CN208088245U - A kind of gallery climbing section well cementing construction trolley - Google Patents
A kind of gallery climbing section well cementing construction trolley Download PDFInfo
- Publication number
- CN208088245U CN208088245U CN201820391660.0U CN201820391660U CN208088245U CN 208088245 U CN208088245 U CN 208088245U CN 201820391660 U CN201820391660 U CN 201820391660U CN 208088245 U CN208088245 U CN 208088245U
- Authority
- CN
- China
- Prior art keywords
- supporting rack
- well cementing
- operating platform
- grooved tracks
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of gallery climbing section well cementing construction trolleys, including two grooved tracks, operating platform and bottle gouard moved by hands;Operating platform includes supporting rack, and the support plate for placing drilling machine is equipped with above supporting rack, and the left and right sides is equipped with the wedged bottom bar that can be slided in grooved tracks below supporting rack, is set in a grooved tracks there are two rail clamping device, rail clamping device is equipped with screw rod;Climbing section rear end both sides are equipped with bottle gouard moved by hands and multiple earth anchors, and supporting rack rear end both sides are connected by the earth anchor of the bottle gouard moved by hands of homonymy and homonymy respectively, and the front side, left and right side above supporting rack are equipped with protective fence.Operating platform left and right ends are right angled triangle, it is parallel with climbing section surface below operating platform, so that being kept above operating platform horizontal, the front side of operating platform, left and right side are equipped with protective fence, the operating space that safety and steady can be provided for bore operation, can effectively reduce security risk and difficulty of construction.
Description
Technical field
The utility model is more particularly to a kind of gallery climbing section well cementing construction trolley.
Background technology
With the development of national economy, China largely builds hydraulic and hydroelectric engineering, and dam is the water blocking of multi-purpose project
Building passes through to reinforce the processing of basic seepage flow usually in dam foundation arranging multiplayer grout curtain hole in the design process
Each basic seepage flow of layer grout curtain basis of formation curtain blocking;If there are a plurality of larger weak low-angle dip changing of the relative positions on basis
Band, grout curtain is poor for larger weak low-angle dip disturbed belt sealing effect, still may under the action of high water head
Along disturbed belt, there are larger seepage dischargies, and security risk is brought to the permanent operation of dam.
The processing mode of the prior art encounters above-mentioned there are the rock matter of larger weak low-angle dip disturbed belt basis, leads to
It can often use and arrange the design of gallery on the disturbed belt on basic curtain axis, and bore grout curtain hole in the curtain hole of upper layer
Across the processing method of gallery.The climbing section inclination angle of gallery is larger, and boring filling construction period, there are top-bottom cross operation, security risks
Height brings great difficulty to construction.
Utility model content
The shortcomings that the purpose of the utility model is to overcome the prior arts provides a kind of gallery climbing section well cementing construction
Trolley, it is larger with the climbing section inclination angle for solving gallery, it bores and fills construction period there are top-bottom cross operation, security risk is high, to applying
Work brings the problem of great difficulty.
To achieve the above object, technical solution adopted in the utility model is:A kind of gallery climbing section drilling filling is provided
Construction trolley, including two grooved tracks parallel to each other for being laid on climbing section surface are starched, can be slided in grooved tracks
Operating platform, and the bottle gouard moved by hands for providing power for operating platform sliding;The operating platform includes that left and right ends are
The supporting rack of right angled triangle, is equipped with the support plate for placing drilling machine above supporting rack, and the left and right sides is below supporting rack
Equipped with the wedged bottom bar that can be slided in grooved tracks, set that there are two for blocking supporting rack rear and front end in a grooved tracks
Rail clamping device, rail clamping device is equipped with screw rod for making its clamping recess track both sides after tightening;The climbing section rear end both sides
It is equipped with bottle gouard moved by hands and multiple earth anchors, supporting rack rear end both sides are connected by the earth anchor of the bottle gouard moved by hands of homonymy and homonymy respectively
It connects, the front side, left and right side above supporting rack are equipped with protective fence.
Preferably, being equipped with steel wire rope between the earth anchor and supporting rack, it is connect on rear side of steel wire rope one end and supporting rack, steel
Cord is equipped with multiple rope slings being sleeved on earth anchor, and each rope sling is made of at least three detachable chucks.
Preferably, before support frame as described above, the left side and the right side be equipped with the more braces for promoting its intensity.
Preferably, the front side and rear side above support frame as described above are equipped with angle member, support plate is located at two angle members
Between.
Preferably, being all covered with safety net on the protective fence.
Preferably, wedged bottom bar rear and front end is the arc upwarped.
Preferably, the climbing section surface is evenly equipped with several section anchoring pieces, anchoring piece lower end vertically hammers into climbing section,
It is welded with grooved tracks anchoring piece upper end.
It is made preferably, support frame as described above and wedged bottom bar are all made of 10# channel steels, grooved tracks are made of 14a channel steels.
Preferably, the support plate is made of the plank of 4.5cm thickness.
The beneficial effects of the utility model are:
1. the utility model operating platform left and right ends are right angled triangle, flat with climbing section surface below operating platform
Row so that keep horizontal above operating platform, the front side of operating platform, left and right side are equipped with protective fence, can be drilling
Operation provides the operating space of safety and steady, can effectively reduce security risk and difficulty of construction.
2. the rope sling on the utility model steel wire rope is made of at least three detachable chucks, by adjusting clamp
The position of rope sling is can be adjusted, the rope capacity of connection earth anchor and supporting rack more can be easily adjusted.
3. before the utility model supporting rack, the left side and the right side be equipped with more braces, can effectively promote trolley
Integral strength.
4. being all covered with safety net on the utility model protective fence, safety net can prevent the article of small volume from falling
Below to trolley.
5. the utility model wedged bottom bar rear and front end is the arc upwarped, trolley moving process can be reduced and encounter resistance
Power.
Description of the drawings
Fig. 1 is the structural schematic diagram of gallery climbing section well cementing construction trolley.
Wherein:1, drilling machine;2, protective fence;3, steel wire rope;4, bottle gouard moved by hands;5, rope sling;6, earth anchor;7, rail clamping device;8, tiltedly
Bottom bar;9, grooved tracks;10, climbing section;11, anchoring piece;12, supporting rack;13, brace;14, operating platform;15, angle steel
Part;16, support plate.
Specific implementation mode
It is specific below in conjunction with the utility model to keep the purpose of this utility model, technical solution and advantage clearer
Technical solutions of the utility model are clearly and completely described in embodiment and corresponding attached drawing.
With reference to figure 1, the present embodiment provides a kind of gallery climbing section well cementing construction trolleys, including two pavings parallel to each other
It is located at the grooved tracks 9 on 10 surface of climbing section, the operating platform 14 that can be slided in grooved tracks 9, and is used for as operation
The sliding of platform 14 provides the bottle gouard moved by hands 4 of power;The operating platform 14 includes the supporting rack that left and right ends are right angled triangle
12, supporting rack 12 is equipped with support plate 16 for placing drilling machine 1 above, and be equipped with can be for the left and right sides below for supporting rack 12
The wedged bottom bar 8 slided in grooved tracks 9, sets that there are two the folders for blocking 12 rear and front end of supporting rack in a grooved tracks 9
Rail device 7, rail clamping device 7 are equipped with the screw rod for making its 9 both sides of clamping recess track after tightening;The 10 rear end both sides of climbing section
It is equipped with bottle gouard moved by hands 4 and multiple earth anchors 6,12 rear end both sides of supporting rack pass through the ground of the bottle gouard moved by hands of homonymy 4 and homonymy respectively
Anchor 6 connects, and the front side, left and right side above supporting rack 12 are equipped with protective fence 2.
Steel wire rope 3 is equipped between the earth anchor 6 and supporting rack 12,3 one end of steel wire rope is connect with 12 rear side of supporting rack, steel wire
Rope 3 is equipped with multiple rope slings 5 being sleeved on earth anchor 6, and each rope sling 5 is made of at least three detachable chucks.
12 front of support frame as described above, the left side and the right side are equipped with the more braces 13 for promoting its intensity.
Front side and rear side above support frame as described above 12 are equipped with angle member 15, support plate 16 be located at two angle members 15 it
Between.
It is all covered with safety net on the protective fence 2.
8 rear and front end of wedged bottom bar is the arc upwarped.
10 surface of climbing section is evenly equipped with several section anchoring pieces 11, and 11 lower end of anchoring piece vertically hammers into climbing section 10,
It is welded with grooved tracks 9 11 upper end of anchoring piece.
Support frame as described above 12 and wedged bottom bar 8 are all made of 10# channel steels and are made, and grooved tracks 9 are made of 14a channel steels.
The support plate 16 is made of the plank of 4.5cm thickness.
In implementation process, drilling machine 1 is stayed on the trolley, it is other all to be removed compared with small articles such as tool, drilling rod,
Then remove all rail clamping devices 7, operation bottle gouard moved by hands 4 by the trolley tethered sliding to designated position, finally again will be all
Rail clamping device 7 fixes, its slide downward in the construction process is prevented again to block the trolley.The operating platform 14 of the trolley
Left and right ends are right angled triangle, and operating platform 14 is parallel with climbing 10 surface of section below so that operating platform 14 is kept above
Level, the front side of operating platform 14, left and right side are equipped with protective fence 2, and the behaviour of safety and steady can be provided for bore operation
Make space, can effectively reduce security risk and difficulty of construction.
Rope sling 5 on steel wire rope 3 is made of at least three detachable chucks, can be adjusted rope by adjusting clamp
The position of set 5 more can easily adjust 3 length of steel wire rope of connection earth anchor 6 and supporting rack 12.
12 front of supporting rack, the left side and the right side are equipped with more braces 13, can effectively promote the integral strength of trolley.
Safety net is all covered on protective fence 2, safety net can prevent the article of small volume from falling to below trolley.
8 rear and front end of wedged bottom bar is the arc upwarped, can reduce trolley moving process and meet obstructions.
Drilled grout hole is constructed by a point sequence principle, and trolley needs frequently move up and down, and the climbing 10 gallery gradient of section is big,
Space is narrow, and trolley and micromechanical, material weight are big.Adequate preparation is carried out before movement, first determines that hole position and trolley are moved
Then dynamic position removes all barriers in the object and moving range of track and surrounding, by equipment on trolley and put down
Platform is fixed, will be easy the article fallen, such as drilling rod, tool removal, tripod are carried to safety area, it is ensured that by track
The sundries such as upper welding slag, cement mortar are cleaned out.
Trolley movement is drawn using two 5t bottle gouards moved by hands 4, and bottle gouard moved by hands 4 is located at climbing 10 top platform of section, machine
Seat surrounding is made earth anchor 6 (long 1.30m, anchoring section 1.2m, leak outside 0.1m) with the screw-thread steel of Ф 32mm and is welded to connect, 6 quantity of earth anchor
It is 8, each 4 of both sides.4 slide fastener snap ring of bottle gouard moved by hands is connect with trolley two ends steel wire rope 3, in orbit with traction chassis
Sliding.
Construction trolley when moving, sends special messenger to carry out commander's warning at the scene, ensures the feelings without construction personnel below trolley
Under condition, trolley rail clamping device 7 is removed, 4 slide fastener of bottle gouard moved by hands starts to draw.In moving process, trolley inclination is such as encountered or by other
When object blocks movement by resistance, to stop in time and ascertain the reason, continue to draw after barrier is excluded.
The above embodiment is used for illustrating the utility model, rather than limits the utility model, in this reality
With in novel spirit and scope of the claims, to any modifications and changes that the utility model is made, this is both fallen within
The protection domain of utility model.
Claims (9)
- The section well cementing construction trolley 1. a kind of gallery is climbed, it is characterised in that:Parallel to each other it is laid on climbing section including two (10) grooved tracks (9) on surface, the operating platform (14) that can be slided in grooved tracks (9), and for being put down for operation Platform (14) sliding provides the bottle gouard moved by hands (4) of power;The operating platform (14) includes the branch that left and right ends are right angled triangle Support (12), supporting rack (12) are equipped with the support plate (16) for placing drilling machine (1) above, and supporting rack (12) controls two below Side is equipped with the wedged bottom bar (8) that can be slided in the grooved tracks (9), set that there are two for blocking on a grooved tracks (9) The rail clamping device (7) of supporting rack (12) rear and front end, rail clamping device (7) are equipped with for making its clamping recess track (9) two after tightening The screw rod of side;Climbing section (10) the rear end both sides are equipped with bottle gouard moved by hands (4) and multiple earth anchors (6), supporting rack (12) rear end Both sides are connect by the bottle gouard moved by hands of homonymy (4) with the earth anchor (6) of homonymy respectively, supporting rack (12) front side above, left side and Right side is equipped with protective fence (2).
- The section well cementing construction trolley 2. gallery according to claim 1 is climbed, it is characterised in that:The earth anchor (6) and It is equipped with steel wire rope (3) between supporting rack (12), is connect on rear side of steel wire rope (3) one end and supporting rack (12), steel wire rope (3) is equipped with Multiple rope slings (5) being sleeved on earth anchor (6), each rope sling (5) are made of at least three detachable chucks.
- The section well cementing construction trolley 3. gallery according to claim 2 is climbed, it is characterised in that:Support frame as described above (12) Front, the left side and the right side are equipped with the more braces (13) for promoting its intensity.
- The section well cementing construction trolley 4. gallery according to claim 3 is climbed, it is characterised in that:Support frame as described above (12) Front side and rear side above is equipped with angle member (15), and support plate (16) is located between two angle members (15).
- The section well cementing construction trolley 5. gallery according to claim 4 is climbed, it is characterised in that:The protective fence (2) Upper whole is covered with safety net.
- The section well cementing construction trolley 6. gallery according to claim 5 is climbed, it is characterised in that:The wedged bottom bar (8) Rear and front end is the arc upwarped.
- 7. according to claim 1-6 any one of them gallerys climbing section well cementing construction trolley, it is characterised in that:It is described to climb Slope section (10) surface is evenly equipped with several section anchoring pieces (11), and anchoring piece (11) lower end vertically hammers into climbing section (10), anchoring piece (11) upper end is welded with grooved tracks (9).
- The section well cementing construction trolley 8. gallery according to claim 7 is climbed, it is characterised in that:Support frame as described above (12) 10# channel steels are all made of with wedged bottom bar (8) to be made, grooved tracks (9) are made of 14a channel steels.
- The section well cementing construction trolley 9. gallery according to claim 7 is climbed, it is characterised in that:The support plate (16) It is made of the plank of 4.5cm thickness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820391660.0U CN208088245U (en) | 2018-03-22 | 2018-03-22 | A kind of gallery climbing section well cementing construction trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820391660.0U CN208088245U (en) | 2018-03-22 | 2018-03-22 | A kind of gallery climbing section well cementing construction trolley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208088245U true CN208088245U (en) | 2018-11-13 |
Family
ID=64060121
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820391660.0U Active CN208088245U (en) | 2018-03-22 | 2018-03-22 | A kind of gallery climbing section well cementing construction trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208088245U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004953A (en) * | 2019-05-10 | 2019-07-12 | 涪特智能装备(重庆)有限公司 | A kind of side slope or retaining wall construction trolley |
CN111140169A (en) * | 2019-12-18 | 2020-05-12 | 大连理工大学 | Method for assembling small-sized drilling equipment for climbing slope |
-
2018
- 2018-03-22 CN CN201820391660.0U patent/CN208088245U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004953A (en) * | 2019-05-10 | 2019-07-12 | 涪特智能装备(重庆)有限公司 | A kind of side slope or retaining wall construction trolley |
CN110004953B (en) * | 2019-05-10 | 2023-11-21 | 涪特智能装备(重庆)有限公司 | Slope or retaining wall construction trolley |
CN111140169A (en) * | 2019-12-18 | 2020-05-12 | 大连理工大学 | Method for assembling small-sized drilling equipment for climbing slope |
CN111140169B (en) * | 2019-12-18 | 2021-04-09 | 大连理工大学 | Method for assembling small-sized drilling equipment for climbing slope |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201810342U (en) | Dump crane | |
CN208088245U (en) | A kind of gallery climbing section well cementing construction trolley | |
CN206280086U (en) | A kind of adjustable height tunnel reinforcement trolley | |
CN105714690A (en) | Segmental cantilever girder lifter for large span steel and concrete composite beam erection construction | |
CN206636155U (en) | A kind of construction Lifting scaffold | |
CN108487089A (en) | A method of railroad bridge is removed and set up on hillside | |
CN211873950U (en) | Combined supporting pile for civil engineering | |
CN105350991A (en) | Roadway construction temporary support device and construction method thereof | |
CN202187539U (en) | Scaffold for slope and platform operation of high-rise building | |
CN104773654B (en) | A kind of cement electric pole press-rod apparatus | |
CN106284333B (en) | A kind of fast positioning pile extension platform and pile extension method | |
CN108643829B (en) | Anchor hole construction method for high slope anchoring | |
CN208166514U (en) | A kind of crane high altitude operation nacelle device | |
CN203904856U (en) | Movable construction platform for construction outside bridge guardrail | |
CN212053684U (en) | Civil engineering is with construction elevating gear | |
CN105672136B (en) | Erecting construction process for large-span steel-concrete combination beam | |
CN206070542U (en) | A kind of new stone blocking net Cable Structure for avalanche preventing and treating | |
CN107227741A (en) | Basement supporting construction | |
CN204662929U (en) | A kind of cross-line walking fence operation device | |
CN201162337Y (en) | Adjustable cliff security operation compartment | |
CN206753488U (en) | A kind of artificial digging pile reaming auxiliary equipment | |
CN106437174B (en) | It is a kind of for tilting the track conveying device and its construction of work surface | |
CN205976546U (en) | A rail transport device for sloping scope of operation | |
CN104370217B (en) | Portal crane for paving bridge decks | |
CN213805399U (en) | Height-adjustable's grout platform truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |