CN205348183U - A novel guider for construction of driven pile pile sinking - Google Patents

A novel guider for construction of driven pile pile sinking Download PDF

Info

Publication number
CN205348183U
CN205348183U CN201521132109.7U CN201521132109U CN205348183U CN 205348183 U CN205348183 U CN 205348183U CN 201521132109 U CN201521132109 U CN 201521132109U CN 205348183 U CN205348183 U CN 205348183U
Authority
CN
China
Prior art keywords
track
jack
support
pile
longitudinal movement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521132109.7U
Other languages
Chinese (zh)
Inventor
王超
梁胜光
于洋
冯先导
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201521132109.7U priority Critical patent/CN205348183U/en
Application granted granted Critical
Publication of CN205348183U publication Critical patent/CN205348183U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a pile foundation construction work equipment field specifically indicates a novel guider for construction of driven pile pile sinking. Fixed platform edge installs the lateral shifting track and the longitudinal movement track of truss -like, the lateral shifting track is installed on the lateral shifting track and is promoted the horizontal thrustor of longitudinal movement track along lateral shifting orbital motion for fixing at fixed platform border position, perpendicular sliding connection is on the lateral shifting track for longitudinal movement track one end, and the other end along longitudinal extension is installed the support and is used for pushing away the vertical thrustor of movable support along longitudinal movement orbital motion on the longitudinal movement track, the perpendicular sliding connection of support one end has the direction longkou in longitudinal movement track, the other end end fixing that extends along horizontal direction. The utility model discloses an all control structures all are the jack, and the apparatus is all very simple, convenient operation, control accuracy is high, can be fine be used for the operation of engineering stake on water direction, very big spreading value has.

Description

A kind of New Guide Device for driven pile piling construction
Technical field
This utility model relates to pile foundation construction engineering equipment field, in particular to a kind of New Guide Device for driven pile piling construction.
Background technology
At present, driven pile piling construction guider mainly includes dismountable guider, fixed guider and straddle-type guider.
Dismountable guider is primarily adapted for use in the good waters of wave condition and land-based area construction, and it has the advantages such as single guide pile position is many, construction technology is simply ripe.But this guider need to coordinate auxiliary pile to use, inefficient;Simultaneously when being used in the marine site of the river of deep water high flow rate and the severe of stormy waves condition, auxiliary pile is affected by flow force or wave force and can produce to rock, and its positioning precision is difficult to ensure that.
Fixed guider generally uses with pile driving barge assembling, need to be coordinated by mobile pile driving barge during location.Although guider itself is not by current and wave effect, but owing to constructing when pile driving barge self is difficult to be suitable for severe sea condition, so its scope of application is affected by pile driving barge, efficiency of construction is not high and the scope of application is limited.
Auxiliary pile is made in the construction work stake of straddle-type guider general, is secured to by hydraulic clamp.In work progress fast without independent Construction Support stake and location.But this guider is cantilever design, single guide pile bit quantity less (being usually no more than 2), simultaneously when engineering pile by flow force or wave force affect generation rock time, be difficult to ensure that its positioning precision and efficiency of construction are relatively low equally.
The concentration guider of prior art is individually present shortcoming, for solving these shortcomings, the Chinese invention patent having " a kind of rail sliding type piling machine and the construction method " by name of the patent No. " CN102888843A " describes a kind of novel guider, this device includes transverse shifting track and vertically moves track, stake machine and pilot hole by transverse shifting track and vertically move track and realize the movement of four direction, can be accurately performed piling construction.But the track that vertically moves of this device needs to be arranged in two fixed platforms, and the requirement of fixed platform is higher, and working place is less, it is difficult to promote the use of on a large scale.
Summary of the invention
The purpose of this utility model seeks to solve the deficiency of above-mentioned background technology, it is provided that a kind of New Guide Device for driven pile piling construction.
The technical solution of the utility model is: a kind of New Guide Device for driven pile piling construction, including fixed platform, it is characterised in that: described fixed platform edge is provided with the transverse shifting track of truss-like and vertically moves track;Described transverse shifting track welding be provided with on fixed platform marginal position, transverse shifting track promote vertically move track laterally move track motion lateral pushing device;Described track one end vertical sliding motion that vertically moves is connected on transverse shifting track, and the other end to longitudinal extension, vertically moves and is provided with support on track and for promoting support to move longitudinally longitudinal thrustor of track motion;Described support one end vertical sliding motion is connected to and vertically moves track, and the other end end that it extends in transverse direction is provided with guiding Longkou.
Further described guiding Longkou includes one end of two pieces of arcs and is articulated and connected in the arcuate guide frame of bracket end;Adjustment jack it is provided with between described leading truck and support, two leading trucks drive respectively through two adjustment jack and rotate, around the pin joint with support, the guide frame forming annular, and leading truck is provided with multiple guiding jack along the arrangement of its circumferencial direction uniform intervals.
Further described lateral pushing device is the lateral pushing jack being bolted on transverse shifting track;The pushing end end of described lateral pushing jack is fixed on and vertically moves on track.
Further described longitudinal thrustor includes being fixed on the longitudinal pushing tow jack vertically moving on track;The pushing end end of described longitudinal pushing tow jack is fixed on support.
Further described longitudinal pushing tow jack has two, and symmetry is fixed on the both lateral sides vertically moving track.
Of the present utility model have the advantages of: 1, whole guider of the present utility model is fixed on the marginal position of fixed platform, arrangement is simpler rationally, transhipment convenient transportation, the movement of guide frame is more accurate, it is possible to well meet guide-localization effect during pile foundation construction;
2, this utility model controls the folding of guiding Longkou by arranging two jack, simple to operation, during pile foundation construction, engineering pile can enter directly in guiding Longkou from sidepiece, after inserted to play completes, can quickly open again guiding Longkou and depart from from engineering pile;
3, all control structures of the present utility model are all jack, and apparatus is all extremely simple, easy to operate, and control accuracy is high, it is possible to well for water project stake guiding operation, have great promotional value.
Accompanying drawing explanation
Fig. 1: top view of the present utility model;
Fig. 2: transverse shifting track of the present utility model and the attachment structure schematic diagram vertically moving track;
Fig. 3: the structural representation of guiding Longkou of the present utility model;
Wherein: 1 fixed platform;2 transverse shifting tracks;3 vertically move track;4 supports;5 leading trucks;6 regulate jack;7 guiding jack;8 lateral pushing jack;9 longitudinal pushing tow jack;10 engineering piles.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Such as Fig. 1~3, a kind of New Guide Device for driven pile piling construction, including fixed platform 1, the fixed platform 1 of the present embodiment is floating type or fixed platform, is easy to guiding pile-sinking operation as long as can be stably fixed on water body.
The guider of the present embodiment is fixed on the marginal position of fixed platform 1, including transverse shifting track 2 with vertically move track 3, transverse shifting track 2 and vertically move track 3 and be truss structure, wherein transverse shifting track 2 is welded on the marginal position of fixed platform 1, vertically moving track 3 one end vertical sliding motion and be connected on transverse shifting track 2, the other end is to longitudinal extension and unsettled layout.As it is shown in figure 1, the transverse direction that the present embodiment refers to is the left and right directions in figure, the above-below direction longitudinally referring in figure.
Transverse shifting track 2 is provided with lateral pushing jack 8, lateral pushing jack 8 one end is bolted on the truss body of transverse shifting track 2, the pushing end end of lateral pushing jack 8 is fixed on and vertically moves on track 3, is promoted vertically moving track 3 and laterally move track 2 and move by the thrusting action of lateral pushing jack 8.
As shown in Figure 2, vertically move track 3 is provided with support 4 and for promote support 4 move longitudinally track 3 motion longitudinal pushing tow jack 9, support 4 one end vertical sliding motion is connected to and vertically moves track 3, and the other end end that it extends in transverse direction is provided with guiding Longkou.Actually, longitudinal pushing tow jack 9 has two, and symmetry is fixed on the both lateral sides vertically moving track 3, and one end is fixed on and vertically moves track 3, its pushing end end is fixed on support 4, promotes support 4 track 3 that moves longitudinally to move by the thrusting action of longitudinal pushing tow jack 9.It is more stable accurately that the movement that two longitudinal pushing tow jack 9 can make support 4 is set.
As it is shown on figure 3, guiding Longkou includes two pieces of semicircular arcuate guide framves 5, leading truck 5 one end is rotatably articulated and connected in the end of support 4, and the other end offers through hole.Adjustment jack 6 it is provided with between leading truck 5 and support 4, two leading trucks 5 drive respectively through two adjustment jack 6 and rotate, around the pin joint with support 4, the guide frame forming annular, after two leading trucks 5 form the loop configuration surrounded, use a root length bar can be fixed by two leading trucks 5 through the through hole on leading truck 5, need to be directed to frame 5 when opening, stock can be extracted out, drive adjustment jack 6 can open leading truck 5.
It addition, leading truck 5 is provided with multiple guiding jack 7 along the arrangement of its circumferencial direction uniform intervals.These guiding jack 7 can promote engineering pile to carry out trickle adjustment to reach the pile sinking position of the best.
During use, the pile sinking position of survey engineering stake, first drive lateral pushing jack 8 promotion to vertically move track 3 and arrive the transverse direction appointment position of pile sinking position, lateral pushing jack 8 often moves a stroke to be needed to disassemble for fixing bolt, a mobile stroke again, carries out incremental launching construction after bolt is fixing again.The longitudinal direction that longitudinal pushing tow jack 9 promotes support 4 to arrive pile sinking position is driven to specify position again.Adjustment jack 6 is driven to open leading truck 5, handling appliance engineering pile of slinging is used to enter laterally inside leading truck 5, drive adjustment jack 6 to close up leading truck 5, slowly accurately adjust the position of engineering pile by regulating guiding jack 6, after completing, start piling construction.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.Skilled person will appreciate that of the industry; this utility model is not restricted to the described embodiments; described in above-described embodiment and description is that principle of the present utility model is described; under the premise without departing from this utility model spirit and scope, this utility model also has various changes and modifications, and these changes and improvements both fall within the scope of claimed this utility model.This utility model claims scope and is defined by appending claims and equivalent thereof.

Claims (5)

1. the New Guide Device for driven pile piling construction, including fixed platform (1), it is characterised in that: described fixed platform (1) edge is provided with the transverse shifting track (2) of truss-like and vertically moves track (3);Described transverse shifting track (2) is welded on fixed platform (1) marginal position, transverse shifting track (2) is provided with promotion and vertically moves track (3) and laterally move the lateral pushing device that track (2) moves;Described track (3) one end vertical sliding motion that vertically moves is connected on transverse shifting track (2), the other end to longitudinal extension, vertically moves and is provided with support (4) and being used for promote support (4) to move longitudinally longitudinal thrustor that track (3) moves on track (3);Described support (4) one end vertical sliding motion is connected to and vertically moves track (3), and the other end end that it extends in transverse direction is provided with guiding Longkou.
2. a kind of New Guide Device for driven pile piling construction as claimed in claim 1, it is characterised in that: described guiding Longkou includes two pieces of one end and is articulated and connected in the arcuate guide frame (5) of support (4) end;Adjustment jack (6) it is provided with between described leading truck (5) and support (4), two leading trucks (5) drive respectively through two adjustment jack (6) and rotate, around the pin joint with support (4), the guide frame forming annular, and leading truck (5) is provided with multiple guiding jack (7) along the arrangement of its circumferencial direction uniform intervals.
3. a kind of New Guide Device for driven pile piling construction as claimed in claim 1, it is characterised in that: described lateral pushing device is the lateral pushing jack (8) being bolted on transverse shifting track (2);The pushing end end of described lateral pushing jack (8) is fixed on and vertically moves on track (3).
4. a kind of New Guide Device for driven pile piling construction as claimed in claim 1, it is characterised in that: described longitudinal thrustor includes being fixed on the longitudinal pushing tow jack (9) vertically moving on track (3);The pushing end end of described longitudinal pushing tow jack (9) is fixed on support (4).
5. a kind of New Guide Device for driven pile piling construction as claimed in claim 1, it is characterised in that: described longitudinal pushing tow jack (9) has two, and symmetry is fixed on the both lateral sides vertically moving track (3).
CN201521132109.7U 2015-12-31 2015-12-31 A novel guider for construction of driven pile pile sinking Expired - Fee Related CN205348183U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521132109.7U CN205348183U (en) 2015-12-31 2015-12-31 A novel guider for construction of driven pile pile sinking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521132109.7U CN205348183U (en) 2015-12-31 2015-12-31 A novel guider for construction of driven pile pile sinking

Publications (1)

Publication Number Publication Date
CN205348183U true CN205348183U (en) 2016-06-29

Family

ID=56173296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521132109.7U Expired - Fee Related CN205348183U (en) 2015-12-31 2015-12-31 A novel guider for construction of driven pile pile sinking

Country Status (1)

Country Link
CN (1) CN205348183U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121507A (en) * 2016-08-15 2016-11-16 中交隧道工程局有限公司 The operation platform of rotary drilling rig in foundation ditch
CN106759351A (en) * 2017-01-25 2017-05-31 山东大学 A kind of perpendicularity guider and method based on permanent support structure prefabricated tubular pile
CN108396744A (en) * 2018-04-27 2018-08-14 中交武汉港湾工程设计研究院有限公司 A kind of moveable steel pile casting sinking guider and its mounting structure
CN109208595A (en) * 2018-09-26 2019-01-15 中交第二航务工程局有限公司 A kind of taper pile construction system based on stake top top pushing platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121507A (en) * 2016-08-15 2016-11-16 中交隧道工程局有限公司 The operation platform of rotary drilling rig in foundation ditch
CN106121507B (en) * 2016-08-15 2018-06-19 中交隧道工程局有限公司 The construction platform of rotary drilling rig in foundation pit
CN106759351A (en) * 2017-01-25 2017-05-31 山东大学 A kind of perpendicularity guider and method based on permanent support structure prefabricated tubular pile
CN108396744A (en) * 2018-04-27 2018-08-14 中交武汉港湾工程设计研究院有限公司 A kind of moveable steel pile casting sinking guider and its mounting structure
CN108396744B (en) * 2018-04-27 2024-03-22 中交武汉港湾工程设计研究院有限公司 Movable steel pile casing sinking guide device mounting structure
CN109208595A (en) * 2018-09-26 2019-01-15 中交第二航务工程局有限公司 A kind of taper pile construction system based on stake top top pushing platform

Similar Documents

Publication Publication Date Title
CN205348183U (en) A novel guider for construction of driven pile pile sinking
CN104652394B (en) A kind of Multifunction shallow sea job platform
CN106381870B (en) A kind of deep concrete mixture ship pile frame system and pile making method
CN204753589U (en) A static pressure stake machine complete machine is planted in reaming
CN102587363A (en) Method for assembling truss framed leg of self-elevating drilling platform
CN110952552A (en) Large-diameter PHC precast tubular pile construction method and pile driver for implementing same
CN105625425A (en) Construction method for carrying out pile sinking based on floating walking platform
CN207987912U (en) A kind of synchronous cutting casting concrete continuous walls construction equipment
CN104736465B (en) Harbour constructing device and the method for construction using same apparatus
CN106120787A (en) A kind of construction method carrying out pile sinking based on pushing tow travelling platform
CN102477733A (en) Installation method for integrally dragging cantilever beam onto platform
CN101915107A (en) Method for arranging coal mine large-mining-height working surface equipment
CN204475334U (en) Large diameter steel pipe sunk pile pile holding device
CN102720432A (en) Self-propelled underground boring jumbo
CN205804349U (en) A kind of travelling platform for steel pipe pile sinking construction
CN204662444U (en) Large diameter steel pipe sunk pile fixed guide
CN102425200A (en) Trenching machine and construction method for anti-seepage and water-stopping wall
CN204078022U (en) Rivers waterway revetment construction Special engineering ship
CN205329691U (en) A floating device that is used for aquatic steel -pipe pile income rock to install
CN105604061B (en) A kind of surface unit and its construction method entering rock installation for steel-pipe pile in water
CN204456106U (en) Waters pile sinking mobile guide station keeping ship
TWI570047B (en) The Manufacturing Method and Disassembling Method of Giant Crane Crane
CN205576922U (en) A novel guider of assembled for construction of driven pile pile sinking
CN103147437A (en) Section steel soil cement mixing pile with longitudinal displacement mechanism
CN109383649B (en) Offshore construction method for crawler-type walking platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160629

Termination date: 20211231