CN106121507A - The operation platform of rotary drilling rig in foundation ditch - Google Patents

The operation platform of rotary drilling rig in foundation ditch Download PDF

Info

Publication number
CN106121507A
CN106121507A CN201610671635.3A CN201610671635A CN106121507A CN 106121507 A CN106121507 A CN 106121507A CN 201610671635 A CN201610671635 A CN 201610671635A CN 106121507 A CN106121507 A CN 106121507A
Authority
CN
China
Prior art keywords
bailey
platform
sliding seat
pedestal
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610671635.3A
Other languages
Chinese (zh)
Other versions
CN106121507B (en
Inventor
高俊华
任军
李辉
张真
冷学岩
李仁杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tunnel Engineering Co Ltd
Original Assignee
CCCC Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tunnel Engineering Co Ltd filed Critical CCCC Tunnel Engineering Co Ltd
Priority to CN201610671635.3A priority Critical patent/CN106121507B/en
Publication of CN106121507A publication Critical patent/CN106121507A/en
Application granted granted Critical
Publication of CN106121507B publication Critical patent/CN106121507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling

Abstract

The invention discloses the operation platform of rotary drill digging machine in a kind of foundation ditch, provide operating condition for rotary drill digging machine.It includes forming pedestal, two Bailey beams being spliced respectively and for forming the track of rotary drill digging machine running lanes supported by multiple beret truss for being located at the end, hole, two described Bailey beams side by side and are all located on described pedestal along horizontal expansion respectively, and connect also by some beret truss between two described Bailey beams, described track includes the steel plate being laid in two described Bailey beams respectively, and the spacing of two described steel plates is corresponding to the spacing of rotary drill digging machine left and right wheels.This operation platform also includes that piston shoes running gear, described piston shoes running gear are arranged between described Bailey beam and described pedestal so that described Bailey beam can be slided along longitudinally opposed described pedestal.

Description

The operation platform of rotary drilling rig in foundation ditch
Technical field
The present invention relates to foundation pit construction field, particularly to the operation platform of rotary drill digging machine in a kind of foundation ditch.
Background technology
Some subway station especially transfer stop is when excavation, and foundation ditch level of ground water is higher.As, outside Gate of Everlasting Stability, station is ground, Beijing No. 8 line three phases of ferrum and the transfer stop at station, more than foundation ditch level of ground water about 21.32m outside No. 14 line Gate of Everlasting Stability.More than waterline can adopt With conventional earth excavation, must take underwater excavation mode below waterline, otherwise dewatering project amount is big, and dewatering project Adjacent Buildings can be produced and destroy, it is therefore desirable to set up a transportable platform to realize underwater excavation.
The excavation of foundation pit form of the sealing scheme of underwater excavation mode and underwater concrete back cover is taked due to subway station, And geology is more closely knit, conventional equipment all cannot efficiently accomplish the construction content of this operating mode.Rotary drilling rig have excavation ability but Being not have working space and operating condition, therefore the operation platform of rotary drilling rig in design foundation ditch, can be that rotary drilling rig provides Operating condition.
Summary of the invention
For reaching object above, the present invention provides the operation platform of rotary drill digging machine in a kind of foundation ditch, carries for rotary drill digging machine For operating condition.
The technical solution used in the present invention is:
The operation platform of rotary drill digging machine in a kind of foundation ditch, it is characterised in that: include for be located at hole the end formed support pedestal, Two respectively by multiple beret truss be spliced Bailey beam and for forming the track of rotary drill digging machine running lanes, two Described Bailey beam side by side and is all located on described pedestal along horizontal expansion respectively, and if between two described Bailey beams also by Dry beret truss connects, and described track includes the steel plate being laid in two described Bailey beams respectively, the spacing of two described steel plates Spacing corresponding to rotary drill digging machine left and right wheels.
Preferably, this operation platform also includes that piston shoes running gear, described piston shoes running gear are arranged on described Bailey beam And so that described Bailey beam can be slided along longitudinally opposed described pedestal between described pedestal.
It is highly preferred that described piston shoes running gear include being located on described pedestal the guide rail extended longitudinally, respectively with The first sliding seat that described guide rail is slidingly fitted and the second sliding seat, one of them described Bailey beam is fixing is located at described first On sliding seat, another described Bailey beam is fixing to be located on described second sliding seat.
Further, described first sliding seat, the bottom of the second sliding seat are respectively equipped with one layer of polyfluortetraethylene plate and lead to Cross described polyfluortetraethylene plate and described guide rail phase sliding contact.
Further, described piston shoes running gear also includes for driving described first sliding seat and the second sliding seat along leading The hydraulic drive mechanism of rail longitudinal sliding motion.
Further, described hydraulic drive mechanism includes for driving described first sliding seat and the second sliding seat to slide Hydraulic jack, the track of creeping that is fixedly installed on described pedestal, described hydraulic jack has climbs head, described in climb on head Offer the groove matched with track of creeping, described in climb headgear be located at described in creep on track.
Preferably, described Bailey beam includes multiple Bailey bracket being transversely sequentially connected with, and each described Bailey bracket includes multiple Along the described beret truss being longitudinally layered on top of each other and connecting.
It is highly preferred that described Bailey beam also includes multiple yoke plate extended longitudinally, each described yoke plate and corresponding shellfish thunder The each described beret truss of frame connects respectively.
Preferably, the upper surface of the steel plate in described Bailey beam is welded with multiple reinforcing bar, and multiple reinforcing bars are laterally spaced joins Row.
Preferably, described pedestal includes the pre-buried thickness steel plate more than or equal to 2cm.
The present invention, by using technique scheme, is compared with prior art had the advantage that and is spliced by beret truss The Bailey beam constituted, as the main body of operation platform, lays steel plate thereon for accepting the left and right wheels of rotary drill digging machine, Er Qie Beret truss is used to connect the globality that ensure that operation platform, for rotary drill digging machine at ground iron-based between the Bailey beam that two assembly are good In hole construction provide a kind of build conveniently, operation platform that fastness is good.
Accompanying drawing explanation
Accompanying drawing 1 is the top view of the operation platform in foundation ditch;
Accompanying drawing 2 is the side view of the operation platform in foundation ditch;
Accompanying drawing 3 be in accompanying drawing 2 A-A to sectional view;
Accompanying drawing 4 be in accompanying drawing 3 B-B to sectional view;
Accompanying drawing 5 be in accompanying drawing 3 C-C to sectional view.
Figure is numbered:
1, pedestal;2, Bailey beam;20, Bailey bracket;200, beret truss;21, yoke plate;3, track;
4, guide rail;5a, the first sliding seat;5b, the second sliding seat;51, polyfluortetraethylene plate;52, bearing pin is connected;53, connecting rod;
6, hydraulic drive mechanism;60, creep track;61, hydraulic jack;62, head is climbed.
Detailed description of the invention
Below in conjunction with the accompanying drawings presently preferred embodiments of the present invention is described in detail, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art.Horizontal, the longitudinal direction mentioned in the present invention is the usual observation according to those skilled in the art Visual angle and defining to describe convenient, does not limit concrete direction, e.g., corresponds respectively to the side shown in arrow in accompanying drawing 1 To.
Accompanying drawing 1-5 show the operation platform of rotary drill digging machine in a kind of foundation ditch of the present invention, particularly a kind of ground iron-based The operation platform of rotary drill digging machine in hole.Wherein, the construction of pore-forming operation during rotary drilling rig is a kind of applicable building foundation engineering Machinery, is primarily adapted for the soil layer constructions such as sand, cohesive soil, slity soil, at multiple grounds such as bored concrete pile, diaphragm wall, strengthenings of foundation Foundation construction is used widely.In subway foundation pit, mainly by churning driven, the closely knit soil body is stirred pine, facilitate pump to incite somebody to action The mixture sucking-off of the soil body and water.
Referring to the drawings shown in 1-5, the operation platform of rotary drill digging machine in a kind of foundation ditch, including for being located at the formation of the end, hole The pedestal held 1, two respectively by multiple beret truss 200 be spliced Bailey beam 2 and for formed rotary drill digging machine travel The track 3 of passage.
The part of pedestal 1 is embedded at the end, hole, the pedestal 1 in the present embodiment include being embedded in thickness at the end, hole more than or Steel plate equal to 2cm.
Two Bailey beams 2 are located on pedestal 1 and extend transversely respectively, and are set up in parallel.Bailey beam 2 is by multiple Bailey brackets 20 trusses being transversely sequentially connected with composition, many to spend window as connecting elements between Bailey bracket 20, fix with bolt.Bailey bracket 20, it is the steelframe of an established cell, a lot of component, equipment can be assembled into its splicing.Bailey bracket 20 length and width size Generally 3m × 1.5m.Specifically, each Bailey bracket 20 includes multiple along the beret truss 200 being longitudinally layered on top of each other and connecting.Have Setting up rapidly, the advantage of mobility strong, Bailey beam 2 is convenient and swift, provides sidewalk for construction, increases the quick and convenient of construction. Connect also by some beret truss 200 between two Bailey beams 2, connect the globality ensureing platform, between two Bailey beams 2 Distance is slightly less than the distance between two crawler belts of rotary drilling rig.Each Bailey beam 2 also includes multiple yoke plate 21 extended longitudinally, with The laterally spaced arrangement of multiple yoke plates 21 in one Bailey beam 2 and respectively with each beret truss 200 points of corresponding Bailey bracket 20 Do not connect, increase the overall torsional property of Bailey bracket 20.
Track 3 includes that two corresponding are respectively laid on the steel plate in above-mentioned two Bailey beam 2, and steel plate uses the mode of full weld In fixing connection Bailey beam 2, for two crawler travels for rotary drill digging machine.And on the upper surface of steel plate, weld multiple reinforcing bar With frictional force during raising crawler travel and between track 3, the laterally spaced arrangement of multiple reinforcing bars.
Bailey beam 2 and track thereon 3 are placed along foundation ditch width (that is, horizontal), and rotary drilling rig on the track 3 may be used To be operated along width, and in order to make rotary drilling rig along foundation ditch longitudinally work, this operation platform also includes piston shoes Running gear, installs piston shoes running gear below Bailey beam 2 and realizes the movement along foundation ditch longitudinal direction.3-5 institute referring to the drawings Showing, above-mentioned Bailey beam 2 can be along being arranged on pedestal 1 with longitudinal sliding, and piston shoes running gear is arranged on Bailey beam 2 and pedestal 1 Between so that Bailey beam 2 can be slided along longitudinally opposed pedestal 1.
Piston shoes running gear includes the guide rail 4 extended longitudinally being located on pedestal 1, is slidingly fitted with guide rail 4 respectively The first sliding seat 5a and the second sliding seat 5b, one of them Bailey beam 2 is fixing to be located on described first sliding seat 5a, another Bailey beam 2 is fixing to be located on the second sliding seat 5b.Specifically, guide rail 4 is bolted to connection the pre-embedded steel slab at pedestal 1 On, the first sliding seat 5a, the bottom of the second sliding seat 5b are respectively equipped with one layer of polyfluortetraethylene plate 52 and by described polytetrafluoro Vinyl plate 52 and described guide rail 4 phase sliding contact, two Bailey beams 2 by bolt assembly be separately fixed at the first sliding seat 5a, On second sliding seat 5b.
Piston shoes running gear also includes hydraulic drive mechanism 6, for driving the first sliding seat 5a and the second sliding seat 5b edge Guide rail 4 slides, and is mainly made up of hydraulic jack 61, upper climbing head, lower climbing head, hydraulic control station, bearing, track 60 etc. of creeping, Track 60 of creeping is fixed by bearing and anchor bolt, operates electromagnetic valve, shrinks piston rod, makes hydraulic jack 61 drive shellfish Thunder truss advances, and continuous operation jack realizes truss and drives weight to creep continuously.Specifically, hydraulic jack 61 is by connecting Bar 53 and the first sliding seat 5a is fixing to be connected, and by connecting, bearing pin 52 and the second sliding seat 5b is fixing to be connected the first sliding seat 5a, Making hydraulic jack 61 when its piston rod stretches, the first sliding seat 5a and the second sliding seat 5b can slide accordingly with it.Climb Row track 60 is fixedly installed on the wherein one end of guide rail 4, is used for supporting installation hydraulic drive mechanism 6.Hydraulic jack 61 has Climb head, climb and on head, offer the groove matched with track 60 of creeping, climb headgear and be located at and creep on track 60.
In above-mentioned foundation ditch, the operation platform of rotary drill digging machine has the most specific
1, platform bearer ability is big
Excavation of foundation pit rotary drilling rig operation platform can load-bearing about 90t weight.Parameters of loading is as follows:
(1) platform structure deadweight: 1# platform 120.6t;2# platform 106.9t;
(2) drilling equipment (3 1 SR250 fully hydraulic auger drill) gross mass 71t;Crawler width 800mm, track gage 3500mm;
(3) rig maximum twist power: 250 kN m;
(4) shoveling weight: 20 kN
(5) SYL958 wheeled elevating conveyor gross mass be 22.4t(work quality be 17.4t;Specified mounted mass is 5t);Wheelbase 3.2m;Front axle weight 16.3t, rear axle weight 6.1t.
, platform mobility good
Bailey beam 2 and track thereon 3 can realize longitudinally moving flexibly along foundation ditch, cover whole excavation of foundation pit area.
Above-described embodiment, only for technology design and the feature of the explanation present invention, its object is to allow person skilled in the art Scholar will appreciate that present disclosure and implements according to this, can not limit the scope of the invention with this.All according to the present invention The equivalence that spirit is made changes or modifies, and all should contain within protection scope of the present invention.

Claims (10)

1. the operation platform of rotary drill digging machine in a foundation ditch, it is characterised in that: include the base forming support for being located at the end, hole Seat, two respectively by multiple beret truss be spliced Bailey beam and for forming the track of rotary drill digging machine running lanes, Two described Bailey beams side by side and are all located on described pedestal along horizontal expansion respectively, and the most logical between two described Bailey beams Crossing some beret truss to connect, described track includes the steel plate being laid in two described Bailey beams respectively, two described steel plates Spacing is corresponding to the spacing of rotary drill digging machine left and right wheels.
Operation platform the most according to claim 1, it is characterised in that: this operation platform also includes piston shoes running gear, institute State piston shoes running gear to be arranged between described Bailey beam and described pedestal so that described Bailey beam can be along longitudinally opposed described base Seat slides.
Operation platform the most according to claim 2, it is characterised in that: described piston shoes running gear includes being located at described pedestal On the guide rail extended longitudinally, the first sliding seat being slidingly fitted with described guide rail respectively and the second sliding seat, Qi Zhongyi Individual described Bailey beam is fixing to be located on described first sliding seat, and another described Bailey beam is fixing is located at described second sliding seat On.
Operation platform the most according to claim 3, it is characterised in that: described first sliding seat, the bottom of the second sliding seat It is respectively equipped with one layer of polyfluortetraethylene plate and by described polyfluortetraethylene plate and described guide rail phase sliding contact.
Operation platform the most according to claim 3, it is characterised in that: described piston shoes running gear also includes for driving State the first sliding seat and the second sliding seat hydraulic drive mechanism along guide rail longitudinal sliding motion.
Operation platform the most according to claim 5, it is characterised in that: described hydraulic drive mechanism includes for driving described Hydraulic jack that first sliding seat and the second sliding seat slide, the track of creeping being fixedly installed on described pedestal, described liquid Pressure jack has and climbs head, described in climb and on head, offer the groove matched with track of creeping, described in climb headgear be located at described in creep On track.
Operation platform the most according to claim 1, it is characterised in that: described Bailey beam includes multiple being transversely sequentially connected with Bailey bracket, each described Bailey bracket includes multiple along the described beret truss being longitudinally layered on top of each other and connecting.
Operation platform the most according to claim 7, it is characterised in that: described Bailey beam also includes multiple extending longitudinally Yoke plate, each described beret truss of each described yoke plate and corresponding Bailey bracket connects respectively.
Operation platform the most according to claim 1, it is characterised in that: the upper surface of the steel plate in described Bailey beam is welded with Multiple reinforcing bars, the laterally spaced assortment of multiple reinforcing bars.
Operation platform the most according to claim 1, it is characterised in that: described pedestal include pre-buried thickness more than or etc. Steel plate in 2cm.
CN201610671635.3A 2016-08-15 2016-08-15 The construction platform of rotary drilling rig in foundation pit Active CN106121507B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610671635.3A CN106121507B (en) 2016-08-15 2016-08-15 The construction platform of rotary drilling rig in foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610671635.3A CN106121507B (en) 2016-08-15 2016-08-15 The construction platform of rotary drilling rig in foundation pit

Publications (2)

Publication Number Publication Date
CN106121507A true CN106121507A (en) 2016-11-16
CN106121507B CN106121507B (en) 2018-06-19

Family

ID=57259066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610671635.3A Active CN106121507B (en) 2016-08-15 2016-08-15 The construction platform of rotary drilling rig in foundation pit

Country Status (1)

Country Link
CN (1) CN106121507B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236242A (en) * 2020-03-17 2020-06-05 中交隧道工程局有限公司 Antitorque foundation ditch of bailey beam excavates platform under water

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101046099A (en) * 2007-04-18 2007-10-03 上海市第二市政工程有限公司 Self descending unit on track beam
CN101046095A (en) * 2007-04-18 2007-10-03 上海市第二市政工程有限公司 Automatic soil eliminating construction apparatus for deep foundation groove
CN101078215A (en) * 2007-04-18 2007-11-28 上海市第二市政工程有限公司 Deep foundation ditch soil excavating and dumping construction device and construction method thereof
CN101078214A (en) * 2007-04-18 2007-11-28 上海市第二市政工程有限公司 Automatic excavation and construction device for deep foundation ditch
CN101537968A (en) * 2009-04-28 2009-09-23 中铁隧道股份有限公司 Break-of-gauge beam for large and long foundation pits and construction method thereof
CN202865994U (en) * 2011-12-02 2013-04-10 中国建筑股份有限公司 Numerical-control hydraulic pressure sliding construction creeprail device
CN203583368U (en) * 2013-12-10 2014-05-07 中铁二十局集团第一工程有限公司 In-water temporary pier on-water construction platform for steel truss girder erection in dragging mode
CN105113427A (en) * 2015-03-03 2015-12-02 北京地圣科创建设工程有限公司 Bridge installation method
CN205134208U (en) * 2015-10-08 2016-04-06 滨州市博远模板有限公司 Basket support that slides is hung in bridge construction
CN205330623U (en) * 2016-02-17 2016-06-22 中国葛洲坝集团基础工程有限公司 Percussion drill shift unit
CN205348183U (en) * 2015-12-31 2016-06-29 中交第二航务工程局有限公司 A novel guider for construction of driven pile pile sinking
CN205840765U (en) * 2016-08-15 2016-12-28 中交隧道工程局有限公司 The operation platform of rotary drilling rig in foundation ditch

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101046099A (en) * 2007-04-18 2007-10-03 上海市第二市政工程有限公司 Self descending unit on track beam
CN101046095A (en) * 2007-04-18 2007-10-03 上海市第二市政工程有限公司 Automatic soil eliminating construction apparatus for deep foundation groove
CN101078215A (en) * 2007-04-18 2007-11-28 上海市第二市政工程有限公司 Deep foundation ditch soil excavating and dumping construction device and construction method thereof
CN101078214A (en) * 2007-04-18 2007-11-28 上海市第二市政工程有限公司 Automatic excavation and construction device for deep foundation ditch
CN101537968A (en) * 2009-04-28 2009-09-23 中铁隧道股份有限公司 Break-of-gauge beam for large and long foundation pits and construction method thereof
CN202865994U (en) * 2011-12-02 2013-04-10 中国建筑股份有限公司 Numerical-control hydraulic pressure sliding construction creeprail device
CN203583368U (en) * 2013-12-10 2014-05-07 中铁二十局集团第一工程有限公司 In-water temporary pier on-water construction platform for steel truss girder erection in dragging mode
CN105113427A (en) * 2015-03-03 2015-12-02 北京地圣科创建设工程有限公司 Bridge installation method
CN205134208U (en) * 2015-10-08 2016-04-06 滨州市博远模板有限公司 Basket support that slides is hung in bridge construction
CN205348183U (en) * 2015-12-31 2016-06-29 中交第二航务工程局有限公司 A novel guider for construction of driven pile pile sinking
CN205330623U (en) * 2016-02-17 2016-06-22 中国葛洲坝集团基础工程有限公司 Percussion drill shift unit
CN205840765U (en) * 2016-08-15 2016-12-28 中交隧道工程局有限公司 The operation platform of rotary drilling rig in foundation ditch

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236242A (en) * 2020-03-17 2020-06-05 中交隧道工程局有限公司 Antitorque foundation ditch of bailey beam excavates platform under water
CN111236242B (en) * 2020-03-17 2021-10-26 中交隧道工程局有限公司 Antitorque foundation ditch of bailey beam excavates platform under water

Also Published As

Publication number Publication date
CN106121507B (en) 2018-06-19

Similar Documents

Publication Publication Date Title
CN106088149A (en) A kind of mechanization rapid constructing method of precast splice type underground gallery
CN101139839B (en) Setting arrangement for high artesian area ultra-deep foundation pit
CN205840765U (en) The operation platform of rotary drilling rig in foundation ditch
CN102900360B (en) Combined type digging drill machine
CN209670900U (en) A kind of tracked hydraulic assembled bolt drilling machine workbench
CN110952552A (en) Large-diameter PHC precast tubular pile construction method and pile driver for implementing same
CN106121507A (en) The operation platform of rotary drilling rig in foundation ditch
CN107964941A (en) A kind of synchronous cutting casting concrete continuous walls construction equipment and its construction method
CN110924861A (en) Walking type omnibearing rotary hydraulic pile foundation drilling machine
CN104314006A (en) High-performance sliding device oriented to large-tonnage incremental launching engineering
CN110004953A (en) A kind of side slope or retaining wall construction trolley
CN105672880A (en) Improved long spiral drilling machine
CN207987912U (en) A kind of synchronous cutting casting concrete continuous walls construction equipment
CN112761691B (en) Distributed anchoring grouting supporting device for fault broken zone of deep mine
CN105888543B (en) A kind of movable type large aperture raise boring machine
CN206128160U (en) Operation device that open caisson sinks unearthedly
CN108343446A (en) A kind of tunnel Deeply buried ditch construction self-propelled lifting combination trestle
CN210216388U (en) Crawler-type drainage plate clamping, sealing and anti-blocking spiral plate inserting machine
CN211777192U (en) Low clearance drilling machine
CN105201003B (en) A kind of open caisson construction method and method for dismounting
CN103614999B (en) A kind of method of clump of piles deep hole construction under complex geological condition
CN215057501U (en) Tunneling and anchoring integrated machine
CN211648163U (en) Self-propelled open type shield machine system for constructing underground box culvert
CN209067210U (en) A kind of dismountable moving tunnel consolidation grouting drilling platform device
CN202560236U (en) Combination type sliding plate rolling paving frame shield tunneling machine

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant