CN218117403U - Transmission tower with clearance snow structure - Google Patents
Transmission tower with clearance snow structure Download PDFInfo
- Publication number
- CN218117403U CN218117403U CN202221268378.6U CN202221268378U CN218117403U CN 218117403 U CN218117403 U CN 218117403U CN 202221268378 U CN202221268378 U CN 202221268378U CN 218117403 U CN218117403 U CN 218117403U
- Authority
- CN
- China
- Prior art keywords
- center
- fixedly connected
- transmission tower
- install bin
- rotating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses a power transmission tower with clearance snow structure, the utility model relates to a power transmission tower technical field, current clearance snow's method mainly clears up through the manual work, and manual cleaning, then need carry out high altitude construction, and such operation has certain danger to requirement to the workman is higher, and consequently the number that can be competent is less to intensity of labour is big, including the power transmission tower body, the front end center department of power transmission tower body is provided with the install bin, the equal fixedly connected with adapter sleeve in four angles of install bin rear side, the top center department fixedly connected with battery of install bin. Through the cooperation of knocking mechanism and each part inside, can be when using, through the horizontal migration who promotes the piece, the position that promotes the adapter sleeve removes to the one side of keeping away from the install bin center to make extension rod and power transmission line produce the striking, thereby realize the purpose of clearance snow.
Description
Technical Field
The utility model relates to a power transmission tower technical field specifically is a power transmission tower with clearance snow structure.
Background
The power grid transmission line is often frozen in rainy and snowy weather in winter, so that the gravity load of the power grid transmission line is increased, the power transmission line is easy to break, and large-area power failure of industry and residents is finally caused, for example, in early 2008, fifty-year severe snow disasters are encountered in the south of China, and serious loss is caused to power transmission facilities of various provinces in the south. Particularly, under the weather condition of snowstorm, the high-voltage transmission line is deposited with a thick ice and snow layer, so that the dead weight of the high-voltage transmission line is greatly increased, and finally the high-voltage transmission line is broken or even the high-voltage transmission tower is pulled down;
the existing method for clearing accumulated snow mainly comprises the steps of manually clearing accumulated snow, and high-altitude operation is needed for manual clearing, so that the operation has certain dangerousness and high requirements on workers, so that the number of qualified people is small, and the labor intensity is high.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a transmission tower with clearance snow structure to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a transmission tower with clearance snow structure, includes the transmission tower body, the front end center department of transmission tower body is provided with the install bin, four equal fixedly connected with adapter sleeves in angle of install bin rear side, the fixedly connected with battery is located at the top center of install bin, the top fixedly connected with solar panel of battery, install bin inner chamber center department is provided with rotates the fluted disc, keep away from the equal fixedly connected with in both ends around the center and remove the rail, the install bin rotates the fixedly connected with traction frame of top center department of fluted disc inner chamber, the equal fixedly connected with in both ends strikes the mechanism around rotating the fluted disc, both ends are close to the center around the install bin and prevent wind the round pin with the equal fixedly connected with in upper and lower both ends, prevent wind the surface of round pin and cup jointed the wind cover, prevent wind the one side fixedly connected with install sleeve that the cover is close to the install bin center, the inside of install sleeve is provided with adjustment mechanism.
As a preferred technical scheme of the utility model, strike mechanism includes the rotating pin, the rotating pin is located the inclined to one side rear side of rotating fluted disc top and the inclined to one side front end in bottom, the actuating lever has been cup jointed to the surface of rotating pin, one side that the installation box inner chamber center was kept away from to the actuating lever articulates there is the promotion piece, promote one side fixedly connected with that the installation box inner chamber center was kept away from to the piece and promote the frame, the meshing has the gear bottom center department of rotating fluted disc, the rear side fixedly connected with axis of rotation at gear center, the rear side of axis of rotation is provided with the motor, the equal fixedly connected with in both ends spacing rail around the installation box inner chamber center.
As an optimal technical scheme of the utility model, the internal surface diameter of actuating lever is greater than the surface diameter of rotating pin, promote the piece and pass through the actuating lever and rotate the fluted disc and constitute the horizontal migration structure.
As a preferred technical scheme of the utility model, promote the inside that the piece inlays and locates spacing rail, the rotation fluted disc passes through gear and motor constitution rotating-structure.
As a preferred technical scheme of the utility model, adjustment mechanism includes the adjusting collar, the adjusting collar inlays the inside center department of locating the installation cover, the equal threaded connection in the upper and lower both ends of adjusting collar inside has the extension rod, the equal fixedly connected with spacer pin in both ends and the left and right sides about the installation cover inner chamber, the spacing groove has all been seted up to the inside at both ends about the extension rod, one side fixedly connected with stretch cord at installation case inner chamber center is kept away from to adjusting collar center department, the upper and lower both ends that the adjusting collar surface is close to the center all are provided with the haulage rope.
As a preferred technical scheme of the utility model, the extension rod constitutes elevation structure through the rotation of adjusting collar, the spacer pin extends to the inside of spacing groove.
As a preferred technical scheme of the utility model, the center department fixed connection of one side at installing box inner chamber center is kept away from respectively in the surface at adjustment sleeve front end center and installation cover inner chamber in the both ends of stretch cord.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. through the matching use of the knocking mechanism and all parts in the knocking mechanism, when the device is used, the position of the connecting sleeve is pushed to move towards one side far away from the center of the mounting box through the horizontal movement of the pushing block, so that the extending rod and the power transmission line are impacted, and the purpose of clearing accumulated snow is achieved;
2. through the cooperation of adjustment mechanism and each part inside and using, can be when using, through the helicitic texture of extension rod and adjusting collar, when the adjusting collar rotates, drive the position of extension rod and remove to the one side of keeping away from the adjusting collar center to make behind extension rod and the adjusting collar combination can clear up many power transmission lines simultaneously, thereby improve work efficiency.
Drawings
FIG. 1 is a schematic perspective view of the installation box of the present invention,
figure 2 is a schematic view of the front view structure of the present invention,
FIG. 3 is a schematic view of the structure of the installation box of the present invention;
FIG. 4 is an enlarged schematic view of the structure at A in FIG. 2 according to the present invention;
fig. 5 is an enlarged schematic view of the structure at B in fig. 2 according to the present invention.
In the figure: 1. a power transmission tower body; 2. installing a box; 3. connecting sleeves; 4. a storage battery; 5. a solar panel; 6. rotating the fluted disc; 7. a moving rail; 8. a traction frame; 9. a knocking mechanism; 901. a rotation pin; 902. a drive rod; 903. a pushing block; 904. a pushing frame; 905. a gear; 906. a motor; 907. a limit rail; 10. a wind-proof pin; 11. a wind-proof sleeve; 12. installing a sleeve; 13. an adjustment mechanism; 1301. an adjusting sleeve; 1302. an extension rod; 1303. an elastic cord; 1304. a hauling rope; 1305. and a limiting pin.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example (b): as shown in fig. 1-5, the utility model provides a transmission tower with clearance snow structure, including transmission tower body 1, transmission tower body 1's front end center department is provided with install bin 2, four equal fixedly connected with adapter sleeve 3 in angle of install bin 2 rear side, install bin 2's top center department fixedly connected with battery 4, battery 4's top fixedly connected with solar panel 5, install bin 2 inner chamber center department is provided with the equal fixedly connected with in both ends around rotating fluted disc 6,6 keeps away from the center and removes rail 7, install bin rotates the top center department fixedly connected with traction frame 8 of 2 inner chambers of fluted disc, the equal fixedly connected with in both ends strikes mechanism 9 around rotating fluted disc 6, both ends are close to the center around the install bin 2 and the equal fixedly connected with in upper and lower both ends prevent wind round pin 10, prevent wind cover 11 has been cup jointed to the surface of preventing wind round pin 10, prevent wind cover 11 is close to one side fixedly connected with install bin 2 center 12, the inside of install sleeve 12 is provided with adjustment mechanism 13.
Further, knocking mechanism 9 includes swivel pin 901, swivel pin 901 is located swivel fluted disc 6 top rear side and the inclined to one side front end in bottom, actuating lever 902 has been cup jointed to the surface of swivel pin 901, one side that 2 inner chamber centers of install bin were kept away from to actuating lever 902 is articulated to have and promotes piece 903, it keeps away from one side fixedly connected with that 2 inner chamber centers of install bin 904 to promote piece 903, the meshing of bottom center department of swivel fluted disc 6 has gear 905, the rear side fixedly connected with axis of rotation at gear 905 center, the rear side of axis of rotation is provided with motor 906, the equal fixedly connected with spacing rail 907 in both ends around the 2 inner chamber centers of install bin.
Further, the diameter of the inner surface of the driving rod 902 is larger than the diameter of the outer surface of the rotating pin 901, and the pushing block 903 forms a horizontal moving structure through the driving rod 902 and the rotating toothed disc 6.
Further, the pushing block 903 is embedded in the limiting rail 907, and the rotating fluted disc 6 forms a rotating structure through the gear 905 and the motor 906.
Further, adjustment mechanism 13 includes adjusting sleeve 1301, adjusting sleeve 1301 inlays the inside center department of locating installation cover 12, the equal threaded connection in upper and lower both ends of adjusting sleeve 1301 inside has extension rod 1302, the equal fixedly connected with spacer pin 1305 in both ends and the left and right sides about installation cover 12 inner chamber, the spacing groove has all been seted up to the inside at both ends about extension rod 1302, one side fixedly connected with stretch cord 1303 at 2 inner chamber centers of installation box is kept away from to adjusting sleeve 1301 center department, the upper and lower both ends that adjusting sleeve 1301 surface is close to the center all are provided with haulage rope 1304.
Further, the extension rod 1302 forms a lifting structure through rotation of the adjusting sleeve 1301, and the limiting pin 1305 extends into the limiting groove.
Furthermore, two ends of the elastic rope 1303 are respectively fixedly connected to the outer surface of the center of the front end of the adjusting sleeve 1301 and the center of one side of the inner cavity of the mounting sleeve 12 away from the center of the inner cavity of the mounting case 2.
The working principle is as follows: firstly, when a power transmission tower body 1 is constructed, an installation box 2 and the power transmission tower body 1 are installed through a connecting sleeve 3, when equipment is not started, an installation sleeve 12 is fixed through a windproof pin 10 and a windproof sleeve 11, when the power transmission tower is required to be used, a motor 906 is started, a rotating shaft and a gear 905 are driven to rotate through the motor 906, and a rotating fluted disc 6 is driven to rotate through the gear 905;
horizontal migration through actuating lever 902, the position that promotes installation cover 12 is to keeping away from the one side removal at installation case 2 center, at the in-process that installation cover 12 removed, under the cooperation of stretch cord 1303 and haulage rope 1304 is used, can rotate adjusting sleeve 1301, thereby the position removal that drives extension rod 1302 through the rotation of adjusting sleeve 1301, thereby make the length extension after extension rod 1302 and adjusting sleeve 1301 make up, and then can clear up many power transmission lines simultaneously after making extension rod 1302 and adjusting sleeve 1301 make up, thereby improve work efficiency.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a transmission tower with clearance snow structure, includes transmission tower body (1), its characterized in that: the utility model discloses a wind-proof structure of power transmission tower, including power transmission tower body (1), the front end center department of power transmission tower body (1) is provided with install bin (2), four equal fixedly connected with adapter sleeves (3) in angle of install bin (2) rear side, fixedly connected with battery (4) are located at the top center of install bin (2), the top fixedly connected with solar panel (5) of battery (4), install bin (2) inner chamber center department is provided with rotation fluted disc (6), the equal fixedly connected with in both ends removes rail (7) around keeping away from the center rotation fluted disc (6), fixedly connected with traction frame (8) are located at the top center of install bin (2) inner chamber, the equal fixedly connected with in both ends strikes mechanism (9) around rotation fluted disc (6), both ends are close to the center around both sides and wind-proof round pin (10) of the equal fixedly connected with in upper and lower both ends about install bin (2), the surface of wind-proof round pin (10) has cup jointed wind-proof cover (11), one side fixedly connected with install sleeve (12) that wind-proof cover (11) are close to install bin (2) center, the inside of install sleeve (12) is provided with adjustment mechanism (13).
2. The transmission tower provided with the structure for removing accumulated snow according to claim 1, wherein: the knocking mechanism (9) comprises a rotating pin (901), the rotating pin (901) is located at the rear side of the rotating fluted disc (6) with the downward top and the front end of the rotating fluted disc with the upward bottom, a driving rod (902) is sleeved on the outer surface of the rotating pin (901), a pushing block (903) is hinged to one side of the driving rod (902) far away from the center of an inner cavity of the installation box (2), a pushing frame (904) is fixedly connected to one side of the pushing block (903) far away from the center of the inner cavity of the installation box (2), a gear (905) is meshed at the center of the bottom of the rotating fluted disc (6), a rotating shaft is fixedly connected to the rear side of the center of the gear (905), a motor (906) is arranged on the rear side of the rotating shaft, and limiting rails (907) are fixedly connected to the front end and the rear end of the center of the inner cavity of the installation box (2).
3. The transmission tower provided with the structure for removing accumulated snow according to claim 2, wherein: the diameter of the inner surface of the driving rod (902) is larger than the diameter of the outer surface of the rotating pin (901), and the pushing block (903) forms a horizontal moving structure through the driving rod (902) and the rotating fluted disc (6).
4. The transmission tower provided with the structure for removing accumulated snow according to claim 2, wherein: the pushing block (903) is embedded in the limiting rail (907), and the rotating fluted disc (6) forms a rotating structure through a gear (905) and a motor (906).
5. The transmission tower provided with the structure for removing accumulated snow according to claim 1, wherein: adjustment mechanism (13) are including adjusting collar (1301), adjusting collar (1301) inlays the inside center department of locating installation cover (12), the equal threaded connection in upper and lower both ends of adjusting collar (1301) inside has extension rod (1302), the equal fixedly connected with spacer pin (1305) in both ends and the left and right sides about installation cover (12) inner chamber, the spacing groove has all been seted up to the inside at both ends about extension rod (1302), one side fixedly connected with stretch cord (1303) at installation box (2) inner chamber center are kept away from to adjusting collar (1301) center department, the upper and lower both ends that adjusting collar (1301) surface is close to the center all are provided with haulage rope (1304).
6. The transmission tower provided with the structure for clearing away the accumulated snow according to claim 5, wherein: the extension rod (1302) forms a lifting structure through rotation of the adjusting sleeve (1301), and the limiting pin (1305) extends to the inside of the limiting groove.
7. The transmission tower provided with the structure for clearing away the accumulated snow according to claim 5, wherein: two ends of the elastic rope (1303) are fixedly connected with the outer surface of the center of the front end of the adjusting sleeve (1301) and the center of one side of the inner cavity of the mounting sleeve (12) far away from the center of the inner cavity of the mounting box (2) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221268378.6U CN218117403U (en) | 2022-05-24 | 2022-05-24 | Transmission tower with clearance snow structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221268378.6U CN218117403U (en) | 2022-05-24 | 2022-05-24 | Transmission tower with clearance snow structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218117403U true CN218117403U (en) | 2022-12-23 |
Family
ID=84514093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221268378.6U Active CN218117403U (en) | 2022-05-24 | 2022-05-24 | Transmission tower with clearance snow structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218117403U (en) |
-
2022
- 2022-05-24 CN CN202221268378.6U patent/CN218117403U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206117087U (en) | Novel transmission line deicing device | |
CN207138351U (en) | Solar photovoltaic cell panel automatic dust removing snow removing protector | |
CN111822401A (en) | Photovoltaic panel self-cleaning system of solar street lamp in green city | |
CN112952720A (en) | High-voltage line defroster based on electronic jar is strikeed | |
CN115995783A (en) | Icing removing device and deicing method for high-voltage transmission line | |
CN114937949A (en) | Cleaning and maintaining device for power equipment | |
CN115102126A (en) | Novel cable deicing robot | |
CN218117403U (en) | Transmission tower with clearance snow structure | |
CN111424894B (en) | Snow sweeping equipment for removing ice on high-rise eave | |
CN209016661U (en) | A kind of electric power transmission line deicing equipment | |
CN219999000U (en) | Opening and closing mechanism for ice cleaning machine | |
CN217281877U (en) | Maintenance tool for power grid power equipment | |
CN112952718A (en) | High-voltage wire deicing device based on knocking and grinding linkage | |
CN115262875A (en) | Eave deicing robot suitable for various parapets | |
CN211308967U (en) | Unmanned aerial vehicle for power line ice breaking | |
CN113346404A (en) | Transmission line foreign matter cleaning device | |
CN112554122A (en) | Automatic snow equipment that sweeps of people's foot bridge | |
CN114336488A (en) | Power transmission and transformation line cleaning device and construction method thereof | |
CN215120053U (en) | High-voltage line defroster based on electronic jar is strikeed | |
CN113404233B (en) | Light household snow remover | |
CN220440350U (en) | Electric power cable defroster | |
CN205311553U (en) | Window cleaner | |
CN204825768U (en) | Portable ice maker that removes of multitool head | |
CN216218793U (en) | Low-carbon environment-friendly greening device | |
CN217904349U (en) | High-efficient photovoltaic module snow clears away car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230804 Address after: 201199 Unit D, 15/F, Building 9, No. 2337, Gudai Road, Minhang District, Shanghai Patentee after: Jingshen (Shanghai) New Energy Co.,Ltd. Address before: No. 15, Fenggui Road, Huyangzhai Village, Dongxiao Town, Xinluo District, Longyan City, Fujian Province, 364000 Patentee before: Jin Longhua |