, a hydraulic cylinder 9 is connected inside the base 1, and the output end of the hydraulic cylinder 9 is connected with a connecting rod 3 in a sliding manner; the outside hydraulic pump lets in liquid oil in pneumatic cylinder 9, drives the inside piston of pneumatic cylinder 9 and slides for pneumatic cylinder 9 can drive connecting rod 3 flexible, has used machinery to replace artificial method to peg graft, has saved staff's intensity of labour.
Specifically, the upper end of the extension ladder 6 is connected with a fixed hook 7; the fixed hook 7 can be hooked on one side of the bridge floor, so that the extension ladder 6 can be conveniently fixed on the bridge floor.
Specifically, the upper surfaces of the two bases 1 are connected with fixing plates 12, and the fixing plates 12 are detachably connected to the upper surfaces of the bases 1 through connecting bolts 11; the fixing plate 12 can fix the two bases 1 together through the connecting bolt 11, so that the structural stability between the two bases 1 is improved, and safety accidents are avoided.
Specifically, the upper surface of the fixing plate 12 is provided with a fixing groove 10, and the connecting bolt 11 is arranged inside the fixing groove 10; connecting bolt 11 locates the inside of fixed slot 10, avoids staff's foot to touch connecting bolt 11, and the diameter of fixed slot 10 is greater than connecting bolt 11, can not influence staff's installation and dismantlement connecting bolt 11.
Specifically, the upper surface of the fixing plate 12 is connected with an anti-skid thread 14; the anti-slip lines 14 can increase the surface friction of the fixing plate 12, prevent workers from slipping, and increase safety.
The utility model discloses a theory of operation and use flow: the two bases 1 can be spliced together through the connection of the connecting rod 3 and the connecting groove 2 to achieve the effect of adjusting the length of the bases 1, so that a worker can conveniently adjust the length of a hanging basket according to the construction environment, the worker can conveniently carry out construction, an external hydraulic pump introduces liquid oil into the hydraulic cylinder 9 to drive the piston inside the hydraulic cylinder 9 to slide, so that the hydraulic cylinder 9 can drive the connecting rod 3 to stretch out and draw back, the splicing is carried out by using a mechanical-to-manual method, the labor intensity of the worker is saved, the two bases 1 can be fixed together through the connecting bolt 11 by the fixing plate 12, the structural stability between the two bases 1 is improved, safety accidents are avoided, the connecting bolt 11 is arranged inside the fixing groove 10, the feet of the worker are prevented from touching the connecting bolt 11, the diameter of the fixing groove 10 is larger than that of the connecting bolt 11, be provided with extension ladder 6 on the hanging flower basket, one side of the upper end of extension ladder 6 and bridge floor is fixed, anti-skidding line 14 can increase the surface friction of fixed plate 12, avoid the staff to slip, the security has been increased, when the hanging flower basket goes up and down in the short distance, extension ladder 6 can stretch out and draw back thereupon, when the staff need leave the hanging flower basket, only need climb extension ladder 6 can, need not go up and down the hanging flower basket, make things convenient for the staff to carry out work, fixed hook 7 can collude in one side of bridge floor, make things convenient for extension ladder 6 to fix on the bridge floor.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a hanging flower basket during removal for bridge construction, includes base (1), guardrail (4) and link (5), the upper surface of base (1) is connected with guardrail (4), the upper surface of guardrail (4) is connected with link (5), its characterized in that: the equal sliding connection in both sides of base (1) has connecting rod (3), spread groove (2), two have all been seted up to the inside both sides of base (1) passes through connecting rod (3) with the connection can be dismantled in spread groove (2), the upper surface of base (1) is connected with extension ladder (6), extension ladder (6) are located the inside of guardrail (4), one side of guardrail (4) is rotated and is connected with connecting door (13).
2. The mobile basket for bridge construction according to claim 1, wherein: the two sides of the guardrail (4) are connected with the triangular supports (8), and the upper surfaces of the triangular supports (8) are connected with the connecting frames (5).
3. The mobile basket for bridge construction according to claim 1, wherein: the inside connection of base (1) has pneumatic cylinder (9), the output sliding connection of pneumatic cylinder (9) has connecting rod (3).
4. The mobile basket for bridge construction according to claim 1, wherein: the upper end of the extension ladder (6) is connected with a fixed hook (7).
5. The mobile basket for bridge construction according to claim 1, wherein: two the upper surface of base (1) is connected with fixed plate (12), fixed plate (12) can dismantle through connecting bolt (11) and connect in the upper surface of base (1).
6. A mobile basket for bridge construction according to claim 5, wherein: the upper surface of the fixing plate (12) is provided with a fixing groove (10), and the connecting bolt (11) is arranged inside the fixing groove (10).
7. A mobile basket for use in bridge construction according to claim 6, wherein: the upper surface of the fixing plate (12) is connected with anti-skid grains (14).
CN201920971640.5U 2019-06-26 2019-06-26 A hanging flower basket during removal for bridge construction Expired - Fee Related CN210194448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920971640.5U CN210194448U (en) 2019-06-26 2019-06-26 A hanging flower basket during removal for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920971640.5U CN210194448U (en) 2019-06-26 2019-06-26 A hanging flower basket during removal for bridge construction

Publications (1)

Publication Number Publication Date
CN210194448U true CN210194448U (en) 2020-03-27

Family

ID=69872407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920971640.5U Expired - Fee Related CN210194448U (en) 2019-06-26 2019-06-26 A hanging flower basket during removal for bridge construction

Country Status (1)

Country Link
CN (1) CN210194448U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112746735A (en) * 2020-12-30 2021-05-04 李艳梅 Hanging flower basket of bottom plate can be spliced with convenient to dismantle to construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112746735A (en) * 2020-12-30 2021-05-04 李艳梅 Hanging flower basket of bottom plate can be spliced with convenient to dismantle to construction

Similar Documents

Publication Publication Date Title
CN201826516U (en) Novel attached lifting scaffold
CN210194448U (en) A hanging flower basket during removal for bridge construction
CN209568688U (en) A kind of elevating construction platform
CN208734045U (en) Monoblock type mould bases for Super High fission conjoined composite structure
CN108035530B (en) Oil tank inner wall construction hanging basket
CN210683010U (en) Stair climbing machine device
CN105800527A (en) Material hoist for building construction
CN206903184U (en) A kind of high architectural engineering assembled bearing of security performance
CN215631444U (en) Construction is with building scaffold who has anti falling structure
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN212078621U (en) Civil engineering safety scaffold
CN213950418U (en) Portable prefabricated plate hoist device
CN114033151A (en) Aerial work hanging basket system suitable for various wall surface conditions
CN210561720U (en) Pier stud maintenance repair operation platform
CN208361837U (en) A kind of Lifting basket of no suspension mechanism
CN218061366U (en) Building external climbing type building construction operation platform
CN110422772A (en) Climbing machine device device and method
CN219840355U (en) Hanging basket device suitable for arc-shaped structure
CN207484936U (en) A kind of nacelle device of Landscape Lighting installation
CN201678398U (en) High-rise indoor object-suspending device
CN206530030U (en) Steel construction operation frame
CN211733663U (en) Building hoisting device
CN209507462U (en) A kind of existing building installation elevator scissors climbing integral hoisting machine
CN116220324B (en) Supporting platform for high-altitude corrosion prevention construction
CN212957582U (en) Be applied to safe basket of hanging of construction is built in room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200327

Termination date: 20210626

CF01 Termination of patent right due to non-payment of annual fee