CN204826006U - Deviational survey pipe based on among deep basal pit retaining structure concrete - Google Patents

Deviational survey pipe based on among deep basal pit retaining structure concrete Download PDF

Info

Publication number
CN204826006U
CN204826006U CN201520628761.1U CN201520628761U CN204826006U CN 204826006 U CN204826006 U CN 204826006U CN 201520628761 U CN201520628761 U CN 201520628761U CN 204826006 U CN204826006 U CN 204826006U
Authority
CN
China
Prior art keywords
pvc
concrete
inclinometer pipe
enclosing structure
inclinometer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520628761.1U
Other languages
Chinese (zh)
Inventor
李明节
赵新华
占义
吴凡
郎来成
邓能伟
陆跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201520628761.1U priority Critical patent/CN204826006U/en
Application granted granted Critical
Publication of CN204826006U publication Critical patent/CN204826006U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model provides a deviational survey pipe based on among deep basal pit envelope concrete, includes PVC deviational survey pipe and steel casing pipe, and the PVC deviational survey pipe is vertical to be buried underground in envelope concrete layer, and the PVC deviational survey pipe lower extreme flushes with the steel reinforcement cage bottom among the envelope concrete layer, and the upper end extends to the crown beam top that is located envelope concrete layer top, and steel casing pipe and the coaxial setting of PVC deviational survey pipe, steel casing pipe bottom are buried underground in the envelope concrete layer, and upper portion exceeds steel reinforcement cage 20 cm. The utility model takes the PVC inclinometer as the main structure, adopts the coaxial arrangement of the steel sleeve and the PVC inclinometer, and prevents the main structure of the inclinometer from being damaged in the process of chiseling the super-filled concrete; the work of cleaning broken slag in the inclinometer, connecting pipes, even scrapping blocked pipes and the like which need to be carried out due to the fact that the inclinometer is damaged by construction is avoided, and meanwhile the safety risk brought to deep foundation pit excavation due to the fact that the later monitoring and measuring work is influenced due to the fact that the inclinometer is damaged by the construction is also avoided.

Description

A kind of based on the inclinometer pipe in deep footing groove enclosing structure concrete
Technical field
The utility model relates to a kind of inclinometer pipe, in particular a kind of based on the inclinometer pipe in deep footing groove enclosing structure concrete.
Background technology
In recent years, the underground engineering construction of China, water conservancy construction and urban traffic infrastructure construction all achieve unprecedented development, along with the raising of social production force level and the extensive use of a large amount of new technology, new construction, new technology, new material and new equipment, the building technology of underground construction is made to have also been obtained unprecedented development.
The peak period that China carries out underground engineering construction construction at present, by resource-constrained between hemisphere, the development trend of following infrastructure is city underground engineering Application and Development, in support system space enclosing structure, for ensureing space enclosing structure construction quality, all will carry out super filling by code requirement, general surpassing fills with 50cm, sometimes because construction control is bad, super length of filling with is higher than specification.Inclinometer pipe pre-buried in measuring for foundation ditch, is easily subject to space enclosing structure top super filling concrete chisel removal and is destroyed during Guan Liang construction.
Urban Underground deep pit digging, first Guan Liang construction is carried out by operation, need to cut the super concrete of filling with of space enclosing structure, cut and super fill with general and adopt artificial and machinery to cut, for ensureing space enclosing structure quality, the general artificial chisel that all adopts removes, but artificial chisel except also easily causing inclinometer pipe to be destroyed, fracture, the phenomenon such as the mouth of pipe blocks.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, provides a kind of based on the inclinometer pipe in deep footing groove enclosing structure concrete, and this inclinometer pipe can prevent from cutting in super filling process and damage.
The utility model is achieved through the following technical solutions:
A kind of based on the inclinometer pipe in deep footing groove enclosing structure concrete, its design feature is, comprise PVC inclinometer pipe and steel sleeve, described PVC inclinometer pipe is vertically embedded in space enclosing structure layer of concrete, described PVC inclinometer pipe lower end flushes with the reinforcing cage bottom in space enclosing structure layer of concrete, upper end extend to be positioned at space enclosing structure layer of concrete top hat beam above, described steel sleeve and PVC inclinometer pipe are coaxially arranged, be embedded in space enclosing structure layer of concrete bottom described steel sleeve, top exceeds reinforcing cage 20cm.
Further, described PVC inclinometer pipe and steel pipe socket are fixed by the reinforcing cage be located in space enclosing structure layer of concrete.
Further, described steel sleeve length is 1150mm-1250mm, and the length that described steel sleeve is positioned at space enclosing structure layer of concrete is 500mm-850mm.
Further, described steel sleeve upper end flushes with PVC inclinometer pipe upper end, and described PVC inclinometer pipe height exceeds hat beam upper surface 80-120mm.
Compared with the prior art, the utility model beneficial effect is embodied in:
The utility model inclinometer pipe is with PVC inclinometer pipe for agent structure is embedded in deep footing groove enclosing structure concrete and hat beam, and due to PVC inclinometer pipe, the cost of material is low, light weight, therefore can be cost-saving, convenient construction, the utility model is when space enclosing structure is constructed, in advance rigid safeguard measure is taked to inclinometer pipe agent structure, namely steel sleeve and PVC inclinometer pipe is adopted coaxially to arrange, be embedded in space enclosing structure layer of concrete bottom steel sleeve, top exceeds hat beam upper surface, prevent from damaging inclinometer pipe agent structure cutting in super filling process, avoid disintegrating slag cleaning in the inclinometer pipe that needs because inclinometer pipe suffers breakage in installation to carry out, to join two pipes together and even plugging such as to scrap at the work, it also avoid simultaneously and affect later stage monitoring measurement work because inclinometer pipe suffers breakage in installation and the security risk brought to deep pit digging, when steel sleeve top flushes with PVC inclinometer pipe top, when can also prevent hat beam concrete from cutting further, inclinometer pipe is not destroyed.
Accompanying drawing explanation
Fig. 1 is the generalized section of using state of the present utility model.
Fig. 2 is using state cross-sectional view of the present utility model.
Number in the figure: 1 space enclosing structure layer of concrete, 2 reinforcing cages, 3 Guan Liang, 4PVC inclinometer pipes, 5 steel pipe sockets.
Detailed description of the invention
Below comprehensive accompanying drawing is described in detail to the utility model; clear, perfect description is carried out to the technical scheme in the utility model embodiment; obviously; described embodiment is only the utility model part embodiment; instead of whole embodiments; the every other embodiment that those of ordinary skill in the art obtain under the prerequisite not making creative work, all belongs to the scope of the utility model protection.
See Fig. 1 and Fig. 2, a kind of based on the inclinometer pipe in deep footing groove enclosing structure concrete, comprise PVC inclinometer pipe 4 and steel sleeve 5, PVC inclinometer pipe 4 is vertically embedded in space enclosing structure concrete 1, its lower end flushes with the reinforcing cage bottom in space enclosing structure layer of concrete 1 or exceeds 20-30cm, upper end extend to be positioned at space enclosing structure concrete top hat beam 3 above, steel sleeve 5 and PVC inclinometer pipe 4 are coaxially arranged, be embedded in space enclosing structure layer of concrete bottom it, top exceeds hat beam upper surface.The utility model, by the setting of steel sleeve, can prevent from cutting in super filling process, pound disconnected PVC inclinometer pipe.Avoid disintegrating slag cleaning in the inclinometer pipe that needs because inclinometer pipe suffers breakage in installation to carry out, to join two pipes together and even plugging such as to scrap at the work, it also avoid simultaneously and affect later stage monitoring measurement work because inclinometer pipe suffers breakage in installation and the security risk brought to deep pit digging.
Wherein, PVC inclinometer pipe and steel pipe socket are fixed by the reinforcing cage 2 be applied in space enclosing structure layer of concrete and hat beam, and the overhead height of reinforcing cage 2 is apart from the low 5-10cm of hat beam upper level.
In preferred embodiment, the length of steel bushing 5 is 1150-1250mm, preferred 1200mm.The length that steel sleeve is positioned at space enclosing structure layer of concrete is 500mm-850mm.
When cutting to prevent hat beam concrete further, inclinometer pipe is not destroyed, and steel sleeve upper end flushes with PVC inclinometer pipe upper end, and PVC inclinometer pipe tip height exceeds hat beam upper surface 80-120mm, preferred 100mm.
The construction method concrete steps of the inclinometer pipe of inclinometer pipe in deep footing groove enclosing structure concrete are:
First make reinforcing cage 2, after reinforcing cage machines, reinforcing cage is installed PVC inclinometer pipe 4, PVC inclinometer pipe and is higher than reinforcing cage; Secondly, space enclosing structure pore-forming or trenching construction is carried out; Then, carry out space enclosing structure reinforcing cage 2 and transfer, transfer before on PVC inclinometer pipe 4 coaxial sheathed steel sleeve 5, steel sleeve 5 is fixed by reinforcing cage or PVC inclinometer pipe simultaneously.The height of steel sleeve 5 is positioned at space enclosing structure concrete hat beam upper surface, is embedded in bottom space enclosing structure reinforcing cage concordant or a little less than reinforcing cage bottom it.Finally will pour into space enclosing structure underwater concrete.After space enclosing structure concreting completes, the concrete construction of space enclosing structure hat girder construction is first carried out before excavation of foundation pit, need the super filling layer cutting space enclosing structure layer of concrete, one of the present utility model is based on sheathed steel sleeve 5 on deep footing groove enclosing structure concrete PVC inclinometer pipe, and when preventing from cutting super filling layer, PVC inclinometer pipe is damaged.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized and uses the utility model.Apparent to the multiple amendment of these embodiments concerning professional and technical personnel.General Principle defined herein when not departing from spirit and scope of the present utility model, can realize in other embodiments.Therefore, the utility model can not be limited in these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and feature.

Claims (4)

1. one kind based on the inclinometer pipe in deep footing groove enclosing structure concrete, it is characterized in that, comprise PVC inclinometer pipe (4) and steel sleeve (5), described PVC inclinometer pipe (4) is vertically embedded in space enclosing structure layer of concrete (1), described PVC inclinometer pipe (4) lower end flushes with reinforcing cage (2) bottom in space enclosing structure layer of concrete (1), upper end extends to Guan Liang (3) top being positioned at space enclosing structure layer of concrete top, described steel sleeve (5) and PVC inclinometer pipe (4) are coaxially arranged, described steel sleeve (5) bottom is embedded in space enclosing structure layer of concrete (1), top exceeds reinforcing cage (3) 20cm.
2. according to claim 1 a kind of based on the inclinometer pipe in deep footing groove enclosing structure concrete, it is characterized in that, described PVC inclinometer pipe (4) and steel pipe socket (5) are fixed by the reinforcing cage (2) be located in space enclosing structure layer of concrete (1).
3. according to claim 1 a kind of based on the inclinometer pipe in deep footing groove enclosing structure concrete, it is characterized in that, described steel sleeve (5) length is 1150mm-1250mm, and the length that described steel sleeve (5) is positioned at space enclosing structure layer of concrete (1) is 500mm-850mm.
4. according to claim 1 a kind of based on the inclinometer pipe in deep footing groove enclosing structure concrete, it is characterized in that, described steel sleeve (5) upper end flushes with PVC inclinometer pipe (4) upper end, and described PVC inclinometer pipe (4) highly exceeds Guan Liang (3) upper surface 80-120mm.
CN201520628761.1U 2015-08-19 2015-08-19 Deviational survey pipe based on among deep basal pit retaining structure concrete Expired - Fee Related CN204826006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520628761.1U CN204826006U (en) 2015-08-19 2015-08-19 Deviational survey pipe based on among deep basal pit retaining structure concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520628761.1U CN204826006U (en) 2015-08-19 2015-08-19 Deviational survey pipe based on among deep basal pit retaining structure concrete

Publications (1)

Publication Number Publication Date
CN204826006U true CN204826006U (en) 2015-12-02

Family

ID=54683622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520628761.1U Expired - Fee Related CN204826006U (en) 2015-08-19 2015-08-19 Deviational survey pipe based on among deep basal pit retaining structure concrete

Country Status (1)

Country Link
CN (1) CN204826006U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756856A (en) * 2018-06-21 2018-11-06 广东赛达交通科技股份有限公司 A kind of construction method of distribution type fiber-optic drillhole inclination survey
CN110080157A (en) * 2019-05-21 2019-08-02 浙江省水利河口研究院 A kind of concrete anti-seepage inclinometer pipe mounting device and method within the walls

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756856A (en) * 2018-06-21 2018-11-06 广东赛达交通科技股份有限公司 A kind of construction method of distribution type fiber-optic drillhole inclination survey
CN110080157A (en) * 2019-05-21 2019-08-02 浙江省水利河口研究院 A kind of concrete anti-seepage inclinometer pipe mounting device and method within the walls

Similar Documents

Publication Publication Date Title
CN106988758B (en) Construction method for crossing large-scale vertical karst cave group tunnel
CN103775092B (en) Tunnels in Shallow Buried tunneling remaining core soil in advance improvement CRD construction
CN104612698A (en) Method for constructing upper step middle partition wall of shallow-buried excavation tunnel
CN102061923B (en) Tunnel construction method capable of protecting existing building
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN110700841B (en) Double-side-wall guide pit type excavation method for tunnel excavation
CN203080518U (en) Self-drilling type recoverable anchor wire
CN101906974A (en) Supporting structure of extra-large cross-section loess tunnel and construction method thereof
CN102953737A (en) Construction method for inverted arch of VI-level water-enriched surrounding rock tunnel
CN103670446B (en) Circular diversion tunnel 2/3 circle concrete-liner construction method
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN105862990A (en) Prefabricated assembly well wall structure and construction method thereof
CN103266602A (en) Diameter-expanding pile for manual hole digging and construction method thereof
CN204826006U (en) Deviational survey pipe based on among deep basal pit retaining structure concrete
CN104314071A (en) Construction method of underground diaphragm wall by employing rotary drilling rig
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN108661652B (en) Reinforcing device and method for shield starting and receiving ends in mine tunnel
CN204533812U (en) A kind of slurry-water balance type jacking construction system
CN111042820B (en) Construction method for sand layer with oversized pilot hole by vertical shaft raise-shaft method
CN110374109B (en) Application method of construction method pile enclosure in comprehensive pipe gallery foundation pit
CN112252302A (en) Method for realizing split hoisting of underground continuous wall special-shaped steel reinforcement cage into groove based on BIM
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN201883453U (en) Combined pipe jacking working well
CN110863496B (en) Method for replacing, supporting, excavating and constructing arch center foundation by concrete supporting in stone-filled island building area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20180819