CN205576922U - A novel guider of assembled for construction of driven pile pile sinking - Google Patents

A novel guider of assembled for construction of driven pile pile sinking Download PDF

Info

Publication number
CN205576922U
CN205576922U CN201620316974.5U CN201620316974U CN205576922U CN 205576922 U CN205576922 U CN 205576922U CN 201620316974 U CN201620316974 U CN 201620316974U CN 205576922 U CN205576922 U CN 205576922U
Authority
CN
China
Prior art keywords
crossbeam
longeron
shoulder pole
leading truck
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620316974.5U
Other languages
Chinese (zh)
Inventor
张育林
孙琦
于洋
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201620316974.5U priority Critical patent/CN205576922U/en
Application granted granted Critical
Publication of CN205576922U publication Critical patent/CN205576922U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a steel sheet pile construction guide structure field specifically indicates a novel guider of assembled for construction of driven pile pile sinking. Including fixing two a plurality of support frames be no less than at the moving platform lateral part, the support frame include the triangular bracket that bracing that the crossbeam arranged by the level and slope were arranged constitutes, triangular bracket on be provided with the leading truck, the leading truck lower extreme install with crossbeam cross arrangement's longeron, the longeron pass through bolted construction detachable and fix on the crossbeam. The utility model discloses only being used in the platform and setting up the triangular bracket structure, the extending direction who uses a set of leading truck just can follow platform lateral part triangular bracket inserts and makes the piling bar, and it is convenient that the leading truck installation is dismantled, can once fix a position with the platform, and locating speed is fast, and once the location can be executed in succession and played many engineering stakes, improves engineering pile driving construction efficiency.

Description

A kind of assembled New Guide Device for driven pile piling construction
Technical field
This utility model relates to steel sheet pile construction guide frame field, in particular to a kind of assembled New Guide Device for driven pile piling construction.
Background technology
At present, driven pile piling construction guider mainly includes dismountable guider, fixed guider, straddle-type guider.
Dismountable guider is primarily adapted for use in the preferable waters of wave condition and land-based area construction, and it has the advantages such as single guide pile position is many, construction technology is simply ripe.But this guider need to coordinate auxiliary pile to use, inefficient;Simultaneously when using the severe marine site in the river of deep water high flow rate and stormy waves condition, auxiliary pile is affected to produce by flow force or wave force to be rocked, and its positioning precision is difficult to ensure that.
Fixed guider is general and pile driving barge assembling uses, and need to be coordinated by mobile pile driving barge during location.Although guider itself is not by current and wave effect, but constructing under the conditions of being difficult to be suitable for severe sea condition due to pile driving barge self, so its scope of application is affected by pile driving barge, efficiency of construction is the highest and the scope of application is limited.
Straddle-type guider typically utilizes construction work stake to make auxiliary pile, is secured to by hydraulic clamp.In work progress fast without independent Construction Support stake and location.But this guider is cantilever design, single guide pile bit quantity less (being usually no more than 2), simultaneously when engineering pile by flow force or wave force affected generation rock time, be difficult to ensure that its positioning precision and efficiency of construction are relatively low equally.
Summary of the invention
The purpose of this utility model seeks to solve the deficiency of above-mentioned background technology, it is provided that a kind of assembled New Guide Device for driven pile piling construction.
The technical solution of the utility model is: a kind of assembled New Guide Device for driven pile piling construction, it is characterised in that: include the multiple bracing frames being intervally arranged side by side no less than two being fixed on mobile platform sidepiece;Described bracing frame includes that crossbeam on a mobile platform and the shelf bracket of diagonal brace composition are fixed in end, and described crossbeam is provided with leading truck;Described leading truck lower end is provided with and the longeron of crossbeam arranged crosswise;Described longeron is detachably mounted on crossbeam by bolt arrangement.
It is provided with, on the most described longeron, the first shoulder pole girder intersected with longeron;The first described shoulder pole girder is bolted on crossbeam beyond the beam body of longeron both sides.
It is provided with two first shoulder pole girders arranged side by side and spaced apart on the most described longeron, the lower end of crossbeam is provided with two second shoulder pole girders corresponding with the first shoulder pole girder, two first shoulder pole girders are provided with two panels the first pad beyond the beam body both sides of longeron, and two second shoulder pole girders are provided with, beyond the beam body both sides of crossbeam, the second pad that two panels is corresponding;The first described pad connects by the second pad that the bolt that is arranged between shoulder pole girder is corresponding with lower section is fixing.
The most described bracing frame also includes the fixed mount being arranged on mobile platform upper surface or sidepiece;Described fixed mount includes the spaced apart fixed plate being fixed on mobile platform upper surface or sidepiece of two panels;Crossbeam and the diagonal brace of described shelf bracket are fixed between two panels fixed plate by bolt arrangement.
The most described leading truck also includes the many groups guide roller being arranged on longeron;Described guide roller is mutually combined arrangement and forms multiple guiding Longkous for guiding H profile steel, steel sheet pile.
Advantage of the present utility model has:
1, easy installation and removal: be only used in platform and shelf bracket structure is set, use one group of leading truck just can be along the bearing of trend inserted to play piling bar of platform sides shelf bracket, leading truck easy installation and removal, can be with platform one-time positioning, locating speed is fast, one-time positioning can many engineering piles of injection continuously, improve Construction of Engineering Pile efficiency.
2, applied widely: this guider can assemble with multiple operation platform, do not contact with waters simultaneously, be both applicable to the rivers of high flow rate, it is possible to be applicable to the marine site of stormy waves inclement condition.
3, constructing operation is easy: this guider simple in construction, all extremely convenients of installing, guide, position and construct, strong operability.
4, economy is strong: this guider puts into and is steel input, and disposable input is little, and is not required to auxiliary pile cooperation, and economy is strong.
Accompanying drawing explanation
Fig. 1: top view of the present utility model;
Fig. 2: shelf bracket of the present utility model and the attachment structure schematic diagram of platform;
Fig. 3: the A enlarged diagram in this utility model Fig. 1;
The attachment structure schematic diagram of Fig. 4: longitudinal and cross beam of the present utility model;
Fig. 5: leading truck of the present utility model guides the roller array schematic diagram of steel sheet pile;
Fig. 6: leading truck of the present utility model guides the roller array schematic diagram of H profile steel;
Wherein: 1 platform;2 crossbeams;3 diagonal braces;4 longerons;5 first shoulder pole girders;6 second shoulder pole girders;7 first pads;8 second pads;9 fixed plates;10 guide rollers.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1~6, the leading truck of the present embodiment is fixed on the sidepiece of mobile platform 1, and the sidepiece of platform 1 is provided with bracing frame that is multiple arranged side by side and that be intervally arranged, and bracing frame includes horizontally disposed crossbeam 2, crossbeam 2 one end is fixed on mobile platform 1, and other end vertical platform 1 is also suspended on the water surface.The lower end of crossbeam 2 is provided with diagonal brace 3, and diagonal brace 3 one end is fixed on the sidepiece of mobile platform 1, and the other end is fixed on the lower surface of crossbeam 2 and supports crossbeam 2.Crossbeam 2 and diagonal brace 3 form shelf bracket structure.
Crossbeam 2 and the diagonal brace 3 of the present embodiment are fixed on the fixed structure on mobile platform 1 as shown in Figure 2, being fixed on mobile platform 1 upper surface or the fixed plate of sidepiece 9 including what two block gaps were arranged, crossbeam 2 and the diagonal brace 3 of shelf bracket are fixed between two panels fixed plate 9 by bolt arrangement.
Leading truck is detachably mounted on crossbeam 2, and the leading truck of the present embodiment is fixed on two crossbeams 2.Leading truck includes the longeron 4 of two and crossbeam 2 arranged crosswise, and longeron 4 is detachably mounted to the upper surface of crossbeam 2 by bolt arrangement.
As shown in figs. 34, two first shoulder pole girders 5 arranged side by side and spaced apart it are provided with on longeron 4, the lower end of crossbeam 2 is provided with two second shoulder pole girders 6 corresponding with the first shoulder pole girder 5, two first shoulder pole girders 5 are provided with two panels the first pad 7 beyond the beam body both sides of longeron 4, two second shoulder pole girders 6 are provided with, beyond the beam body both sides of crossbeam 2, the second pad 8 that two panels is corresponding, and the first pad 7 is by the second pad 8 fixing connection corresponding with lower section of the bolt that is arranged between shoulder pole girder.
Time actually used, two bolts may be at crossbeam 2 and longeron 4 infall, and such setting can effectively prevent from producing between crossbeam 2 and longeron 4 rotating.Use shoulder pole girder as fixed structure, it is to avoid to hole on crossbeam 2 and longeron 4, be on the one hand have impact on crossbeam 2 and the structural strength of longeron 4, produce with diagonal brace 3 when being on the other hand to avoid installing and interfere.
The leading truck that the present embodiment uses is truss structure, truss structure includes the longeron 4 of two parallel interval arrangements, being provided with the guide roller of many groups on longeron 4, as shown in Fig. 5~6, guide roller is mutually combined arrangement and forms multiple guiding Longkous for guiding H profile steel, steel sheet pile or steel-pipe pile.
During use, using bolt by the first pad 7 and the second fixing connection of pad 8, be directed to frame and be fixed on crossbeam 2, mobile platform 1 positions, and after having positioned, begins to use leading truck inserted to play piling bar.After piling bar inserted to play in the range of subject-oriented frame completes, start to dismantle leading truck, unclamp bolt, longeron 4 and crossbeam 2 being separated, mobile guide frame, to another position, reuses bolt longitudinal beam connected 4 and crossbeam 2, location fixed guide frame, completes the piling bar inserted to play of next stake position.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.Skilled person will appreciate that of the industry; this utility model is not restricted to the described embodiments; described in above-described embodiment and description, principle of the present utility model is simply described; on the premise of without departing from this utility model spirit and scope, this utility model also has various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model claims scope and is defined by appending claims and equivalent thereof.

Claims (5)

1. the assembled New Guide Device for driven pile piling construction, it is characterised in that: include the multiple bracing frames being intervally arranged side by side no less than two being fixed on mobile platform (1) sidepiece;Described bracing frame includes crossbeam (2) that end is fixed on mobile platform (1) and the shelf bracket that diagonal brace (3) forms, and described crossbeam (2) is provided with leading truck;Described leading truck lower end is provided with the longeron (4) with crossbeam (2) arranged crosswise;Described longeron (4) is detachably mounted on crossbeam (2) by bolt arrangement.
A kind of assembled New Guide Device for driven pile piling construction, it is characterised in that: it is provided with the first shoulder pole girder (5) intersected with longeron (4) on described longeron (4);Described the first shoulder pole girder (5) is bolted on crossbeam (2) beyond the beam body of longeron (4) both sides.
A kind of assembled New Guide Device for driven pile piling construction, it is characterized in that: on described longeron (4), be provided with two first shoulder pole girders (5) arranged side by side and spaced apart, the lower end of crossbeam (2) is provided with two second shoulder pole girders (6) corresponding with the first shoulder pole girder (5), two first shoulder pole girders (5) are provided with two panels the first pad (7) beyond the beam body both sides of longeron (4), two second shoulder pole girders (6) are provided with, beyond the beam body both sides of crossbeam (2), the second pad (8) that two panels is corresponding;Described the first pad (7) connects by the second pad (8) that the bolt that is arranged between shoulder pole girder is corresponding with lower section is fixing.
A kind of assembled New Guide Device for driven pile piling construction, it is characterised in that: described bracing frame also includes being arranged on mobile platform (1) upper surface or the fixed mount of sidepiece;Described fixed mount includes that two panels is spaced apart and is fixed on mobile platform (1) upper surface or the fixed plate of sidepiece (9);Crossbeam (2) and the diagonal brace (3) of described shelf bracket are fixed between two panels fixed plate (9) by bolt arrangement.
A kind of assembled New Guide Device for driven pile piling construction, it is characterised in that: described leading truck also includes the many groups guide roller (10) being arranged on longeron;Described guide roller (10) is mutually combined arrangement and forms multiple guiding Longkous for guiding H profile steel, steel sheet pile.
CN201620316974.5U 2016-04-15 2016-04-15 A novel guider of assembled for construction of driven pile pile sinking Expired - Fee Related CN205576922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620316974.5U CN205576922U (en) 2016-04-15 2016-04-15 A novel guider of assembled for construction of driven pile pile sinking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620316974.5U CN205576922U (en) 2016-04-15 2016-04-15 A novel guider of assembled for construction of driven pile pile sinking

Publications (1)

Publication Number Publication Date
CN205576922U true CN205576922U (en) 2016-09-14

Family

ID=56862850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620316974.5U Expired - Fee Related CN205576922U (en) 2016-04-15 2016-04-15 A novel guider of assembled for construction of driven pile pile sinking

Country Status (1)

Country Link
CN (1) CN205576922U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356166A (en) * 2018-11-06 2019-02-19 福建卓越建设工程开发有限公司 Steel-pipe pile-right and wrong combination of Larsen steel sheet pile sets combination supporting system and construction method
CN110273426A (en) * 2019-07-01 2019-09-24 中铁七局集团有限公司 A kind of lattice column detachable positioning device that stake top locates below ground level

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356166A (en) * 2018-11-06 2019-02-19 福建卓越建设工程开发有限公司 Steel-pipe pile-right and wrong combination of Larsen steel sheet pile sets combination supporting system and construction method
CN109356166B (en) * 2018-11-06 2023-12-29 福建卓越建设工程开发有限公司 Steel pipe pile-Larson steel sheet pile bending direct combined driving combined supporting system and construction method
CN110273426A (en) * 2019-07-01 2019-09-24 中铁七局集团有限公司 A kind of lattice column detachable positioning device that stake top locates below ground level
CN110273426B (en) * 2019-07-01 2024-03-19 中铁七局集团有限公司 Lattice column detachable positioning device with pile top below ground

Similar Documents

Publication Publication Date Title
CN106381870B (en) A kind of deep concrete mixture ship pile frame system and pile making method
CN105603881B (en) A kind of the integral erection system and its construction method of large-scale arch bridge over strait
CN106120787B (en) A kind of construction method carrying out pile sinking based on pushing tow travelling platform
CN102839678B (en) Structure for improving rigidity and stability of foundation pit steel support
CN205399220U (en) Whole system of erectting of large -scale arched bridge over strait
CN205804349U (en) A kind of travelling platform for steel pipe pile sinking construction
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN205576922U (en) A novel guider of assembled for construction of driven pile pile sinking
CN112411348A (en) Construction trestle
CN205348183U (en) A novel guider for construction of driven pile pile sinking
CN106284348B (en) The construction method of pile sinking is carried out based on assembly mobile platform
CN105544409A (en) Erecting composite beam on-site section splicing girder construction technology of double guide beam bridge erecting machine
CN203383221U (en) Foundation pit support structure formed by armoured concrete and steel structure
CN202755370U (en) Structure for improving rigidity and stability of foundation pit steel support
CN205329691U (en) A floating device that is used for aquatic steel -pipe pile income rock to install
CN109056534B (en) Movable cast-in-situ bored pile construction platform and method
CN101929129A (en) Novel slipway beam for incremental launching construction
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN109944609B (en) Irregular widened arch section tunnel construction device and construction method
CN106544997A (en) A kind of guiding mechanism of truss leg jacking system
CN203007843U (en) Variable amplitude deck derrick crane
CN206279527U (en) A kind of deep concrete mixture ship pile frame system
CN203846506U (en) Angle bracing structure for foundation pit supporting
CN209010945U (en) A kind of split type bottom pushes away movable highway Biodge device
CN206815778U (en) A kind of construction platform for building sheet pile driving construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914