CN218201861U - Under-cover unloading system of subway vehicle section - Google Patents

Under-cover unloading system of subway vehicle section Download PDF

Info

Publication number
CN218201861U
CN218201861U CN202222762960.4U CN202222762960U CN218201861U CN 218201861 U CN218201861 U CN 218201861U CN 202222762960 U CN202222762960 U CN 202222762960U CN 218201861 U CN218201861 U CN 218201861U
Authority
CN
China
Prior art keywords
unloading
cover
under
bridge crane
site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222762960.4U
Other languages
Chinese (zh)
Inventor
周亮节
张荫�
王永辉
梁守科
董立威
郭爱平
王欣
李伟东
董微微
陈世浩
徐久勇
王薪
金永乐
张攀锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN202222762960.4U priority Critical patent/CN218201861U/en
Application granted granted Critical
Publication of CN218201861U publication Critical patent/CN218201861U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a cover unloading system of a metro vehicle section, which comprises an unloading field and a bridge crane arranged above the unloading field; the unloading site comprises parking spaces and unloading lines which are sequentially arranged along the span direction L of the bridge crane; also includes a support structure; the support structures are arranged in multiple groups, and the multiple groups of support structures are arranged pairwise at intervals along the length direction of the unloading field; the support structure comprises a first upright and a second upright arranged in pairs; the unloading site is located between the first stand column and the second stand column, and the bridge crane is installed and supported through the first stand column and the second stand column. And the unloading under the cover is realized. The cover plate lifting device can not only avoid local lifting of the cover plate by using a truck crane for unloading under the cover, but also avoid independent construction of an unloading site and a line outside the cover, and is favorable for property development of the cover while investment is saved.

Description

Under-cover unloading system of subway vehicle section
Technical Field
The utility model relates to a track traffic technical field, concretely relates to system of unloading under lid of railcar section.
Background
The vehicle section is a subway vehicle operation and maintenance base, is used for daily parking, maintenance and regular maintenance of vehicles, and is an important component of a subway system. After the vehicle section is built, the subway vehicles are usually placed on the vehicle section line by adopting a mode of automobile transportation and loading and unloading of hoisting equipment.
In the non-covered vehicle section, the unloading work is generally performed in an open material line and a material yard. And hoisting the metro vehicle from the transport flat car to the material line through two cranes. The requirement of using a truck to unload is high, and an open field with a square of at least 100m multiplied by 60m and a clear height requirement of at least 20m are required. At present, more and more vehicle sections adopt the design scheme of property development with an upper cover, the integral layer height of a property development upper cover plate is at most 15m, and the unloading requirement of a truck crane cannot be met.
The existing methods include two types:
firstly, locally lifting an upper cover plate in an unloading area to enable the height of the upper cover plate to be higher than 20m, and then unloading by using a truck crane.
And secondly, independently finding an unloading place outside the cover. At this time, the line of the vehicle section needs to be extended to the unloading site outside the cover, and then the vehicle is unloaded by the truck crane.
The two existing unloading modes not only increase investment and are not beneficial to covering property development, but also are difficult to find a proper unloading place outside the cover under most conditions.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a system of unloading under lid of railcar section is provided, realize unloading under the lid.
The utility model provides a technical scheme that its technical problem adopted is: the under-cover unloading system of the metro train section comprises an unloading field and a bridge crane arranged above the unloading field;
the unloading site comprises parking spaces and unloading lines which are sequentially arranged along the span direction L of the bridge crane;
also includes a support structure; the support structures are provided with a plurality of groups, and the support structures are arranged in pairs at intervals along the length direction of the unloading field;
the support structure comprises a first upright and a second upright arranged in pairs;
the unloading site is located between the first stand column and the second stand column, and the bridge crane passes through the first stand column and the second stand column are installed and supported.
Further, a first bracket is arranged on the first upright post, and a second bracket is arranged on the second upright post;
the first bracket and the second bracket are arranged correspondingly, and the bridge crane is installed and supported through the first bracket and the second bracket.
Furthermore, the bridge crane is provided with two, and the two bridge cranes are arranged at intervals along the length direction of the unloading site.
Further, the first upright post and the second upright post are both of a concrete structure.
Furthermore, the unloading site is a hardened ground, and the bearing capacity of the unloading site is greater than 15t/m 2
Furthermore, the unloading site is of a rectangular structure, the length a of the unloading site is larger than 35m, and the width b of the unloading site is larger than 12m.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model provides a system of unloading under lid of railcar section realizes unloading under the lid. The cover plate lifting device can not only avoid local lifting of the cover plate by using a truck crane for unloading under the cover, but also avoid independent construction of unloading sites and lines outside the cover, and is favorable for property development on the cover while saving investment.
Drawings
FIG. 1 is a schematic sectional view of the present invention;
fig. 2 is a schematic plan view of the present invention;
reference numerals: 1, covering the cover; 2-a first upright; 201-a first corbel; 3-a second upright; 301-a second corbel; 4-a bridge crane; 5-unloading the yard; 501-parking space; 502-unloading the train line; 6-a metro vehicle; 7-a flat carrier vehicle; 8-road; 9-hoisting tool.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
As shown in the attached drawings, the under-cover unloading system of the subway vehicle section comprises an unloading field 5 and a bridge crane 4 arranged above the unloading field 5; the unloading site 5 comprises a parking space 501 and an unloading line 502 which are sequentially arranged along the span direction L of the bridge crane 4; also includes a support structure; the support structures are provided with a plurality of groups, and the support structures are arranged in pairs at intervals along the length direction of the unloading field 5; the support structure comprises a first upright 2 and a second upright 3 arranged in pairs; unloading place 5 is located between first stand 2 and the second stand 3, just bridge crane 4 passes through first stand 2 and the installation of second stand 3 are supported.
The first upright 2 and the second upright 3 are used as a support system of the upper cover 1 and a support system of the bridge crane 4. And the unloading site 5 is not provided with other supporting systems of the upper cover 1. The upper cover 1, the bridge crane 4 and the unloading site 5 are sequentially arranged at intervals from top to bottom, the distance between the upper cover 1 and the bridge crane 4 can meet the requirements of the installation and the running height of the bridge crane 4, and the distance between the bridge crane 4 and the unloading site 5 can meet the requirements of the unloading height. The bridge crane 4 is prior art. The length direction of the unloading site 5 is perpendicular to the span direction L of the bridge crane 4. The parking space 501 is communicated with the road 8, and the flat transport vehicle 7 loaded with the subway vehicles 6 is transported to the parking space 501 through the road 8 and is parked below the bridge crane 4. Installing a hoisting tool 9, wherein the hoisting tool 9 comprises a hanging strip and a balance beam, binding the hanging strip on the metro vehicle 6, then connecting the hanging strip with the balance beam positioned above the metro vehicle 6, and enabling the balance beam to be hooked with a lifting hook of the bridge crane 4 through a lifting rope. The metro vehicle 6 on the flat transport vehicle 7 is hoisted to the unloading line 502 along the span direction L of the bridge crane 4 through the bridge crane 4, so that unloading is realized. Preferably, the support structure is provided with five groups.
As a preferred embodiment, a first bracket 201 is arranged on the first upright 2, and a second bracket 301 is arranged on the second upright 3; the first bracket 201 and the second bracket 301 are arranged correspondingly, and the bridge crane 4 is installed and supported by the first bracket 201 and the second bracket 301. One end of the bridge crane 4 in the span direction L is attached to the first bracket 201, and the other end is attached to the second bracket 301.
In a preferred embodiment, two bridge cranes 4 are provided, and the two bridge cranes 4 are arranged at intervals along the length direction of the unloading site 5. The two bridge cranes 4 are spaced apart a certain distance along the length of the unloading site 5. The two bridge cranes 4 are synchronously lifted during unloading operation, and each bridge crane 4 is connected with the metro vehicle 6 through one set of hoisting tool 9. Has the advantages of stable and reliable hoisting.
The first upright post 2 and the second upright post 3 are of concrete structures, and preferably, the first upright post 2 and the second upright post 3 are both of reinforced concrete structures.
Preferably, the unloading site 5 is a hardened ground with a bearing capacity of more than 15t/m 2 . The clear height between the unloading site 5 and the upper cover 1 is more than 12m.
Preferably, the unloading site 5 is a rectangular structure, and the length a of the unloading site is greater than 35m, and the width b of the unloading site is greater than 12m. The span direction L of the overhead crane 4 is perpendicular to the longitudinal direction of the unloading line 502. The dump lane 502 doubles as a vehicle section material lane.
The utility model discloses an above do the embodiment, can see out from the implementation, the utility model provides a system of unloading under lid of railcar section realizes unloading under the lid. The cover plate lifting device can not only avoid local lifting of the cover plate by using a truck crane for unloading under the cover, but also avoid independent construction of an unloading site and a line outside the cover, and is favorable for property development of the cover while investment is saved.

Claims (6)

1. Unloading system under lid of railcar section, its characterized in that: comprises an unloading site (5) and a bridge crane (4) arranged above the unloading site (5);
the unloading site (5) comprises parking spaces (501) and an unloading line (502) which are sequentially arranged along the span direction L of the bridge crane (4);
also includes a support structure; the support structures are provided with a plurality of groups, and the support structures are arranged in a pairwise interval manner along the length direction of the unloading site (5);
the supporting structure comprises a first upright (2) and a second upright (3) arranged in pairs;
the unloading site (5) is located between the first upright post (2) and the second upright post (3), and the bridge crane (4) is installed and supported through the first upright post (2) and the second upright post (3).
2. The under-cover unloading system for a metro vehicle section of claim 1, wherein: a first bracket (201) is arranged on the first upright post (2), and a second bracket (301) is arranged on the second upright post (3);
the first bracket (201) and the second bracket (301) are arranged correspondingly, and the bridge crane (4) is installed and supported through the first bracket (201) and the second bracket (301).
3. The under-cover unloader system for a railcar section according to claim 1, wherein: the bridge crane (4) is provided with two bridge cranes (4) which are arranged at intervals along the length direction of the unloading site (5).
4. The under-cover unloader system for a railcar section according to claim 1, wherein: the first upright post (2) and the second upright post (3) are both of a concrete structure.
5. The under-cover unloading system for a metro vehicle section of claim 1, wherein: the unloading site (5) is a hardened ground, and the bearing capacity of the unloading site is more than 15t/m 2
6. The under-cover unloading system for a metro vehicle section of claim 1, wherein: the unloading field (5) is of a rectangular structure, the length a of the unloading field is larger than 35m, and the width b of the unloading field is larger than 12m.
CN202222762960.4U 2022-10-19 2022-10-19 Under-cover unloading system of subway vehicle section Active CN218201861U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222762960.4U CN218201861U (en) 2022-10-19 2022-10-19 Under-cover unloading system of subway vehicle section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222762960.4U CN218201861U (en) 2022-10-19 2022-10-19 Under-cover unloading system of subway vehicle section

Publications (1)

Publication Number Publication Date
CN218201861U true CN218201861U (en) 2023-01-03

Family

ID=84644592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222762960.4U Active CN218201861U (en) 2022-10-19 2022-10-19 Under-cover unloading system of subway vehicle section

Country Status (1)

Country Link
CN (1) CN218201861U (en)

Similar Documents

Publication Publication Date Title
CN109457626B (en) Method for mounting precast beam in height-limited area
CN110886233A (en) Construction method for connecting T-shaped beam with bridge
WO2022088053A1 (en) Girder transporting vehicle, girder transporting system, steel box girder assembly system, and steel box girder assembly method
CN111139743A (en) Method for improving speed of highway beam frame and installation method of gantry crane
CN201962607U (en) Movable elevating device for hoisting elevated bridge cantilever arm
CN111778857B (en) Process for synchronously erecting upper and lower beams of double-layer overhead bridge of urban public rail
CN218201861U (en) Under-cover unloading system of subway vehicle section
CN205973675U (en) Large -scale spare parts storage device that takes one's place
CN102815251A (en) Transport vehicle provided with brick stack loading and unloading device
CN201605110U (en) Device for hoisting waveform steel webs at the front end of truss in cantilever construction
CN108518071B (en) Installation method of double-layer large-span steel structure corridor
CN215591798U (en) Curtain wall plate traction transfer device for tower crane dismantling part
KR101162346B1 (en) Launching box using l-box structure and moving appratus and bridge construction method
CN205397851U (en) Hanger
CN111139742B (en) Method for mounting and dismounting highway bridge girder erection machine
CN103043454A (en) Silo feeding equipment mounting method
JPH033616Y2 (en)
CN113459937A (en) Reinforcing device for automobile transportation of steel box girder and transportation method
CN207293955U (en) The railway track construction for possessing new derricking gear is hung with just beam is traversing
KR101213377B1 (en) A bridge deck lift-launching contruction method and a lift-launching device for the same
CN112192503A (en) Installation method for installing tower in cold box
CN212151321U (en) Hoisting underframe
CN211001334U (en) Retraction device for rail vehicle or equipment
CN112874417B (en) Bridge girder erection machine transition system and bridge girder erection machine transition method
CN205170191U (en) Steel construction main couple hoist and mount system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant