CN218143946U - Ultra-long-distance large-caliber steel jacking pipe construction system - Google Patents
Ultra-long-distance large-caliber steel jacking pipe construction system Download PDFInfo
- Publication number
- CN218143946U CN218143946U CN202221273021.7U CN202221273021U CN218143946U CN 218143946 U CN218143946 U CN 218143946U CN 202221273021 U CN202221273021 U CN 202221273021U CN 218143946 U CN218143946 U CN 218143946U
- Authority
- CN
- China
- Prior art keywords
- box body
- fixedly connected
- long distance
- ultra
- construction system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses an ultra-long distance heavy-calibre steel ejector pipe construction system, including the guide rail, it has two first sliders and two second sliders to slide respectively on the guide rail, and drive locomotive fixed connection is passed through at the top of two first sliders, there is shedding mechanism at the back of drive locomotive through link fixed mounting, the top fixed connection of shedding mechanism and two second sliders, shedding mechanism includes the box, box fixed connection is at the top of two second sliders, the left side fixed mounting at box top has first connecting axle, swing joint has rotatory fagging on the first connecting axle. This super long distance heavy-calibre steel ejector pipe construction system can carry out quick transportation transfer to the construction material in super long distance heavy-calibre steel ejector pipe construction site, need not to go on through the manual work again, and has the advantage of being convenient for unload to the maximization improve the efficiency of construction, can satisfy people's demand comprehensively.
Description
Technical Field
The utility model relates to a building construction equipment technical field specifically is an ultra-long distance heavy-calibre steel ejector pipe construction system.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, can also be a process of changing various lines on a design drawing into a real object in a specified place, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like.
At present, to in the extra-long distance heavy-calibre steel ejector pipe job site, often adopt the manual work to go on to the transportation transfer of construction material, or a small number adopt the portable mode of transporting of mechanical equipment, mostly have the problem of being not convenient for to unload, therefore the maximization reduce the efficiency of construction, be difficult to satisfy the demand, we have provided an extra-long distance heavy-calibre steel ejector pipe construction system for this reason to solve the problem that proposes among the above-mentioned background art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an extra long distance heavy-calibre steel ejector pipe construction system to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the construction system comprises a guide rail, wherein two first sliding blocks and two second sliding blocks slide on the guide rail respectively, the tops of the two first sliding blocks are fixedly connected through a driving headstock, the back of the driving headstock is fixedly provided with a discharging mechanism through a connecting frame, and the discharging mechanism is fixedly connected with the tops of the two second sliding blocks;
the discharging mechanism comprises a box body, the box body is fixedly connected to the tops of two second sliding blocks, a first connecting shaft is fixedly mounted on the left side of the top of the box body, a rotating supporting plate is movably connected to the first connecting shaft, a storage trough is fixedly connected to the top of the rotating supporting plate, a servo motor is fixedly mounted at the left bottom of the box body, a driving rotating shaft is fixedly connected to an output shaft of the servo motor, the right end of the driving rotating shaft penetrates through the box body and extends to an internal fixedly connected screw rod of the box body, a moving block is connected to the surface of the screw rod through threads, the bottom of the moving block is connected with the bottom of the inner wall of the box body in a sliding mode through a limiting sliding block, a second connecting shaft is fixedly mounted at the top of the moving block, a third connecting shaft is fixedly mounted at the right side of the bottom of the storage trough, and the second connecting shaft is movably connected with the third connecting shaft through a push-pull plate.
Preferably, the box body is provided with a dustproof sleeve at the left side and corresponding to the servo motor, and the surface of the dustproof sleeve is provided with heat dissipation holes.
Preferably, the box inner wall right side just corresponds the fixed position of screw rod and installs the bearing frame, the one end of screw rod runs through the bearing frame and extends to its inside rather than swing joint.
Preferably, a through groove is formed in the top of the box body and corresponds to the push-pull plate.
Preferably, the box top just corresponds the equal fixedly connected with supporting shoe in both sides around through the groove, the top fixedly connected with rubber pad of supporting shoe, the top and the storage tank bottom of rubber pad contact each other.
Preferably, the length of the guide rail is adapted to the length of the construction distance of the large-caliber steel jacking pipe.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses distance length according to heavy-calibre steel push pipe job site lays the guide rail, utilize the drive locomotive can drive shedding mechanism and remove, place the construction material in the stock chest, when unloading, open servo motor, it is rotatory to make the drive pivot drive the screw rod, threaded connection is spacing that the movable block on it passes through spacing slider, it moves to the inboard to drive the second connecting axle, at first connecting axle, under the connection of rotatory fagging and stock chest, and the swing joint of cooperation third connecting axle and push-and-pull plate, can promote the stock chest and incline to the outside, and then realize empting the automation of construction material, this super long distance heavy-calibre steel push pipe construction system, can be in super long distance heavy-calibre steel push pipe job site, carry out quick transportation to the construction material and shift, need not to go on through the manual work again, and have the advantage of being convenient for unloading, thereby maximization has improved the efficiency of construction, can satisfy people's demand comprehensively.
2. The utility model discloses a set up the dirt proof boot, to servo motor from the outside protection of preventing dust, with increase of service life, through setting up the bearing frame, can carry out joint support to the right-hand member head of screw rod, with the smoothness when improving its rotation, through setting up the groove, can realize passing through of push-and-pull plate and use, through setting up supporting shoe and rubber pad, can provide certain supporting role from the bottom of stock chest under the non-state of unloading, can effectively improve the stability of transportation.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a structural section view of a side view of the discharging mechanism of the present invention;
fig. 3 is a schematic structural diagram of a rear view of the discharging mechanism of the present invention.
In the figure: the device comprises a guide rail 1, a first sliding block 2, a second sliding block 3, a driving headstock 4, a connecting frame 5, a discharging mechanism 6, a box body 61, a first connecting shaft 62, a rotary supporting plate 63, a material storage groove 64, a servo motor 65, a driving rotating shaft 66, a screw 67, a movable block 68, a limiting sliding block 69, a second connecting shaft 610, a third connecting shaft 611, a push-pull plate 612, a dust-proof sleeve 613, a bearing seat 614, a bearing seat 615, a through groove 616, a supporting block 617 and a rubber pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the construction system for the ultra-long-distance large-caliber steel jacking pipe comprises a guide rail 1, wherein two first sliding blocks 2 and two second sliding blocks 3 are respectively arranged on the guide rail 1 in a sliding mode, the tops of the two first sliding blocks 2 are fixedly connected through a driving head 4, a discharging mechanism 6 is fixedly arranged on the back face of the driving head 4 through a connecting frame 5, and the discharging mechanism 6 is fixedly connected with the tops of the two second sliding blocks 3.
The discharging mechanism 6 comprises a box body 61, the box body 61 is fixedly connected to the tops of the two second sliding blocks 3, a first connecting shaft 62 is fixedly mounted on the left side of the top of the box body 61, a rotary supporting plate 63 is movably connected to the first connecting shaft 62, a material storage groove 64 is fixedly connected to the top of the rotary supporting plate 63, a servo motor 65 is fixedly mounted at the bottom of the left side of the box body 61, a driving rotating shaft 66 is fixedly connected to an output shaft of the servo motor 65, the right end of the driving rotating shaft 66 penetrates through the box body 61 and extends to the inner portion of the box body 67, a moving block 68 is connected to the surface of the screw 67 in a threaded manner, the bottom of the moving block 68 is slidably connected with the bottom of the inner wall of the box body 61 through a limiting sliding block 69, a second connecting shaft 610 is fixedly mounted at the top of the moving block 68, a third connecting shaft 611 is fixedly mounted at the right side of the bottom of the material storage groove 64, and the second connecting shaft 610 is movably connected with the third connecting shaft 611 through a push-pull plate 612.
A dust-proof sleeve 613 is fixedly arranged on the left side of the box body 61 and corresponds to the position of the servo motor 65, a heat dissipation hole is formed in the surface of the dust-proof sleeve 613, and the servo motor 65 is protected from dust from the outside by arranging the dust-proof sleeve 613, so that the service life is prolonged; a bearing seat 614 is fixedly arranged on the right side of the inner wall of the box body 61 and corresponds to the position of the screw 67, one end of the screw 67 penetrates through the bearing seat 614 and extends into the interior of the bearing seat 614 to be movably connected with the bearing seat, and the right end of the screw 67 can be connected and supported by the bearing seat 614 so as to improve the stability of the screw in rotation; the top of the box body 61 and the position corresponding to the push-pull plate 612 are provided with through grooves 615, and the push-pull plate 612 can be used through the through grooves 615.
Supporting blocks 616 are fixedly connected to the top of the box body 61 and the front side and the rear side of the corresponding through groove 615, rubber pads 617 are fixedly connected to the top of the supporting blocks 616, the tops of the rubber pads 617 are in contact with the bottom of the storage groove 64, and by arranging the supporting blocks 616 and the rubber pads 617, a certain supporting effect can be provided from the bottom of the storage groove 64 in a non-discharging state, so that the transportation stability can be effectively improved; the length of the guide rail 1 is adapted to the length of the construction distance of the large-caliber steel jacking pipe; this super long distance heavy-calibre steel ejector pipe construction system can carry out quick transportation transfer to the construction material in super long distance heavy-calibre steel ejector pipe construction site, need not to go on through the manual work again, and has the advantage of being convenient for unload to the maximization improve the efficiency of construction, can satisfy people's demand comprehensively.
When the device is used, the guide rail 1 is laid according to the distance and the length of a large-caliber steel jacking pipe construction site, the driving headstock 4 can be used for driving the discharging mechanism 6 to move, construction materials are placed in the material storage tank 64, the servo motor 65 is started during discharging, the driving rotating shaft 66 drives the screw rod 67 to rotate, the moving block 68 in threaded connection with the driving rotating shaft drives the second connecting shaft 610 to move inwards through the limiting of the limiting slide block 69, and the material storage tank 64 can be pushed to incline outwards by matching with the movable connection of the third connecting shaft 611 and the push-pull plate 612 under the connection of the first connecting shaft 62, the rotating supporting plate 63 and the material storage tank 64, so that the construction materials can be automatically dumped.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an ultra-long distance heavy-calibre steel ejector pipe construction system, includes the guide rail, its characterized in that: the guide rail is respectively provided with two first sliding blocks and two second sliding blocks in a sliding manner, the tops of the two first sliding blocks are fixedly connected through a driving headstock, the back of the driving headstock is fixedly provided with a discharging mechanism through a connecting frame, and the discharging mechanism is fixedly connected with the tops of the two second sliding blocks;
the discharging mechanism comprises a box body, the box body is fixedly connected to the tops of two second sliding blocks, a first connecting shaft is fixedly mounted on the left side of the top of the box body, a rotating supporting plate is movably connected to the first connecting shaft, a storage trough is fixedly connected to the top of the rotating supporting plate, a servo motor is fixedly mounted at the left bottom of the box body, a driving rotating shaft is fixedly connected to an output shaft of the servo motor, the right end of the driving rotating shaft penetrates through the box body and extends to an internal fixedly connected screw rod of the box body, a moving block is connected to the surface of the screw rod through threads, the bottom of the moving block is connected with the bottom of the inner wall of the box body in a sliding mode through a limiting sliding block, a second connecting shaft is fixedly mounted at the top of the moving block, a third connecting shaft is fixedly mounted at the right side of the bottom of the storage trough, and the second connecting shaft is movably connected with the third connecting shaft through a push-pull plate.
2. The construction system of the ultra-long distance large-caliber steel jacking pipe according to claim 1, characterized in that: the box left side just corresponds servo motor's fixed position and installs the dirt proof boot, the louvre has been seted up on the surface of dirt proof boot.
3. The construction system of the ultra-long distance large-caliber steel jacking pipe according to claim 2, characterized in that: the box inner wall right side just corresponds the fixed position of screw rod and installs the bearing frame, the one end of screw rod runs through the bearing frame and extends to its inside rather than swing joint.
4. The construction system of the ultra-long distance large-caliber steel jacking pipe according to claim 3, wherein: and a through groove is formed in the top of the box body and corresponds to the position of the push-pull plate.
5. The construction system of the ultra-long distance large-caliber steel jacking pipe according to claim 4, wherein: the storage tank is characterized in that supporting blocks are fixedly connected to the top of the tank body and correspond to the front side and the rear side of the through groove, rubber pads are fixedly connected to the tops of the supporting blocks, and the tops of the rubber pads are in contact with the bottom of the storage tank.
6. The construction system of the ultra-long distance large-caliber steel jacking pipe according to claim 5, wherein: the length of the guide rail is adaptive to the length of the construction distance of the large-caliber steel jacking pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221273021.7U CN218143946U (en) | 2022-05-24 | 2022-05-24 | Ultra-long-distance large-caliber steel jacking pipe construction system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221273021.7U CN218143946U (en) | 2022-05-24 | 2022-05-24 | Ultra-long-distance large-caliber steel jacking pipe construction system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218143946U true CN218143946U (en) | 2022-12-27 |
Family
ID=84573074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221273021.7U Active CN218143946U (en) | 2022-05-24 | 2022-05-24 | Ultra-long-distance large-caliber steel jacking pipe construction system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218143946U (en) |
-
2022
- 2022-05-24 CN CN202221273021.7U patent/CN218143946U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102995911B (en) | Multi-use architecture lathe | |
CN218143946U (en) | Ultra-long-distance large-caliber steel jacking pipe construction system | |
CN114619365A (en) | Steel plate polishing and scribing integrated device | |
CN214454069U (en) | Four-way shuttle | |
CN211945140U (en) | Material conveying device for civil construction | |
CN211842846U (en) | Three-roller calender is used in waterproofing membrane processing | |
CN208883046U (en) | A kind of mechanical equipment loading/unloading platform | |
CN207686242U (en) | A kind of floor tile laying auxiliary device | |
CN216066789U (en) | Device for grinding burrs of composite board | |
CN206343968U (en) | A kind of planer-type milling machine | |
CN210791324U (en) | Plank processing drilling equipment | |
CN214570336U (en) | Tensioning winch convenient for positioning and butt joint for mine hoisting | |
CN214293573U (en) | Inclined nailing machine | |
CN220806744U (en) | Automatic grinding device of portal formula template | |
CN210024771U (en) | Framed grinding device is mounted to fine arts | |
CN217437454U (en) | Guide rail type lifting operation platform mechanical brake equipment | |
CN219584228U (en) | Novel mobile operation vehicle for constructional engineering | |
CN216235260U (en) | Pay-off for construction | |
CN217353472U (en) | Guide rail truss capable of automatically lifting construction platform | |
CN216883200U (en) | Bearing bush is polished and is used dustless workstation of high environmental protection | |
CN219363019U (en) | Lifting device for toughened glass conveying | |
CN218988669U (en) | Wollastonite automatic feeding device | |
CN216253611U (en) | Control terminal for power grid operation | |
CN217175306U (en) | High-integrity prefabricated floor convenient to assemble | |
CN215158000U (en) | Cylinder class material storage position width adjusting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |