CN205604226U - Underground continuous wall cross -shaped steel plate connects brush wall ware - Google Patents

Underground continuous wall cross -shaped steel plate connects brush wall ware Download PDF

Info

Publication number
CN205604226U
CN205604226U CN201620228471.2U CN201620228471U CN205604226U CN 205604226 U CN205604226 U CN 205604226U CN 201620228471 U CN201620228471 U CN 201620228471U CN 205604226 U CN205604226 U CN 205604226U
Authority
CN
China
Prior art keywords
wall
steel plate
brush
brush wall
underground continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620228471.2U
Other languages
Chinese (zh)
Inventor
周宏�
朱儒
杨超
刘志中
刘素云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority to CN201620228471.2U priority Critical patent/CN205604226U/en
Application granted granted Critical
Publication of CN205604226U publication Critical patent/CN205604226U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an underground continuous wall cross -shaped steel plate connects brush wall ware, includes churn drill bit (1), churn drill bit (1) tup bottom one side is provided with square steel plate frame (2), and sunken spill guide way (3) in square steel plate frame (2) middle part is provided with, the distribution has steel brush (4) on the brush wall of square steel plate frame (2) and spill guide way (3) the interior both sides wall, and the horizontal width of brush wall of square steel plate frame (2) is lighter than underground continuous wall thickness. Simple structure, easy and simple to handle, the straightness that hangs down is good, has guaranteed the completeness of brush wall, can effectively clear away around irritating concrete or other barrier firmly.

Description

A kind of diaphram wall cross steel plate terminal bruss wall device
Technical field
This utility model relates to a kind of brush wall device, a kind of diaphram wall cross steel plate terminal bruss wall device, belongs to deep footing groove enclosing structure underground continuous wall construction technique field.
Background technology
Along with the rapid propelling of China's Urbanization Construction, urban infrastructure construction scale is increasing, and house construction engineering, city track traffic engineering etc. are the most substantial amounts of devises deep basal pit.Deep footing groove enclosing structure diaphram wall support technology, its technology is more ripe, geological conditions strong adaptability, and the stability of building enclosure, water proofing property are all preferable, are therefore widely used in engineering design and construction.
The work progress of diaphram wall is carried out by unit groove section one by one, connecting sewing can be formed during adjacent cells groove section sequence construction, the intersegmental joint style of adjacent cells groove has flexible joint and rigid joint to realize seam, existing realizes seam by rigid joint under normal circumstances.Rigid joint typically uses cross steel plate, and steel reinforcement cage is transferred rear cross steel plate joint and need to be filled bag sand (or stone etc.) or transfer joint case, cross steel plate remains consolidation thing or streams concrete;And owing to there are slurry coat method in groove section, this connecting sewing cross steel plate surface can form layer of mud skin in work progress;In particular cases, cross steel plate can be attached with other foreign material of solidification or around the concrete filled.For ensureing in connecting sewing position, concrete and cross steel plate that later stage pours preferably combine, the globality of body of wall of avoiding leaking, increase, need previous groove section cross steel plate joint is carried out brush wall process after diaphram wall follow-up groove section becomes trough end, remove all foreign material being attached to cross steel plate surface, to ensure effective contact of adjacent slot section concrete, add the globality of diaphram wall body of wall.
The brush wall of existing cross steel plate joint processes and generally uses joint case, utilizes crane to sling joint case, and makes joint case against by brush steel plate surface, sling the most back and forth and put down, being purged the work of attachment on diaphram wall cross steel plate joint during use.But, had the disadvantage that owing to using crane brush wall, crane カ brachium by joint case brush wall, easily cause brush wall device, affect brush wall effect;Simultaneously as use crane brush wall, brush wall device cannot provide enough impulsive forces when falling, and upper groove segment has cannot be removed in time filling concrete, it is impossible to meet use demand.
Summary of the invention
The purpose of this utility model is have in time filling concrete, for the existing brush wall effect groove segment poor, upper existed by joint case brush wall, problems such as cannot removing, it is provided that a kind of diaphram wall cross steel plate terminal bruss wall device.
For achieving the above object, technical solution of the present utility model is:A kind of diaphram wall cross steel plate terminal bruss wall device, including chopping bit, described chopping bit tup bottom side is provided with square plate framework, described square plate frame mid portion is provided with the spill gathering sill of sunken inside, wire brush is distributed in the brush wall of square plate framework and spill gathering sill on two side, and the brush wall horizontal width of square plate framework is less than diaphram wall thickness.
Described wire brush is distributed three groups up and down.
Compared with prior art, the beneficial effects of the utility model are:
1, simple in construction, easy and simple to handle, this brush wall device is by deadweight whereabouts brush wall, and the brush wall device comparing crane brush wall needs to be controlled by crane lifting rope, and its perpendicularity is more preferable, it is ensured that the completeness of brush wall, and brush wall is effective.
2, heavier due to chopping bit in this utility model, impact velocity is fast in addition, therefore impact advantage can also be utilized effectively to remove when running into around filling concrete or other relatively sound-hard obstacles.
3, when this brush wall device falls, speed is fast, put down brush wall device brush wall with crane by slinging back and forth compared with saved certain time, speed of application is very fast.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Fig. 2 is this utility model top view.
In figure, chopping bit 1, steel plate framework 2, spill gathering sill 3, wire brush 4.
Detailed description of the invention
Illustrate with detailed description of the invention, this utility model to be described in further detail below in conjunction with accompanying drawing.
Seeing Fig. 1 to Fig. 2, a kind of diaphram wall cross steel plate terminal bruss wall device, including chopping bit 1, bottom described chopping bit 1 tup, any side is provided with square plate framework 2.It is provided with the spill gathering sill 3 of sunken inside in the middle part of described square plate framework 2, in the brush wall of square plate framework 2 and spill gathering sill 3, on two side, wire brush 4 is distributed;Square plate framework 2 has five herein, wherein goes up lower horizontal plane and to be vertically parallel to the two sides of spill gathering sill 3 be stationary plane, vertical face be perpendicular to spill gathering sill 3 for brush wall.And the brush wall horizontal width of square plate framework 2 is slightly less than diaphram wall thickness, the vertical height of square plate framework 2 is 50cm.
Described wire brush about 4 is distributed three groups.
See Fig. 1 to Fig. 2, during making, on chopping bit 1, first cut spill gathering sill 3, be then welded with eight block plates and form square plate framework 2;Steel plate thickness and square plate framework 2 internal pore filling steel plate quantity balance with chopping bit 1 and are adjusted for standard.
Seeing Fig. 1 to Fig. 2, this brush wall device, while completing to brush mud skin, can remove solidfied material more difficult to remove on cross steel plate and effectively around filling concrete.During Specific construction, after continuous wall trench underground, impact is bored in place, former drill hammer is changed into this brush wall device, starting impact to bore, impact is bored to move up and down and is repeatedly washed away, and constantly scrubs the attachment on cross steel plate by wire brush 4 thus realizes that diaphram wall is scrubbed face and carry out cleaning brush wall.When running into solidfied material more difficult to remove or in time filling concrete, this brush wall device by the impact capacity bored by impact by removing, the most repeatedly, until the eliminating impurities on cross steel plate is clean.
Above content is to combine concrete preferred implementation further detailed description of the utility model, it is impossible to assert that of the present utility model being embodied as is confined to these explanations.For this utility model person of an ordinary skill in the technical field, without departing from the concept of the premise utility, it is also possible to make some simple deduction or replace, said structure all should be considered as belonging to protection domain of the present utility model.

Claims (2)

1. a diaphram wall cross steel plate terminal bruss wall device, including chopping bit (1), it is characterized in that: described chopping bit (1) tup bottom side is provided with square plate framework (2), described square plate framework (2) middle part is provided with the spill gathering sill (3) of sunken inside, wire brush (4) is distributed on the brush wall of square plate framework (2) and spill gathering sill (3) interior two side, and the brush wall horizontal width of square plate framework (2) is less than diaphram wall thickness.
A kind of diaphram wall cross steel plate terminal bruss wall device the most according to claim 1, it is characterised in that: described wire brush (4) is distributed three groups up and down.
CN201620228471.2U 2016-03-23 2016-03-23 Underground continuous wall cross -shaped steel plate connects brush wall ware Expired - Fee Related CN205604226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620228471.2U CN205604226U (en) 2016-03-23 2016-03-23 Underground continuous wall cross -shaped steel plate connects brush wall ware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620228471.2U CN205604226U (en) 2016-03-23 2016-03-23 Underground continuous wall cross -shaped steel plate connects brush wall ware

Publications (1)

Publication Number Publication Date
CN205604226U true CN205604226U (en) 2016-09-28

Family

ID=56963733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620228471.2U Expired - Fee Related CN205604226U (en) 2016-03-23 2016-03-23 Underground continuous wall cross -shaped steel plate connects brush wall ware

Country Status (1)

Country Link
CN (1) CN205604226U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677224A (en) * 2017-02-28 2017-05-17 浙江绩丰岩土技术股份有限公司 Milling wheel wall brushing device for underground diaphragm wall lock catch pipe connector
CN107120065A (en) * 2017-07-06 2017-09-01 中铁八局集团昆明铁路建设有限公司 A kind of oblique rock groove section rectangular impact drill bit of ground-connecting-wall construction and construction method
CN111719544A (en) * 2020-06-18 2020-09-29 中煤江南建设发展有限公司 Construction method of dry dock lattice type underground wall connecting structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677224A (en) * 2017-02-28 2017-05-17 浙江绩丰岩土技术股份有限公司 Milling wheel wall brushing device for underground diaphragm wall lock catch pipe connector
CN107120065A (en) * 2017-07-06 2017-09-01 中铁八局集团昆明铁路建设有限公司 A kind of oblique rock groove section rectangular impact drill bit of ground-connecting-wall construction and construction method
CN107120065B (en) * 2017-07-06 2024-01-30 中铁八局集团昆明铁路建设有限公司 Rectangular impact drill bit for construction of inclined rock groove section of underground diaphragm wall and construction method
CN111719544A (en) * 2020-06-18 2020-09-29 中煤江南建设发展有限公司 Construction method of dry dock lattice type underground wall connecting structure

Similar Documents

Publication Publication Date Title
CN205604226U (en) Underground continuous wall cross -shaped steel plate connects brush wall ware
CN206844707U (en) A kind of Reinforced Concrete Reinforcement component
CN205152983U (en) Stratum pre -reinforcing of underground space construction handles structure
CN102561387A (en) Reverse construction method of underground core-tube diaphragm wall
CN105332386B (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN106545343B (en) Construction method for underground pipe gallery and storage well
CN101200892A (en) Ballastless track steel reinforced concrete pile-net construction method
CN208517998U (en) It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket
CN205503059U (en) Circulation slip casting cutting remove system
CN108166395A (en) A kind of construction method that beam bridge is built across Business Line
CN208088245U (en) A kind of gallery climbing section well cementing construction trolley
CN102287193A (en) Special hanging scaffold for sleeve-building inner shaft wall in shaft sinking of vertical shaft
CN202181898U (en) Special hanging scaffold for sheathing and building inner-layer well wall in vertical shaft sinking construction
CN106193086B (en) A kind of method of construction of earthquake-resistant structure
CN109056540A (en) A kind of construction method of small-sized Reinforced Concrete Simple bridge
CN213358349U (en) Movable hanging basket for construction of side part of viaduct
CN204826006U (en) Deviational survey pipe based on in deep basal pit envelope concrete
CN108035372A (en) A kind of method using drilling platform gooseneck suspension steel lifted trunk
CN204475350U (en) Bored pile construction system under high-voltage line
CN204344081U (en) A kind of ram pile driver denoising device
CN209854661U (en) Water conservancy construction slope protection structure
CN208280028U (en) A kind of segment splicing Bridge Erector
CN205502001U (en) Anti -floating anchor rod waterproof construction
CN205296849U (en) Letter storehouse concrete funnel structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928