CN205804349U - A kind of travelling platform for steel pipe pile sinking construction - Google Patents

A kind of travelling platform for steel pipe pile sinking construction Download PDF

Info

Publication number
CN205804349U
CN205804349U CN201620676029.6U CN201620676029U CN205804349U CN 205804349 U CN205804349 U CN 205804349U CN 201620676029 U CN201620676029 U CN 201620676029U CN 205804349 U CN205804349 U CN 205804349U
Authority
CN
China
Prior art keywords
pipe pile
travelling platform
platform
track girder
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620676029.6U
Other languages
Chinese (zh)
Inventor
张治明
刘世奇
杨帅
于洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201620676029.6U priority Critical patent/CN205804349U/en
Application granted granted Critical
Publication of CN205804349U publication Critical patent/CN205804349U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

This utility model relates to steel pipe pile sinking construction technical field, in particular to a kind of pushing tow travelling platform for steel pipe pile sinking construction.Including the many track girders being erected at the steel-pipe pile upper end that inserted to play completes;Described track girder upper surface is provided with the travelling platform that can slide along track girder, is provided with the jack of pushing tow travelling platform between track girder and travelling platform;The pushing end of described jack is fixed on travelling platform, and the housing of jack is detachably arranged on track girder;The crawler crane for inserted to play steel-pipe pile and leading truck it is provided with on described travelling platform.Travelling platform of the present utility model, simple in construction, easy to operate, use the steel-pipe pile that inserted to play completes can the stability that improve piling construction platform of high degree as pile sinking basis, it is ensured that piling construction accurate, and working procedure is the simplest.

Description

A kind of travelling platform for steel pipe pile sinking construction
Technical field
This utility model relates to steel pipe pile sinking construction technical field, in particular to a kind of for steel pipe pile sinking construction Travelling platform.
Background technology
Steel-pipe pile is bridge pier column, port and pier isostructural important support assembly, in order to maintain what these built to stablize Property, steel-pipe pile typically requires good structural stability, and the piling construction of steel-pipe pile needs to require to carry out according to strict design Construction, the steel-pipe pile of such guarantee pile sinking has good support performance.The piling construction of steel-pipe pile generally has two at present The method of kind, one is pile driving barge piling construction, and two is piling construction based on floating travelling platform.
Pile driving barge construction utilizes special pile driving barge to carry out piling construction exactly, and pile driving barge transport steel-pipe pile is to pile sinking ground Point, utilizes the hanging device on ship and rapping equipment to carry out piling construction.Pile driving barge construction technology is simple, operates the most square Just, it is not necessary to the supplementary structures such as auxiliary pile are installed.But pile driving barge construction is affected relatively big, at the water that stormy waves is rapid by water project situation Territory, pile driving barge is very big by water wave influence of fluctuations, and pile driving barge difficulty of construction with this understanding is bigger, it is difficult to keep the precision of construction, There is also the biggest potential safety hazard.As can be seen here, pile driving barge construction method is only applicable to, in the less waters of stormy waves, be only used for The stable region of water environment.
The method of walking platform construction of floating is that the floating platform swimming on the water surface by use is as piling construction The strong point, floating platform is anchored by anchor line, and the stability in horizontal direction is fine, but asking as existing with pile driving barge construction Topic, in the case of water wave is rapid, the stability on the vertical direction of floating platform is bad, and floating platform can be along with the ripple of water wave Dynamic fluctuating.For solving this problem, some platform uses auxiliary pile fixed platform, so can solve the problem that asking of platform stabilization difference Topic, but construction auxiliary pile take time and effort, later stage auxiliary pile also need to remove, high degree dragged slowly whole construction speed.
In sum, the method for the steel pipe pile sinking construction of prior art all existence and stabilities are poor, difficulty of construction high and deposit Problem in potential safety hazard.
Utility model content
The purpose of this utility model seeks to solve the deficiency of above-mentioned background technology, it is provided that a kind of steel-pipe pile pile sinking that is used for is executed The travelling platform of work.
The technical solution of the utility model is: a kind of travelling platform for steel pipe pile sinking construction, it is characterised in that: bag Include the many track girders being erected at the steel-pipe pile upper end that inserted to play completes;Described track girder upper surface is provided with can be along track girder The travelling platform slided, is provided with the jack of pushing tow travelling platform between track girder and travelling platform;Described jack Pushing end is fixed on travelling platform, and the housing of jack is detachably arranged on track girder;Set on described travelling platform It is equipped with the crawler crane for inserted to play steel-pipe pile and leading truck.
The most described travelling platform includes the crossbeam being positioned on track girder, the distribution beam being set up on crossbeam and consolidates The panel being scheduled in distribution beam, track girder is criss-cross arranged with crossbeam, and crossbeam is criss-cross arranged with distribution beam, crossbeam, point Join beam and panel upper and lower superposition successively is fixedly connected to form platform structure.
It is provided with one layer of slide plate between the most described track girder and crossbeam;Described slide plate is solid in the horizontal direction On crossbeam, the lower surface of slide plate is slidably connected with track girder.
The most described crossbeam lower surface is welded with polylith block, and block is centered around slide plate surrounding and limits the water of slide plate Square to movement.
It is provided with dismountable pedestal between housing and the track girder of the most described jack;Described pedestal bag Include the base being fixed on jack shell;Described both sides, base lower end are provided with the base plate being fixed on base;Described Through hole is offered on base plate;It is provided with multiple pin-and-hole corresponding with through hole on described track girder, in pin-and-hole, is equipped with bearing pin, the end Plate is removably attached on track girder through through hole and pin-and-hole by bearing pin.
Further described track girder is fastened in the draw-in groove of steel-pipe pile upper end, track girder lower surface by stiffener with Steel-pipe pile is fixing to be connected.
It is provided with, on the panel of the most described travelling platform, the walking track moved for crawler crane.
Advantage of the present utility model has: 1, the steel-pipe pile by utilizing inserted to play to complete ensure that platform as platform base On sinking apparatus construction time be in stable environment, it is ensured that the accuracy of piling construction, pile sinking of the present utility model is executed Work method, not by Lidar Equation, is suitably applied various waters;
2, by using the steel-pipe pile that completes of inserted to play as platform base, it is to avoid need inserted to play auxiliary pile, directly utilize The steel-pipe pile that inserted to play completes saves operation, reduces the difficulty of construction, improves the pile sinking efficiency of steel-pipe pile;
3, by setting up track girder on steel-pipe pile, recycling track girder is as the carrying basis of travelling platform, it is to avoid Putting into new equipment and carry out building of platform, the work progress of platform is simple and convenient, makes full use of and has used the steel pipe being complete Stake, engineering input amount is few;
4, platform can be promoted easily to walk by arranging jack and skateboard, the regulation moving process pole of platform For simple and convenient, by the construction that just can complete all steel-pipe piles without introducing other equipment of forward walking;
5, by setting up track girder between steel-pipe pile, the walking of travelling platform can either be facilitated to move, it is also possible to as The primary structure of the later stage i.e. clip pile of steel-pipe pile bracing structure, improves the stability between steel-pipe pile, also reduces construction Operation, improves the efficiency of steel-pipe pile construction.
Travelling platform simple in construction of the present utility model, easy to operate, use the steel-pipe pile that inserted to play completes as heavy Pile foundation can the stability that improve piling construction platform of high degree, it is ensured that piling construction accurate, and working procedure is more For simply, there is great promotional value.
Accompanying drawing explanation
Fig. 1: top view of the present utility model;
Fig. 2: crawler crane of the present utility model and the mounting structure schematic diagram of leading truck;
Fig. 3: crossbeam of the present utility model and the structural representation of track girder;
Fig. 4: slide plate mounting structure schematic diagram of the present utility model;
Fig. 5: base mounting structure schematic diagram of the present utility model;
Wherein: 1 steel-pipe pile;2 track girders;3 crossbeams;4 slide plates;5 blocks;6 jack;7 distribution beam; 8 crawler cranes;9 leading trucks;10 stiffeners;11 bases;12 base plates;13 through holes;14 pin-and-holes;15 walking rails Road.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1~5, the travelling platform of the present embodiment includes crossbeam 3, and setting up above crossbeam 3 has a distribution beam 7, distribution beam 7 with Crossbeam 3 is criss-cross arranged, and forms the support frame of whole platform, distribution beam 7 is laid panel, result in formation of travelling platform Agent structure, the sidepiece of travelling platform is provided with leading truck 9.
The travelling platform of the present embodiment is slidably connected on the track girder 2 of steel-pipe pile upper end, as shown in figs. 2 to 4, and this enforcement The track girder 2 of example is fixed on the upper end of steel-pipe pile 1, after steel-pipe pile 1 installation, offers fixing groove in the upper end of steel-pipe pile 1, Track girder 2 is fastened in fixing groove, is welded with stiffener 10 between track girder 2 and steel-pipe pile 1, will by the connection of stiffener 10 Track girder 2 is fixed on the upper end of steel-pipe pile 1.Track girder 2 is not removed after all of steel-pipe pile 1 has been constructed, but directly Connect the clip pile structure as steel-pipe pile 1, play the effect of cross-brace steel-pipe pile 1.
As shown in figures 2-3, the present embodiment is provided with thrustor between track girder 2 and travelling platform, the present embodiment Thrustor is the jack 6 being fixed between crossbeam 3 and track girder 2.The housing of jack 6 is fixed on pedestal, and pedestal can Releasably being arranged on track girder 2, the pushing end of jack 6 is fixed on crossbeam 3, just can be real by the pushing tow of jack 6 The movement of existing travelling platform.The present embodiment is provided with three jack 6 on a crossbeam 3, by the pushing tow of three jack 6 Effect, it is possible to achieve travelling platform advances along piling construction point, also additionally is able to realize the least model of travelling platform The mobile adjustment enclosed, adapts to piling construction with this.
The structure of pedestal is shown in Fig. 3, and the pedestal of the present embodiment includes base 11, and the housing of jack 6 is fixing on the pedestal 11, Base plate 12 is installed, as it is shown in figure 5, base plate 12 is positioned at the lower end sidepiece both sides beyond base 11 of base 11, the end on base 11 Offer through hole 13 on plate 12, track girder 2 offers the pin-and-hole 14 of multiple corresponding through hole 13, during use, by through hole 13 and pin Aliging in hole 14, inserts bearing pin, completes the fixing of base 11 and track girder 2, and extracting bearing pin out just can be by base 11 and track girder 2 points From.
For the ease of the movement of travelling platform, the present embodiment is provided with slide plate 4 between travelling platform and track girder 2, tool The mounting structure of body is shown in Fig. 3, and the slide plate 4 of the present embodiment is positioned at the lower end of crossbeam 3, and crossbeam 3 is welded with polylith block on lower surface 5, block 5 produces sliding outer restriction of slide plate 4 that be all around wound on of slide plate 4 between slide plate 4 and crossbeam 3 in the horizontal direction. Slide plate 4 lower surface contacts with the upper surface of track girder 2, promotes crossbeam 3 by thrustor, and crossbeam 3 relies on slide plate 4 at track girder Sliding on 2, thus realize the movement of travelling platform.The frictional force that the layout of slide plate 4 produces when reducing travelling platform sliding, has It is beneficial to the movement of travelling platform.
The present embodiment mainly utilizes the steel-pipe pile 1 that is complete as the carrying basis of travelling platform, and travelling platform is opened most When beginning to build, the first round steel-pipe pile as carrying basis mainly uses pile driving barge or other platform structure is carried out Arrange, it is also possible to rely on bank base to carry out pile sinking.First round steel-pipe pile is the starting point of piling construction.By on first round steel-pipe pile Travelling platform is installed and carries out the installation of other steel-pipe piles.
The concrete construction method of the steel-pipe pile 1 of the present embodiment is as follows: 1, utilizes pile driving barge or floats walking platform construction First round steel-pipe pile, first round steel-pipe pile is as the starting point of travelling platform piling construction, after first round steel-pipe pile inserted to play completes, Slot in first round steel-pipe pile upper end, attachment rail beam 2, and track girder 2 and first round steel-pipe pile are connected as whole by welding stiffener 10 Body, so can effectively strengthen the lateral stability of steel-pipe pile 1 so that it is form the carrying structure stably supporting travelling platform;
2, on the first round steel-pipe pile constructed and track girder 2, travelling platform is built, the building method of travelling platform For: at the slide plate arranged above 4 of track girder 2, slide plate 4 sets up crossbeam 3, more staggered in the welding of the upper end of crossbeam 3 Distribution beam 7, the upper surface of distribution beam 7 lays panel and forms platform structure, be directed to frame 9 and be arranged on the sidepiece of travelling platform, Complete building of platform, then jack 6 is installed between track girder 2 and travelling platform, bearing pin is sequentially passed through through hole 13 He Base 11 is fixed on track girder 2 by pin-and-hole 14;
3, transport track is hung on 8 to travelling platform, adjusts leading truck 9, and leading truck 9 structure of the present embodiment is shown in the patent No. Leading truck knot in the patent of entitled " a kind of New Guide Device for driven pile piling construction " of " 2015211321097 " Structure, is positioned by leading truck 9, uses crawler crane 8 to carry out the second wheel steel pipe pile sinking construction;
4, second take turns after steel-pipe pile constructed, set up new track girder 2 and take turns steel-pipe pile by all of second and couple together, And set up new track girder 2 and first round steel-pipe pile and second are taken turns steel-pipe pile couple together, the stake of the most all of steel-pipe pile with All being disposed with horizontal track girder 2 between Zhuan, jack 6 pushing tow travelling platform moves to second along new track girder 2 and takes turns steel pipe In stake, detailed process is: after jack 6 pushing tow crossbeam runs a stroke, removes base 11, and bounce back a row by jack 6 Journey, then base 11 is fixed on track girder 2, jack 6 runs the most forward a stroke, alternately and repeatedly carries out, until row Walk platform traveling over to the second top taking turns steel-pipe pile from first round steel-pipe pile;
5, the crawler crane 8 on recycling travelling platform and leading truck 9 carry out third round steel pipe pile sinking construction, travelling platform Upper surface is provided with the walking track 15 of crawler crane 8 walking, and crawler crane 8 adjusts steel-pipe pile 1 pile sinking along walking track 15 walking and executes Station is put;
6, the most alternately until all of steel-pipe pile 1 has been constructed.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.One's own profession Skilled person will appreciate that of industry, this utility model is not restricted to the described embodiments, described in above-described embodiment and description Principle of the present utility model is simply described, on the premise of without departing from this utility model spirit and scope, this utility model also can There are various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model is wanted Protection domain is asked to be defined by appending claims and equivalent thereof.

Claims (7)

1. the travelling platform for steel pipe pile sinking construction, it is characterised in that: include being erected at the steel pipe that inserted to play completes The many track girders (2) of stake (1) upper end;Described track girder (2) upper surface is provided with can put down along the walking that track girder (2) slide Platform, is provided with the jack (6) that pushing tow travelling platform moves between track girder (2) and travelling platform;Described jack (6) Pushing end is fixed on travelling platform, and the housing of jack (6) is detachably arranged on track girder (2);Described walking is put down The crawler crane (8) for inserted to play steel-pipe pile and leading truck (9) it is provided with on platform.
A kind of travelling platform for steel pipe pile sinking construction, it is characterised in that: described walking Platform includes the crossbeam (3) being positioned on track girder (2), be set up on crossbeam (3) distribution beam (7) and be fixed on distribution beam (7) On panel, track girder (2) is criss-cross arranged with crossbeam (3), and crossbeam (3) is criss-cross arranged with distribution beam (7), crossbeam (3), the upper and lower superposition successively of distribution beam (7) and panel is fixedly connected to form platform structure.
A kind of travelling platform for steel pipe pile sinking construction, it is characterised in that: described track One layer of slide plate (4) it is provided with between beam (2) and crossbeam (3);Described slide plate (4) is fixed on crossbeam (3) in the horizontal direction, The lower surface of slide plate (4) is slidably connected with track girder (2).
A kind of travelling platform for steel pipe pile sinking construction, it is characterised in that: described crossbeam (3) lower surface is welded with polylith block (5), and block (5) is centered around the shifting that slide plate (4) surrounding limits the horizontal direction of slide plate (4) Dynamic.
A kind of travelling platform for steel pipe pile sinking construction, it is characterised in that: described is very heavy It is provided with dismountable pedestal between housing and the track girder (2) on top (6);Described pedestal includes being fixed on jack (6) shell Base (11) on body;Described base (11) both sides, lower end are provided with the base plate (12) being fixed on base (11);Described Through hole (13) is offered on base plate (12);Multiple pin-and-hole (14) corresponding with through hole (13) it is provided with on described track girder (2), Being equipped with bearing pin in pin-and-hole (14), base plate (12) is removably attached to track by bearing pin through through hole (13) and pin-and-hole (14) On beam (2).
6. a kind of travelling platform for steel pipe pile sinking construction as described in claim 1,2,3 or 5, it is characterised in that: institute The track girder (2) stated is fastened in the draw-in groove of steel-pipe pile (1) upper end, and stiffener (10) and steel pipe are passed through in track girder (2) lower surface Stake (1) is fixing to be connected.
A kind of travelling platform for steel pipe pile sinking construction, it is characterised in that: described walking The walking track (15) for crawler crane (8) movement it is provided with on the panel of platform.
CN201620676029.6U 2016-06-29 2016-06-29 A kind of travelling platform for steel pipe pile sinking construction Active CN205804349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620676029.6U CN205804349U (en) 2016-06-29 2016-06-29 A kind of travelling platform for steel pipe pile sinking construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620676029.6U CN205804349U (en) 2016-06-29 2016-06-29 A kind of travelling platform for steel pipe pile sinking construction

Publications (1)

Publication Number Publication Date
CN205804349U true CN205804349U (en) 2016-12-14

Family

ID=57512061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620676029.6U Active CN205804349U (en) 2016-06-29 2016-06-29 A kind of travelling platform for steel pipe pile sinking construction

Country Status (1)

Country Link
CN (1) CN205804349U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107244388A (en) * 2017-05-17 2017-10-13 中铁十九局集团有限公司 Floating tug for mounting steel beams and bridge erection system and method
CN108396744A (en) * 2018-04-27 2018-08-14 中交武汉港湾工程设计研究院有限公司 A kind of moveable steel pile casting sinking guider and its mounting structure
CN109457700A (en) * 2018-12-07 2019-03-12 中交第航务工程局有限公司 Stake top walking Pile Installation Platform, its erection method and pile base construction method
WO2021179466A1 (en) * 2020-03-13 2021-09-16 中交武汉港湾工程设计研究院有限公司 Movable land construction platform and method for wharf reconstruction
CN115198711A (en) * 2022-07-06 2022-10-18 中国建筑第八工程局有限公司 Construction platform structure and construction method of concrete cast-in-place pile for Yangjiang river

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107244388A (en) * 2017-05-17 2017-10-13 中铁十九局集团有限公司 Floating tug for mounting steel beams and bridge erection system and method
CN108396744A (en) * 2018-04-27 2018-08-14 中交武汉港湾工程设计研究院有限公司 A kind of moveable steel pile casting sinking guider and its mounting structure
CN108396744B (en) * 2018-04-27 2024-03-22 中交武汉港湾工程设计研究院有限公司 Movable steel pile casing sinking guide device mounting structure
CN109457700A (en) * 2018-12-07 2019-03-12 中交第航务工程局有限公司 Stake top walking Pile Installation Platform, its erection method and pile base construction method
CN109457700B (en) * 2018-12-07 2024-02-13 中交第一航务工程局有限公司 Pile top walking type pile foundation construction platform, erecting method thereof and pile foundation construction method
WO2021179466A1 (en) * 2020-03-13 2021-09-16 中交武汉港湾工程设计研究院有限公司 Movable land construction platform and method for wharf reconstruction
CN115198711A (en) * 2022-07-06 2022-10-18 中国建筑第八工程局有限公司 Construction platform structure and construction method of concrete cast-in-place pile for Yangjiang river

Similar Documents

Publication Publication Date Title
CN106120787B (en) A kind of construction method carrying out pile sinking based on pushing tow travelling platform
CN205804349U (en) A kind of travelling platform for steel pipe pile sinking construction
CN209493932U (en) A kind of Waterborne movable operation platform of rotary churning pile
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN101831888A (en) 1200 tonner water conservancy aqueduct transportation and erection equipment
CN107956202B (en) Safe and stable crescent bridge and mounting process thereof
CN102477733A (en) Installation method for integrally dragging cantilever beam onto platform
CN108487089A (en) A method of railroad bridge is removed and set up on hillside
CN109252521B (en) Equipment for pulling out steel pipe pile in water in limited space under steel beam and construction method thereof
CN106400693B (en) A kind of ramp steel box-girder beam car and fortune beam method
CN105544409A (en) Erecting composite beam on-site section splicing girder construction technology of double guide beam bridge erecting machine
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN204662929U (en) A kind of cross-line walking fence operation device
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN206070516U (en) The construction system of over-water bored pile is carried out based on pushing tow mobile platform
CN210827111U (en) Environment-friendly down self-propelled steel trestle structure
CN203007843U (en) Variable amplitude deck derrick crane
CN205369040U (en) Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device
CN212771950U (en) Movable operation platform for mounting transverse beam of I-shaped steel-concrete combined beam
CN111705682A (en) Construction method and equipment for removing and rebuilding superstructure of widened bridge across electrified railway
CN102409623B (en) Floating bridge removing method
CN205712111U (en) One is applicable to subway work moving concrete material distributing machine under small space
CN206279527U (en) A kind of deep concrete mixture ship pile frame system
CN205576922U (en) A novel guider of assembled for construction of driven pile pile sinking
CN108217448A (en) A kind of integrated bridge floor device for hoisting for composite beam construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant