CN218051567U - Anchor is production drilling equipment for clamp piece - Google Patents

Anchor is production drilling equipment for clamp piece Download PDF

Info

Publication number
CN218051567U
CN218051567U CN202220531975.7U CN202220531975U CN218051567U CN 218051567 U CN218051567 U CN 218051567U CN 202220531975 U CN202220531975 U CN 202220531975U CN 218051567 U CN218051567 U CN 218051567U
Authority
CN
China
Prior art keywords
fixedly connected
anchor
piece
drilling equipment
mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220531975.7U
Other languages
Chinese (zh)
Inventor
徐国成
徐楚
杨晓华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Fuyang Sancheng Machinery Co ltd
Original Assignee
Hangzhou Fuyang Sancheng Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Fuyang Sancheng Machinery Co ltd filed Critical Hangzhou Fuyang Sancheng Machinery Co ltd
Priority to CN202220531975.7U priority Critical patent/CN218051567U/en
Application granted granted Critical
Publication of CN218051567U publication Critical patent/CN218051567U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses an anchor is production drilling equipment for cramp, including mount and drilling equipment, drilling equipment fixed connection is in the left side at the mount top, the collecting vat has been seted up at the top of mount, the inner wall fixedly connected with fixed block of collecting vat, the right side fixedly connected with baffle at mount top. The utility model discloses a set up the fly leaf, can be using the rebound fly leaf, then put the anchor clamping piece on the fixed block, move down to drill the anchor clamping piece through drilling equipment, can avoid the piece to splash to the outside through baffle and fly leaf, then the piece that drops passes through the collecting vat and falls into in the collecting box, it is more convenient when making the collection piece, it can produce very to the piece to have solved current drilling equipment when drilling the anchor clamping piece, long-time not clear up can cause clastic piling up, thereby the influence is to the drilling of anchor clamping piece, simultaneously when clearing up the piece with the problem of hand fish tail easily.

Description

Anchor is production drilling equipment for clamp piece
Technical Field
The utility model relates to an anchor clip technical field specifically is an anchor clip is with production drilling equipment.
Background
The anchorage device is widely applied to projects such as highway bridges, railway bridges, urban overpasses, urban light rails, high-rise buildings, hydraulic and hydroelectric dams, ports and wharfs, rock slope protection anchoring, foundation reinforcement, tunnel mine roof anchor tops, prestressed net frames, subways, large-scale building halls, warehouse workshops, tower buildings, weight lifting, sliding film intermittent propulsion, bridge and tunnel jacking, large-scale containers and ships, sleepers, bridge support replacement, bridge and building reinforcement, steel bar engineering, antimagnetic and anticorrosive engineering, carbon fiber reinforcement, pretensioned beam yard construction, in-vitro prestressed engineering, stay cables, suspension cables and the like.
SUMMERY OF THE UTILITY MODEL
For solving the problem that provides in the above-mentioned background art, the utility model aims to provide an anchor is production drilling equipment for clamping piece has possessed and has collected clastic advantage, has solved current drilling equipment and can produce very to the piece when drilling to the anchor clamping piece, and long-time not clear up can cause clastic piling up to the influence is to the drilling of anchor clamping piece, simultaneously when clearing up the piece with the problem of hand fish tail easily.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an anchor is production drilling equipment for clamp piece, includes mount and drilling equipment, drilling equipment fixed connection is in the left side at the mount top, the collecting vat has been seted up at the top of mount, the inner wall fixedly connected with fixed block of collecting vat, the right side fixedly connected with baffle at mount top, the bottom on mount right side is seted up flutedly, the inner wall swing joint of recess has the collecting vat, the standing groove has been seted up to the bottom on baffle right side, the inner wall swing joint of standing groove has the fly leaf, the bottom of collecting vat inner wall is linked together with the top of recess inner wall.
As the utility model discloses it is preferred, the draw-in groove has been seted up at the top of fixed block, the inner wall fixedly connected with rubber ring of draw-in groove.
As the utility model discloses it is preferred, the right side fixed connection magnet one of standing groove inner wall, the right side fixedly connected with magnet two at fly leaf top.
As the utility model discloses it is preferred, the both sides of fixed block bottom are the slope setting, the guide way has been seted up to the both sides at fixed block top.
As the utility model discloses it is preferred, the inboard fixedly connected with lug of rubber ring, the lug is provided with threely, and three lug is the equidistance and distributes.
As the utility model discloses it is preferred, the equal fixedly connected with gyro wheel in four corners of collecting box bottom, the equal fixedly connected with handle in both sides of collecting box.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the fly leaf, can be using the rebound fly leaf, then put the anchor clamping piece on the fixed block, move down and drill the anchor clamping piece through drilling equipment, can avoid the piece to splash to the outside through baffle and fly leaf, then the piece that drops falls in the collecting box through the collecting vat, it is more convenient when making the collection piece, it can produce very to the piece to have solved current drilling equipment when drilling the anchor clamping piece, long-time unclean can cause clastic piling up, thereby the influence can cause the drilling of anchor clamping piece, simultaneously when clearing up the piece easy problem with the hand fish tail, possessed and can collect clastic advantage.
2. The utility model discloses a set up draw-in groove and rubber ring, can fix a position the anchor clamping piece through the draw-in groove when placing the anchor clamping piece, can avoid boring partially when drilling, then the rubber ring can press from both sides the anchor clamping piece tightly when putting into the draw-in groove with the anchor clamping piece.
3. The utility model discloses a set up magnet one and magnet two, can make the fly leaf fixed through magnet one and two mutual adsorptions of magnet when upwards pulling the fly leaf, can be more convenient when using.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the front cross-sectional structure of the present invention;
fig. 3 is an enlarged schematic structural diagram of a position a in fig. 2 according to the present invention.
In the figure: 1. a fixed mount; 2. a drilling device; 3. collecting tank; 4. a fixed block; 5. a baffle plate; 6. a groove; 7. a collection box; 8. a placement groove; 9. a movable plate; 10. a card slot; 11. a rubber ring; 12. a magnet I; 13. a second magnet; 14. a bump; 15. a guide groove; 16. a roller; 17. a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 to 3, the utility model provides a pair of anchor is production drilling equipment for clamp, including mount 1 and drilling equipment 2, 2 fixed connection of drilling equipment are in the left side at 1 top of mount, collecting vat 3 has been seted up at the top of mount 1, the inner wall fixedly connected with fixed block 4 of collecting vat 3, the right side fixedly connected with baffle 5 at 1 top of mount, recess 6 has been seted up to the bottom on 1 right side of mount, the inner wall swing joint of recess 6 has collecting box 7, standing groove 8 has been seted up to the bottom on 5 right sides of baffle, the inner wall swing joint of standing groove 8 has fly leaf 9, the bottom of 3 inner walls of collecting vat is linked together with the top of 6 inner walls of recess.
Referring to fig. 2, a clamping groove 10 is formed at the top of the fixing block 4, and a rubber ring 11 is fixedly connected to the inner wall of the clamping groove 10.
As a technical optimization scheme, through setting up draw-in groove 10 and rubber ring 11, can fix a position the anchor clamping piece through draw-in groove 10 when placing the anchor clamping piece, can avoid boring partially when drilling, then rubber ring 11 can press from both sides the anchor clamping piece tightly when putting into draw-in groove 10 with the anchor clamping piece.
Referring to fig. 3, a first magnet 12 is fixedly connected to the right side of the inner wall of the placement groove 8, and a second magnet 13 is fixedly connected to the right side of the top of the movable plate 9.
As a technical optimization scheme of the utility model, through setting up magnet one 12 and two 13 of magnet, can make fly leaf 9 fixed through magnet one 12 and two 13 mutual adsorptions of magnet when upwards pulling fly leaf 9, can be more convenient when using.
Referring to fig. 2, two sides of the bottom of the fixing block 4 are obliquely arranged, and two sides of the top of the fixing block 4 are provided with guide grooves 15.
As the utility model discloses a technical optimization scheme, through setting up fixed block 4 and guide way 15, can make the piece that drops reduce friction through guide way 15, make the piece can not stop on fixed block 4, then be the slope and set up the piece that can make to drop to both sides landing.
Referring to fig. 2, the inner side of the rubber ring 11 is fixedly connected with three protrusions 14, and the three protrusions 14 are equidistantly distributed.
As a technical optimization scheme of the utility model, through setting up lug 14, can take place the area of contact of deformation increase and anchor clamping piece through lug 14 when using, can be more convenient when the anchor clamping piece is fixed, more make things convenient for the anchor clamping piece simultaneously.
Referring to fig. 2, the four corners of the bottom of the collecting box 7 are fixedly connected with the rollers 16, and the two sides of the collecting box 7 are fixedly connected with the handles 17.
As a technical optimization scheme of the utility model, through setting up gyro wheel 16 and handle 17, pass through gyro wheel 16 when removing collecting box 7, can make the removal of collecting box 7 more convenient, then handle 17 can be more convenient when moving collecting box 7.
The utility model discloses a theory of operation and use flow: when the portable plate drilling device is used, the movable plate 9 is moved upwards, the anchor clamping piece is placed on the fixed block 4, the anchor clamping piece is drilled through downward movement of the drilling device 2, the fragments can be prevented from splashing to the outside through the baffle 5 and the movable plate 9, then the dropped fragments fall into the collecting box 7 through the collecting groove 3, the collection of the fragments is more convenient, the anchor clamping piece can be positioned through the clamping groove 10, the drilling deviation during drilling can be avoided, then the rubber ring 11 can clamp the anchor clamping piece when the anchor clamping piece is placed into the clamping groove 10, the movable plate 9 can be fixed through mutual adsorption of the first magnet 12 and the second magnet 13 when the movable plate 9 is pulled upwards, the portable plate drilling device can be used more conveniently, the dropped fragments can be reduced in friction through the guide groove 15, the fragments can not stay on the fixed block 4, the dropped fragments can slide towards two sides through the inclined arrangement, the contact area with the anchor clamping piece is increased through the convex block 14 when the portable plate drilling device is used, the portable plate can be used more conveniently fixed, the collecting box 7 can be moved through the idler wheels 16 when the fixed block 7 is moved, the collecting box 7 can be moved more conveniently, and the collecting box can be moved conveniently when the collecting box 17 is used.
In conclusion: this anchor is production drilling equipment for clamp, through setting up fly leaf 9, can be using the rebound fly leaf 9, then put the anchor clamping piece on fixed block 4, drill the anchor clamping piece through drilling equipment 2 lapse, can avoid the piece to splash to the outside through baffle 5 and fly leaf 9, then the piece that drops falls in collecting tank 7 through collecting vat 3, it is more convenient when making the collection piece, it can produce very to the piece to have solved current drilling equipment when drilling the anchor clamping piece, long-time unclean reason can cause clastic piling up, thereby the influence is to the drilling of anchor clamping piece, simultaneously when clearing up the piece easily with the problem of hand fish tail.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an anchor is production drilling equipment for clamp piece, includes mount (1) and drilling equipment (2), its characterized in that: drilling equipment (2) fixed connection is in the left side at mount (1) top, collecting vat (3) have been seted up at the top of mount (1), the inner wall fixedly connected with fixed block (4) of collecting vat (3), right side fixedly connected with baffle (5) at mount (1) top, recess (6) have been seted up to the bottom on mount (1) right side, the inner wall swing joint of recess (6) has collecting box (7), standing groove (8) have been seted up to the bottom on baffle (5) right side, the inner wall swing joint of standing groove (8) has fly leaf (9), the bottom of collecting vat (3) inner wall is linked together with the top of recess (6) inner wall.
2. The anchor clip production drilling device of claim 1, wherein: the top of the fixed block (4) is provided with a clamping groove (10), and the inner wall of the clamping groove (10) is fixedly connected with a rubber ring (11).
3. The anchor clip production drilling device of claim 1, wherein: the right side of the inner wall of the placing groove (8) is fixedly connected with a first magnet (12), and the right side of the top of the movable plate (9) is fixedly connected with a second magnet (13).
4. The anchor clip production drill of claim 1, wherein: the two sides of the bottom of the fixed block (4) are obliquely arranged, and the two sides of the top of the fixed block (4) are provided with guide grooves (15).
5. The anchor clip production drilling device of claim 2, wherein: the inner side of the rubber ring (11) is fixedly connected with three bumps (14), and the three bumps (14) are distributed equidistantly.
6. The anchor clip production drilling device of claim 1, wherein: the four corners of the bottom of the collecting box (7) are fixedly connected with idler wheels (16), and the two sides of the collecting box (7) are fixedly connected with handles (17).
CN202220531975.7U 2022-03-13 2022-03-13 Anchor is production drilling equipment for clamp piece Active CN218051567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220531975.7U CN218051567U (en) 2022-03-13 2022-03-13 Anchor is production drilling equipment for clamp piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220531975.7U CN218051567U (en) 2022-03-13 2022-03-13 Anchor is production drilling equipment for clamp piece

Publications (1)

Publication Number Publication Date
CN218051567U true CN218051567U (en) 2022-12-16

Family

ID=84413423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220531975.7U Active CN218051567U (en) 2022-03-13 2022-03-13 Anchor is production drilling equipment for clamp piece

Country Status (1)

Country Link
CN (1) CN218051567U (en)

Similar Documents

Publication Publication Date Title
CN209604015U (en) A kind of simple trestle for tunnel
CN106120787A (en) A kind of construction method carrying out pile sinking based on pushing tow travelling platform
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN106368129A (en) Pushing construction method of single-line railway steel truss bridge utilizing guide beam
CN205804349U (en) A kind of travelling platform for steel pipe pile sinking construction
CN218051567U (en) Anchor is production drilling equipment for clamp piece
CN201560587U (en) Box girder tensioning frame adopting post-tensioning method
CN206986644U (en) A kind of tunnel track simply removes device
CN205935580U (en) Novel large tracts of land mechanical float
CN202482767U (en) Steel tube bailey beam column type support
CN205604226U (en) Underground continuous wall cross -shaped steel plate connects brush wall ware
CN110374018A (en) A kind of combined steel cross bearer sets up multispan just beam track strengthening method
CN212296237U (en) Side slope drilling trolley
CN213265634U (en) A quick hoisting device for road bridge tunnel construction
CN210368578U (en) Emergency bridge for oil field emergency
CN210217753U (en) Integral supporting removal landing stage of tunnel invert
CN206352299U (en) A kind of cage car device constructed for water seepage mechanism
CN206767512U (en) A kind of overhead prestressed tensioning suspender
CN206299150U (en) One kind construction packway
CN216781232U (en) Burnishing device is used in anchor clip production
CN218563671U (en) Assembled utility tunnel major structure construction formwork trolley
CN218562012U (en) Cast-in-place foam concrete road base tectorial membrane device of making level
CN209212259U (en) A kind of tunneling Subway Tunnel standard section tunnel new type formwork trolley
CN213419121U (en) 6 long semi-mechanized vertical arch frame trolley of dry tunnel of usefulness of length
CN218150781U (en) Telescopic tower device of well drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant