CN208517998U - It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket - Google Patents

It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket Download PDF

Info

Publication number
CN208517998U
CN208517998U CN201820979883.9U CN201820979883U CN208517998U CN 208517998 U CN208517998 U CN 208517998U CN 201820979883 U CN201820979883 U CN 201820979883U CN 208517998 U CN208517998 U CN 208517998U
Authority
CN
China
Prior art keywords
wall
forming machine
chute forming
grab bucket
brush
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820979883.9U
Other languages
Chinese (zh)
Inventor
杨永华
梁亚华
范波
陆永智
戴景轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201820979883.9U priority Critical patent/CN208517998U/en
Application granted granted Critical
Publication of CN208517998U publication Critical patent/CN208517998U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of ground-connecting-wall brush wall devices for being installed on chute forming machine grab bucket, comprising: be detachably secured to the frame structure of the side of chute forming machine grab bucket, frame structure offers drain hole;The chisel wall construction for being fixed on frame structure and being oppositely arranged with chute forming machine grab bucket;And the brush wall construction for being fixed on frame structure and being located above chisel wall construction;It is grabbed bucket in the work progress for carrying out grooving in chute forming machine, ground-connecting-wall is cleared up by chisel wall construction and brush wall construction, to be completed at the same time the brush wall construction of ground-connecting-wall during realizing grooving.

Description

It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket
Technical field
The utility model relates to the realm of building construction, espespecially a kind of ground-connecting-wall brush wall device for being installed on chute forming machine grab bucket.
Background technique
It is required according to " code for construction and acceptance of subway engineering ", underground continuous wall connector must be cleaned with water completely, with true Protect the construction quality of ground-connecting-wall seam.
Diaphram wall is cleared up by the wire brush wall device that crawler crane lifts in traditional construction technique, but this steel wire Brush wall device almost has no effect for streaming concrete.It is directly excavated according to chute forming machine, due between the bucket tooth of chute forming machine Away from larger, can not clean with water completely clean.If in addition being spent a lot of time after grooving to clear up diaphram wall, may due to when Between it is too long and exist and collapse the hidden danger such as wall, shrinkage cavity, sediment.
Utility model content
The purpose of the utility model is to overcome the defects of the prior art, provide a kind of ground company for being installed on chute forming machine grab bucket Wall brush wall device, solves to spend a lot of time cleaning diaphram wall after grooving in the prior art and to there is the wall shrinkage cavity sediment etc. that collapses hidden The problem of suffering from.
Realizing the technical solution of above-mentioned purpose is:
The utility model provides a kind of ground-connecting-wall brush wall device for being installed on chute forming machine grab bucket, comprising:
It is detachably secured to the frame structure in the outside of chute forming machine grab bucket, the frame structure offers drain hole;
It is fixed on the chisel wall construction of the side far from chute forming machine grab bucket in the frame structure;And
The brush wall construction for being fixed on the frame structure and being located above the chisel wall construction, grabs bucket in the chute forming machine Under in the open state, the brush wall construction is less than institute away from the frame structure at a distance from the junction that the chute forming machine is grabbed bucket Chisel wall construction is stated away from the frame structure at a distance from the junction that the chute forming machine is grabbed bucket, so that the chisel wall construction can Chisel wall construction is carried out to the soil body;In chute forming machine grab bucket under closed state, the chisel wall construction is located at the chute forming machine The lower section of grab bucket, the brush wall construction is located at the two sides of chute forming machine grab bucket so that the brush wall construction can be to chisel wall construction The trough wall surface of formation carries out brush wall construction.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device the utility model has the advantages that
The ground-connecting-wall brush wall device that the utility model is installed on chute forming machine grab bucket passes through will be removably solid with frame structure It grabs bucket due to chute forming machine, fixed chisel wall construction and brush wall construction in frame structure, during the trenching construction of chute forming machine grab bucket, With the movement that chute forming machine is grabbed bucket, chisel wall construction can effectively be crushed the ground of ground-connecting-wall, and brush wall construction can be to being crushed or soft Weak mud is scraped to slot bottom, can guarantee and clean ground-connecting-wall completely with water.The ground of slot bottom will be fallen within by finally being grabbed bucket again by chute forming machine Catch ground.Grooving and the work of brush wall can be synchronously completed during construction of diaphragm wall grooving in this way, improves construction Efficiency spends a lot of time cleaning diaphram wall and there is asking for the hidden danger such as wall shrinkage cavity sediment of collapsing after solving grooving in the prior art Topic.The present apparatus is not required to clean with water by joint progress soil of the additional elevating mechanism to diaphram wall, therefore is using grooving During machine need not switching equipment complete the lasting construction of diaphram wall, improve construction efficiency.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device further improvement lies in that, the frame knot Side far from chute forming machine grab bucket on structure is equipped with the operation panel being obliquely installed, the bottom of the operation panel and the chute forming machine The distance between grab bucket is greater than the distance between top and chute forming machine grab bucket of the operation panel, and the chisel wall construction is fixed In the bottom of the operation panel.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device further improvement lies in that, the chisel wall knot Structure includes multiple chisel parietal tooths that the bottom of the operation panel is fixed at interval.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device further improvement lies in that, the chisel parietal tooth For wedge structure.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device further improvement lies in that, the frame knot Structure further includes a pair of side plates set on the operation panel opposite end, and the side plate offers through-hole, is worn by steel wire described The through-hole of side plate and the otic placode for being fixed on the chute forming machine grab bucket, so that the frame structure is fixed on the chute forming machine Grab bucket.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device further improvement lies in that, the frame knot Structure further includes the top plate for being fastened transversely between the pair of side plate and being fixed at the top of the operation panel.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device further improvement lies in that, the brush wall knot Structure includes multiple chisel wall brushes that the top plate is fixed in lateral separation.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device further improvement lies in that, the top plate is The end sandwiched of doubling plate, the chisel wall brush is fixed in the doubling plate.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device further improvement lies in that, the chisel wall brush For wirerope.
The utility model be installed on chute forming machine grab bucket ground-connecting-wall brush wall device further improvement lies in that, further include fix In the suspension hook of the top plate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for the ground-connecting-wall brush wall device that the utility model is installed on chute forming machine grab bucket.
Fig. 2 is the Construction State schematic diagram for the ground-connecting-wall brush wall device that the utility model is installed on chute forming machine grab bucket.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Refering to fig. 1, it is shown that the utility model is installed on the structural schematic diagram of the ground-connecting-wall brush wall device of chute forming machine grab bucket. Referring to Fig.2, showing that the utility model is installed on the Construction State schematic diagram of the ground-connecting-wall brush wall device of chute forming machine grab bucket.In conjunction with Shown in Fig. 1, the ground-connecting-wall brush wall device that the utility model is installed on chute forming machine grab bucket includes: to be detachably secured to chute forming machine to grab The frame structure 20 in the outside of bucket 10, frame structure 20 offer drain hole 210;It is fixed in frame structure 20 far from chute forming machine The chisel wall construction 30 of the side of grab bucket 10;And it is fixed on frame structure 20 and is located at the brush wall construction of 30 top of chisel wall construction 40, in the case where chute forming machine grab bucket 10 is in the open state, junction of the brush wall construction 40 away from frame structure 20 and chute forming machine grab bucket 10 Distance be less than chisel wall construction 30 away from frame structure 20 and chute forming machine grab bucket 10 junction at a distance from so that dig wall construction 30 can carry out chisel wall construction to the soil body;In chute forming machine grab bucket 10 under closed state, chisel wall construction 30 is located at chute forming machine grab bucket 10 lower section, brush wall construction 40 is located at the two sides of chute forming machine grab bucket 10 so that brush wall construction 40 can construct the slot to be formed to chisel wall Wall surface carries out brush wall construction.
A better embodiment of the ground-connecting-wall brush wall device of chute forming machine grab bucket, frame knot are installed on as the utility model Structure 20 includes a pair of side plates 21 for being oppositely arranged, the operation panel 22 being connected between a pair of side plates 21, and is fastened transversely to grasp The top plate 23 for making 22 top of plate, to build to form a stereochemical structure.The whole intensity of stereochemical structure is high and stability is good.
A better embodiment of the ground-connecting-wall brush wall device of chute forming machine grab bucket, an opposite side are installed on as the utility model Through-hole is opened up on plate 21, otic placode 11 is fixed in chute forming machine grab bucket 10 accordingly, when need to use when the present apparatus, using steel wire 12 wear the through-hole of side plate 21 and are fixed on the otic placode 11 of chute forming machine grab bucket 10, grab so that frame structure 20 is fixed on chute forming machine Bucket 10.After construction is completed, steel wire 12 can be removed, so that frame structure 20 be disassembled from chute forming machine grab bucket 10. It is easy for installation and removal.
A better embodiment of the ground-connecting-wall brush wall device of chute forming machine grab bucket, side plate 21 are installed on as the utility model It is also provided with drain hole 210, the water for entering the present apparatus is discharged during construction and excavation for the present apparatus, is easy to use.
In the present embodiment, side plate 21 is right-angled trapezium plate, is fixed on side plate 21 to facilitate and operation panel 22 is sticked It holds and is obliquely installed a bit.
A better embodiment of the ground-connecting-wall brush wall device of chute forming machine grab bucket, frame knot are installed on as the utility model Side far from chute forming machine grab bucket 10 on structure 20 is equipped with the operation panel 22 being obliquely installed, and the bottom of operation panel 22 and chute forming machine are grabbed bucket The distance between 10 are greater than the distance between the top of operation panel 22 and chute forming machine grab bucket 10.Operation panel 22 is angularly disposed, thus When clearing up vertically arranged ground-connecting-wall 50, be conducive to operation panel 22 with chute forming machine grab bucket 10 and along ground-connecting-wall 50 is mobile, and operation panel 22 is prevented to be difficult to move down.
It is installed on a better embodiment of the ground-connecting-wall brush wall device of chute forming machine grab bucket as the utility model, digs wall knot Structure 30 includes multiple chisel parietal tooths that the bottom of operation panel 22 is fixed at interval.Chisel parietal tooth is used to cut the ground or mud on ground-connecting-wall Slurry.In the present embodiment, chisel parietal tooth is wedge structure, to be conducive to cut hard ground or mud.Dig the structure of parietal tooth It is not limited thereto, can also be pyramidal structure.
A better embodiment of the ground-connecting-wall brush wall device of chute forming machine grab bucket, frame knot are installed on as the utility model The top plate 23 of structure 10 being fastened transversely between a pair of side plates 21 and be fixed on 22 top of operation panel.Top plate 23 plays enhancing behaviour Make the effect of the stability of the connection between plate 22 and side plate 21.
A better embodiment of the ground-connecting-wall brush wall device of chute forming machine grab bucket is installed on as the utility model, it is corresponding Ground, brush wall construction 40 include multiple chisel wall brushes that top plate 23 is fixed in lateral separation.Wall construction 30 is dug by ground-connecting-wall using After hard ground or mud is cut, ground-connecting-wall is further cleared up using chisel wall brush, so that cleaning construction is more thorough.
In the present embodiment, top plate 23 is doubling plate, and the end sandwiched of chisel wall brush is fixed in doubling plate, fixation. Specifically, the wirerope that chisel wall brush is diameter 20mm.Every length of steel rope 300mm, wirerope is sandwiched between doubling plate, and is made Doubling plate is worn with bolt carry out bolt fasten.
The present apparatus further includes the suspension hook 24 for being fixed on top plate 23, to facilitate the handling present apparatus.
The utility model is installed on having the beneficial effect that for the ground-connecting-wall brush wall device of chute forming machine grab bucket
The ground-connecting-wall brush wall device that the utility model is installed on chute forming machine grab bucket passes through will be removably solid with frame structure It grabs bucket due to chute forming machine, fixed chisel wall construction and brush wall construction in frame structure, during the trenching construction of chute forming machine grab bucket, With the movement that chute forming machine is grabbed bucket, chisel wall construction can effectively be crushed the ground of ground-connecting-wall, and brush wall construction can be to being crushed or soft Weak mud is scraped to slot bottom, can guarantee and clean ground-connecting-wall completely with water.The ground of slot bottom will be fallen within by finally being grabbed bucket again by chute forming machine Catch ground.Grooving and the work of brush wall can be synchronously completed during construction of diaphragm wall grooving in this way, improves construction Efficiency spends a lot of time cleaning diaphram wall and there is asking for the hidden danger such as wall shrinkage cavity sediment of collapsing after solving grooving in the prior art Topic.The present apparatus is not required to clean with water by joint progress soil of the additional elevating mechanism to diaphram wall, therefore is using grooving During machine need not switching equipment complete the lasting construction of diaphram wall, improve construction efficiency.
Combine figure embodiment that the utility model is described in detail above, those skilled in the art can root Many variations example is made to the utility model according to above description.Thus, certain details in embodiment should not constitute practical to this Novel restriction, the utility model will be using the ranges that the appended claims define as the protection scope of the utility model.

Claims (10)

1. a kind of ground-connecting-wall brush wall device for being installed on chute forming machine grab bucket characterized by comprising
It is detachably secured to the frame structure in the outside of chute forming machine grab bucket, the frame structure offers drain hole;
It is fixed on the chisel wall construction of the side far from chute forming machine grab bucket in the frame structure;And
The brush wall construction for being fixed on the frame structure and being located above the chisel wall construction is in chute forming machine grab bucket Under opening state, the brush wall construction is less than the chisel away from the frame structure at a distance from the junction that the chute forming machine is grabbed bucket Wall construction away from the frame structure at a distance from the junction that the chute forming machine is grabbed bucket so that the chisel wall construction can be to soil Body carries out chisel wall construction;In chute forming machine grab bucket under closed state, the chisel wall construction is located at chute forming machine grab bucket Lower section, the brush wall construction is located at the two sides of chute forming machine grab bucket so that the brush wall construction can construct and be formed to chisel wall Trough wall surface carry out brush wall construction.
2. being installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket as described in claim 1, which is characterized in that the frame knot Side far from chute forming machine grab bucket on structure is equipped with the operation panel being obliquely installed, the bottom of the operation panel and the chute forming machine The distance between grab bucket is greater than the distance between top and chute forming machine grab bucket of the operation panel, and the chisel wall construction is fixed In the bottom of the operation panel.
3. being installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket as claimed in claim 2, which is characterized in that the chisel wall knot Structure includes multiple chisel parietal tooths that the bottom of the operation panel is fixed at interval.
4. being installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket as claimed in claim 3, which is characterized in that the chisel parietal tooth For wedge structure.
5. being installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket as claimed in claim 2, which is characterized in that the frame knot Structure further includes a pair of side plates set on the operation panel opposite end, and the side plate offers through-hole, is worn by steel wire described The through-hole of side plate and the otic placode for being fixed on the chute forming machine grab bucket, are grabbed so that the frame structure is fixed on the chute forming machine Bucket.
6. being installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket as claimed in claim 5, which is characterized in that the frame knot Structure further includes the top plate for being fastened transversely between the pair of side plate and being fixed at the top of the operation panel, the brush wall construction It is fastened transversely to the edge of the top plate.
7. being installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket as claimed in claim 6, which is characterized in that the brush wall knot Structure includes multiple chisel wall brushes that the top plate is fixed in lateral separation.
8. being installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket as claimed in claim 7, which is characterized in that the top plate is The end sandwiched of doubling plate, the chisel wall brush is fixed in the doubling plate.
9. being installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket as claimed in claim 7, which is characterized in that the chisel wall brush For wirerope.
10. being installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket as claimed in claim 6, which is characterized in that further include solid Due to the suspension hook of the top plate.
CN201820979883.9U 2018-06-25 2018-06-25 It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket Active CN208517998U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820979883.9U CN208517998U (en) 2018-06-25 2018-06-25 It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820979883.9U CN208517998U (en) 2018-06-25 2018-06-25 It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket

Publications (1)

Publication Number Publication Date
CN208517998U true CN208517998U (en) 2019-02-19

Family

ID=65336709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820979883.9U Active CN208517998U (en) 2018-06-25 2018-06-25 It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket

Country Status (1)

Country Link
CN (1) CN208517998U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216269A (en) * 2021-04-15 2021-08-06 中国建筑一局(集团)有限公司 Wall brushing device for underground diaphragm wall after grooving
CN115182401A (en) * 2021-04-06 2022-10-14 宏润建设集团股份有限公司 Super-digging cutter, mounting method thereof and trenching machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115182401A (en) * 2021-04-06 2022-10-14 宏润建设集团股份有限公司 Super-digging cutter, mounting method thereof and trenching machine
CN113216269A (en) * 2021-04-15 2021-08-06 中国建筑一局(集团)有限公司 Wall brushing device for underground diaphragm wall after grooving

Similar Documents

Publication Publication Date Title
CN208517998U (en) It is installed on the ground-connecting-wall brush wall device of chute forming machine grab bucket
CN101858090B (en) Construction method for soft connection of diaphram wall rigid joints
CN111005381A (en) Bottom-pocket type vibration hammer profile steel pile extractor and pile extracting method thereof
CN211057770U (en) Grab bucket combined shovel brush device for grooving machine
CN205604226U (en) Underground continuous wall cross -shaped steel plate connects brush wall ware
CN205421328U (en) Soleplate post -cast strip structure convenient to later stage clearance
CN209384231U (en) Combined type ruggedized construction based on building pile foundation
CN214573883U (en) Scraper suitable for underground continuous wall I-shaped steel joint
CN211171923U (en) Wall brushing tool for diaphragm wall
CN210263193U (en) Wall brushing device and grooving machine
CN208545784U (en) A kind of irrigation canals and ditches sewage disposal apparatus
CN211200065U (en) Drainage device convenient to clean for bridge
CN215367478U (en) Foundation ditch brush wall device
CN117266134B (en) Method and cleaner for treating continuous wall joint pipe accident
CN211735352U (en) Underground continuous wall is with brushing wall ware and digging machine soon
CN109487785A (en) Combined type ruggedized construction and its construction method based on building pile foundation
CN211314103U (en) Full-hydraulic crawler drill convenient to maintain
CN205314136U (en) Brush wall ware that underground continuous wall connects
CN217629189U (en) Railway ballast bed renovation device
CN212026394U (en) Wall brushing device for I-steel joint attached to grab bucket of underground diaphragm wall
CN214657426U (en) Water saving fixtures for construction
CN214574582U (en) Dredging equipment for municipal pipeline
CN209653095U (en) A kind of clear bricklayer's's tool in pipeline bottom
CN211774041U (en) Portable desilting and sand digging device
CN212534230U (en) Underground continuous wall seam wall scraping device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant