CN205576922U - A novel guider of assembled for construction of driven pile pile sinking - Google Patents
A novel guider of assembled for construction of driven pile pile sinking Download PDFInfo
- Publication number
- CN205576922U CN205576922U CN201620316974.5U CN201620316974U CN205576922U CN 205576922 U CN205576922 U CN 205576922U CN 201620316974 U CN201620316974 U CN 201620316974U CN 205576922 U CN205576922 U CN 205576922U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- longeron
- shoulder pole
- leading truck
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 238000009434 installation Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000003643 water by type Substances 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Abstract
The utility model relates to a steel sheet pile construction guide structure field specifically indicates a novel guider of assembled for construction of driven pile pile sinking. Including fixing two a plurality of support frames be no less than at the moving platform lateral part, the support frame include the triangular bracket that bracing that the crossbeam arranged by the level and slope were arranged constitutes, triangular bracket on be provided with the leading truck, the leading truck lower extreme install with crossbeam cross arrangement's longeron, the longeron pass through bolted construction detachable and fix on the crossbeam. The utility model discloses only being used in the platform and setting up the triangular bracket structure, the extending direction who uses a set of leading truck just can follow platform lateral part triangular bracket inserts and makes the piling bar, and it is convenient that the leading truck installation is dismantled, can once fix a position with the platform, and locating speed is fast, and once the location can be executed in succession and played many engineering stakes, improves engineering pile driving construction efficiency.
Description
Technical field
This utility model relates to steel sheet pile construction guide frame field, in particular to a kind of assembled New Guide Device for driven pile piling construction.
Background technology
At present, driven pile piling construction guider mainly includes dismountable guider, fixed guider, straddle-type guider.
Dismountable guider is primarily adapted for use in the preferable waters of wave condition and land-based area construction, and it has the advantages such as single guide pile position is many, construction technology is simply ripe.But this guider need to coordinate auxiliary pile to use, inefficient;Simultaneously when using the severe marine site in the river of deep water high flow rate and stormy waves condition, auxiliary pile is affected to produce by flow force or wave force to be rocked, and its positioning precision is difficult to ensure that.
Fixed guider is general and pile driving barge assembling uses, and need to be coordinated by mobile pile driving barge during location.Although guider itself is not by current and wave effect, but constructing under the conditions of being difficult to be suitable for severe sea condition due to pile driving barge self, so its scope of application is affected by pile driving barge, efficiency of construction is the highest and the scope of application is limited.
Straddle-type guider typically utilizes construction work stake to make auxiliary pile, is secured to by hydraulic clamp.In work progress fast without independent Construction Support stake and location.But this guider is cantilever design, single guide pile bit quantity less (being usually no more than 2), simultaneously when engineering pile by flow force or wave force affected generation rock time, be difficult to ensure that its positioning precision and efficiency of construction are relatively low equally.
Summary of the invention
The purpose of this utility model seeks to solve the deficiency of above-mentioned background technology, it is provided that a kind of assembled New Guide Device for driven pile piling construction.
The technical solution of the utility model is: a kind of assembled New Guide Device for driven pile piling construction, it is characterised in that: include the multiple bracing frames being intervally arranged side by side no less than two being fixed on mobile platform sidepiece;Described bracing frame includes that crossbeam on a mobile platform and the shelf bracket of diagonal brace composition are fixed in end, and described crossbeam is provided with leading truck;Described leading truck lower end is provided with and the longeron of crossbeam arranged crosswise;Described longeron is detachably mounted on crossbeam by bolt arrangement.
It is provided with, on the most described longeron, the first shoulder pole girder intersected with longeron;The first described shoulder pole girder is bolted on crossbeam beyond the beam body of longeron both sides.
It is provided with two first shoulder pole girders arranged side by side and spaced apart on the most described longeron, the lower end of crossbeam is provided with two second shoulder pole girders corresponding with the first shoulder pole girder, two first shoulder pole girders are provided with two panels the first pad beyond the beam body both sides of longeron, and two second shoulder pole girders are provided with, beyond the beam body both sides of crossbeam, the second pad that two panels is corresponding;The first described pad connects by the second pad that the bolt that is arranged between shoulder pole girder is corresponding with lower section is fixing.
The most described bracing frame also includes the fixed mount being arranged on mobile platform upper surface or sidepiece;Described fixed mount includes the spaced apart fixed plate being fixed on mobile platform upper surface or sidepiece of two panels;Crossbeam and the diagonal brace of described shelf bracket are fixed between two panels fixed plate by bolt arrangement.
The most described leading truck also includes the many groups guide roller being arranged on longeron;Described guide roller is mutually combined arrangement and forms multiple guiding Longkous for guiding H profile steel, steel sheet pile.
Advantage of the present utility model has:
1, easy installation and removal: be only used in platform and shelf bracket structure is set, use one group of leading truck just can be along the bearing of trend inserted to play piling bar of platform sides shelf bracket, leading truck easy installation and removal, can be with platform one-time positioning, locating speed is fast, one-time positioning can many engineering piles of injection continuously, improve Construction of Engineering Pile efficiency.
2, applied widely: this guider can assemble with multiple operation platform, do not contact with waters simultaneously, be both applicable to the rivers of high flow rate, it is possible to be applicable to the marine site of stormy waves inclement condition.
3, constructing operation is easy: this guider simple in construction, all extremely convenients of installing, guide, position and construct, strong operability.
4, economy is strong: this guider puts into and is steel input, and disposable input is little, and is not required to auxiliary pile cooperation, and economy is strong.
Accompanying drawing explanation
Fig. 1: top view of the present utility model;
Fig. 2: shelf bracket of the present utility model and the attachment structure schematic diagram of platform;
Fig. 3: the A enlarged diagram in this utility model Fig. 1;
The attachment structure schematic diagram of Fig. 4: longitudinal and cross beam of the present utility model;
Fig. 5: leading truck of the present utility model guides the roller array schematic diagram of steel sheet pile;
Fig. 6: leading truck of the present utility model guides the roller array schematic diagram of H profile steel;
Wherein: 1 platform;2 crossbeams;3 diagonal braces;4 longerons;5 first shoulder pole girders;6 second shoulder pole girders;7 first pads;8 second pads;9 fixed plates;10 guide rollers.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1~6, the leading truck of the present embodiment is fixed on the sidepiece of mobile platform 1, and the sidepiece of platform 1 is provided with bracing frame that is multiple arranged side by side and that be intervally arranged, and bracing frame includes horizontally disposed crossbeam 2, crossbeam 2 one end is fixed on mobile platform 1, and other end vertical platform 1 is also suspended on the water surface.The lower end of crossbeam 2 is provided with diagonal brace 3, and diagonal brace 3 one end is fixed on the sidepiece of mobile platform 1, and the other end is fixed on the lower surface of crossbeam 2 and supports crossbeam 2.Crossbeam 2 and diagonal brace 3 form shelf bracket structure.
Crossbeam 2 and the diagonal brace 3 of the present embodiment are fixed on the fixed structure on mobile platform 1 as shown in Figure 2, being fixed on mobile platform 1 upper surface or the fixed plate of sidepiece 9 including what two block gaps were arranged, crossbeam 2 and the diagonal brace 3 of shelf bracket are fixed between two panels fixed plate 9 by bolt arrangement.
Leading truck is detachably mounted on crossbeam 2, and the leading truck of the present embodiment is fixed on two crossbeams 2.Leading truck includes the longeron 4 of two and crossbeam 2 arranged crosswise, and longeron 4 is detachably mounted to the upper surface of crossbeam 2 by bolt arrangement.
As shown in figs. 34, two first shoulder pole girders 5 arranged side by side and spaced apart it are provided with on longeron 4, the lower end of crossbeam 2 is provided with two second shoulder pole girders 6 corresponding with the first shoulder pole girder 5, two first shoulder pole girders 5 are provided with two panels the first pad 7 beyond the beam body both sides of longeron 4, two second shoulder pole girders 6 are provided with, beyond the beam body both sides of crossbeam 2, the second pad 8 that two panels is corresponding, and the first pad 7 is by the second pad 8 fixing connection corresponding with lower section of the bolt that is arranged between shoulder pole girder.
Time actually used, two bolts may be at crossbeam 2 and longeron 4 infall, and such setting can effectively prevent from producing between crossbeam 2 and longeron 4 rotating.Use shoulder pole girder as fixed structure, it is to avoid to hole on crossbeam 2 and longeron 4, be on the one hand have impact on crossbeam 2 and the structural strength of longeron 4, produce with diagonal brace 3 when being on the other hand to avoid installing and interfere.
The leading truck that the present embodiment uses is truss structure, truss structure includes the longeron 4 of two parallel interval arrangements, being provided with the guide roller of many groups on longeron 4, as shown in Fig. 5~6, guide roller is mutually combined arrangement and forms multiple guiding Longkous for guiding H profile steel, steel sheet pile or steel-pipe pile.
During use, using bolt by the first pad 7 and the second fixing connection of pad 8, be directed to frame and be fixed on crossbeam 2, mobile platform 1 positions, and after having positioned, begins to use leading truck inserted to play piling bar.After piling bar inserted to play in the range of subject-oriented frame completes, start to dismantle leading truck, unclamp bolt, longeron 4 and crossbeam 2 being separated, mobile guide frame, to another position, reuses bolt longitudinal beam connected 4 and crossbeam 2, location fixed guide frame, completes the piling bar inserted to play of next stake position.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.Skilled person will appreciate that of the industry; this utility model is not restricted to the described embodiments; described in above-described embodiment and description, principle of the present utility model is simply described; on the premise of without departing from this utility model spirit and scope, this utility model also has various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model claims scope and is defined by appending claims and equivalent thereof.
Claims (5)
1. the assembled New Guide Device for driven pile piling construction, it is characterised in that: include the multiple bracing frames being intervally arranged side by side no less than two being fixed on mobile platform (1) sidepiece;Described bracing frame includes crossbeam (2) that end is fixed on mobile platform (1) and the shelf bracket that diagonal brace (3) forms, and described crossbeam (2) is provided with leading truck;Described leading truck lower end is provided with the longeron (4) with crossbeam (2) arranged crosswise;Described longeron (4) is detachably mounted on crossbeam (2) by bolt arrangement.
A kind of assembled New Guide Device for driven pile piling construction, it is characterised in that: it is provided with the first shoulder pole girder (5) intersected with longeron (4) on described longeron (4);Described the first shoulder pole girder (5) is bolted on crossbeam (2) beyond the beam body of longeron (4) both sides.
A kind of assembled New Guide Device for driven pile piling construction, it is characterized in that: on described longeron (4), be provided with two first shoulder pole girders (5) arranged side by side and spaced apart, the lower end of crossbeam (2) is provided with two second shoulder pole girders (6) corresponding with the first shoulder pole girder (5), two first shoulder pole girders (5) are provided with two panels the first pad (7) beyond the beam body both sides of longeron (4), two second shoulder pole girders (6) are provided with, beyond the beam body both sides of crossbeam (2), the second pad (8) that two panels is corresponding;Described the first pad (7) connects by the second pad (8) that the bolt that is arranged between shoulder pole girder is corresponding with lower section is fixing.
A kind of assembled New Guide Device for driven pile piling construction, it is characterised in that: described bracing frame also includes being arranged on mobile platform (1) upper surface or the fixed mount of sidepiece;Described fixed mount includes that two panels is spaced apart and is fixed on mobile platform (1) upper surface or the fixed plate of sidepiece (9);Crossbeam (2) and the diagonal brace (3) of described shelf bracket are fixed between two panels fixed plate (9) by bolt arrangement.
A kind of assembled New Guide Device for driven pile piling construction, it is characterised in that: described leading truck also includes the many groups guide roller (10) being arranged on longeron;Described guide roller (10) is mutually combined arrangement and forms multiple guiding Longkous for guiding H profile steel, steel sheet pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620316974.5U CN205576922U (en) | 2016-04-15 | 2016-04-15 | A novel guider of assembled for construction of driven pile pile sinking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620316974.5U CN205576922U (en) | 2016-04-15 | 2016-04-15 | A novel guider of assembled for construction of driven pile pile sinking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205576922U true CN205576922U (en) | 2016-09-14 |
Family
ID=56862850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620316974.5U Expired - Fee Related CN205576922U (en) | 2016-04-15 | 2016-04-15 | A novel guider of assembled for construction of driven pile pile sinking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205576922U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356166A (en) * | 2018-11-06 | 2019-02-19 | 福建卓越建设工程开发有限公司 | Steel-pipe pile-right and wrong combination of Larsen steel sheet pile sets combination supporting system and construction method |
CN110273426A (en) * | 2019-07-01 | 2019-09-24 | 中铁七局集团有限公司 | A kind of lattice column detachable positioning device that stake top locates below ground level |
-
2016
- 2016-04-15 CN CN201620316974.5U patent/CN205576922U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356166A (en) * | 2018-11-06 | 2019-02-19 | 福建卓越建设工程开发有限公司 | Steel-pipe pile-right and wrong combination of Larsen steel sheet pile sets combination supporting system and construction method |
CN109356166B (en) * | 2018-11-06 | 2023-12-29 | 福建卓越建设工程开发有限公司 | Steel pipe pile-Larson steel sheet pile bending direct combined driving combined supporting system and construction method |
CN110273426A (en) * | 2019-07-01 | 2019-09-24 | 中铁七局集团有限公司 | A kind of lattice column detachable positioning device that stake top locates below ground level |
CN110273426B (en) * | 2019-07-01 | 2024-03-19 | 中铁七局集团有限公司 | Lattice column detachable positioning device with pile top below ground |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106381870B (en) | A kind of deep concrete mixture ship pile frame system and pile making method | |
CN105603881B (en) | A kind of the integral erection system and its construction method of large-scale arch bridge over strait | |
CN106120787B (en) | A kind of construction method carrying out pile sinking based on pushing tow travelling platform | |
CN102839678B (en) | Structure for improving rigidity and stability of foundation pit steel support | |
CN205399220U (en) | Whole system of erectting of large -scale arched bridge over strait | |
CN205804349U (en) | A kind of travelling platform for steel pipe pile sinking construction | |
CN106522112A (en) | Cable-stayed bridge side span beam section erecting system and method thereof | |
CN205576922U (en) | A novel guider of assembled for construction of driven pile pile sinking | |
CN112411348A (en) | Construction trestle | |
CN205348183U (en) | A novel guider for construction of driven pile pile sinking | |
CN106284348B (en) | The construction method of pile sinking is carried out based on assembly mobile platform | |
CN105544409A (en) | Erecting composite beam on-site section splicing girder construction technology of double guide beam bridge erecting machine | |
CN203383221U (en) | Foundation pit support structure formed by armoured concrete and steel structure | |
CN202755370U (en) | Structure for improving rigidity and stability of foundation pit steel support | |
CN205329691U (en) | A floating device that is used for aquatic steel -pipe pile income rock to install | |
CN109056534B (en) | Movable cast-in-situ bored pile construction platform and method | |
CN101929129A (en) | Novel slipway beam for incremental launching construction | |
CN103806374B (en) | The overall track erection supplying system of assembly type steel bridge on highway and erection push technique | |
CN109944609B (en) | Irregular widened arch section tunnel construction device and construction method | |
CN106544997A (en) | A kind of guiding mechanism of truss leg jacking system | |
CN203007843U (en) | Variable amplitude deck derrick crane | |
CN206279527U (en) | A kind of deep concrete mixture ship pile frame system | |
CN203846506U (en) | Angle bracing structure for foundation pit supporting | |
CN209010945U (en) | A kind of split type bottom pushes away movable highway Biodge device | |
CN206815778U (en) | A kind of construction platform for building sheet pile driving construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160914 |