CN218117230U - Concrete wall body sets up entrance to a cave aluminum mould board combination system - Google Patents

Concrete wall body sets up entrance to a cave aluminum mould board combination system Download PDF

Info

Publication number
CN218117230U
CN218117230U CN202222142438.6U CN202222142438U CN218117230U CN 218117230 U CN218117230 U CN 218117230U CN 202222142438 U CN202222142438 U CN 202222142438U CN 218117230 U CN218117230 U CN 218117230U
Authority
CN
China
Prior art keywords
entrance
cave
template body
box
concrete wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222142438.6U
Other languages
Chinese (zh)
Inventor
姜淦清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhaoqing Chuangfu New Materials Technology Co.,Ltd.
Original Assignee
Zhaoqing Chuangfu New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhaoqing Chuangfu New Material Technology Co ltd filed Critical Zhaoqing Chuangfu New Material Technology Co ltd
Priority to CN202222142438.6U priority Critical patent/CN218117230U/en
Application granted granted Critical
Publication of CN218117230U publication Critical patent/CN218117230U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a concrete wall sets up entrance to a cave aluminum mould board combination system relates to aluminum mould board combination field, including template body and entrance to a cave box, be provided with locking bolt on the template body, entrance to a cave box inboard is provided with rather than complex fastening nut, the outer end of entrance to a cave box is trapezoidal setting, and is located and all is provided with the bolt hole on template body and the entrance to a cave box. The utility model discloses an effect of locking bolt carries out indentation with entrance to a cave box and template body and links together, treats later stage concrete shaping back, through unscrewing locking bolt for the entrance to a cave box separates with the template body, can directly demolish the template body, and the one end width of entrance to a cave box is less than the width in the outside simultaneously, and the workman of being convenient for demolishs the entrance to a cave box in the concrete wall, and this process is simple convenient, has accelerated the engineering progress greatly, has improved the engineering quality.

Description

Concrete wall body sets up entrance to a cave aluminum mould board combination system
Technical Field
The utility model relates to an aluminium template combination field specifically is a concrete wall body sets up entrance to a cave aluminium template combination system.
Background
The structural form of the high-rise building of the hotel and the office building is generally a concrete core tube and outer frame system, the template engineering in the whole concrete structure is an important process, and the selection of the template system has great influence on the progress, quality and benefit of the engineering construction.
The existing concrete pouring is completed, the wall opening template is disassembled manually, the bolt assemblies at the joints of the templates are disassembled one by one, and then the templates after pouring are disassembled manually and are collected in a unified mode.
Because above-mentioned structure staff is great at the dismantlement in-process degree of difficulty, and the flow is too loaded down with trivial details, reduces staff's dismantlement efficiency and has increased workman's work burden simultaneously, is unfavorable for going on in order of engineering progress, has reduced the engineering quality.
SUMMERY OF THE UTILITY MODEL
Based on this, the utility model aims at providing a concrete wall sets up entrance to a cave aluminium template combination system to solve because above-mentioned structure staff is great at the dismantlement in-process degree of difficulty, and the flow is too loaded down with trivial details, reduce staff's dismantlement efficiency and increased workman's work burden simultaneously, be unfavorable for going on in order of engineering progress, reduced the technical problem of engineering quality.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a concrete wall sets up entrance to a cave aluminum mould board combination system, includes template body and entrance to a cave box, be provided with locking bolt on the template body, entrance to a cave box inboard is provided with rather than complex fastening nut, the outer end of entrance to a cave box is trapezoidal setting, and is located and all is provided with the bolt hole on template body and the entrance to a cave box.
Through adopting above-mentioned technical scheme, carry out indentation with entrance to a cave box and template body through locking bolt's effect and link together, treat later stage concrete shaping back, through unscrewing locking bolt for entrance to a cave box separates with the template body, can directly demolish the template body, and the one end width of entrance to a cave box is less than the width in the outside simultaneously, and the workman of being convenient for demolishs the entrance to a cave box in the concrete wall, and this process is simple convenient, has accelerated the engineering progress greatly, has improved the engineering quality.
The utility model discloses further set up to, the outside of template body is provided with several array connecting holes.
Through adopting above-mentioned technical scheme, can carry out the concatenation of different shapes with the template body through the effect of multiunit connecting hole, make it be applicable to not unidimensional template and pour.
The utility model discloses further set up to, the inboard of template body is provided with the multiunit stiffening rib.
Through adopting above-mentioned technical scheme, when preventing to pour into concrete through the effect of stiffening rib, the too big template body that leads to of inside impact force takes place deformation, improves the device's anti deformability.
The utility model discloses further set up to, fastening nut welds in the longer one side of width in the entrance to a cave box.
Through adopting above-mentioned technical scheme for when later stage was dismantled, the workman of being convenient for was quick pulls down the entrance to a cave box from the wall post body.
The utility model discloses further set up to, the one end of template body is provided with the panel, and the other end is the opening setting.
Through adopting above-mentioned technical scheme, the concrete placement shaping back of being convenient for, the workman can be relaxed unscrews fastening nut.
To sum up, the utility model discloses mainly have following beneficial effect:
the utility model discloses a there is fastening nut in the inboard welding of entrance to a cave box, carry out the indentation with entrance to a cave box and template body through the effect of locking bolt and link together, treat later stage concrete shaping back, through unscrewing locking bolt for the entrance to a cave box separates with the template body, can directly demolish the template body, and the one end width of entrance to a cave box is less than the width in the outside simultaneously, and the workman of being convenient for demolishs the entrance to a cave box in the concrete wall, and this process is simple convenient, has accelerated the engineering progress greatly, has improved the engineering quality.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the opening box of the present invention;
FIG. 3 is a side sectional view of the opening box of the present invention;
fig. 4 is a side view of the formwork body of the present invention.
In the figure: 1. a template body; 2. an opening box; 3. fastening a nut; 4. locking the bolt; 5. connecting holes; 6. a wall stud body; 7. bolt holes.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
Next, an embodiment of the present invention will be described with reference to the overall structure thereof.
A concrete wall body is provided with an opening aluminum formwork combination system, as shown in figures 1-4, the concrete wall body comprises a formwork body 1 and an opening box 2, locking bolts 4 are arranged on the formwork body 1, fastening nuts 3 matched with the inner sides of the opening box 2 are arranged on the inner sides of the opening box 2, the opening box 2 and the formwork body 1 are combined together in a fastening mode through the locking bolts 4 and the fastening nuts 3, the outer ends of the opening box 2 are arranged in a trapezoid mode, the fastening nuts 3 are welded on one side, with longer width, of the opening box 2, when the opening box 2 is embedded into a wall column body 6, workers can easily take the opening box out of the wall column body 6, the later-stage worker dismounting efficiency is improved, bolt holes 7 are formed in the formwork body 1 and the opening box 2, a panel is arranged at one end of the formwork body 1, the other end of the formwork body is arranged in an opening mode, after internal concrete is formed, the locking bolts 4 can be directly unscrewed through the opening, and dismounting burden of the workers is reduced.
Referring to fig. 1 and 4, a plurality of groups of connecting holes 5 are formed in the outer side of the formwork body 1, the formwork body 1 can be spliced into a required size under the action of the connecting holes 5, the application range of the device is enlarged, and a plurality of groups of reinforcing ribs are arranged on the inner side of the formwork body 1 and can improve the overall deformation resistance of the device and prevent the formwork body 1 from deforming in the pouring process.
The utility model discloses a theory of operation does: during the use, run through template body 1 through locking bolt 4 and with fastening nut 3's cooperation with entrance to a cave box 2 with template body 1 carry out the equipment fastening and be in the same place, be provided with the stiffening rib in the template body 1, can increase the device's anti deformability through the stiffening rib, treat inside concrete shaping back that finishes, through unscrewing locking bolt 4, can separate entrance to a cave box 2 and template body 1, the staff of being convenient for directly takes off it, entrance to a cave box 2 is trapezoidal setting simultaneously, be convenient for directly take out it in the concrete wall, this process is simple convenient, the engineering progress has been accelerated greatly, the engineering quality is improved.
While embodiments of the invention have been illustrated and described, it is not intended to limit the invention to the exact construction and operation illustrated and described, and that various other features, structures, materials, or characteristics may be substituted for those illustrated and described without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a concrete wall sets up entrance to a cave aluminum mould board combination system, includes template body (1) and entrance to a cave box (2), its characterized in that: the template is characterized in that locking bolts (4) are arranged on the template body (1), fastening nuts (3) matched with the holes are arranged on the inner sides of the hole boxes (2), the outer ends of the hole boxes (2) are in a trapezoidal arrangement, and bolt holes (7) are formed in the template body (1) and the hole boxes (2).
2. The concrete wall body is provided with entrance to a cave aluminum mould board combination system of claim 1, its characterized in that: the outer side of the template body (1) is provided with a plurality of groups of connecting holes (5).
3. The concrete wall body is provided with entrance to a cave aluminum mould board combination system of claim 1, its characterized in that: the inner side of the template body (1) is provided with a plurality of groups of reinforcing ribs.
4. The concrete wall body provided hole aluminum template combination system according to claim 1, characterized in that: the fastening nut (3) is welded on one side with longer width in the hole box (2).
5. The concrete wall body is provided with entrance to a cave aluminum mould board combination system of claim 1, its characterized in that: one end of the template body (1) is provided with a panel, and the other end of the template body is provided with an opening.
CN202222142438.6U 2022-08-15 2022-08-15 Concrete wall body sets up entrance to a cave aluminum mould board combination system Active CN218117230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222142438.6U CN218117230U (en) 2022-08-15 2022-08-15 Concrete wall body sets up entrance to a cave aluminum mould board combination system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222142438.6U CN218117230U (en) 2022-08-15 2022-08-15 Concrete wall body sets up entrance to a cave aluminum mould board combination system

Publications (1)

Publication Number Publication Date
CN218117230U true CN218117230U (en) 2022-12-23

Family

ID=84523543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222142438.6U Active CN218117230U (en) 2022-08-15 2022-08-15 Concrete wall body sets up entrance to a cave aluminum mould board combination system

Country Status (1)

Country Link
CN (1) CN218117230U (en)

Similar Documents

Publication Publication Date Title
CN102409851B (en) Method and system for reinforcing telescopic supporting system for deformation joint template of shear wall structure
CN110344588A (en) A kind of building template bracing means
CN206599883U (en) A kind of truss-like combined steel plate wall
CN218117230U (en) Concrete wall body sets up entrance to a cave aluminum mould board combination system
CN212866865U (en) Assembled aluminum constructional column die
CN106978861A (en) A kind of truss-like combined steel plate wall
CN216840656U (en) Telescopic separator for beam column node concrete pouring
CN215519942U (en) Assembly template applied to super high-rise dual-core barrel structure
CN213143870U (en) Quick-release formwork system for square hole in beam
CN211229548U (en) Quick form removal tool for aluminum template
CN108222503A (en) A kind of combined large pier stud steel form
CN213173791U (en) Assembled landing stage pile cap
CN211849566U (en) Roughing mill body reserved bolt hole support-free template
CN113668849A (en) Post-cast strip pouring equipment and construction method thereof
CN210659227U (en) Exterior wall formwork system free of external scaffold
CN210105302U (en) Supporting-free adjustable combined die for sealing die of post-cast joint of prefabricated primary and secondary beams
CN111173263A (en) Integral aluminum die body based on narrow expansion joint
CN112609982A (en) Method for manufacturing wall with heat-insulation plate by adopting energy-saving bolt
CN207363256U (en) A kind of type quick detaching beam bottom mother plate supporting rack
CN205875707U (en) Wall form reentrant corner tool to lock
CN207673005U (en) A kind of containment one side formwork top bracing means
CN219100723U (en) Mould for reserving small holes in concrete structure
CN218149804U (en) Article font template reinforcing apparatus
CN217175711U (en) Constructional column aluminum formwork that can open door
CN214364977U (en) A install fast and dismantle fixer for reinforced concrete construction template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 526200 No. 11, Huiyuan Avenue, Longfu Town, Sihui City, Zhaoqing City, Guangdong Province

Patentee after: Zhaoqing Chuangfu New Materials Technology Co.,Ltd.

Address before: 526200 No. 11, Huiyuan Avenue, Longfu Town, Sihui City, Zhaoqing City, Guangdong Province

Patentee before: Zhaoqing Chuangfu New Material Technology Co.,Ltd.

CP01 Change in the name or title of a patent holder