CN205973675U - Large -scale spare parts storage device that takes one's place - Google Patents

Large -scale spare parts storage device that takes one's place Download PDF

Info

Publication number
CN205973675U
CN205973675U CN201621005449.8U CN201621005449U CN205973675U CN 205973675 U CN205973675 U CN 205973675U CN 201621005449 U CN201621005449 U CN 201621005449U CN 205973675 U CN205973675 U CN 205973675U
Authority
CN
China
Prior art keywords
place
support
storage device
spare part
buttress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621005449.8U
Other languages
Chinese (zh)
Inventor
严庆云
刘玉涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201621005449.8U priority Critical patent/CN205973675U/en
Application granted granted Critical
Publication of CN205973675U publication Critical patent/CN205973675U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a large -scale spare parts storage device that takes one's place, include: at least one interior transport vechicle (1) of got into factory building that is used for transporting the jumbo, at least one is placed the jumbo outside the factory building the equipment that lifts by crane on transport vechicle (1), at least one places the jumbo and cooperation jumbo support (2) of together rising and falling and storing, and at least one set sets up in the factory building the supporting device that storage area is used for the uninstallation and stores the jumbo. The utility model provides a large -scale spare parts storage device that takes one's place can save the investment that the loading and unloading of large -scale spare parts are taken one's place, shortens purchase and construction period simultaneously, and simple structure is convenient for operate moreover.

Description

A kind of large-scale spare part storage device in place
Technical field
This utility model is related to mechanical transport and equipment storage art, and more particularly, to a kind of large-scale spare part is in place to store dress Put.
Background technology
Now in each industrial premises, the transport of heavy mail equipment is in place mainly two ways, i.e. crane transport and rail transport. Wherein crane transport is more ripe and universal, can life-time service and transport behaviour in place after installing the crane of corresponding tonnage in Factory Building Make that method is simple, but crane the weight according to storage device heaviest piece need to be chosen in plant designing.For built but Being not provided with the Factory Building of crane or crane tonnage is unsatisfactory for the Factory Building that equipment hoisting weight requires, carrying out old factory rehabilitation thus setting up The quantities of crane is larger, costly, time-consuming longer, wherein, quantities include crane equipment buying, mill construction reinforcement, Factory Building roof truss is removed and is installed, takes and needs more than 6 months.
Rail transport need to carry out transporting in place it is adaptable to heavy mail sets to equipment by laying sled tracks and elevator machine travel Standby is disposably in place, after equipment is in place dismantles track, if mobile device need to carry out conceptual design and track laying again, Therefore it is applied to the equipment relatively low with regard to bit frequency.
Transport for equipment in Factory Building is in place, and adoptable technical scheme also has hydraulic pressure full trailor to coordinate fixed buttress Technical scheme, the program requires Factory Building to possess great tonnage hydraulic full trailor and the fixed buttress rising and falling for cooperating equipment, and factory Area's road and Factory Building road possess the driving conditions of hydraulic pressure full trailor and corresponding radius of turn, are not suitable for not possessing plant area road The Factory Building of travel permit part and no great tonnage hydraulic full trailor.
Utility model content
This utility model embodiment technical problem to be solved is, for the defect of above-mentioned prior art, provides one Plant large-scale spare part storage device in place.
In order to solve above-mentioned technical problem, this utility model embodiment provides a kind of large-scale spare part storage device in place, Including:At least one is used for transporting the transport vehicle in the entered Factory Building of jumbo, and heavy type is set outside Factory Building by least one The standby lifting appliance being placed in described transport vehicle, at least one is placed jumbo and coordinates jumbo together to rise and fall simultaneously The support of storage, at least a set of be arranged at storage area in Factory Building and be used for unloading and store the corollary apparatus of jumbo.
Preferably, described corollary apparatus include:Be arranged on below described support and be used for confirm described support laterally and The buttress of lengthwise position, and one end supports in described support lower stress point position, for supporting the hydraulic jack of described support Top.
Preferably, described buttress is set to two rows, often arranges at least one, and buttress described at least two is disposed on described Below support, between two described buttresses, form the space for passing in and out for described transport vehicle.
Preferably, described buttress is four, and described support is square structure, and four described buttresses set up separately in described support four On individual diagonal position.
Preferably, described hydraulic jack is set to two groups, every group at least one, one end of each described hydraulic jack It is fixed on ground, the other end of each described hydraulic jack supports in described stress point position.
Preferably, described hydraulic jack is four, and each described hydraulic jack sets up separately diagonal on four, described support Position and being disposed adjacent with each described buttress.
Preferably, described transport vehicle includes:Wheel, sweep, it is layed between described sweep and described support and makes described Frame height is higher than the sleeper of described buttress.
Preferably, the minimum constructive height of described hydraulic jack is less than described buttress, and lifting altitude is higher than described sleeper height.
Preferably, described buttress is concrete or steel pipe manufacture.
Preferably, described support is rectangle steel support.
Implement this utility model embodiment, have the advantages that:The large-scale spare part of this utility model offer is in place to be deposited Storage device, can save large-scale spare part handling investment in place, shorten buying and construction period simultaneously, and structure is simple, just Complete moreover it can be used to build in operation, but the Factory Building of no large tonnage crane.
Brief description
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or in description of the prior art the accompanying drawing of required use be briefly described it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise not paying creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the large-scale spare part of the first embodiment memory device structure front view in place that this utility model provides;
Fig. 2 is the large-scale spare part of the first embodiment memory device structure top view in place that this utility model provides;
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely description is it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of making creative work The every other embodiment being obtained, broadly falls into the scope of this utility model protection.
Refer to Fig. 1 and Fig. 2, wherein, Fig. 1 is the large-scale spare part of the first embodiment storage in place dress that this utility model provides Put structural front view, Fig. 2 is the large-scale spare part of the first embodiment memory device structure top view in place that this utility model provides.As Shown in Fig. 1 and 2, the large-scale spare part storage device in place that the present embodiment provides includes:1 is used for transporting entering of jumbo 1,1 placement jumbo of transport vehicle in Factory Building and 2, the 1 set of setting of support coordinating jumbo together to rise and fall and store In Factory Building, storage area is used for unloading and store the corollary apparatus of jumbo.In the present embodiment, transport vehicle is flat board wooden handcart. In the other embodiments that this utility model provides, transport vehicle can be to meet bearing capacity and loading guardrail is demountable leads Draw car, lorry, dumper etc..Complete the transport of horizontal direction, flexible operation with transport vehicle, do not limited by rail transport, can Solve rail transport technology and be adapted only to the heavy mail equipment relatively low with regard to bit frequency, steel consumption amount is big, and track laying has high demands, just The dismounting troublesome problem of upgrading of track during position.
In FIG, the corollary apparatus that the implementation case provides include:It is arranged on support 2 lower section and be used for confirming that support 2 exists The buttress 4 of horizontal and vertical position, and the hydraulic jack that one end supports in 2 support lower stress point positions, is used for supporting support 2 Top 5.Complete the unloading of heavy spare part with the cooperation of support 2, buttress 4 and hydraulic jack 5, can be used for building, but internal nothing The Factory Building of large tonnage crane, can greatly reduce the expense of old factory rehabilitation and take.In addition, transport vehicle is transported than track in Factory Building Defeated or lifting appliance is more convenient, and is not take up Factory Building overhead space completely, it is very convenient to use.
Preferably, the width of transport vehicle 1 is less than the distance between 2 row's buttresses 4.Preferably, buttress 4 is disposed on support Below 2, between two row's buttresses 4, form the space for passing in and out for transport vehicle 1.Preferably, transport vehicle 1 includes:Wheel 13, sweep 11st, it is layed in the sleeper 12 making support 2 height be higher than buttress 4 between sweep 11 and support 2.The width of transport vehicle 1 is less than buttress 4 Between spacing distance, transporting vehicle-mounted jumbo and enters between Factory Building storage area buttress 4, and unloading jumbo does not need to use To lifting appliance or rail transport, it is not take up Factory Building superjacent air space completely.
Preferably, the minimum constructive height of hydraulic jack 5 is less than buttress 4, and lifting altitude is higher than sleeper 12 height.Preferably, The width of support 2 exceedes the distance between the width of transport vehicle 1 and 2 buttresses.Preferably, hydraulic jack is set to two groups, Every group 2, one end of each hydraulic jack 5 is fixed on ground, and the other end supports the stress point position in support 2.Using same Stepped hydraulic jack 5 plus buttress 4 coordinate the in place and storage completing large-scale spare part in Factory Building, have both solved great tonnage hydraulic and have entirely hung The road that car+fixed buttress technical requirements Factory Building possesses great tonnage hydraulic full trailor and is suitable to great tonnage hydraulic full trailor traveling With the problem of Factory Building condition, and have necessarily at aspects such as the transformation of Factory Building, design, engineering costs compared with crane transportation technology in place Advantage.
Preferably, buttress 4 is concrete or steel pipe manufacture.In other embodiments, buttress 4 can be steel and iron manufacturing, can To move in Factory Building, so can adjust the size of support 2 according to the size of jumbo, to adjust between two row's buttresses 4 Distance, effective save space, but in jumbo storing process in place, buttress 4 remains stationary as.
Preferably, described support 2 is rectangle steel support.In other embodiments, support 2 can be according to jumbo chi Very little arranging groove or can be with the hook of the rope of fixing equipment or perforation in case transportation or uninstall process are uneven Lead to equipment landing.As shown in Figure 2, wherein buttress 4 is four to the one of preferred embodiment of this utility model, four buttresses 4 Set up separately on four diagonal positions of support 2, the vertical and horizontal position between two neighboring buttress 4 corresponds setting, this The benefit of sample setting is to confirm support (2) in horizontal and vertical correspondence position.Hydraulic jack 5 also selects and props up simultaneously Pier 4 same number, as four, four hydraulic jack 5 set up separately support 2 four diagonal positions and with respectively with four Pier 4 is disposed adjacent, and the buttress 4 in certain Fig. 2 and the quantity of hydraulic jack 5 are not limited thereto, can be according to actual needs It is adjusted.
The Factory Building external lifting appliance that is seated in the fixation of equipment with transport vehicle 1 for the support 2 completes, it is to avoid in Factory Building Interior limited by Factory Building size and crane specification, it is possible to resolve crane transportation technology in place has crane specification and limited by spare part weight System, has high demands to the design of Factory Building, transformation, quantities is larger, costly, time-consuming longer problem.Four buttresses of setting can To increase stability during jumbo storage, when reducing loading-unloading heavy spare part, the status requirement of support, arranges four liquid simultaneously Pressure jack can increase stability during jumbo handling, reduce the load-bearing requirements of jack simultaneously.
Specifically process in place is as follows for the implementation case:
(1) in transport vehicle, laying makes the sleeper that support height is higher than buttress, props up in outer be positioned over storage device of Factory Building On frame, overall afterwards in place in transport vehicle;
(2) transport vehicle enters between storage area two row's buttress, until support is located at relevant position above buttress;
(3) fixed hydraulic jack relevant position to support.Confirm jack placement location horizontal, longitudinally right Together, so that jack uniform force;
(4) so that hydraulic jack work surface is synchronously increased, in uphill process progressively on pad by jack jacking chock with Prevent until acting on support jack-up certain distance below support;
(5) vehicle slowly leaves, and synchronous hydra-ulic jacks work surface declines, until total weight is undertaken by buttress.Thousand During the lower general who has surrendered's motor in jin top is placed to buttress, takes and progressively detach neonychium flitch method, keep safe distance, until electricity Machine is deposited to buttress;
(7) remove jack, complete to unload, heavy mail is in place to be finished.Entrucking process is identical with process approach of unloading, and step is not With.
The implementation case is passed through to complete transport in Factory Building for the jumbo using transport vehicle 1 and support 2, is propped up by adopting Pier 4, hydraulic jack 5 and support 2 cooperation complete the loading of storage area jumbo and storage in Factory Building, for newly constructing the factory buildings This invention will save crane buying expenses in Factory Building, for built and no in Factory Building available this invention of crane save Factory Building and hang Car improvement expenses, shortens buying and construction period simultaneously;When plant designing is built, can be not considered and meet the relatively low of individual equipment Load and unload frequency and large tonnage crane, great tonnage hydraulic full trailor and corresponding road Factory Building condition are set.This device in place and The more other scheme of storage scheme, equipment is simply easily purchased, and equipment purchase expense is relatively low, and operating procedure is easy, and Factory Building condition Restraining factors are less.
A kind of above disclosed only preferred embodiment of this utility model, can not limit this practicality with this certainly New interest field, one of ordinary skill in the art will appreciate that realizing all or part of flow process of above-described embodiment, and according to The equivalent variations that this utility model claim is made, still fall within the scope that utility model is covered.

Claims (10)

1. a kind of large-scale spare part storage device in place, including:At least one is used for transporting in the entered Factory Building of jumbo Transport vehicle (1), jumbo is placed into the lifting appliance in described transport vehicle (1) outside Factory Building by least one, at least one The support (2) placed jumbo and coordinate jumbo together to rise and fall and store, at least a set of being arranged in Factory Building stores Area is used for unloading and store the corollary apparatus of jumbo.
2. according to claim 1 large-scale spare part storage device in place it is characterised in that described corollary apparatus include:Setting Below described support (2) and be used for confirming the buttress (4) in horizontal and vertical position for the described support (2), and one end supports In described support (2) lower stress point position, it is used for supporting the hydraulic jack (5) of described support (2).
3. according to claim 2 large-scale spare part storage device in place it is characterised in that described buttress (4) is set to two rows, Often arrange at least one, buttress described at least two (4) is disposed on below described support (2), between two described buttresses (4) Form the space for passing in and out for described transport vehicle (1).
4. large-scale spare part storage device in place is it is characterised in that described buttress (4) is four, described according to claim 3 Support (2) is square structure, and four described buttresses (4) are set up separately on described (2) four diagonal positions of support.
5. according to claim 2 large-scale spare part storage device in place it is characterised in that described hydraulic jack (5) setting For two groups, every group at least one, one end of each described hydraulic jack (5) is fixed on ground, each described hydraulic jack (5) the other end supports in described stress point position.
6. according to claim 5 large-scale spare part storage device in place it is characterised in that described hydraulic jack (5) be four Individual, each described hydraulic jack (5) is set up separately in described (2) four diagonal positions of support and adjacent with each described buttress (4) Setting.
7. according to claim 2 large-scale spare part storage device in place it is characterised in that described transport vehicle (1) include:Wheel (13), sweep (11), be layed between described sweep (11) and described support (2) make described support (2) highly be higher than described The sleeper (12) of pier (4).
8. according to claim 7 large-scale spare part storage device in place it is characterised in that described hydraulic jack (5) Low height is less than described buttress (4), and lifting altitude is higher than described sleeper (12) highly.
9. according to claim 2 large-scale spare part storage device in place it is characterised in that described buttress (4) be concrete or Steel pipe manufactures.
10. according to claim 1 large-scale spare part storage device in place it is characterised in that described support (2) be rectangle steel Support.
CN201621005449.8U 2016-08-30 2016-08-30 Large -scale spare parts storage device that takes one's place Active CN205973675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621005449.8U CN205973675U (en) 2016-08-30 2016-08-30 Large -scale spare parts storage device that takes one's place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621005449.8U CN205973675U (en) 2016-08-30 2016-08-30 Large -scale spare parts storage device that takes one's place

Publications (1)

Publication Number Publication Date
CN205973675U true CN205973675U (en) 2017-02-22

Family

ID=58039192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621005449.8U Active CN205973675U (en) 2016-08-30 2016-08-30 Large -scale spare parts storage device that takes one's place

Country Status (1)

Country Link
CN (1) CN205973675U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780398A (en) * 2017-11-14 2018-03-09 天津百利越象模具制造有限责任公司 A kind of efficient man-made island module installation supplementary structure
CN108946548A (en) * 2018-10-10 2018-12-07 贵州大学 A kind of dedicated tool and its application method of unloading for ship lift retarder
CN110937424A (en) * 2019-12-18 2020-03-31 南通泰胜蓝岛海洋工程有限公司 Upper transportation method of offshore booster station

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780398A (en) * 2017-11-14 2018-03-09 天津百利越象模具制造有限责任公司 A kind of efficient man-made island module installation supplementary structure
CN108946548A (en) * 2018-10-10 2018-12-07 贵州大学 A kind of dedicated tool and its application method of unloading for ship lift retarder
CN110937424A (en) * 2019-12-18 2020-03-31 南通泰胜蓝岛海洋工程有限公司 Upper transportation method of offshore booster station

Similar Documents

Publication Publication Date Title
CN205973675U (en) Large -scale spare parts storage device that takes one's place
CN107254849A (en) Steel box-girder installation method under a kind of clear height constrained state
CN205955237U (en) Plug -type platform of unloading of encorbelmenting
CN110886233A (en) Construction method for connecting T-shaped beam with bridge
CN109626224B (en) Bridge crane mounting, dismounting and construction method in limited space
JP5769961B2 (en) Construction method and removal method of structure
CN104210411A (en) Transportation device and method for loading and transporting heavy equipment
JP3539885B2 (en) Mobile suspension apparatus for furnace body ring block, blast furnace body dismantling method, and blast furnace body construction method
WO2021196465A1 (en) Hoisting system for overweight horizontal high-pressure heater and hoisting method
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN103382702A (en) Cast-in-situ box grider bracket and constructing method thereof
CN103043454A (en) Silo feeding equipment mounting method
CN114086485A (en) Construction method for replacing support of long-span high-speed rail continuous beam
CN201046888Y (en) Bridge-dismantling hoisting device
CN104213512B (en) Fortune frame railway D beam one chassis and D beam installation method
CN201891087U (en) Auxiliary girder feeding platform of transport rack integrated machine
CN107143175A (en) A kind of low spatial rear cantilever type two-layer lift-sliding parking systems
CN209383043U (en) A kind of " platform formula " auxiliary device of unloading of large size three-phase power transformer
CN201343871Y (en) Curtain wall moving plate support
CN101446118A (en) Curtain-wall board-shifting support
CN103587540A (en) Large-tonnage movable trolley with convertible load distribution
CN216615545U (en) Support system for dismantling box girder
CN105970988B (en) The construction method of elevator sidewall reinforcing bar is installed in raft foundation
CN110862019A (en) Installation method of device capable of simultaneously solving vertical and horizontal material transportation
CN218201861U (en) Under-cover unloading system of subway vehicle section

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant